Top Banner
1 Project Brief Introduction To Construction Industry (QSB30105) Name of project: Budget Hotel Tutor: Miss Jaqurliyn Ann See Peng Group members: Jacquelyn Vanessa Tee (0320021) Hazel Razon Crisostomo (0320152)
18
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Proposal ici final

   

1

   

Project Brief Introduction  To  Construction  Industry  (QSB30105)  

Name  of  project:  Budget  Hotel  

Tutor:  Miss  Jaqurliyn  Ann  See  Peng  

Group  members:  

 

 

 

 

Jacquelyn  Vanessa  Tee  

(0320021)  

Hazel  Razon  Crisostomo  

(0320152)  

Page 2: Proposal ici final

   

2

 

 

 

 

 

 

CONTEXT    

 

 

 

 

 

 

 

Page 3: Proposal ici final

   

3

  CONTEXT   PAGES  

1 .   INTRODUCTION  TO  PROJECT    

  1.1  Project  Description    

  1.2  Site  Analysis    

  1.3  Project  Concept    

  1.4  Project  Background      

  1.5  Project  Summary    

  1.6  Visuals    

  • 1.6.1  Sketches  of  Proposed  Site    

  1.7  Project  Objectives    

  1.8  Project  Benefits    

  1.9  Success  Criteria    

2 .   RATIONALE  &  CLIENT  EVALUATION    

  2.1  Issues  of  the  area    

  2.2  Benefits  of  the  area    

  2.3  Goals  of  the  construction  project    

3 .   PROJECT  ORGANIZATION    

  3.1  Overview    

  3.2  Team  Objective    

  3.3  Project  Management  Team    

4 .     DOCUMENTS    

  4.1  Letter  to  authorities    

 

Page 4: Proposal ici final

   

4

1 .   Introduct ion   to  pro jec t    

1 . 1  Pro jec t  Descr ipt ion  

 

For  our  final  project  for  the  subject  Introduction  to  Construction  Industry,  

we  were   asked   to  make   a   project   proposal.  Hence,   the   title  –  The  Project  

Proposal.   The   objective   behind   this   project   is   to   enable   us   students   to  

develop   an   understanding   of   the   building   team,   its   organization,   duties  

and   inter-­‐relations   within   which   they   will   seek   employment,   career  

progression   or   further   study.   Not   only   that,   it   is   also   to   develop   an  

awareness   of   their   professional   responsibilities   and   to   appreciate   their  

profession  in  the  construction  industry.    

 

Basically,  our  project’s  name  is  called  “Maharajalela  Road  Hotel”.  It  involves  

the   construction  

of   a   budget   hotel  

right   beside   a  

staircase   that  

leads   to   the  

Maharajalela  

Monorail   Station.  

LOCATION PLAN  

The 30M X 30M SITE

N

Page 5: Proposal ici final

   

5

The   project   is   on   top   of   a   30m   x   30m   vacant   ground,   located   at   Jalan  

Maharajalela,  Kuala  Lumpur,  Malaysia,  with   the   coordinates   of   3°8′20″N  

101°41′56″E.  

The  estimated  date  for  the  agreement  of  the  project  brief  to  be  signed  is  on  

November   18th   2014.   The   whole   construction   process   will   be   up   to  

approximately  6  months.  

 

(Site  Context)  

 

 

 

 

 

 

 

 

1. Kuan  Yin  Temple  

2. Wisma  Pahlawan  

3. Stadium  Merdeka  

4. Selangor  Chinese  Assembly  Hall  

5. Maharajalela  Monorail  Station  

6. Malayan  Public  Library  Association  

Page 6: Proposal ici final

   

6

1 . 2  S i t e  Analys i s  

 

These  are  the  photos  of  the  site.  

   

 

 

 

 

 

 

Our   site   is   actually   a   recent   large   vacant   space.  Before   this,   it  was  a   land  

filled  with  trees.  But  now  that  the  trees  have  been  timbered  down,  we  came  

up  with  a  site  analysis  and  it  showed  that  the  site  is  ideal  for  a  construction  

plan.  These  are  the  reasons  why:    

1. Next  to  a  monorail  station.  

• Tourists   or   locals,   who   uses   the   monorail   and   gets   down   at  

Maharajalela  Monorail  Station,  can  stay  at  our  hotel  proposed  at  

this  site  because  of  the  convenience  it  brings.  

2. Approximately  10  minutes  walk  away  from  Stadium  Merdeka.  

• If  there’s  a  sport  events  held  in  Stadium  Merdeka,  the  hotel  at  our  

site   is   the  perfect  place   to   spend   the  night   in   after   a   tiring   and  

fun  day/night  there.    

Page 7: Proposal ici final

   

7

3. Ventilation  at  this  site  is  good  because  it  has  a  big  open  space.  

• This  benefits  our  hotel  at  our  site  because  it  is  cooling  and  breezy.  

Because   from   a   rational   perspective,   no   one   wants   to   stay   in   a  

place   where   it’s   hot   and   humid.   People   would   usually   aim   for  

places  with  a  comfortable  temperature,  and  a  nice  environment.  

 

1 . 3  PROJECT  CONCEPT  

 

We  have  teamed  up  to  brainstormed  and  discuss  ideas  as  well  as  concepts  

that   fit   in   this   construction   project   after   conducting   a   site   analysis.   In  

conclusion,  we  came  up  with  the  idea  for  our  finished  project  to  function  as  

a  place  for  people  to  stay  in  that  comes  with  an  affordable  price.  The  price  

for  a  night   in  this  hotel  will  be   fairly  reasonable,  which   is  why   it  will  be  a  

budget   hotel.  Our   targeted   customers   are   tourists  who   are   finding   a   fine  

place  to  live  in,  and  at  the  same  time  trying  to  save  money.  

 

 

 

 

 

 

 

Page 8: Proposal ici final

   

8

A  green  budget  hotel  building  

 

 

 

 

 

 

 

 

Due  to  Malaysia’s  tropical  weather,  the  exterior  of  the  budget  hotel  will  be  

filled  with  greenery  to  emit  more  breezy  air  to  the  surroundings.  Not  only  

that,   this   concept  will   attract  people’s   attention.  Besides,   this   concept  will  

definitely  attract  the  attention  of  other’s  because  it  is  unique  and  it  helps  in  

minimizing  the  carbon  footprints  we  humans  are  causing.  Basically,   it’s  a  

win-­‐win  situation.    

 

 

 

(Building  design  inspirations)  

Page 9: Proposal ici final

   

9

1 .4  PROJECT  BACKGROUND  

 

Actually,   it’s  only  recently  that  this  site  has  become  a  vacant  space.  Before  

this,   it   is   actually   filled   with   trees   and   tall   grass.   Now   that   the   trees   are  

chopped  down  and  some  grass  got  trimmed,  this  area  requires  something  

for   it   to   be   a   sight   for   sore   eyes.  We   think   this   site   is   very   strategic   for   a  

budget   to   be   located   due   to   the   site   contexts.   For   example:  Maharajalela  

Monorail  Station,  Kuan  Yin  Temple,  as  well  as  Stadium  Merdeka.  These  site  

contexts  revolve  around  the  tourism  industry,  so  why  not  make  it  easier  for  

tourist   to   roam  around  by  building  a  budget  hotel   that   is   so  nearby  and  

convenient?  Therefore,  we  proposed  this  project.  

 

Page 10: Proposal ici final

   

10

1 . 5  PROJECT  SUMMARY  

 

1. A  budget  hotel  will  be  built  to  utilize  the  vacant  space  in  the  site  we  

have  chosen.    

2. The  name  of  the  hotel  will  be  “Maharaja  Road  Hotel”,  in  conjunction  

of  the  name  of  the  road  of  where  it  is  located.  

3. Comfortable   hotel   rooms’   will   built   inside  

and   have   a   simple   yet   artistic   interior  

design.  

4. If  there  is  a  major  sports  event  held  in  Stadium  Merdeka,  there  will  

be  promotions  on  the  prices  of  the  rooms.  

5. The   exterior   of   the   building   will   be   filled   with   greenery,   for   the  

surroundings  of  the  site  to  be  breezy  and  airy.    

6. An  underground  car  park  will  be  built  and  provided  for  guests  with  

cars  to  park  their  cars.  

7. A  muslim   praying   room   will   be   provided   too   in   the   hotel   for   the  

muslim-­‐raced  customers.  

8. A  rooftop  garden  will  be  built   too   that  will  

function  as  a  recreational  area  for  guests  to  

relax.  Garden  lamps,   tables,  benches  and  a  

hammock   will   be   provided   for   the   uses   of  

the  guests.  

Page 11: Proposal ici final

   

11

9. A  small  gym  will  also  be  provided  in  the  hotel  to  encourage  guests  to  

keep  themselves  fit  and  healthy.  

 

1 .6  VISUALS  

 

1.6.1  Sketches  of  Proposed  Site  

 

 

 

 

 

 

 

 

(Sketch  of  proposed  budget  hotel)  

 

 

 

 

 

 

(Sketch  of  rooftop  garden  design,  on  top  of  the  hotel)  

Page 12: Proposal ici final

   

12

1 .7  PROJECT  BENEFITS    

1. Provide  convenience  for  tourist  and  locals    

2. To  promote  good  business  ethics  and  standards  

3. To  provide  more  greenery  to  the  city  that  is  known  as  a  “concrete  

jungle”.  

 

1 .8  PROJECTS  NUMBERING    

1. Convenient   for   sports-­‐goers   to   stay   at   the   budget   hotel   we  

proposed  as  Stadium  Merdeka  is  located  nearby.  

2. The  site  is  strategic  to  build  a  budget  hotel.  

3. People   who   just   came   down   from   the   Maharajalela   Monorail  

Station  could  just  drop  by  the  budget  hotel  to  use  the  restrooms  if  

needed.  

4. The  increase  of  softscape  helps  in  decreasing  the  negative  effects  

that  is  caused  by  urban  development.  

 

1 .9  SUCCESS  CRITERIA    

1. The  hotel  will  be  built  completely  within  the  estimated  time.  

2. The  rooftop  garden  will  be  designed  with  the  furniture  as  well  as  

floras  within  the  estimated  time  and  also  estimated  budget.  

3. The  rooms  will  be  fully  furnished  within  the  estimated  time.  

Page 13: Proposal ici final

   

13

4. Furniture   in   the   hotel   for   all   rooms   will   be   within   the   targeted  

budget.  

5. The  rooftop  will  have  a  shade  that  can  help  to  protect  guests  from  

UV  rays.  

6. The   gym   equipment   will   be   well   maintained   and   always   in   a  

usable  manner.  

7. All   rooms  will   have   a   television  provided   that   comes  with   a   few  

selected  channels  that  are  family-­‐friendly.  

8. Wi-­‐Fi  availability  for  guests.  

9. Hotel  to  provide  good  customer  service.  

10. Able  to  get  enough  staff  for  the  hotel  within  the  estimated  time.  

 

 

 

 

 

 

 

 

 

 

 

Page 14: Proposal ici final

   

14

2 .  RATIONALE  AND  CLIENT  EVALUATION    

Our   site   that   we   chose   is   a   900  

square   meter   (30m   x   30m)   vacant   area  

next  to  the  Maharajalela  Monorail  Station.  

After   looking   at   the   area   features   the  

advantage   and   disadvantages   we   could  

design  around  the  site,  we  settled  on  the  purpose  of  our  site  to  be:  “Budget  

Hotel”.  For  this  construction  project,  we  decide  to  look  upon  the  weakness  

of   the   area   currently   the   facility   of   study   by  

doing  so,  we  are  able  to   issues  and  problems  

and  propose  a  plan  that  can  make  up  for  its  

shortcomings,  particular  at  the  Budget  Hotel  

area.  Through  analysis,  we  have  pinpointed  the  following  issues  of  the  area,  

which  we  hope  to  use  this  information  to  create  a  Budget  Hotel  area  fit  for  

the  clients  of  our  project.    

 

 

 

 

 

 

Page 15: Proposal ici final

   

15

2 . 1   ISSUES  OF  THE  AREA  

 

1. Few   budget   hotel   and   some   old   hotel   is   already   existing   near   the  

area  of  the  site.  The  competition  for  the  walk-­‐in  guest  is  high.  

2. The   location   is   exactly   opposite   of   the   stadium,   that   is   why   when  

there   is   an   occasion,   event,   or   concert   the   area   will   be   noisy   and  

crowded.    This  will  affect  the  peace  in  the  area.  

3. The  area  is  a  bit  dark  especially  at  night.  There  is  inefficient  light  in  

the  main  road  especially  at  night.    

 

2 .2  BENEFITS  OF  THE  AREA  

 

1. Location-­‐wise  it  is  great  because  it  is  situated  in  the  center  of  Kuala  

Lumpur.  

2. Very   accessible,   because   it   is   near   to   the   Maharajalela   Monorail  

Station.  

3. Walking   distance   to   China   Town,   Times   Square,   as   well   as   Bukit  

Bintang.  These  3  are  one  of  Kuala  Lumpur’s  favourite  tourist  spots.  

4. About  15  minutes  drive  to  Petronas  Twin  Tower  that  used  to  hold  the  

record  for  World’s  Tallest  Building  Structure.  

5. 45  minute  drive  from  the  airport.  

 

Page 16: Proposal ici final

   

16

2 .3  GOALS  OF  THE  CONSTRUCTION  PROJECT    

1. Site  should  be  simplistic  and  idealistic.  

2. Utilize  the  location  and  space  effectively.  

3. Compensate  the  failures  of  the  area  to  enhance  study.  

 

2 .4  CONCEPT  

 

1. The   concept   of   our   project   must   be   able   to   provide   a   comfortable  

space  for  the  traveler.  

2. We   also   implement   a   green   landscape   approach   that  will   help   the  

guest   to   feel   more   connected   to   the   nature   &   enable   to   make   the  

Budget  Hotel  progress  with  harmony  with  the  nature.  

3. It  should  address  the  issues  of  the  area  particular  the  issue  of  sound  

effect  from  stadium  specially  when  there  is  an  occasion  going  on  to  

the   area   as   a   result   we   should   provide   isolation   with   feeling  

claustrophobic  through  well  space  isolation  room.    

4. Grassy   field   and   implementation   of   green   approaches   provides  

customer  a  relaxing  and  cozy  space  as  well  as  encourage  green  space  

into   a   human   lifestyle   Isolation   rooms   provide   personal   space   and  

privacy  to  relax  and  enjoy  the  stay  in  the  budget  hotel.    

5. Open   space   gives   the   impression   of   freedom   -­‐   more   open   air  

especially  in  the  lobby  area.  

Page 17: Proposal ici final

   

17

3 .  PROJECT  ORGANIZATION  

 

3 . 1  Overv iew  

 

Project  Requestor:  Dewan  Bandaraya  Kuala  Lumpur  

Project  Sponsor:  Dewan  Bandaraya  Kuala  Lumpur  

Project  Owner:  Dewan  Bandaraya  Kuala  Lumpur  

Project  Manager:  Ar.  Hazel  Razon  Crisostomo  

Team  Members:   Architect  –  Ar.  Hazel  Razon  Crisostomo  

      Landscape  Architect  –  Ar.  Jacquelyn  Vanessa  Tee  

      Quantity  Surveyor  –  Sir.  Satesh  Raj  

      Civil  &  Structural  Engineer  –  Ir.  Siti  Md.  Ezamudin  

      Mechanical  &  Electrical  Engineer  –  Pn.  Atiqah  Syasya  

      Contractor  –  Mr.  Charel  Fernando  

      Supplier  –  Sir.  Abdul  Qayyum  Shahmie  

 

3 .2  TEAM  OBJECTIVE      

Basically,   it   is   to   understand   everything   such   as   the   need   to   plan   and  

design  the  building  from  scratch,  to  produce  “Maharajalela  Road  Hotel”.  

 

 

Page 18: Proposal ici final

   

18

3 .3  PROJECT  MANAGEMENT  TEAM  

 

Key  Members   Person   In -­‐Charge   Company  

Architect   Ar.  Hazel  Crisostomo   H.R.C  Architect  Firm  

Landscape  Architect   Ar.  Jacquelyn  Vanessa   JV  Landschitecture  Firm  

Quantity  Surveyor   Sir.  Satesh  Raj   SR  Construction  BHD.  

Civil  &  Structural  Engineer   Ir.  Siti  Md.  Ezamudin   Siti’s  Engineering  Firm  

Mechanical  &  Electrical  Engineer   Pn.  Atiqah  Syasya   Syasya’s  Electrical  Works