Imagine! Dixon
Street Office
Remodel Progress
Before Remodel 2/13/2015
Before Remodel 2/13/2015
Before Remodel 2/13/2015
Before Remodel 2/13/2015
2/20/2015
Staff, Equipment Moved Out
2/20/2015
Staff, Equipment Moved Out
2/20/2015
Staff, Equipment Moved Out
2/20/2015
Staff, Equipment Moved Out
2/27/2015
Furniture Is (Mostly) Gone
2/27/2015
Furniture Is (Mostly) Gone
2/27/2015
Temporary walls installed to block off areas so staff in a few
departments (HR, Finance, Administration) may continue to work in
limited areas
3/6/2015
Demolition Is Underway
3/6/2015
Don’t worry – we saved all the pictures of the monthly recipients of
Imagine!’s Excellence in Customer Service Award
3/6/2015
For those hearty souls still working at Dixon,
bathroom availability is at a premium
3/13/2015
First floor break area
3/13/2015
1st
floor looking southeast, former IBHS and EI
support offices
3/13/2015
2nd
floor looking South and West on Case
Management wing
3/13/2015
2nd
floor Case Management wing
3/13/2015
1st
floor looking through O’Shea Room
3/13/2015
1st
floor looking South and West through O’Shea
Room
3/13/2015
Two new ten person conference rooms framed
(near former IBHS space), new
office for HR Director
3/20/2015
1st
floor meeting room,
adjacent to Human Resources
3/20/2015
Reception area
3/20/2015
First floor hallway looking into patio and break area