Top Banner
1 - Copyright©Statoil October 2012 Corporate presentation: Crossing energy frontiers Trine Ingebjørg Ulla Head of Business Development Floating Wind Statoil ASA Lisbon, 26 November 2012 Hywind Experience and way forward with Hywind
12
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Hywind 2 Sessao IV 2 Trine Ulla Statoil BUDUCNOST

1 - Copyright©Statoil October 2012 Corporate presentation: Crossing energy frontiers

Trine Ingebjørg Ulla

Head of Business Development Floating Wind

Statoil ASA

Lisbon, 26 November 2012

Hywind

Experience and way

forward with Hywind

Page 2: Hywind 2 Sessao IV 2 Trine Ulla Statoil BUDUCNOST

2 - Copyright©Statoil October 2012 Corporate presentation: Crossing energy frontiers

Page 3: Hywind 2 Sessao IV 2 Trine Ulla Statoil BUDUCNOST

3 - Copyright©Statoil October 2012 Corporate presentation: Crossing energy frontiers

Page 4: Hywind 2 Sessao IV 2 Trine Ulla Statoil BUDUCNOST

4 - Copyright©Statoil October 2012 Corporate presentation: Crossing energy frontiers

Our renewables strategy: Creating value from superior offshore experience

Leveraging Statoil’s existing core competencies, we focus on:

Offshore wind

Carbon capture and storage

Page 5: Hywind 2 Sessao IV 2 Trine Ulla Statoil BUDUCNOST

5 - Copyright©Statoil October 2012 Corporate presentation: Crossing energy frontiers

Project execution to

operations:

Sheringham Shoal, UK

317 MW

In operation, 2012

Working to bring technology

costs down:

Dudgeon Offshore, UK

Up to 560 MW

Under development

Larger projects, further from

shore:

Doggerbank, UK

Up to 9 GW

Under consent

Building material positions in offshore wind

Page 6: Hywind 2 Sessao IV 2 Trine Ulla Statoil BUDUCNOST

6 - Copyright©Statoil October 2012 Corporate presentation: Crossing energy frontiers

Applying technology to develop Hywind Demo

• Slender floating cylinder, anchored

• In operation from September 2009

• Produced 23 GWh since start-up

• Capacity factor 50% in 2011

• Experienced wind speed of 40 m/s and

maximum wave height of 19 m

• Floater motions have no negative impact

on turbine performance

• Concept verified

Page 7: Hywind 2 Sessao IV 2 Trine Ulla Statoil BUDUCNOST

7 - Copyright©Statoil October 2012 Corporate presentation: Crossing energy frontiers

Technology development

• Hywind Demo results

− Technical concept is proven

− Basis for optimized design

• Next step: Pilot parks (2 - 4 years)

− Demonstrate improvements

− Demonstrate park feasibility

− Risk reduction

• Future step: Large parks (8 - 10 years)

− 500 - 1000MW

− Economy of scale

Will be cost competitive with bottom-

fixed in mature market

Hywind Demo Future Hywind

Page 8: Hywind 2 Sessao IV 2 Trine Ulla Statoil BUDUCNOST

8 - Copyright©Statoil October 2012 Corporate presentation: Crossing energy frontiers

Scaled-up design

Standardisation

Optimised fabrication

Assembly,

transportation and

installation

Better winds

Reduced Costs

Higher income

Value will be maximised in mature market

Page 9: Hywind 2 Sessao IV 2 Trine Ulla Statoil BUDUCNOST

9 - Copyright©Statoil October 2012 Corporate presentation: Crossing energy frontiers

Hywind Pilot Park objective to demonstrate cost efficient and low risk solutions for commercial scale parks

• 12 – 15 MW

• Production start 2016

• Multiple units in park-configuration

• Verify scaled up, lighter design

• Optimise assembly and installation

• Reduce construction risk for full scale parks

Classificati

on: Internal

2012-01-06 9

Hywind Demo Hywind II

Alternative locations for Pilot Park

in Maine, US or Scotland

Page 10: Hywind 2 Sessao IV 2 Trine Ulla Statoil BUDUCNOST

10 - Copyright©Statoil October 2012 Corporate presentation: Crossing energy frontiers

Floating wind - potential markets

North sea – Norway and UK

Japan and Korea

US, Atlantic and Pacific coast – and Great Lakes

Iberian Peninsula and Mediterranean Sea

Page 11: Hywind 2 Sessao IV 2 Trine Ulla Statoil BUDUCNOST

11 - Copyright©Statoil October 2012 Corporate presentation: Crossing energy frontiers 11

Conclusions

• Significant global potential for floating

wind

• Local supply chains can be

developed

• Will be cost competitive with fixed

bottom solutions

Page 12: Hywind 2 Sessao IV 2 Trine Ulla Statoil BUDUCNOST

12 - Copyright©Statoil October 2012 Corporate presentation: Crossing energy frontiers

Trine Ulla

Head of Business Development Floating Wind

Statoil ASA

www.statoil.com

Thank you