    1West Bokaro Q-SE

    West Bokaro

    Mining Stream

    Quarry - Sou th Eas tern

  • 7/30/2019 Iduction Quarry Se west bokaro

    2/37

    2West Bokaro Q-SE

    West Bokaro Seam Wise Reserve 1.11.2008

    West Bokaro

    WASHERY

    FRS

    Sec_C

    Sect._DQuarry_SE

    Housing

    Dump Dump

    Dump

    Dump

    G.M. Office

    Banji

    N

    DURUN.E.BLOCK

    KARMATIA

    CMC

    Mine office

    Quarry_AB

    Qyarry_E

    Central Side

  • 7/30/2019 Iduction Quarry Se west bokaro

    3/37

    3West Bokaro Q-SE

    Our Operations

    Blasting Shovelling Dumping

    Overburden Removal

    Coal Loading

    Coal Crushing

    Coal

    Beneficiation

    Despatch

    Coal Mining & Beneficiation

    Environmental

    Measures

    Earth filling

    Afforestation

    Drilling

  • 7/30/2019 Iduction Quarry Se west bokaro

    4/37

    4West Bokaro Q-SE

    Raw Coal Production till FY20

  • 7/30/2019 Iduction Quarry Se west bokaro

    5/37

    5West Bokaro Q-SE

    Box Cut 1 & 2

    Box Cut _3

    Box Cut _4

    Quarry SE Work ings

  • 7/30/2019 Iduction Quarry Se west bokaro

    6/37

    6West Bokaro Q-SE

    Q-SE Equ ipment f leet

    Excavators : 6 ( 4 Shovels : 14.8 m3, 2 Loaders : 15.8 m3)Rear Dumpers : 40(95 T)Rotary Drills : 7 (150 mm).

    Graders :2

    (16 H)

    Dozers : 7 TD and2 WD.Explosive Used : SME (Orica)

  • 7/30/2019 Iduction Quarry Se west bokaro

    7/377West Bokaro Q-SE

    Best Practices

    7 days working.

    Staggered weekly day of rest and canteen breaks.

    Two grade system without supervisory level.

    Semi-mobile canteens and field offices.

    Ergonomically designed equipment.

    Competency mapping- 4Q Toyota Model

    Electronic Display Board.

    GPS Online Data Management.

  • 7/30/2019 Iduction Quarry Se west bokaro

    8/378West Bokaro Q-SE

    EMPLOYEE SATISFACTION

    - Reward & Recognition

    - SHABASH

    - Attractive Incentive Bonus

    - SGA recognition

    - Aspire / SIPs recognition

    - Suggestion Reward

    - Rewarding Performances in JDCs

    - Long Service award ( 20, 25,30,35,40 Years)

  • 7/30/2019 Iduction Quarry Se west bokaro

    9/379West Bokaro Q-SE

    ACHIVEMENT OF THE

    TRAINING PROCESSES

    REDUCED TRAINING PERIOD (18 TO 6 MONTHS)

    EASY ACCEPTABILITY TO WORLDS BEST

    OPERATING PRACTICES.

    GREENTRAINEES TRAINED AS TRAINERS .

    FIELD TRAINING TIME REDUCED DRASITICALLY

    FROM SEVERAL MONTHS TO AVERAGE 3 WEEKS.TRAINEDTO HANDLE ALL POSSIBILE TYPES OF

    EMERGENCIES.

    ENABLER FOR ACHIEVING BENCHMARK

    OPERATING PARAMETERS.

  • 7/30/2019 Iduction Quarry Se west bokaro

    10/3710West Bokaro Q-SE

    OUTDOOR ADVENTURE TRG.

    BY TSAF.

    TECHNICAL TRG. AT SNTI

    HMV COURSE AT JSR.

    PROCESS ORIENTED TRG. AT

    WB.

    TRAINING BY OEMS

    SIMULATOR BASED TRAINING

    TRG. BY EXPERT INTERNTL

    TRAINERS + OJT.

    OUTDOOR ADVENTURETRAINING BY TSAF

    GREEN TRAINING PROGRAMME

  • 7/30/2019 Iduction Quarry Se west bokaro

    11/3711West Bokaro Q-SE

    SIMULATOR TRAINING

  • 7/30/2019 Iduction Quarry Se west bokaro

    12/3712West Bokaro Q-SE

    SIMULATOR TRAINING

    Teaches correct control procedures from safety, production

    and machine wear and tear perspectives.

    Starting the truck Reversing under a shovel Dumping

  • 7/30/2019 Iduction Quarry Se west bokaro

    13/3713West Bokaro Q-SE

    SIMULATOR TRAINING

    Simulators...

    Creates an environment very similar to a real machine at work

  • 7/30/2019 Iduction Quarry Se west bokaro

    14/3714West Bokaro Q-SE

    SIMULATOR TRAINING

    Exposes the operator to various simulated events many

    too dangerous or difficult to test for real.

    Dust or Fog Road Surfaces

  • 7/30/2019 Iduction Quarry Se west bokaro

    15/3715West Bokaro Q-SE

    SIMULATOR TRAINING

    Records the operator's reactions together with vital machine

    operating information

  • 7/30/2019 Iduction Quarry Se west bokaro

    16/3716West Bokaro Q-SE

    SIMULATOR TRAINING

    Gives out an operator's detailed report, and can "play back"

    the operator's session to evaluate his performance.

  • 7/30/2019 Iduction Quarry Se west bokaro

    17/3717West Bokaro Q-SE

    Quarry Production in Process

  • 7/30/2019 Iduction Quarry Se west bokaro

    18/3718West Bokaro Q-SE

    Canteen

  • 7/30/2019 Iduction Quarry Se west bokaro

    19/37

    19West Bokaro Q-SE

    Locker Room

  • 7/30/2019 Iduction Quarry Se west bokaro

    20/37

    20West Bokaro Q-SE

    GREENERY AT SHOPFLOOR

  • 7/30/2019 Iduction Quarry Se west bokaro

    21/37

    21West Bokaro Q-SE

    Quarry SE at Night (Face)

  • 7/30/2019 Iduction Quarry Se west bokaro

    22/37

    22West Bokaro Q-SE

    Quarry SE at Night (Haul Road)

  • 7/30/2019 Iduction Quarry Se west bokaro

    23/37

    23West Bokaro Q-SE

    Quarry SE at Night (Dump yard)

  • 7/30/2019 Iduction Quarry Se west bokaro

    24/37

    24West Bokaro Q-SE

    Quarry SE at Night (Installations)

  • 7/30/2019 Iduction Quarry Se west bokaro

    25/37

    25West Bokaro Q-SE

    OB DUMP UNDER RECLAIMATION

  • 7/30/2019 Iduction Quarry Se west bokaro

    26/37

    26West Bokaro Q-SE

    Thank you

  • 7/30/2019 Iduction Quarry Se west bokaro

    27/37

    27West Bokaro Q-SE

    Location

  • 7/30/2019 Iduction Quarry Se west bokaro

    28/37

    28West Bokaro Q-SE

    A brief history

    West Bokaro becomes a Division of Tata Steel1972

    Management taken over by M/s West Bokaro (P)Ltd., a wholly owned subsidiary of Tata Steel

    1952

    Mine comes into existence as M/s Bokaro &Ramgarh Ltd. Management of mine given to M/s

    Anderson Wright

    1947

  • 7/30/2019 Iduction Quarry Se west bokaro

    29/37

    29West Bokaro Q-SE

    A Division of TATA STEEL, providing 48% coking coal & 100%

    thermal coal requirement of the Company

    We also provide 34% of the thermal coal requirement of Jojobera

    Plant, Tata Power

    Employee strength 3411 of which 40% are technically qualified

    12 % unskilled , Mostly employment on land basis

    Location: 200 kms North of Jamshedpur

    Leasehold: 4300 acres

    West Bokaro : An Introduction

  • 7/30/2019 Iduction Quarry Se west bokaro

    30/37

    30West Bokaro Q-SE

    Our customers and Products

    Clean Coal

    Middlings

    Tailings

    Rejects

    Coke Plant,TISCO

    Power Engg., TISCO

    Brick Kilns

    Captive Power Plant

    Ash 13 %

    Ash 38-41 %

    Ash 35-38 %

    Ash 66-68 %

    Our Key Customers

    Tata Power

    Products

  • 7/30/2019 Iduction Quarry Se west bokaro

    31/37

    31West Bokaro Q-SE

    Overland Conveyor

    Transportation of Material

    Ropeways

  • 7/30/2019 Iduction Quarry Se west bokaro

    32/37

    32West Bokaro Q-SE

    Quick Loading Complex, Chainpur

  • 7/30/2019 Iduction Quarry Se west bokaro

    33/37

    33West Bokaro Q-SE

    EMPLOYEE SATISFACTION

    - Joint consultation Foras

    Joint Departmental Council

    Central Joint Council

    JCCM

    (Department Level)

    (Divisional Level)

    (Apex Level)

    Frequency

    Quarterly

    Monthly

    Quarterly

  • 7/30/2019 Iduction Quarry Se west bokaro

    34/37

    34West Bokaro Q-SE

    CONDUCIVE WORK ENVIRONMENT

    ISO 14001 Certified

    Towards OHSAS 18000 certification

    Ergonomically Designed equipment

    Review of Safety & Environment every Day

    Haul Road Profile Mapping (ASI)

    Adoption of Total Productive Maintenance (TPM)

  • 7/30/2019 Iduction Quarry Se west bokaro

    35/37

    35West Bokaro Q-SE

    Quality of Life

    Free Electricity & Fuel Free Accommodation to employees

    Free Education

    Coaching & Career counseling

    Schemes like Employees Family Benefit Scheme and

    Medical Separation Scheme

    Club, Recreation & Community Centers

    Parks & Gardens 60 bedded hospital

    A i i

  • 7/30/2019 Iduction Quarry Se west bokaro

    36/37

    36West Bokaro Q-SE

    Aspiration

    To be the most admired unit in

    the Coal Industry