2nd November, 2016 1
IGG Agenda
Minutes from Previous IGG Meeting 10:15 – 10:20
Review of Action Items 10:20 – 10:40
CER Update 10:40 – 11:00
Gemserv Update 11:00 – 11:10
MRSO Update 11:10 – 11:20
ESB Networks Update 11:20 – 11:45
Retail Market Design Service Update 11:45 – 12:05
AOB 12:05 – 12:10
Next Steps 12:10 – 12:15
All participants are kindly requested to mute their phones when dialled into the forum conference call
2nd November, 2016 2
Minutes
Minutes (v1.0) from IGG meeting
31st August 2016
For Approval Today
2nd November, 2016 3
IGG Action Items
Updated IGG Action List issued in advance of
meeting
4 Actions closed since last IGG meeting
7 IGG Actions carried forward
2nd November, 2016 4
Update on Actions - Closed
AP No. Title
Org. Assigned
to Date Closed Date Raised
1013
MRSO Presentations - Suppliers to provide suggestions as to what they want to see in
the MRSO IGG Presentations in the future & suggest whether the current forum slide
deck is best placed on the RMDS website only rather than provided at all IGGs. Suppliers 31/08/2016 29/06/2016
1015
DR1180 New Registrations - Suppliers to provide comments on this DR ahead of the
next IGG. Suppliers 31/08/2016 29/06/2016
1012 CER to circulate the Terms of Reference of the IGG to all Participants via RMDS CER 28/09/2016 04/05/2016
1019
Revenue Protection - Suppliers to submit nominee details, if any, for the Revenue
Protection Group to ESBN via RMDS Suppliers 28/09/2016 31/08/2016
2nd November, 2016 5
Update on Actions - Open
AP No. Title
Org.
Assigned to Date Due Date Raised
948/1004
ESBN to analyse the process where Move out with no Move takes place and make
proposals based on existing Supplier processes for best business practise within this
area. Process must enable MPs to notify CMS when a move out without a move in takes
place. Proposal to be issued to market in the form of a DR. (The issue is an
amalgamation of 948 and 1004) ESBN 02/11/2016 14/01/2015
986
Technical Details - DR covering the importance of appropriate Technical Details (name
and phone) to the 016 to be drafted. Detail to be added to MPD 01 & 02 ESBN 02/11/2016 02/09/2015
1017
Green Source Verification Process Clarifications and revised timelines - Suppliers to
submit questions/comments to CER (via RMDS) on the Green Source Presentation
outlined by CER. Suppliers 02/11/2016 31/08/2016
1018
Retail Market Code - CER is in the process of considering framework and requirements
for a Retail Market Code. Suppliers are requested to submit comments/suggestions to
CER (via RMDS) relating to proposed framework, content and requirements. Suppliers 02/11/2016 31/08/2016
1020
CER Rebrand - CER to provide details of the CER Rebrand & Timelines to Suppliers via
RMDS. CER 02/11/2016 31/08/2016
1021
Suppliers are requested to submit comments on the Terms of Reference of the IGG to
CER via RMDS (linked to IGG Action 1012) Suppliers 02/11/2016 28/09/2016
1022
RMDS to circulate if possible the NI Retail Market Code to Suppliers (linked to IGG
Action 1018) Suppliers 02/11/2016 28/09/2016
6
CER Update
02.11.2016
Retail Market Assurance
Services for the Irish Electricity
Market
Lizzie Montgomerie
IGG
2 November 2016
Belfast
Assured Parties – November 2016
Gemserv 8
Number and type of live participants assured by Gemserv since 2005
NB this is not a reflection of the live market position.
Next Market Release (Agreed it will not be 2016, but 2017/2018?)
Decision as to when the next Schema and Non Schema releases will take place are pending the
outcome to
ReMCoSG action 135 (CER/UR to provide a decision around the future Co-ordinated Market
Priorities and deliveries of such) and
WG action 145 (CER/UR to respond to ESBN/NIEs with a position on how to progress the
Schema Market Release, specifically whether ROI/NI is supported in progressing planning
activity for the 2018 Schema Release as detailed in the Co-ordinated Market Retail Delivery
Plan.)
Market Release Summary
2nd November, 2016 31
The core driver from CER for this DR is that for sites which do not elect a supplier
within 5 days of energisation, should not automatically be assigned to Electric Ireland..
The difference to the current process is that for sites < 30 kVA the customer will in
future have to contact a Supplier of choice who will submit a registration to ESBN with
the customer name, and receipt of the registration by MRSO becomes a requirement
before the site is energised.
This DR was brought to last Forum and Market Participants generally support the
principle of a mandatory selection of a Supplier before energisation. However a
number of questions have arisen with regards to how New Registrations are cancelled.
This DR is now therefore on Hold until the Cooling off DR has been finalised, as the
design of this will affect how New Registration cancellations are handled.
At Today’s Meeting: For Information as the DR completion is dependant on outcome
of DR 1184 (Cooling Off period)
DR1180 – New Registrations(Place Holder)
2nd November, 2016 32
CER’s Retail Market team asked ESB Networks in January 2015 to assess the impact of
the ISEM on the Retail Market in Ireland..
Whilst the SEM is to undergo a radical transformation arising from changes to European
legislation designed to create a single wholesale electricity market across Europe, the
intention of the RA’s I-SEM team is that there would be minimum impact for the Retail
Market and for Meter Data Providers arising from the I-SEM.
ESB Networks is one of the four Meter Data Providers represented at the I-SEM Metering
Working Group and have been considering the impacts of the I-SEM.
The proposed changes are fully detailed in MCR1182 and include changes to the Data
Processing and the Data Aggregation Retail Market business process between ESB
Networks and Market Participants.
At Today’s Meeting: For Approval as MCR
MCR1182 –Impact of I-SEM on the Retail Market
2nd November, 2016 33
The customers’ right to the cooling off period is detailed in Directive 2011/83/EU
on consumer rights, which was transposed into Irish legislations through the
Statutory Instrument S.I. No. 484 of 2013
Under this directive , customers have a right to a cooling off period of 14 days.
This includes situations when switching their gas and / or electricity accounts.
The cooling off period allows the customer to cancel the switch within a certain
time without incurring penalty.
The CER have completed a review on whether or not the a cancellation process
should be incorporated into the market design to allow for change of mind.
Options were presented to industry for comment, this resulted in selection of an
option which the majority of Suppliers supported.
DR1184 – Cooling off for COS(1/2)
2nd November, 2016 34
DR1184 – Cooling off for COS(2/2)
The Competition & Consumer Protection Commission’s website states that
the cooling off period is 14 calendar days.
The scenarios outlined in the DR were created based on 14 calendar days.
Once the customer contacts the Supplier, they have up to 4 days to send the
010 and the customer has 14 cooling off calendar days to exercise their
cooling off rights.(18 days total).
At Today’s Meeting: For Discussion
2nd November, 2016 35
DR1185 – Small Supplier Categorisation(1/2)
Currently the structure of the Small Supplier category does not facilitate
the business model of a Supplier having a small number of sites but
energy usage greater than 10MW power at peak demand.
The proposal is to change the current categorisation and assurance
approach within the Small Supplier category
the threshold of < 200 sites registered will continue to be part of the
criteria in qualifying and operating as a Small Supplier in the Retail
Market at all times
the threshold of 10MW power supplied at peak demand will not
apply as criteria where a Supplier indicates that their model is one
which is a small number of customers but where there will be greater
than 10MW power at peak demand.
2nd November, 2016 36
DR1185 – Small Supplier Categorisation(2/2)
The assurance body will determine the assurance assessment required for
each Small Supplier entering the Retail Market based on the segment(s)
the Supplier is entering and their Business model.
The Scope of Change to Design Documentation relates to amendments to
the Market Assurance and Market Entry Documentation.
At Today’s Meeting: For Approval
2nd November, 2016 37
Non Schema 2017 – Prioritisation
MCR NumberDR / MCR Description Comment
Delivery Event
DR1185 DR Small Supplier Categorisation For Approval at Forum on 2/11/2016 MMR
DR1184 DR Cooling Off for COS For Discussion at Forum 2/11/2016 NS / MMR
MCR1182 MCR I-Sem Changes For Approval at IGG on 2/11/2016 - delivered as part of I-SEM I-SEM proj
DR1180 DR New RegistrationsWaiting on Cooling off DR to be finalised prior to completion (reliant on Cooling off) NS
MCR1179 MCR Cessation of Eligible Cust Files on Extranet approved. To be impact assessed by ESBN NS
MCR1176 MCR Extranet Message Ordering Approved May 2016 NS
MCR1175 MCR Provide MP Bus Ref for Reading Approved June 2016 NS
MCR1169 MCRAddition of Postal Codes to two downloadable Meter Point Details Files Approved November 2015 (linked to MCR 1140 & Schema MCR ) NS
MCR 1141 MCR Supplier ID Validation on 260MM
With ESBN Currently. ROI still to determine best approach for ROI. With ESBN scope and design. Implemented in NI in 2015 on the 1st May 2015 and this was advised to the CDA Board at the CDA Board meeting that took place on 13th May 2015 ?
MCR1140 MCRNew RoI Postcodes into the Market Design(Eircodes)
Re-Versioned to cater for changes to GNI. Approved at IGG on 29/6/2016 (linked to MCR 1140 and Schema MCR NS
MCR 1135 MCRMarket Webservice as opposed to a Market Website to provide On-Demand Customer Information.... Read more
The MCR has been approved but has been put on hold. This is on hold due to concerns by CER that its implementation may have impacts on the central market systems NS
DR 1001 DRIncrease number of days for a Customer Read for a COS to match the Supplier Cooling Off Period - 7 Working Days
Brought to IGG meeting on 04.12.13 requesting withdrawal. Approval was not granted and this is now on hold. Outcome of DR 1184 may negate need for this DR. DR has to be reassessed in light of DR1184 ?
MCR 0062 MCRNew rule for MPD1 NQH Change of Supplier.... Read more
This MCR is on Hold. This must be reassessed in light of DR 1184 and LTCA WG outcomes. ?
Exclude first 3 as either Delivered outside of NS release
2nd November, 2016 38
Activity Role Action DateRank each of the changes highlighted in orange 1-7 with 1 being your top priority and 7 your least important. Items excluded are due to low probability of approval prior to mid 2017 or being subsumed into new DR/MCRs. Current applicability still to be determined. MPs Return to RMDS by 30/11/2016
Consolidate and formulate Market prioritised list. RMDS Issue to Market by 16/12/2016
Determine any action required to get prioritised MCR's approved. RMDSFormulate, plan & communicate by 11/01/2017
Communicate outcome of prioritisation exercise to Market at IGG RMDSPresent at IGG and issue email by 11/01/2017
Include Market feedback following delivery of list RMDS 18/01/2017
Provide ESBN list of prioritised MCRs for impact assessment. RMDS Issue to ESBN 19/01/2017
ESBN suggest proposed package of changes based on MP prioritisation and dependencies between MCRs, other work programmes. Proposed delivery dates of changes provided ESBN Issue to RMDS by TBD
Proposed package with delivery dates issued to Market for review & comment RMDS RMDS TBD
MPs MP TBD
Market Approval of Non Schema Package and delivery Date at IGG Market Approve at IGG in Q1 2017 TBD
CER approve Non Schema Package and delivery CER Approve Q1 2017 TBD
Non Schema Prioritisation 2017
2nd November, 2016 39
Extranet Screenshot issue - RMDS has been alerted by ESBN that a Supplier sent a
screenshot of the Extranet to one of it’s prospective customers. This is a breach of Data
Protection. Under no circumstances should Suppliers send Extranet screenshots to
Customers.
Working Practice 19 – Hardship PAYG. Some suppliers may have incorrectly been
advised to follow COS practises not agreed and contained in WP19. Please can all MPs
continue to follow the processes outlined in WP19 for hardship PAYG.
CER Lock Moratorium period for Christmas Period 2016.
Information for Suppliers
2nd November, 2016 40
2017 IGG & IGG Conference Call Dates – Full details are available on the RMDS website
under Reference Section/Guidance Documents
IGG/IGG Conference Call dates & Times 2017
ReMCoWG/IGG/CDA(8 week cycle)
Location IGG Conference Call(4 weeks after IGG)
11th January Dublin
8th February
8th March Belfast
5th April
3rd May Dublin
31st May
28th June Belfast
26th July
30th August Dublin
4th October
1st November Belfast
6th December
2017 Forum timings – As per WG Action 146 - CDA Meetings now only 1 hour 30 Minutes
CDA/WG/IGG in Dublin IGG/WG/CDA in Belfast
CDA 10:30 - 12:00 IGG 10:30 - 12:30
WG 12:30 - 13:30 WG 13:00 - 14:00
IGG 13:30 - 15:30 CDA 14:00 - 15:30
2nd November, 2016 41
Annual Tasks
Documents / Links
Meter Reading Calendar
Load Profile Indexes (6 Individual Files) – will be available
shortly.
Load Profile Indexes 2017
Unmetered PL Burn Hour Calendar 2017
Unmetered PL Index Values 24H 2017
Unmetered PL Index Values Dusk to Dawn 2017
Unmetered PL Index Values Dusk to Midnight 2017
Night Storage Heating Derived Profiles 2017
Derived Load Profiles 2017
Distribution Loss Factors 1.10.2016 - 30.09.2017
Site Specific Loss Factors effective 1.10.2016
ESB Networks Ltd – Statement of Charges
Christmas New Year Working Arrangements
IGG/CDA/ReMCoWG/ReMCoSG/Meeting Dates
2nd November, 2016 42
End of Year Working Arrangements Document covers period Friday 16th December 2016 to Tuesday 3rd
January 2017
This document is available on the RMDS website under guidance
documents. The link is http://rmdservice.com/guidance-documents/
The document is also placed on the calendar post for today’s IGG 2nd