www.construction.murrob.com IMPALA North-West, Rustenburg PROJECT TYPE: OPENCAST MINING CLIENT: Impala Platinum Mine VALUE: R340 Million CONSULTANTS: None PROJECT DURATION: Contract renewable annually DATE OF PROJECT: 1 April 1998 PROJECT DESCRIPTION: Opencast Mining of both Merensky and UG2 Reef to a depth of 35m. Contract is renewed on annual basis. Approximate volumes mined for the project :- • Blasted over burden 37,438,859m³ • Topsoil 5,841,186m³ • Ore 2,347,362m³ • Topsoil Rehab 5,695,638m³ • Filling Void 12,724,866m³