Page 1: ICI Project 1b: Magazine

CIVILTHE

E N G I N E E R I N G L I F E

Get to know hisbackground, what he doesas a civil engineer, his roles

and responsibilities, etc.

An exclusive interviewwith Mr. Kenny about thesuccessful projects he was

involved in.

Celcom Tower, the ongoingproject Mr. Kenny and Miss

Sing Ying is involved in.

ABOUT MR.KENNY

SUCCESSFULPROJECTS

ONGOINGPROJECT

Page 2: ICI Project 1b: Magazine

Sing Yingcontract manager

4 years in Crest Builder

Mr. KennyCivil Engineer

2 years in Crest Builder

2

Page 3: ICI Project 1b: Magazine

Contents

3

About Crest Builder Holdings.........................4

Crest Builder's Journey.......................................5

Getting to know Mr. Kenny...............................6

The Awesome Celcom Tower..........................7

Nature Calls!...................................................................8

Need for speed...............................................................9

Editors' page..................................................................10

Page 4: ICI Project 1b: Magazine

CrestBuilder

HoldingsBerhad

CBHB was incorporated inMalaysia under the Companies

Act, 1965 on 9th March 2002 as apublic limited company, CBHB is

principally an investment holdingcompany and had successfully

undertaken a Corporate and DebtRestructuring Scheme which

involved taking over the listingstatus of MGR Corporation

Berhad. CBHB was listed on theMain Board Of Bursa Malaysia on

12th June 2003.

The CBHB Group was founded in1985 by Mr Yong Soon Chow.

What started out as a small timerof less than 10 staffs has grownto a strong corporation of over

500 staffs under its stable.

Over the past 25 years, the CBHBgroup has carved a strong foothold inthe local construction industry. With

in depth industry experience, theCBHB group has a proven track

record in the sector – especially in thecommercial, residential and

institutional building construction.Then Group counts top branded

developers and international propertyplayers amongst its clientele.

4

Page 5: ICI Project 1b: Magazine

The Crest Builder Group was foundedby Yong Soon Chow, a former engineer

with the Public Works Dept (JKR) in1983. Spearheading with foresight,

armed with the expertise of hismanagement artillery, the ManagingDirector successfully earmarked for

the company, a niche in theconstruction industry. It has been a

steady journey towards the top, guidedby a vision to create shareholders’

value through prudent businesspolicies, while emphasizing on quality

and timely delivery of projects.

Today, Crest Builder has diversifiedfrom its core construction businessinto other businesses. Construction

aside, Crest Builder also offersdesign-and-build (D&B) services to

its clients where it advises onbuildings, technicalities as well asdesign. The group’s Mechanical &

Electrical division offers a series ofwide M&E services. The Group has

also diversified into propertydevelopment, of which our maiden

development project is at the heart ofPetaling Jaya. 3 Two Square, a

commercial development, comprisesretail shops and offices, as well as acorporate office tower, The Crest.

When thejourney started....

More than 30 YEARS

building the nation!5

Page 6: ICI Project 1b: Magazine

AboutMr. Kenny

“It’s all a matter of time and cost...And the wayyou plan,” Mr. Kenny stated. Mr. Kenny, from

Penang, has been in the construction industryfrom the year 2000, so that makes it about 15years. He graduated at Universiti Teknologi

Malaysia (UTM) Johor, with a Diploma in CivilEngineering and a Degree in Civil Engineering.After he got his diploma, he worked part timeas an assistant engineer. It got busier after hedecided to continue his studies in Degree. He

worked from Monday to Friday and studies onSaturday and Sunday. Basically, he had no

weekends for 5 years. 15 years ago, Mr. Kennybecame a civil engineer in Penang. He workedwith the government under the company WCT

Holdings Berhad. In this company he got towork overseas in Dubai, Abu Dhabi and Qatar.

His projects with this company involve inmaking Formula 1 racetrack

Mr. Kenny’s role as a civil engineer is involving intender. There are two processes in tender: the firstone is commercial and financial. His responsibilityis getting the projects and knowing where the siteoffice and workers headquarters is. The second

part is the technical part. This is where Mr. Kennyanalyze and make logistics plan, such as figuringout where to put the tower crane and how many.He began working with Crest Builder in 2013. For

these past 2 years in this company, he was involvedwith tender again.

Mr. Kenny loves to explore new things.He likes challenges. He told us that

teamwork is the most important partin his work. If there were any problemsregarding the project, they would all sit

down and discuss it together untileveryone is satisfied. He said that thework wouldn’t be as tough or stressful

if you love it. “Once you have thepassion, you don’t care.”

“CHALLENGING.Once you have thepassion, you don’t

care.”6

Page 7: ICI Project 1b: Magazine

The AwesomeCelcom Tower

One project that Mr. Kenny is involved in is theCELCOM Tower. This particular project iscurrently ongoing and will be located in

Petaling Jaya. The CELCOM Tower has beenunder construction since the end of November2014. Upon the completion of the tower, it willbecome CELCOM’s Corporate Headquarters.

The expected completion date of constructionis around the end of August, 2016.

Taking 19 months estimatedbefore completion, the end

product of this ongoing projectwill be a 33 floor, glass exterior,futuristic like building costing a

staggering 90 million MYS. In thisproject, Mr. Kenny will be in

charge of all technical issues iffaced with any. From what Mr.

Kenny has shared with us aboutthe CELCOM Tower, everything

seems to be in order and smooth-flowing without any speedbumpsin the way of construction. Mostimportant is that nothing much

has come up to delay theconstruction process.

7

Page 8: ICI Project 1b: Magazine

NatureCalls!

8

One other project that Mr.Kenny was involved in is

the ALAM SANJUNGbuilding. Mr. Kenny was the

one doing the tenderingand was also in charge of

the technical issues.

The ALAM SANJUNG building is aresidential building and started in

June of 2013. It took 24 monthsfrom start to finish and and isnow a thriving metropolis-like

building consisting of shop lots,parks or gardens and apartment

units.

This project wasaccomplised on June of

2015, exactly 2 yearsafter constructionbegan. The ALAM

SANJUNG building is a25 level building

costing a cool 128million MYR. Now fully

booked, with rareaccounts of

apartments being onsale or to let.

Page 9: ICI Project 1b: Magazine

NEED FORSPEED

F1 CIRCUITAbu Dhabi

in racing car news!

9

One of Mr. Kenny's proudest accomplishments andbiggest projects will be the F1 Grand Prix Racetrack in

Abu Dhabi. Now known as The Yas Marina Circuit. Beingused for well-known F1 racing ever since 2009, after

Formula 1 first appeared in Abu Dhabi in 2007.

Mr. Kenny at that time beingunder WCT, was again, undertechnical issues and QA/QC(Quality Assurance/Quality

Control). With being the largestpermanent sports venue lighting

project in the world, meanscoming in with a cost amounting

to 4.2 Billion MYR.

Page 10: ICI Project 1b: Magazine

10

EDITORSAtiqah Ghazali

Adam Songan

Jeff Tan

Cheah Man Yee

Haney Marsya

Raimy