Aug 08, 2015
Imagine! Dixon Street Office Remodel
Progress
Before Remodel 2/13/2015
Before Remodel 2/13/2015
Before Remodel 2/13/2015
Before Remodel 2/13/2015
2/20/2015Staff, Equipment Moved Out
2/20/2015Staff, Equipment Moved Out
2/20/2015Staff, Equipment Moved Out
2/20/2015Staff, Equipment Moved Out
2/27/2015Furniture Is (Mostly) Gone
2/27/2015Furniture Is (Mostly) Gone
2/27/2015Temporary walls installed to block off areas so staff in a few
departments (HR, Finance, Administration) may continue to work in limited areas
3/6/2015Demolition Is Underway
3/6/2015Don’t worry – we saved all the pictures of the monthly recipients of
Imagine!’s Excellence in Customer Service Award
3/6/2015For those hearty souls still working at Dixon,
bathroom availability is at a premium
3/13/2015First floor break area
3/13/20151st floor looking southeast, former IBHS and EI support
offices
3/13/20152nd floor looking South and West on Case Management
wing
3/13/20152nd floor Case Management wing
3/13/20151st floor looking through O’Shea Room
3/13/20151st floor looking South and West through O’Shea Room
3/13/2015Two new ten person conference rooms framed (near
former IBHS space), new office for HR Director
3/20/20151st floor meeting room,
adjacent to Human Resources
3/20/2015Reception area
3/20/2015First floor hallway looking into patio and break area
3/20/2015First floor large meeting room West wing
3/20/2015First floor large meeting room West wing
3/20/2015First floor small meeting room West wing
3/20/2015First floor office West wing (old FSSP area)
3/20/2015First floor old FSSP area, looking East
3/20/2015Women’s second floor bathroom
3/20/2015First floor IBHS office
3/20/2015First floor South Wing meeting room
3/27/2015New meeting room adjacent to IBHS
3/27/2015IBHS on right side of hall. Meeting rooms on left.
3/27/2015Meeting room adjacent to HR on left. Meeting room across
from IBHS on right.
3/27/2015HR Director’s Office
3/27/2015Door from HR Director’s office to HR office
3/27/2015New meeting room adjacent to work stations, 1st floor,
Southeast wing
3/27/2015Two offices, 1st floor, Southeast wing
3/27/2015IBHS office and treatment room
4/3/2015This week walls started to go up, like the walls for this
small meeting room in South wing first floor.
4/17/2015We have a hint of color! These pictures are from the
Southeast 1st floor.
4/17/2015We have a hint of color! These pictures are from the
Southeast 1st floor.
4/17/2015We have a hint of color! These pictures are from the West
wing 2nd floor.
4/17/2015We have a hint of color! These pictures are from the West
wing 2nd floor.
4/24/20151st floor break area
4/24/20151st floor reception area
4/24/20152nd floor break area
4/24/2015Got mail? We’ve go the space for it.
4/24/20151st floor West wing office
4/24/2015Tiling the reception area
4/24/2015Tile for the kitchen backsplash, created by Imagine!
CORE/Labor Source artists
5/1/2015Reception area with finished tile
5/1/2015Meeting rooms near reception area
5/1/20151st floor break area
5/1/20151st floor South wing with carpet
5/8/2015Ceilings
5/8/2015Furnishings first floor South wing
5/8/2015Second floor copy area
5/8/2015Second floor kitchen
5/8/2015First floor West wing furniture
5/22/2015Second floor kitchen with custom backsplash designed by
CORE/Labor Source artists
5/22/2015Imagine! Foundation/Public Relations Workspace
5/22/2015Furniture is returning
5/22/2015Hallway lighting – this area will feature artwork by
CORE/Labor Source artists
5/22/2015Second floor women’s bathroom
5/22/2015Case Manager Supervisor office with frosted glass
5/22/2015Entryway artwork restored
5/22/2015First floor break area with custom backsplash tiles created
by CORE/Labor Source artists
5/22/2015Family Support office
5/22/2015Inside view of small meeting room with frosted glass for
privacy
5/22/2015New furniture second floor West wing
5/22/2015Second floor West wing
5/22/2015First floor West wing
5/22/2015First floor South wing
5/22/2015New workstations
5/22/2015Kitchen/break area