IKM Testing UK Ltd Bespoke design for pre-commissioning / IRM work Reduced mob / demob time: Function testing completed in IKM yard prior to mob Reduction in number of quayside lifts Reduced seafastening Minimal rig-up time Reduction in required deck space Fewer hose runs on deck Reduced vessel schedules as hose deployment / recovery time is faster • • • IRM Container IKM’s self-contained innovative IRM container challenges the way industry carries out subsea pipeline pre-commissioning and IRM work, providing a decrease in both vessel mob/demob and operational time. Benefits www.IKM.com/ikm-testing-uk/ • • • • • •
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
IKM TestingUK Ltd
Bespoke design for pre-commissioning/ IRM work
Reduced mob / demob time: Function testing completed in IKM yard prior to mob Reduction in number of quayside lifts Reduced seafastening Minimal rig-up time
Reduction in required deck space
Fewer hose runs on deck
Reduced vessel schedules as hose deployment / recovery time is faster
•
•
•
IRM ContainerIKM’s self-contained innovative IRM container challenges the way industry carries out subsea pipeline pre-commissioning and IRM work, providing a decrease in both vessel mob/demob and operational time.
Benefits
www.IKM.com/ikm-testing-uk/
•
•
•
•
•
•
www.IKM.com/ikm-testing-uk/
Physical - Weights & Dimensions / Electrical / Power
Dimensions
Weight
Power Requirements
Maximum Air Requirements
4,800 mm x 2,438 mm x 2,895 mm (L x W x H)
8,750 kg
440V 3PH - 50/60 Hz
7 barg - 450 scfm
Pressure
Flow
• 1000 barg pressure rated components
Auxiliary pressure testing point
HDMI touch screen controls – Pressure and flowrate controlled internally
•
•
• Digital instrumentation
• Internal flowmeter
• Self-deploying hose reel c/w 240m ¾” HP downline