   ICI  FINAL  PROJECT  |  THE  PROJECT  PROPOSAL  |  FNBE  AUG  2014    

     

 AMANDA  CHIONG  -­‐  0320328  |  BRIDGET  HSU  -­‐  0320218  |  PN  HAS    

     

 PROJECT  3  :    THE  PROJECT  PROPOSAL      INTRODUCTION  TO  CONSTRUCTION  INDUSTRY    [QSB30105]    AMANDA  CHIONG  |  0320328    BRIDGET  HSU  |  0320218    FNBE  AUG  2014        

         

Page 2: Ici proposal (18 nov 2014)

 

 

   ICI  FINAL  PROJECT  |  THE  PROJECT  PROPOSAL  |  FNBE  AUG  2014    

     

 AMANDA  CHIONG  -­‐  0320328  |  BRIDGET  HSU  -­‐  0320218  |  PN  HAS    

     

Content    1. Project  Background    2. Introduction  To  Site    3. Location  &  Key  Plan  &  Site  Plan    4. Existing  Condition  5. Site  context    6. Analysis  +  Inventory  +  Observation    

-­‐ Circulation    -­‐ Microclimate    -­‐ Drainage    

7. Individual  proposal  (Amanda  Chiong)  8. Individual  proposal  (Bridget  Hsu)  

                             

Page 3: Ici proposal (18 nov 2014)

 

 

   ICI  FINAL  PROJECT  |  THE  PROJECT  PROPOSAL  |  FNBE  AUG  2014    

     

 AMANDA  CHIONG  -­‐  0320328  |  BRIDGET  HSU  -­‐  0320218  |  PN  HAS    

     

PROJECT  INTRODUCTION      1.1 PROJECT  BACKGROUND  

    This  is  the  final  project  of    Introduction  to  

Construction  Industry      .  This  project  consist  of  10%  Group  and  30%  Individual    The  objective  of  this  project  is  to  enable  students  to  develop  an  understanding  of  the  building  team,  its  organization,  duties  and    inter-­‐relations  within  which  they  will  seek  employment,  career  progression  or  further  study  and  also  to  develop  an  awareness  of  their  professional  responsibilities  and  to  appreciate  their  profession  in    the  construction  industry.      

  In  a  group  of  2  students  ,  student  need  to  find  a  specific  empty  land  to  initiate  a  small  construction  project.  The  size  of  the  land  shall  between  900m2  (30m  x  30m)  –  1200m2                                      

(  30m  x  40m)  and  come  out  with  a  proposal  .    

 

           

           

Page 4: Ici proposal (18 nov 2014)

 

 

   ICI  FINAL  PROJECT  |  THE  PROJECT  PROPOSAL  |  FNBE  AUG  2014    

     

 AMANDA  CHIONG  -­‐  0320328  |  BRIDGET  HSU  -­‐  0320218  |  PN  HAS    

     

Introduction  to  the  Site    

 

 After   surveying   and   consulting   with   our  

tutor,  we  choose  this  site  for  our  project  which  is   located   at   Lorong   Kumpang   6,   Taman  Ridgeway,   93200   Kuching,   Sarawak.   It   is   an  empty   land  which   is   surrounded  by  residential  area   as   shown   in   the   pictures   above.   We   find  that   it   is   wasteful   to   let   it   remain   blank   and  unused   as   it   is   located   in   the   center   of  residential   area   which   have   development  potential   on   various   purposes   to   benefit   the  residents.   Thus,   we   decided   to   start   our  development  project  on  it.  

Page 5: Ici proposal (18 nov 2014)

 

 

   ICI  FINAL  PROJECT  |  THE  PROJECT  PROPOSAL  |  FNBE  AUG  2014    

     

 AMANDA  CHIONG  -­‐  0320328  |  BRIDGET  HSU  -­‐  0320218  |  PN  HAS    

     

LOCATION  &  KEY  PLAN      

PROJECT  SITE  2.1  SITE  LOCATION    

 

 

LOCATION  :    Lorong  Kumpang  6,  Taman  Ridgeway,  93200  Kuching,  Sarawak.  

Page 6: Ici proposal (18 nov 2014)

 

 

   ICI  FINAL  PROJECT  |  THE  PROJECT  PROPOSAL  |  FNBE  AUG  2014    

     

 AMANDA  CHIONG  -­‐  0320328  |  BRIDGET  HSU  -­‐  0320218  |  PN  HAS    

     

 

SITE  PLAN      

                         

Page 7: Ici proposal (18 nov 2014)

 

 

   ICI  FINAL  PROJECT  |  THE  PROJECT  PROPOSAL  |  FNBE  AUG  2014    

     

 AMANDA  CHIONG  -­‐  0320328  |  BRIDGET  HSU  -­‐  0320218  |  PN  HAS    

     

Existing  Condition    

 

   

è  This  site  is  an  empty  land  which  is  located  at  Taman  Hwata.    

è  It  is  surrounded  by  residential  area.      

è  There  is  no  any  shoplots  around  it  except  houses.    

Page 8: Ici proposal (18 nov 2014)

 

 

   ICI  FINAL  PROJECT  |  THE  PROJECT  PROPOSAL  |  FNBE  AUG  2014    

     

 AMANDA  CHIONG  -­‐  0320328  |  BRIDGET  HSU  -­‐  0320218  |  PN  HAS    

     

                                         

è  There  is  a  few  types  of  development  project  had  been  carried  out  in  the  same  area.      

Page 9: Ici proposal (18 nov 2014)

 

 

   ICI  FINAL  PROJECT  |  THE  PROJECT  PROPOSAL  |  FNBE  AUG  2014    

     

 AMANDA  CHIONG  -­‐  0320328  |  BRIDGET  HSU  -­‐  0320218  |  PN  HAS    

     

SITE  CONTEXT        

                         

 

Page 10: Ici proposal (18 nov 2014)

 

 

   ICI  FINAL  PROJECT  |  THE  PROJECT  PROPOSAL  |  FNBE  AUG  2014    

     

 AMANDA  CHIONG  -­‐  0320328  |  BRIDGET  HSU  -­‐  0320218  |  PN  HAS    

     

             

SITE    ANALYSIS    INVENTORY  OBSERVATION  

               

Page 11: Ici proposal (18 nov 2014)

 

 

   ICI  FINAL  PROJECT  |  THE  PROJECT  PROPOSAL  |  FNBE  AUG  2014    

     

 AMANDA  CHIONG  -­‐  0320328  |  BRIDGET  HSU  -­‐  0320218  |  PN  HAS    

     

CIRCULATION      

-­‐  -­‐ )  

                     

             

       

Circulation  1    Circulation  2        

 

The  site  can  be  easily  accessed  .  There  is  no  specific  circulation  of  peoples  ,  because  there  is  nothing’s  can  attract  people  to  go  to  the  site  .  People  can  enter  to  the  site  through  circulation  1  or  circulation  as  you  can  see  on  the  picture  .      

Page 12: Ici proposal (18 nov 2014)

 

 

   ICI  FINAL  PROJECT  |  THE  PROJECT  PROPOSAL  |  FNBE  AUG  2014    

     

 AMANDA  CHIONG  -­‐  0320328  |  BRIDGET  HSU  -­‐  0320218  |  PN  HAS    

     

MICROCLIMATE      

   

 

   

THE  SITE  IS  MODERATELY  HOT  AND  EXTREMELY  SULTRY  ALL  YEAR  ROUND  .  IT  IS  COOLER  IN  THE  EARLY  MORNING  (6-­‐8AM)  AND  LATE  EVENING  (6-­‐8PM),  WITH  TEMPARATURE  ABOUT  28  °C    

           

-­‐WIND  FLOW  FROM  2  DIRECTION-­‐  

Page 13: Ici proposal (18 nov 2014)

 

 

   ICI  FINAL  PROJECT  |  THE  PROJECT  PROPOSAL  |  FNBE  AUG  2014    

     

 AMANDA  CHIONG  -­‐  0320328  |  BRIDGET  HSU  -­‐  0320218  |  PN  HAS    

     

 DRAINAGE      

                 

 

   There  is  only  one  drainage  can  be  seen  on  our  site  .          

   

Page 14: Ici proposal (18 nov 2014)

 

 

   ICI  FINAL  PROJECT  |  THE  PROJECT  PROPOSAL  |  FNBE  AUG  2014    

     

 AMANDA  CHIONG  -­‐  0320328  |  BRIDGET  HSU  -­‐  0320218  |  PN  HAS    

     

 SITE  ANALYSIS    

 SITE  CONTEXT     Image Distance Time

Kuching  International    Airport  

9.2 km 15 min

Kuching  City  Center  

5.6 km 12 min

SHOPPING  MALL    

City  ONE  Megamall  

2.4 km 5 min

Boulevard  Shopping  Mall    

3.6  km  

6  min  

The  Spring  Shopping  Mall    

3.6  km 6  min  

HEATH  CENTER      

Page 15: Ici proposal (18 nov 2014)

 

 

   ICI  FINAL  PROJECT  |  THE  PROJECT  PROPOSAL  |  FNBE  AUG  2014    

     

 AMANDA  CHIONG  -­‐  0320328  |  BRIDGET  HSU  -­‐  0320218  |  PN  HAS    

     

       

Timberland  Medical  Centre  

1.6 km 4  min

Borneo  Medical  Centre  

2  km 3  min

EDUCATION  AREA      SMK  DPHA  Gapor  

1.8 km 4  min

Inti  College  Sarawak    

1.8 km 4  min

Swinburne  University  of  Technology    

2.5  km 5  min

Sunway  College  Kuching    

1.5  km 4  min

Page 16: Ici proposal (18 nov 2014)

 

 

   ICI  FINAL  PROJECT  |  THE  PROJECT  PROPOSAL  |  FNBE  AUG  2014    

     

 AMANDA  CHIONG  -­‐  0320328  |  BRIDGET  HSU  -­‐  0320218  |  PN  HAS    

     

   

SERVICE  CENTER    

Maybank  Kuching  Selantan  

1.9  km 4  min

Petronas    station  

1.4  km 3  min

SUPERMARKET      Morning  Market  

2.3  km 5  min

RESTAURANT      KFC    

1.6  km 4  min

MacDonald    

2.0  km 5  min

Page 17: Ici proposal (18 nov 2014)

 

 

   ICI  FINAL  PROJECT  |  THE  PROJECT  PROPOSAL  |  FNBE  AUG  2014    

     

 AMANDA  CHIONG  -­‐  0320328  |  BRIDGET  HSU  -­‐  0320218  |  PN  HAS    

     

                                         

Pizza  Hut    

1.6  km 4  min

RELIGIOUS  AREA      Church    

1.3  km 4  min

Kuching  Buddhist  Society    

0.9  km 2  min

Masjid    

1  km 2  min

Page 18: Ici proposal (18 nov 2014)

 

 

   ICI  FINAL  PROJECT  |  THE  PROJECT  PROPOSAL  |  FNBE  AUG  2014    

     

 AMANDA  CHIONG  -­‐  0320328  |  BRIDGET  HSU  -­‐  0320218  |  PN  HAS    

     

 

       

AMANDA  CHIONG  PROPOSAL  

         

Page 19: Ici proposal (18 nov 2014)

 

 

   ICI  FINAL  PROJECT  |  THE  PROJECT  PROPOSAL  |  FNBE  AUG  2014    

     

 AMANDA  CHIONG  -­‐  0320328  |  BRIDGET  HSU  -­‐  0320218  |  PN  HAS    

     

       

Final  Project  :    A  Sport  Recreational  Centre  Development  Plan  Proposal      Name  :  Amanda  Chiong  Pei  Shan    Student  ID  :  0320328    Tutor  :  Pn.  Hasmanira    Course  :  Foundation  in  Natural  and  Built  Environment  (FNBE)    Module  :  Introduction  to  the  Constructed    Industry  (QSB30105)    Intake  :  August  2014      

Page 20: Ici proposal (18 nov 2014)

 

 

   ICI  FINAL  PROJECT  |  THE  PROJECT  PROPOSAL  |  FNBE  AUG  2014    

     

 AMANDA  CHIONG  -­‐  0320328  |  BRIDGET  HSU  -­‐  0320218  |  PN  HAS    

     

Contents    

No.   Topic   Page  

1.   Introduction   3  

2.   Objective  of  the  Construction   4  

3.   Sketch  Plan  of  Proposal   5-­‐12  

4.   Concept   13-­‐14  

5.   Rationale  and  Benefits   15-­‐16  

6.   Costing   17  

7.   References  List   18  

   

Page 21: Ici proposal (18 nov 2014)

 

 

   ICI  FINAL  PROJECT  |  THE  PROJECT  PROPOSAL  |  FNBE  AUG  2014    

     

 AMANDA  CHIONG  -­‐  0320328  |  BRIDGET  HSU  -­‐  0320218  |  PN  HAS    

     

   Introduction  

             In  this  final  project,  we  are  given  a  task  to   find   a   specific   empty   land   with   a  maximum  size  of  900m²  to  initiate  a  small  construction  project  on   it   in  a  group  of  2  people.              For   this   project,   we   have   to   do  research   on   the   types   of   building  development,   for   instance,   recreation  area,   commercial   area,   industrial   area,  agricultural   area,   tourism   area   and  residential  area.  In  this  plan  proposal,  we  should   include   suggestion,   rationale,  benefits,   site  analysis,   evaluation  and   the  requirement  of  the  project.              For   our   group,   we   come   out   with   an  outcome  to  use  the  empty  land  located  in  Kuching,   Sarawak.   Thus,   I   decided   to  build   a   sport   recreation   centre   on   this  empty  land  for  my  individual  report.        

Page 22: Ici proposal (18 nov 2014)

 

 

   ICI  FINAL  PROJECT  |  THE  PROJECT  PROPOSAL  |  FNBE  AUG  2014    

     

 AMANDA  CHIONG  -­‐  0320328  |  BRIDGET  HSU  -­‐  0320218  |  PN  HAS    

     

 Objective  of  the  Construction   è  To  serve  as  a  sport  recreation  centre  for  the  residents  in  Taman  Hwata    è   To   provide   a   recreation   and   leisure  venue  for  the  residents  è  To  provide  a  standard  and  high  quality  sports  environment  for  the  residents  è  To  promote  good  relation  between  neighborhood    è  To  raise  awareness  about  importance  of  exercise  for  health    è  To  provide  an  area  for  the  teenagers  to  relax  through  a  positive  and  healthy  way  è  To  improve  public  interests  in  sports  especially  among  the  teenagers  è  To  provide  a  comfortable  and  convenient  place  which  is  equipped  with  complete  facilities  for  exercise      

Page 23: Ici proposal (18 nov 2014)

 

 

   ICI  FINAL  PROJECT  |  THE  PROJECT  PROPOSAL  |  FNBE  AUG  2014    

     

 AMANDA  CHIONG  -­‐  0320328  |  BRIDGET  HSU  -­‐  0320218  |  PN  HAS    

     

Sketch  Plan  of  Proposal    

           This  mini  sport  stadium  is  equipped  with  complete  facilities  to  enable  the  residents  to  enjoy  a  standard  quality  environment  of  exercise.  The  stadium  consists  of  2  storeys,  which  have  an  indoor  basketball  court  on  the  ground  floor  whereas  two  volleyball  courts,  two  badminton  courts,  and  a  yoga  studio  on  the  first  floor  as  well.  Therefore,  different  types  of  games  can  be  carried  out  at  the  same  time.  Other  than  that,  it  also  solve  the  problem  of  space  insufficiency  for  exercise  which  often  occur  in  the  reality  life.              In  the  mini  stadium,  there  are  two  glass  sliding  door  as  the  main  entrance  located  on  each  side  of  the  stadium  for  easy  access.  Beside  that,  two  staircases  is  provided  too  near  the  entrance  which  connected  the  ground  floor  to  the  second  floor.  Since  the  entrance  is  faced  to  the  parking  area,  thus  there  would  be  no  problem  for  the  visitor  to  access  the  stadium  and  explore  throughout  the  entire  building.              For  the  interior  ground  floor  area,  the  stadium  are  accommodated  with  two  sides  of  audience  seats  that  are  distributed  scientifically  to  avoid  any  visual  obstruction  provide  the  audience  a  good  view  during  the  game  is  

Page 24: Ici proposal (18 nov 2014)

 

 

   ICI  FINAL  PROJECT  |  THE  PROJECT  PROPOSAL  |  FNBE  AUG  2014    

     

 AMANDA  CHIONG  -­‐  0320328  |  BRIDGET  HSU  -­‐  0320218  |  PN  HAS    

     

playing.  Other  than  that,  there  is  also  athletes’  rest  room  provided  in  the  stadium  with  different  gender  separated.  Each  of  the  rest  room  supplied  with  shower  room,  stadium  lockers,  benches,  toilets  and  sinks.  There  are  also  public  toilets  provided  for  males  and  females  beside  the  rest  room  for  public.              On  the  first  floor,  there  are  two  benches  on  the  side  of  each  court.  There  is  a  net  windscreen  playing  the  role  as  a  barrier  between  volleyball  courts  and  badminton  courts  for  safety  purposes.  A  yoga  studio  is  located  near  to  the  badminton  court  and  there  is  a  storeroom  beside  it.  There  is  also  restroom  for  athletes  and  public  toilets  provided  on  this  floor.  Other  than  that,  there  is  also  a  coffeehouse  as  a  resting  area  on  the  first  floor.      

Page 25: Ici proposal (18 nov 2014)

 

 

   ICI  FINAL  PROJECT  |  THE  PROJECT  PROPOSAL  |  FNBE  AUG  2014    

     

 AMANDA  CHIONG  -­‐  0320328  |  BRIDGET  HSU  -­‐  0320218  |  PN  HAS    

     

Plan  of  the    building      

Page 26: Ici proposal (18 nov 2014)

 

 

   ICI  FINAL  PROJECT  |  THE  PROJECT  PROPOSAL  |  FNBE  AUG  2014    

     

 AMANDA  CHIONG  -­‐  0320328  |  BRIDGET  HSU  -­‐  0320218  |  PN  HAS    

     

Plan  of  interior  structure        

> Volleyball  court  

> Basketball  court  

Page 27: Ici proposal (18 nov 2014)

 

 

   ICI  FINAL  PROJECT  |  THE  PROJECT  PROPOSAL  |  FNBE  AUG  2014    

     

 AMANDA  CHIONG  -­‐  0320328  |  BRIDGET  HSU  -­‐  0320218  |  PN  HAS    

     

   

> Coffeehouse  

> Badminton  court  

Page 28: Ici proposal (18 nov 2014)

 

 

   ICI  FINAL  PROJECT  |  THE  PROJECT  PROPOSAL  |  FNBE  AUG  2014    

     

 AMANDA  CHIONG  -­‐  0320328  |  BRIDGET  HSU  -­‐  0320218  |  PN  HAS    

     

   

-­‐  locker  -­‐  shower  room  -­‐  benches    

Examples  of  the  facilities    

1.  Restrooms  

-­‐  toilets      

Page 29: Ici proposal (18 nov 2014)

 

 

   ICI  FINAL  PROJECT  |  THE  PROJECT  PROPOSAL  |  FNBE  AUG  2014    

     

 AMANDA  CHIONG  -­‐  0320328  |  BRIDGET  HSU  -­‐  0320218  |  PN  HAS    

       

-­‐  pvc  flooring  > low  sound  transmission > Longer  service  life > Robust  > Less  maintenance  > Easy  installation  > Sturdy  construction  

> An  wireless  electrical  scoreboard  is  hanging  down  from  the  ceiling  in  the  middle  of  the  court      

> Audience  seat  on  the  both  side  of  the  basketball  court  

-­‐  basketball  court  >  width  =  15m  >  length  =  28m  

Page 30: Ici proposal (18 nov 2014)

 

 

   ICI  FINAL  PROJECT  |  THE  PROJECT  PROPOSAL  |  FNBE  AUG  2014    

     

 AMANDA  CHIONG  -­‐  0320328  |  BRIDGET  HSU  -­‐  0320218  |  PN  HAS    

       

6.  Coffeehouse        

5.  Yoga  Studio        

4.  Volleyball  Court        

3.  Badminton  Court      

Page 31: Ici proposal (18 nov 2014)

 

 

   ICI  FINAL  PROJECT  |  THE  PROJECT  PROPOSAL  |  FNBE  AUG  2014    

     

 AMANDA  CHIONG  -­‐  0320328  |  BRIDGET  HSU  -­‐  0320218  |  PN  HAS    

     

Concept    

           This  construction  plan  proposal  is  designed  based  on  the  30m×30m  empty  land  located  at  Kuching,  Sarawak.  The  aim  of  this  construction  is  to  transform  the  unused  empty  land  into  a  place  that  can  benefit  the  residents.              After  surveying,  I  found  that  there  is  no  any  place  provided  for  the  residents  to  exercise  in  this  area.  Thus,  I  decided  to  start  a  construction  of  a  mini  sport  stadium  on  this  empty  land,  which  accommodate  with  3  kinds  of  courts,  a  yoga  studio  and  a  coffeehouse  to  provide  a  sufficient  space  for  the  residents  to  enjoy  exercising  under  a  complete  equipped  environment.                        Residents  can  enjoy  some  popular  indoor  sport  activities,  for  example,  basketball,  badminton  and  volleyball.  Besides  that,  small  games  competition  or  matches  can  be  held  at  here  as  the  facilities  are  complete  equipped.                After  considered  every  single  problems,  I  had  came  out  with  an  outcome  of  the  design  of  my  site  which  makes  it  become  an  unique  place  that  is  suitable  for  exercise  and  training.  The  stadium  is  a  recreation  area,  which  is  designed  to  be  constructed  using  sustainable  and  environment-­‐friendly  construction  materials.  

Page 32: Ici proposal (18 nov 2014)

 

 

   ICI  FINAL  PROJECT  |  THE  PROJECT  PROPOSAL  |  FNBE  AUG  2014    

     

 AMANDA  CHIONG  -­‐  0320328  |  BRIDGET  HSU  -­‐  0320218  |  PN  HAS    

     

           This  building  is  generally  eco-­‐friendly  and  the  concept  of  the  entire  building  is  basically  based  on  the  green  building  concept.  The  outer  part  of  the  building  is  a  combination  of  steel  and  glass  that  is  counted  as  elements  of  recycled-­‐content  building  materials.        

Page 33: Ici proposal (18 nov 2014)

 

 

   ICI  FINAL  PROJECT  |  THE  PROJECT  PROPOSAL  |  FNBE  AUG  2014    

     

 AMANDA  CHIONG  -­‐  0320328  |  BRIDGET  HSU  -­‐  0320218  |  PN  HAS    

     

Rationale  and  Benefits    

           There  is  a  lot  of  reasons  and  benefits  to  built  this  stadium.  First,  the  location  of  or  site  is  strategic  in  the  city  with  a  big  empty  surface  area.  The  surplus  empty  spaces  after  the  complete  construction  of  the  stadium  can  be  considered  to  build  as  a  car  park  to  make  the  circulation  and  access  for  the  residents  and  public  to  the  stadium  very  convenient  and  comfortable.                This  construction  plan  is  targeting  majorly  on  the  residents  in  Taman  Hwata  as  this  area  is  lack  of  a  sport  recreation  area.  In  fact,  the  stadium  serves  free  and  standard  sport  equipment  and  facilities  for  public  to  encourage  the  residents  to  be  more  active  in  sports  and  also  encourage  the  teenagers  to  relax  through  a  positive  ways.  Besides  that,  the  stadium  also  can  promote  the  relation  between  neighborhoods.                Sports  bring  many  benefits  to  us,  it’s  not  only  improves  our  health  physically  but  also  empower  youth  and  promote  higher  self-­‐esteem  among  the  teenagers.  Other  than  that,  it  also  motivates  students  in  their  studies,  which  lead  them  to  get  better  grades.  Playing  sports  also  can  create  friendships  and  extend  social  networks  because  sports  gather  peoples  

Page 34: Ici proposal (18 nov 2014)

 

 

   ICI  FINAL  PROJECT  |  THE  PROJECT  PROPOSAL  |  FNBE  AUG  2014    

     

 AMANDA  CHIONG  -­‐  0320328  |  BRIDGET  HSU  -­‐  0320218  |  PN  HAS    

     

together  from  different  places,  backgrounds,  and  communities.  Many  times,  the  friendships  that  create  on  the  field  remain  intact  even  when  you  are  not  playing  sports.                Overall,  this  recreational  development  plan  brings  a  lot  of  benefits  and  comfortable  for  the  residents.        

Page 35: Ici proposal (18 nov 2014)

 

 

   ICI  FINAL  PROJECT  |  THE  PROJECT  PROPOSAL  |  FNBE  AUG  2014    

     

 AMANDA  CHIONG  -­‐  0320328  |  BRIDGET  HSU  -­‐  0320218  |  PN  HAS    

     

 Costing  

 

No.   Item   Unit   Qty   Amount(RM)  1.   Cement   m2   310   7,750.00  2.   Brick   m2   335   8,375.00  3.   Roof   m2   910   145,600.00  4.   Lamp   no.   350   5,600.00  5.   Bench   no.   26   7,800.00  6.   Scoreboard   no.   1   2,000.00  7.   Locker   no.   80   9,600.00  8.   Dustbin   no.   20   1,300.00  9.   Toilet  bowl   no.   24   2,400.00  10.   Urinal   no.   8   40.00  11.   Toilet  sink   no.   24   720.00  12.   Shower   no.   24   1,920.00  13.   Toilet  door   no.   28   4,480.00  14.   Sliding  door   no.   2   225.00  15.   Door   no.   3   720.00  16.   Air  Conditioner   no.   42   126,000.00  

17.   Fan   no.   25   2,125.00  

Total   326,655.00  

Page 36: Ici proposal (18 nov 2014)

 

 

   ICI  FINAL  PROJECT  |  THE  PROJECT  PROPOSAL  |  FNBE  AUG  2014    

     

 AMANDA  CHIONG  -­‐  0320328  |  BRIDGET  HSU  -­‐  0320218  |  PN  HAS    

     

References  List    What  are  the  benefits  of  Sport?  Advantages  of  sport.  (n.d.).  Retrieved  November  10,  2014,  from  http://www.onlinesportscommunity.com/The  benefits  of  sport/    Advantages  Of  Sports  And  Teens.  (n.d.).  Retrieved  November  10,  2014,  from  http://www.more4kids.info/359/advantages-­‐of-­‐sports-­‐and-­‐teens/    (n.d.).  Retrieved  November  10,  2014,  from  http://www.polokwane.gov.za/index.php?view_page  1782    Construction  elements  for  Melbourne  sports  stadium.  (n.d.).  Retrieved  November  10,  2014,  from  https://www.thyssenkrupp.com/en/bildstrecke/41/    Design  elements  -­‐  Basketball  courts.  (n.d.).  Retrieved  November  10,  2014,  from  https://conceptdraw.com/a2201c3/preview    (n.d.).  Retrieved  November  10,  2014,  from  http://www.uefa.org/MultimediaFiles/Download/EuroExperience/competitions/General/01/74/38/69/1743869_DOWNLOAD.pdf  

 

Page 37: Ici proposal (18 nov 2014)

 

 

   ICI  FINAL  PROJECT  |  THE  PROJECT  PROPOSAL  |  FNBE  AUG  2014    

     

 AMANDA  CHIONG  -­‐  0320328  |  BRIDGET  HSU  -­‐  0320218  |  PN  HAS    

     

       

BRIDGET  HSU      PROPOSAL  

           

Page 38: Ici proposal (18 nov 2014)

 

 

   ICI  FINAL  PROJECT  |  THE  PROJECT  PROPOSAL  |  FNBE  AUG  2014    

     

 AMANDA  CHIONG  -­‐  0320328  |  BRIDGET  HSU  -­‐  0320218  |  PN  HAS    

     

PROJECT  3  :    THE  PROJECT  PROPOSAL      INTRODUCTION  TO  CONSTRUCTION  INDUSTRY    [QSB30105]    BRIDGET  HSU  |  0320218    FNBE  AUG  2014                                            

Page 39: Ici proposal (18 nov 2014)

 

 

   ICI  FINAL  PROJECT  |  THE  PROJECT  PROPOSAL  |  FNBE  AUG  2014    

     

 AMANDA  CHIONG  -­‐  0320328  |  BRIDGET  HSU  -­‐  0320218  |  PN  HAS    

     

 CONTENT      1. PROJECT  INTRODUCTION    2. PROJECT  CONCEPT    3. PROJECT  PLAN    4. JUSTIFICATION    5.  COSTING        

                           

                       Page    

3  4-­‐6  7  8  9    

Page 40: Ici proposal (18 nov 2014)

 

 

   ICI  FINAL  PROJECT  |  THE  PROJECT  PROPOSAL  |  FNBE  AUG  2014    

     

 AMANDA  CHIONG  -­‐  0320328  |  BRIDGET  HSU  -­‐  0320218  |  PN  HAS    

     

PROJECT  INTRODUCTION      1.2 PROJECT  BACKGROUND  

    This  is  the  final  project  of    Introduction  to  

Construction  Industry  .  In  this  project  I  was  given  a  task  to  find  a  specific  empty  land  to  initiate  a  small  construction  project.  The  size  of  the  land  shall  between  900m2  (30m  x  30m)  –  1200m2    (  30m  x  40m)  and  come  out  with  a  proposal.    

I  have  decided  to  develop  a  commercial  area  on  the  land  that  we  found  .  I  plan    to  build  a  drive  –  thru  laundry  and  a  café  on  that  empty  land  because  the  land  is  surround  with  residential  area  ,  education  area  and  also  service  area  which  means  a  lot  of  people  will  go  through  this  land  to  access  to  another  land.  

 

     

       

       

       

Page 41: Ici proposal (18 nov 2014)

 

 

   ICI  FINAL  PROJECT  |  THE  PROJECT  PROPOSAL  |  FNBE  AUG  2014    

     

 AMANDA  CHIONG  -­‐  0320328  |  BRIDGET  HSU  -­‐  0320218  |  PN  HAS    

     

 PROJECT  CONCEPT      3.1  PROJECT  CONCEPT      

The  construction  plan  is  design  on  30  x  30  in  Lorong  Kumpang  6,  Taman  Ridgeway,  93200  Kuching,  Sarawak  .  It  conceive  two  kind  of  commercial  area  .  It  is  a  sufficient  space  for  the  resident  staying  around  to  enjoy  the  good  facilities  provided  at  the  commercial  building  .    

Furthermore  ,  the  part  which  I  really  highlighted  in  my  commercial  building  is  the  Drive-­‐  Thru  Laundry  ,  people  nowadays  have  a  very  tight  schedule  of  life  ,  therefore  drive-­‐  thru  laundry  will  bring  a  lot  of  benefit  to  everyone.    

 There  is  also  a  lovely  café  inside  the  building  .  The  café  is  where  people  have  a  little  break  time  while  waiting  for  the  cloths  to  be  collect    .  

             

Page 42: Ici proposal (18 nov 2014)

 

 

   ICI  FINAL  PROJECT  |  THE  PROJECT  PROPOSAL  |  FNBE  AUG  2014    

     

 AMANDA  CHIONG  -­‐  0320328  |  BRIDGET  HSU  -­‐  0320218  |  PN  HAS    

     

OBJECTIVE      -­‐ Offer  clients  services  ranging  from  full-­‐service  washing  and  drying  to  optional  folding,  and  extended  business  hours.    

-­‐ To  provide  convenient,  clean,  and  friendly  laundry  service.  

   

-­‐ Unite  the  neighborhood  relationship  between  each  other  .    

   BENEFIT      -­‐ Busy  people  can  just  drop  their  dirty  clothes  and  collect  it  when  the  cloth  are  ready  to  be  collect  by  just  drive  thru  the  laundry  shop  .    

-­‐ Citizen  staying  around  the  building  can  send  their  clothes  by  walking  .    

-­‐ Citizen  staying  in  that  area  will  know  more  about  people  staying  around  them  by  seeing  them  at  the  coffee  shop  inside  the  laundry  building  ,  this  might  help  to  get  know  each  other  more  and  be  friend  .  

-­‐ Business  man  /  women  can  save  their  money  by  paying  so  much  to  maid  for  only  helping  washing  cloths  and  folding  it  .    

   

Page 43: Ici proposal (18 nov 2014)

 

 

   ICI  FINAL  PROJECT  |  THE  PROJECT  PROPOSAL  |  FNBE  AUG  2014    

     

 AMANDA  CHIONG  -­‐  0320328  |  BRIDGET  HSU  -­‐  0320218  |  PN  HAS    

     

 3.2  PROJECT  IMAGES      

                                 

           

Page 44: Ici proposal (18 nov 2014)

 

 

   ICI  FINAL  PROJECT  |  THE  PROJECT  PROPOSAL  |  FNBE  AUG  2014    

     

 AMANDA  CHIONG  -­‐  0320328  |  BRIDGET  HSU  -­‐  0320218  |  PN  HAS    

     

PROJECT  PLAN    

 

ELEVATION    

FLOOR  PLAN    

Page 45: Ici proposal (18 nov 2014)

 

 

   ICI  FINAL  PROJECT  |  THE  PROJECT  PROPOSAL  |  FNBE  AUG  2014    

     

 AMANDA  CHIONG  -­‐  0320328  |  BRIDGET  HSU  -­‐  0320218  |  PN  HAS    

     

 JUSTIFICATION  

   Building  a  commercial  area  on  the  empty  land  

has  made  it  a  business  opportunity  with  great  potential  .  Drive  –  Thru  Laundry  +  Coffee  shop  .    

According  to  my  research  and  also  my  own  experience  living  Malaysia  ,  Malaysia  has  a  very  unpredictable  weather  country  .  Due  to  this  issue  many  people  complain  especially  business  man  ,  student  even  house  wife  complain  about  the  weather  in  Malaysia  .  What  they  complain  ?  People  complaint  on  a  sunny  day  out  of  sudden  it  will  rain  and  all  clothes  are  wet  again  before  it  dry  completely  .  This  make  people  very  angry  .  

People  are  rushing  with  time  nowadays  .  Everyone  has  a  very  tight  life  schedule  .  A  drive  thru  (Pick  &  Pay  &  Go)  will  be  more  convenient  for  everyone  .  But  there  is  also  a  sitting  area  and  a  coffee  shop  to  relax  inside  this  commercial  building  .      

Resident  staying  in  this  area  can  walk  to  this  Drive-­‐  Thru  laundry  .  1  min  walking  distance  from  housing  area  .  You  might  see  your  neighbor  which  you  haven’t  seen  them  before  .  Higher  chance  of  getting  know  more  people  staying  at  your  neighborhood  .      

Therefore  ,  in  my  opinion  opening  a  drive  thru  -­‐  laundry  shop  in  Kuching  ,Malaysia  has  a  very  high  potential  .      

     

   

Page 46: Ici proposal (18 nov 2014)

 

 

   ICI  FINAL  PROJECT  |  THE  PROJECT  PROPOSAL  |  FNBE  AUG  2014    

     

 AMANDA  CHIONG  -­‐  0320328  |  BRIDGET  HSU  -­‐  0320218  |  PN  HAS    

     

ESTIMATE  COSTING      

   

Item     Description     Unit   Qty   Amount  (RM)     A  –  Concrete             Cement     M³   300   7500.00     Brick     M2   350   8750  .00     B  –  Roofing             Roof     M2   1200   192000.00     C  –  Element             Washer  –  38Ib  capacity     No.   5   15000.00     Tumbler  Dryer  40Ib  capacity     No.   5   17500.00     Dry  Cleaning  machine  25Ib     No.   5   17500.00     Roller  Iron  40  x  12  inch     No.   3   6000.00     Ironing  table     No.   3   6000.00     Steaming  vacuum  board   No.   3   5000.00     LED  lamp     No.   250   4000.00     Tables     No.   25   15000.00     Chair     No.   100   15000.00     Dustbin     No.   10   650.00     Toilet  bowl     No.   5   1500.00     Toilet  sink     No.   5   1000.00     Sliding  door     No.   4   2000.00     Air  conditioner     No.   10   30000.00     D  –  Others             Water  tap     No.   4   100.00     Fire  extinguisher     No.   8   150.00     Fire  alarm     No.   5   500.00     Fire  sprinkler     No.   15   100.00     Subtotal  :325250.00     Estimate  Cost  :  350000.00