HVAC TESTING, ADJUSTING AND BALANCING SERVICES EKU New Science Building Phase 2 Eastern Kentucky University Richmond, Ky. ACC# 430-C73Y-KU59-00 24 November 2015 SPECIAL CONDITIONS 01050 - 1 DIVISION 1 - GENERAL REQUIREMENTS SECTION 01050 - SPECIAL CONDITIONS SCOPE The specifications describe the work to be done and the material to be provided for performing HVAC testing, adjusting and balancing (“TAB”) services for the construction of the new Science Building Phase II, Eastern Kentucky University, Richmond, Ky. These Special Conditions shall apply to all Divisions of the Specifications. PROJECT DESCRIPTION The new construction is to be a six-story science building. The new science building includes classrooms, teaching laboratories, research laboratories, offices, support spaces, chemical storage areas, and common spaces. The building includes approximately 174,195 gross square feet. The sixth floor is for mechanical equipment only. Building components; extensive laboratory casework and fume hoods and limited fixed laboratory. The HVAC System consists of a variable-air-volume with reheat HVAC system, and on-site chillers (Steam is supplied by the university's central power plant). DEFINITIONS The term "Owner" as used throughout the Specifications and Contract Documents means the Commonwealth of Kentucky, acting through the Finance and Administration Cabinet and its Administrative Agent, the Department for Facilities Management. Marc Avery, PE, 502-782-0312 ( [email protected]). The term “Engineer" as used throughout the Specifications and Contract Documents means the firm Staggs & Fisher Engineers, 3264 Lochness Dr., Lexington, Ky. 40517 (859) 271-3246 Attn: John Mason ([email protected]). The term “Prime or General Contractor” as used throughout the Specifications and Contract Documents means D.W Wilburn, Inc. 153 Blue Sky Pkwy., Lexington Ky. 40509, cell Attn: Jeff Edwards, (859) 797-9375 ( [email protected]).
11
Embed
HVAC TESTING, ADJUSTING AND BALANCING …HVAC TESTING, ADJUSTING AND BALANCING SERVICES EKU New Science Building Phase 2 Eastern Kentucky University Richmond, Ky. ACC# 430-C73Y-KU59-00
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
HVAC TESTING, ADJUSTING AND BALANCING SERVICES EKU New Science Building Phase 2 Eastern Kentucky University Richmond, Ky.
ACC# 430-C73Y-KU59-00 24 November 2015
SPECIAL CONDITIONS 01050 - 1
DIVISION 1 - GENERAL REQUIREMENTS
SECTION 01050 - SPECIAL CONDITIONS
SCOPE
The specifications describe the work to be done and the material
to be provided for performing HVAC testing, adjusting and
balancing (“TAB”) services for the construction of the new
Science Building Phase II, Eastern Kentucky University, Richmond,
Ky.
These Special Conditions shall apply to all Divisions of the
Specifications.
PROJECT DESCRIPTION
The new construction is to be a six-story science building. The
new science building includes classrooms, teaching laboratories,
research laboratories, offices, support spaces, chemical storage
areas, and common spaces. The building includes approximately
174,195 gross square feet. The sixth floor is for mechanical
equipment only.
Building components; extensive laboratory casework and fume hoods
and limited fixed laboratory. The HVAC System consists of a
variable-air-volume with reheat HVAC system, and on-site chillers
(Steam is supplied by the university's central power plant).
DEFINITIONS
The term "Owner" as used throughout the Specifications and
Contract Documents means the Commonwealth of Kentucky, acting
through the Finance and Administration Cabinet and its
Administrative Agent, the Department for Facilities Management.
HVAC TESTING, ADJUSTING AND BALANCING SERVICES EKU New Science Building Phase 2 Eastern Kentucky University Richmond, Ky.
ACC# 430-C73Y-KU59-00 24 November 2015
SPECIAL CONDITIONS 01050 - 6
LIST OF UNIT PRICES
Unit Prices shall include the furnishing of all labor,
materials, supplies, services and shall include all items
of cost, overhead and profit for the Contractor and any
Subcontractor involved, and shall be used uniformly
without modification for either additions or deductions.
DESCRIPTION OF WORK
QUANTITY UNIT PRICE
1. ADDITONAL WORK &
DUCT LEAK TESTING __HOUR__ $_____________/Hr .
Includ ing Travel, Eq uip m ent & Mat er ials
Est im at ed Num b er o f hours f o r Duct Leak Test ing (in f o rm at ion on ly)
____________Hr .
NOTE: The Travel Tim e Hour ly Rat e includes t he t ransport at ion
cost (i.e . m ileage f or an equipped service vehicle.
Cars and m inim ally equipped light t rucks w ill be at t he norm al
t ravel St at e Travel rat e plus Travel Tim e).
END OF SECTION 01050
HVAC TESTING, ADJUSTING AND BALANCING SERVICES EKU New Science Building Phase 2 Eastern Kentucky University Richmond, Ky.
ACC# 430-C73Y-KU59-00 24 November 2015
SPECIAL CONDITIONS 01050 - 7
TAB ALLOWANCE LOG
This log is to track the Specified Allowance Work associated with the Testing & Balancing Contract – normally duct pressure testing, unanticipated work or special work related to the Commissioning effort. Update this log as the work is completed; then attach the updated log with each invoice. Submit related Change Orders as appropriate.
Project Title: New Science Building Phase 2 - Eastern Kentucky University
DATE TASK (INDICATE IF THIS IS A REPEAT) UNITS WORKED UNIT PRICE TOTAL _____________________________________________________________________________ _____________________________________________________________________________ _____________________________________________________________________________ _____________________________________________________________________________ _____________________________________________________________________________ _____________________________________________________________________________ _____________________________________________________________________________ _____________________________________________________________________________ _____________________________________________________________________________ _____________________________________________________________________________ _____________________________________________________________________________ _____________________________________________________________________________ _____________________________________________________________________________ _____________________________________________________________________________ _____________________________________________________________________________ _____________________________________________________________________________ GRAND TOTAL (This Page)
HVAC TESTING, ADJUSTING AND BALANCING SERVICES EKU New Science Building Phase 2 Eastern Kentucky University Richmond, Ky.
ACC# 430-C73Y-KU59-00 24 November 2015
SPECIAL CONDITIONS 01050 - 8
NET CHANGE ORDER:(This Page)________________________________________________
PAGE _____ OF _____ SAMPLE FINAL AFFIDAVIT:
HVAC TESTING, ADJUSTING AND BALANCING SERVICES EKU New Science Building Phase 2 Eastern Kentucky University Richmond, Ky.
ACC# 430-C73Y-KU59-00 24 November 2015
SPECIAL CONDITIONS 01050 - 9
HVAC TESTING, ADJUSTING AND BALANCING SERVICES EKU New Science Building Phase 2 Eastern Kentucky University Richmond, Ky.
ACC# 430-C73Y-KU59-00 24 November 2015
SPECIAL CONDITIONS 01050 -
10
HVAC TESTING, ADJUSTING AND BALANCING SERVICES EKU New Science Building Phase 2 Eastern Kentucky University Richmond, Ky.