Top Banner
Implementation of PoA standards The point of view of a DOE Environmental Management and Climate Change Regional Workshop, ISO/TC 207 WG. Bonn, 24 – 25 March 2012
10

Implementation of PoA standards The point of view of a DOE Environmental Management and Climate Change Regional Workshop, ISO/TC 207 WG. Bonn, 24 – 25.

Mar 27, 2015

Download

Documents

Jada Donnelly
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Implementation of PoA standards The point of view of a DOE Environmental Management and Climate Change Regional Workshop, ISO/TC 207 WG. Bonn, 24 – 25.

Implementation of PoA standards

The point of view of a DOE

Environmental Management and Climate Change Regional Workshop, ISO/TC 207 WG.

Bonn, 24 – 25 March 2012

Page 2: Implementation of PoA standards The point of view of a DOE Environmental Management and Climate Change Regional Workshop, ISO/TC 207 WG. Bonn, 24 – 25.

• PRESENTATION OF AENOR

• PoA EXPERIENCE

• MAIN ISSUES ON PoA VALIDATION

• NEW PoA STANDARD EB 65

• OPPORTUNITIES

SUMMARY

Page 3: Implementation of PoA standards The point of view of a DOE Environmental Management and Climate Change Regional Workshop, ISO/TC 207 WG. Bonn, 24 – 25.

• AENOR = ASOCIACIÓN ESPAÑOLA DE NORMALIZACIÓN Y CERTIFICACIÓN (SPANISH ASSOCIATION FOR STANDARDIZATION AND CERTIFICATION)

• AENOR: Spain + 12 branch offices in Europe, Africa and America

• Non profitable association

• Standardization body of Spain + certification company

PRESENTATION OF AENOR

Page 4: Implementation of PoA standards The point of view of a DOE Environmental Management and Climate Change Regional Workshop, ISO/TC 207 WG. Bonn, 24 – 25.

• Validation of 17 Poas

• 2 registered: waste compost programme (Uganda); Turbococinas (El Salvador)

• 1 PoA requesting registration (energy efficient lighting, Senegal)

• 14 validation on going

• Sectoral scopes: 1; 3; 13; 15.

PoA EXPERIENCE

Page 5: Implementation of PoA standards The point of view of a DOE Environmental Management and Climate Change Regional Workshop, ISO/TC 207 WG. Bonn, 24 – 25.

PoA EXPERIENCE

Page 6: Implementation of PoA standards The point of view of a DOE Environmental Management and Climate Change Regional Workshop, ISO/TC 207 WG. Bonn, 24 – 25.

• Eligibility criteria not enough clear or detailed

• Demonstration of additionality is based on opinions, non on substantiated facts

• CPA starting date is not in accordance with requirements

• Additionality and eligibility

•Some eligibility criteria are not verifiable

MAIN ISSUES ON PoA VALIDATION

Page 7: Implementation of PoA standards The point of view of a DOE Environmental Management and Climate Change Regional Workshop, ISO/TC 207 WG. Bonn, 24 – 25.

• Monitoring plan is not detailed and it is non described according to the Procedure for Registration of a programme of activities as a single CDM project activity. (EB 55 annex 38) (sampling vs. surveys)

• Guidelines on the assessment of investment analysis is not properly and completely explained.

• Emission Factor: PoA-DD does not specify if the EF is fixed ex ante

or each CPA will use its own Emission Factor.

MAIN ISSUES ON PoA VALIDATION

Page 8: Implementation of PoA standards The point of view of a DOE Environmental Management and Climate Change Regional Workshop, ISO/TC 207 WG. Bonn, 24 – 25.

NEW PoA STANDARD EB 65

• Eligibility criteria: “Validating DOE and/or the Board may specify additional criteria depending on the specific characteristics of a PoA”.

• The CME shall develop and implement a management system

• The revision of eligibility criteria of a registered PoA may be initiated by the Board at any time during the lifetime of the PoA if an issue related to environment integrity is identified.

•Application of multiple CDM methodologies (…) Combinations of technologies/measures and methodologies vary across CPAs of a PoA.

Page 9: Implementation of PoA standards The point of view of a DOE Environmental Management and Climate Change Regional Workshop, ISO/TC 207 WG. Bonn, 24 – 25.

• Further clarification on additionality

• New procedures for CPA withdrawal

• DOE liability

OPPORTUNITIES

Page 10: Implementation of PoA standards The point of view of a DOE Environmental Management and Climate Change Regional Workshop, ISO/TC 207 WG. Bonn, 24 – 25.

Thank you very much for your kind attention

Luis Fernando Robles Olmos

Head, Climate Change Unit

AENOR

E-mail: [email protected]