Page 1: Ht Switch Gear & Breakers Manual

N02

Chandrashekar Shriyan 27-10-2006

WHY THE SAME DOCUMENT IS SUBMITTED WITH DIFFERENT DOCUMENT Nos.?

Page 2: Ht Switch Gear & Breakers Manual

s

Air Insu lated

M etal-Clad Sing le Busbar

M edium Volt age Sw it chgear

Type 8BK80On w ithdrawable circuit -breaker t ruck upto 24 kV

Operat ion and Maint enance

Inst ruct ions

PLEASE REFER DOC. No. 25194-JGZ-ES0L01-MA-000-B02-0001 FOR COMMENTS

Page 3: Ht Switch Gear & Breakers Manual

2

Table of ContentsPage Nos

1. Techn ical Descript ion

1.1 General 3

1.1.1 Applicat ion 3

1.1.2 Specif ic Standards 3

1.1.3 Ambient Temperature and Hum idity 3

1.1.4 Site Alt itude 3

1.2 Design Features 5

1.2.1 Sw itchgear Layout 5

1.2.2 Circuit Breaker Compartment 5

1.2.2.1 Service Posit ion 6

1.2.2.2 Test Posit ion 6

1.2.2.3 Isolated Posit ion 7

1.2.2.4 Removed Posit ion 7

1.2.3 Busbar Compartment 7

1.2.4 Cable & CT Compartment 7

1.2.5 Compartment for Low Voltage Equipment 7

1.2.6 Accessory Items 7

1.2.7 Range of Panels 7

1.2.7.1 Feeder Panels 8

1.2.7.2 Bus Sect ionalizer Panel 8

1.2.7.3 Metering Panel 8

1.2.7.4 Panel w ith I/C & O/G Connect ions 8

1.2.8 General Construct ion 8

1.2.9 Interlocks 8

1.3 Technical Data 8

1.4 Rating Plate 9

2. Inst al lat ion

2.1 Foundat ion 10

2.2 Elect rical Service Room Dimensions 11

2.3 Transportation Units 11

2.4 Packing 13

2.5 Unloading 13

2.5.1 Handling Equipment Required 13

2.5.2 Procedure 13

2.6 Examining the Sw itchgear against damages 13

2.6.1 Storage 13

2.7 Transferring the Transport Units 13

2.7.1 Remove the t ruck f rom the panel 14

2.8 Assembling the Sw itchboard 14

2.8.1 Bolt ing the Panels together 14

2.8.2 Fixing the Sw itchboard to the Foundat ion 15

2.8.3 Bolt ing the Busbars together 15

2.8.4 Bolt ing the Main Earth Busbar

section together 15

2.9 Making HV Cable Connect ions 15

2.10 Earthing of Sw itchboard 16

2.11 Other Work to be carried out 16

2.11.1 Checking the HV Connect ion 16

2.11.2 Checking the bolted Joints 16

2.11.3 Cleaning the Sw itchboard 16

2.11.4 Insert ing the w ithdrawable parts 17

2.11.5 Protecting the panels against Environmental

ef fects 17

2.12 Interpanel Wiring 17

3. Put t ing the Sw i tchgear in to Service

3.1 Test Operat ions 18

3.1.1 With Door Open 18

3.1.2 With Door Closed 18

3.2 Checking the Accessory Items 19

3.3 Revising the Circuit Diagram 19

3.4 Space Heaters 19

Page Nos

4. Operat ions

4.1 Withdrawable Truck 21

4.1.1 Posit ions of the w ithdrawable t ruck 21

4.1.2 Transferring the Withdrawable Part from the

test / disconnected posit ion manually 21

4.1.2.1 Normal Operat ions 21

4.1.3 Transferring the Withdrawable Part from

the Connected posit ion to the test /

disconnected posit ion manually 21

4.1.3.1 Normal Operat ions 21

4.1.3.2 Castell Key Operation (Opt ional) 22

4.1.4 Removing the LV Plug 22

4.1.5 Connect ing the LV Plug 22

4.2 Circuit Breaker Operat ing Mechanism 22

4.3 Circuit Breaker Operat ion 22

4.3.1 Charging the closing spring by hand 22

4.3.1.1 Breaker ON and OFF 22

4.3.1.2 Mechanically 22

4.3.1.3 Electrically 22

4.3.2 Sw itch ing State Indicat ion 23

4.4 Line PT w ith Drawout Fuse Mechanism 23

4.5 Earthing 23

4.5.1 Earthing of Busbars and Cables 23

4.5.1.1 Direct Earthing of Busbars w ith Conductors 23

4.5.1.2 Earthing of Cables w ith Conductors 23

4.5.1.3 Removing Earthing Connect ions 23

4.5.2 Earthing of Busbars / Cables w ith a

Drawout Truck 24

4.5.2.1 Disconnect ion of Earthing Drawout Truck 24

4.5.3 Earthing the Busbars / Cables w ith

Earth ing Sw itch 24

4.5.3.1 Earthing Busbars w ith Earth ing Sw itch 24

4.5.3.2 Earthing Cables w ith Earthing Sw itch 24

4.5.3.3 Disconnection of Earthing Sw itch 24

4.5.4 Earthing of Busbars or Cables w ith Truck 24

4.5.4.1 Earthing of Busbars w ith Bus Earthing Truck 24

4.5.4.2 Earthing of Cables w ith Cable Earth ing Truck 25

4.5.4.3 Link Type Earthing Truck 25

4.6 Breaker Compartment Door 25

4.6.1 To Open the Door 25

4.6.2 To Close The Door 25

4.7 Door to LV Compartment 25

4.7.1 To Open the Door 25

4.7.2 To Close the Door 25

5. Main t enance

5.1 Inspect ion Schedule 26

5.2 Cleaning 26

5.3 Lubricat ion 27

5.4 Replacement Parts 27

5.5 Defeating the Door Interlock of HV

Compartment 27

5.5.1 Drawout Unit in Connected Posit ion 27

5.5.2 Drawout Unit in Disconnected Posit ion 27

5.5.3 Restoring the Door Interlock 27

6. Disposal o f Product 28

7. Summary of Import an t Inst ruct ions 29

8. Addi t ional In fo rm at ion

8.1 Reference list of Items 30

8.2 Jointing Torque 31

Page 4: Ht Switch Gear & Breakers Manual

3

1. Techn ical Descript ion

1.1 General

8BK80 metal clad sw itchgear is of .horizontal

isolat ion & horizontal drawout type suitable for easy

extension of sw itchgear in both direct ion for system

voltage upto 24kV. The sw itchgear is designed for

single busbar system & is fully compartmentalized.

The design incorporates the set of interlocks for safe

operat ion of sw itchgear.

1.1.1 Applicat ion

The sw itchgear is suitable for use as dist ribut ion unit

for sw itching load at substat ions of elect ric supply

companies as well as for power stat ions & industrial

plants.

1.1.2 Specif ic Standards

The metal clad metal enclosed sw itchgear has been

type tested as per all the requirements of IEC 60298

"Specif icat ion for Rat ing & test ing of insulat ion of

elect rical Sw itchboards & sw itchgear for AC Voltages

above 1 kV & conforms to the standards IS3427,

IS12729. The Sw itchgear is supplied in ready

assembled condit ion. The Sw itchgear can be installed

free standing.

1.1.3 Ambient Temperature and Hum id it y

Ambient temperature is understood as the

Warn ingTo Ensure Personnel & Product Safety

This equipment carrries hazardous voltages and

moving mechanical parts that shall be controlled

remotely.

Non observance of the safety inst ruct ions w ill

result in death and / or severe personnel injury or

damage to property & environment .

Only qualif ied personnel shall work on or around

this equipment af ter becoming thoroughly familiar

w ith all warnings, safety not ices and maintenance

procedures contained herein. The

components labeled w ith the

Danger Sign shall be removed only

af ter ensuring that the supply to the

live parts behind them is de-

energized & earthed.

Successful and safe operat ion of this equipment is

dependent on perfect planning of the system,

proper handling (t ransport, storage), installat ion,

operat ion and maintenance.

temperature of the air in the sw itchboard room .

At ambient temperatures below -5°C prevailing for a

longer period the sw itchboard room has to be heated.

The air temperature in the panels should alw ays be

about 5°C above the ambient temperature to avoid

condensat ion. (Sw itch on the heater against

condensat ion!)

The hum idity of upto 95% is perm issible.

If the t ruck-type sw itchboard is exposed to a hum id

climate and rapid temperature changes, the

sw itchboard room has to be heated.

1.1.4 Sit e Alt i t ude

The rated insulat ing capacity values (rated impulse

w ithstand voltage, rated power frequency w ithstand

voltage)1 ) specif ied for the equipment are, in

accordance w ith the provisions of IEC Publicat ion 71,

based on standard atmospheric condit ions (1013 h

Pa, 20°C and 11 g/m 3 water content). i.e. sea level.

The insulat ing capacity of an insulat ion in air

decreases w ith increasing alt itude as a result of

changes in the air density. Standards promulgated by

IEC and other disregard this decrease in insulat ing

capacity for alt itude of up to 1000 m, i.e. the

decrease of approximately 9% at t his alt itude is st il l

perm issible.

The standards provide no guideline for alt itudes of

more than 1000 m w ith respect to insulat ion rat ings;

they leave t his up to an agreement between

manufacturer and user.

Our own recommendat ion is as follows:

Since this method used for rat ing insulat ion up to

alt itudes of 1000 m has proved to be sat isfactory, it

should also be applied to higher alt itudes. The

alt itude correct ion factor a should therefore be based

on the insulat ing capacity at 1000 m , which is lower

by 9% (corresponding to 0.91 or 1/1.1) than the

capacity at sea level.

The follow ing expression thus applies for the

select ion of the equipment :

Fig 1: Basic Circuit Diagram

Page 5: Ht Switch Gear & Breakers Manual

4

Rated w ithstand voltage to be selected2)

Required w ithstand voltage2)

1,1 · a

Exam ple:

Site alt itude above sea level .......................... 3000 m

Required impulse w ithstand voltage .................. 75 kV

Correct ion factor a .............................................. 0 ,73

(according to Fig. 1.1)

Rated impulse w ithstand 75 kV

voltage to be selected= 93 kV

1.1 x 0.73

Sw itchgear w ith rated voltage of 15 kV, IEC List 2

(rated lightning impulse w ithstand voltage of 95 kV)

meets this requirement.

The actual insulat ing capacity at the site is then

w ithstand voltage 3) = a · rated w ithstand volt age2 ) of

the selected sw itchgear unit .

2.1. Circuit Breaker compartment (HV Compartment)

2.2. Busbar compartment

2.3. Cable & CT compartment

Fig 2: Side view of sw itchgear cubicle

2.3

2.2

2.1

2.4

2.5

Fig. 1.1 Relat ionship between the correct ion factor "a" and

the site alt itude

The follow ing def init ions apply:1 ) Rated w ithstand volt age2 ) = required value corresponding to

the provisions of IEC etc. for sea level.

Withstand voltage3 ) = actual value for the given alt itude2 ) Rated lightning impulse w ithstand voltage

Rated power f requency w ithstand voltage3 ) Lightning impulse w ithstand voltage

Power f requency w ithstand volt age

2.4. Low Voltage compartment (LV Compartment)

2.5. Withdrawable Truck

Page 6: Ht Switch Gear & Breakers Manual

5

3.1. Vacuum Interrupter

3.2. Insulat ing Sw itching Rod

3.3. LV Plug on the truck

3.4. Contact Arm

3.5. Truck Handle

3.6. Cast Resin Insulator

3.7. Guide Roller on truck

3.8. PP Tube

Fig 3 : Withdrawable Truck w ith Circuit Breaker

3.1.1 Pole Flange (Upper)

3.1.2 Pole Flange (Lower)

3.1.3 PT's on the t ruck

Fig. 3.1: Rear View of the truck

3.1.1

3.1.2

3.1.3

3.13.2

3.3

3.4

3.5

3.6

3.8

1.2 Design Feat ures

1.2.1 Sw itchgear layout (Refer Fig . 2)

Metal part it ions subdivide each panel into

- Circuit breaker compartment (2.1)

- Cable & CT compartment (2.3)

- Busbar compartment (2.2)

- Low voltage compartment (2.4)

- Withdrawable Truck (2.5)

The outside covers are bolted to the f rame and the

doors are hinged.

1.2.2 Circu it breaker Compartm en t

The circuit breaker compartment contains a

w ithdraw able truck w ith Vacuum circuit breaker or

Bus PT Truck. The breaker term inals are f it ted w ith

contact arms (3.4, Fig 3)

The w ithdrawable truck can be t ransferred between

the service & test posit ions behind closed doors using

a hand crank.

3.2.1 Mechanical ON' Push But ton

3.2.2 Mechanical OFF' Push Button

3.2.3 Spring Charging Opening

3.2.4 Spring Charge Indicat ion

3.2.5 Mechanical ON' & OFF' indication

3.2.6 Mechanical Operat ions Counter

3.2.7 Earthing for the Truck

Fig 3.2: Mechanical ON & OFF Push But tons

3.2.1

3.2.2

3.2.3

3.2.4

3.2.5

3.2.6

3.2.7

3.7

Page 7: Ht Switch Gear & Breakers Manual

6

1.2.2.1 Service Posit ion (Connected Posit ion )

The posit ion of a Withdrawable Truck in which it is

fully connected for its intended funct ion. In th is

posit ion of the t ruck, the contact arms of the circuit

breaker are connected to the busbars as well as to the

out going cables via the f ixed mounted isolat ing

contacts in the cubicle.

The t ruck is locked against w ithdraw ing.

The low voltage circuit is connected through the low

voltage plug & socket connect ion (3.3, Fig. 3 & 4.5,

Fig. 4).

1.2.2.2 Test Posi t ion

The posit ion of w ithdrawable t ruck in which an

isolat ing distance or segregat ion is established in the

main circuit & in which control circuits are connected.

In the test posit ion, the t ruck w ith the breaker is

w ithdraw n so far between busbars & outgoing cables

that there is isolat ing distance according to VDE 0670,

part 2 / 2.65. The truck is locked against moving. The

low voltage circuit is connected through low voltage

plug connect ion (4.5, Fig. 4).

The circuit breaker can be sw itched for test ing & all

funct ions.

6.1. Main Earth Busbar

6.2. Bushings for lower mat ing contact

6.3. Current t ransformer

6.4. Cable connect ing pieces

6.5. Wiring Cover

6.6. Gland Plate for Power Cables

Fig 6: Looking into Cable compartment

6.1

6.2 6.3 6.4

6.56.6

4.1. Door Locking h inge pin

4.2. Door close interlock

4.3. View ing w indow for truck

posit ion

4.4. View ing w indow for

Spring charge indicator

and Mechanical Counter

4.5. LV Socket

4.6. Drive Mechanism housing

4.7. Ramp

Fig 4: Withdraw able Truck in Test Posit ion & door open

4.8. Interlocking Plate

(Drive Box)

4.9. Holder for LV Plug

4.10. Clip for locking LV

Plug to Breaker

4.12. Trip mechanism for

operat ing the breaker

in service posit ion

4.13. Rod Lever

5.1. Bushings of upper mating

cont act

5.2. Cast resin insulator

5.3. Feeder connect ions

5.4. Busbars

Fig 5: Busbar Compartment

4.14.7

4.8

4.13

4.6

4.54.104.2

4.3

4.4

4.9

4.12

5.15.2

5.3

5.4

Page 8: Ht Switch Gear & Breakers Manual

7

8.18.2 8.38.48.5

1.2.2.3 Disconnected Posit ion (Isolat ed Posit ion )

The posit ion of w ithdrawable t ruck in w hich an

isolat ing distance or segregat ion is established in t he

circuits of the w ithdraw able t ruck, the t ruck

remaining mechanically at tached to the enclosure.

In this posit ion the t ruck is w ithdraw n as in test

posit ion but the LV plug is disconnected.

In the test & disconnected posit ion the contact arms &

their mating contacts are separated by metallic

shut ters.

1.2.2.4 Removed Posi t ion

The posit ion of w ithdraw able t ruck when it is outside

the panel and electrically & mechanically separated

from it . Ramps are provided at the front bottom of the

panel to w it hdraw the truck out of the panel

smoothly.

Drive Mechanism of the t ruck is at tached to the

cubicle f rame using Rod Lever.

The Earthing st rip at the bottom of the breaker

compartment , along w ith the spring loaded pin

provided at the bottom of the circuit breaker t ruck

ensures the earthing of the t ruck in all the posit ions.

1.2.3 Busbar Compartm ent (Ref er Fig .5)

The busbar compartment contains:

- The busbars (5.4)

- Bushings w ith the mat ing contacts for the upper

contact arms (5.1)

- Feeder Connect ions (5.3)

The Main Busbars are mounted on cast resin

insulators (5.2). The ends of the smaller Main Busbars

are connected w ith the longer Busbar Links extending

from one panel to the next.

1.2.4 Cable and CT compartmen t (Ref er Fig .6)

The Cable compartment contains:

7.1 LV Compartment Door

Fig 7: Looking into LV compartment

8.1. Charging Handle

8.2. Cranking Handle

8.3. Double Bit Key

Fig 8: Accessories

7.1

- Bushings w ith the mating contacts for the lower

contact arms of t he w ithdrawable part (6.2)

- Cable terminat ion pieces (6.4)

- A sect ion of the main earth bar (6.1)

- Current t ransformers (6.3)

The cable term ination pieces are accessible f rom the

rear.

1.2.5 Compar tm en t for Low Volt age Equipment

(Refer Fig 7)

This compartment contains all the low voltage

devices (protect ive relays, MCB's, terminals, etc.,)

Indicators and relays are accommodated in door

cutouts.

1.2.6 Accessory It em (Refer Fig .8)

Follow ing accessories are supplied w ith the

sw itchgear.

- Changing handle for charging the closing spring of

the vacuum circuit breaker (8.1)

- Cranking handle for truck movement between

service and test posit ioning (8.2).

- Double bit key for locking the t ruck transfer

operat ing mechanism (8.3)

- Rod Trap key for LV compartment. (8.4)

- Earthing Sw itch Handle (Opt ional). (8.5)

1.2.7 Range of Panels

General:

For a metal clad enclosed sw itchgear there are

various panel modules available. All the panels are

constructed using ident ical parts as far as possible.

1.2.7.1 Feeder Panels (Fig 9a)

The feeder panels are suit able for input or output of

elect rical energy.

8.4. Rod Trap Key

8.5. Earthing Sw itch

Handle

Page 9: Ht Switch Gear & Breakers Manual

8

panels are interchangeable.Trucks are earthed

w ith panel in both test & service posit ions.

- Outgoing cables can be earthed by means of

manually operated earthing sw itch. (Opt ional)

- C.T.s are mounted on stat ionery part in the Cable

Chamber.

- Line P.T.s are available w ith a drawout

arrangement and w ith fuses.

- Future extension of exist ing sw itchboard is

possible

1.2.9 In ter locks

The posit ions of the w ithdrawable part are described

on page 4

State The follow ing operat ions

are not possible

Withdrawable t ruck in - Removal of the

service posit ion, w ithdrawable t ruck

sw itching device "ON" - Opening of the door

- Pulling of the LV plug

Withdrawable t ruck in - Removal of the

service posit ion, w ithdrawable t ruck

sw itching device "OFF" - Opening of the door

- Pulling of the LV Plug

Withdrawable t ruck - Closing of the

located between the sw itching device

service and test - Opening of the door

posit ions - Pulling of the LV plug

Withdrawable truck in - Transfer of the

test posit ion, sw itching w ithdrawable t ruck

device "ON" to service posit ion

Withdrawable t ruck in - Closing of the door

disconnected posit ion transfer of the

LV plug pulled of f , w ithdrawable t ruck

sw itching device "OFF", to service posit ion.

door open

1.3 Techn ical Data

Rated Voltage, Frequency (50Hz) 7.2kV 12kV 24kV

Rated Current of the Feeders 3150A 3150A 3150A

Rated Current of the Busbar 4000A 4000A 3150A

Rated Power Frequency 20kV 28kV/ 50kV

withstand Voltage (rms) 60 sec. 38kV* *

Rated Lighting Impulse 60kV 75kV/ 125kV

Withstand Voltage (peak) 95kV* *

1.2/50 Micro sec.

Rated short circuit 44kA 44kA 26.3kA

breaking current

Rated short time withstand 44kA 44kA 26.3kA

current (3 sec)

Rated short circuit 110kA 110kA 66kA

making current (peak)

* * On request upto 31.5 kA

Outgoing feeder panels w ith C.B. on the truck are

most f requent ly used.

Alternat ively, these panels can also be equipped w ith

an isolat ing t ruck.

The panel is available w ith current t ransformer either

w ith earthing sw itch or w ithout earthing sw itch. The

earthing sw itch is always equipped w ith manual

drive.

1.2.7.2 Bus Sect ional izer Panels (Fig 9b)

In bus sect ionalizing panel one panel is used for the

truck w ith the C.B. (alternat ively, an isolat ing t ruck) &

one panel for connection of busbars to the top. Both

the panels are usually delivered as one assembled

transport unit .

1.2.7.3 Meter ing Panel (Fig 9c)

Basically metering panels are of the same

construct ion as the standard outgoing panels. The

metering truck w ith voltage t ransformers & HRC fuses

in series is equipped w ith 3 top contact arms.

1.2.7.4 Panel w ith I/C & O/G Connect ions (Fig 9d)

These panels are comprising of Incom ing & Outgoing

Cables in the same panel.

1.2.8 General Const ruct ion

- Safety devices & interlocks are provided to avoid

any malfunct ioning. These devices protect the

operat ing personnel & ensure reliable operat ions.

The interlocks are explained in sect ion 1.2.9.

- The panel is compartmentalized in dif ferent

compartments w ith metallic part it ions.

- Vacuum Circuit Breaker for the panel is mounted

on the t ruck. All the ident ical t rucks in dif ferent

Fig 9a Fig 9b

Fig 9c Fig 9d

I/C

VCB

CT

O/G

VCB

CT

VCB

CT

Fuses

P.T.

I/C

O/G

VCB

CT

Page 10: Ht Switch Gear & Breakers Manual

9

Maximum values indicated

Overal l Panel w eigh t : Approx. w eight w ith vacuum

circuit breaker

15 kV (800W) 650 kg approx.

12 kV (600W) 450 kg approx.

24 kV (1000W) 800 kg approx.

Overal l Panel Dim ensions :

w h h1 d d1 d2 d3

mm mm mm mm mm mm mm

Upto 15 kV 600/800 1600 2000 1808 1750 380 750

24 kV 1000 1450 2300 2270 2215 380 1000

1.4 Rat ing Plat e

A Rat ing Plate containing the par t icular data is f ixed

inside each panel. The w ithdrawable vacuum breaker

has its own rat ing plate and the rated normal current

stated on it does not apply to the sw itchgear.

Degree of protect ion

Basic model IP 4X acc. To IEC 298 or

IP 40 acc. To IEC 529

The panels are gasketted to make them dust & verm in

proof.

IP 41, IP 5X and IP 51 can also be provided.

Fig 11: Rating Plate of a Panel

10.1. End Covers are f itted to the lef t & right hand end panels

of the sw itchboard

10.2. Pressure relief channel for the terminat ion

compartment , 110 mm deep.

10.3 Pressure Relief Flaps

† Minimum from highest pressure relief f lap

(Part 10.1) af ter it has opened

All dimensions are in mm and are for

the standard panel

* Single Row of Panels

* * Double Row of Panel

Fig: 10 Overall Panel Dimensions

750†

10.1

2020.0

800 min

on either side

800 min

W

10.2

d3

d2

10.3

d1

d

38

1100* / 2000* *

FRONT

h

Page 11: Ht Switch Gear & Breakers Manual

10

2. Inst allat ion

The installat ion sequence should be planned and

prepared w ith care. Ensure that the erectors and the

operat ing personnel read the operat ion, installat ion &

maintenance inst ruct ions.

2.1 Foundat ion

- False Floor

Place a girder in the cutout common to several or all

of the sw itchboards so that it is parallel to the

operat ing f ront . The girder is meant to support the

panel bot tom rails below the 30mm x 30mm cutouts.

Two girders (depthw ise) must be f ixed along the

wheel tracks of the truck as shown in the foundat ion

plans (Fig. 12a, 12b & 12c).

- Concret e Floor

This should be provided w ith foundat ion rails on

which the panels are to rest. For f loor cutouts refer to

Fig 12a,12b &12c. The foundation should be

prepared before the panels arrive. Level dif ferences

between the mount ing surfaces of the individual

panels should be determ ined and compensated for by

using a sheet as shown in Fig 16.

Note : All dimensions are in mm

Fig.12a: Foundat ion Plan for 12 kV (600W) Panel

Note : All dimensions are in mm

Fig.12b Foundat ion Plan for 12 kV (800W) Panel

Note : All dimensions are in mm

Fig 12c : Foundation Plan for 24 kV (1000 W) Panel

450 450

800

1000

1215

32.5

65

75

75

Standard panel

Rear box

400

300

40

Front

1000

375 375 37.5

10 45

1140

777.5

300

45 10 221532.5

30 ø

Rear cover

65.0 670.0 65.0

65.020.0

25.0

310.0

1750.0

300.0

935.0

580.0

45.0

10.0

300.0

120.0

45.0

10.0

38.032.5

800.0

450.0175.0 175.0

H.T./L.T. Front door

65.0

Rear cover

65.0470.0

65.020.0

310.0

1750.0

300.0

935.0

580.0

10.0

45.0

300.0

120.0

45.0

10.0

38.032.5

175.0 250.0 175.0

600.0

H.T./L.T. Front door

CUTOUT FOR

POWER CABLES

CABLE CHAMBER

C.B. CHAMBER

CUTOUT FOR

CONTROL CABLES

6x holes for M12 bolts

(for fixing to foundat ion)

FRONT

CUTOUT FOR

POWER CABLES

CABLE CHAMBER

6x holes for M12 bolt s

(for f ixing to foundation)

CUTOUT FOR

CONTROL CABLES

C.B. CHAMBER

FRONT

198.0 198.0

Wheel Track

295.0 295.0

Wheel

Track

295.0 295.0

Wheel Track

Page 12: Ht Switch Gear & Breakers Manual

11

- Base Frame (opt ional)

A solid base frame can be provided. The base f rame

gives a st rong support to the panels at their joining

line & also under it along the movement of the t ruck

w heels. It is made up of rolled steel sect ions.

A reference sketch of the base f rame is as shown in

Fig 13a, 13b & 13c

2.2 Elect rical Service Room Dim ensions

Min. Clearance to the ceiling 750 mm min

above the top (Refer Fig. 10)

Min.Clearance on the sides 800 mm m in

of the Panels

Min.Width of control aisle in 1100* /

front of the Panel for Single row 1500* * mm m in

Min.Width of control aisle 2000* /

in front of the Panel for 2500* * mm m in

two rows facing each other

* For upto 15 kV Panel * * For 24kV Panel

A power source must be available. Work likely to

produce dust or dir t may not be carried out while the

panels are being installed. The floor should be

levelled to enable transport units to be moved on

roller and/or sim ilar devices.

2.3 Transpor t Unit s

A transport unit consists of maximum upto 3

assembled sw itch cubicle w ith w ithdrawable t ruck.

The cubicle should not be lif ted f rom the top w ith

circuit breaker inside.

Fig 13a: Base Frame Dimensions (12 kV 600W)

Fig 13b: Base Frame Dimensions (12 kV 800 W)

Fig 13c: Base Frame Dimensions (24 kV 1000W)

40.040.0

75.0

75.0

1780.0

1705.0

1027.5

952.5

75.0

75.0

75.0

75.0

75.0

75.0

Ø14.0

Ø14.0

1780.0

Ø14.0

ISA 40x40x5

M12 NUT

WELDED

0.0

67.5

142.5

175.0

425.0

457.5

532.5

600.0

47.50.0

ISMC 75x40x5

T

O

P

40.040.0

75.0

75.0

1780.0

1705.0

1027.5

952.5

75.0

75.0

75.0

75.0

75.0

75.0

Ø14.0

Ø14.0

1780.0

ISA 40x40x5

M12 NUT

WELDED

0.0

67.5

142.5

175.0

625.0

657.5

732.5

800.0

47.5

ISMC 75x40x5

0.0

T

O

P

40.0

ISA 40x40x5

ISMC 75x40

75

1AØ

0

60

125

875

940

1000

Page 13: Ht Switch Gear & Breakers Manual

12

Tolerance as p

er D

IN 43661:

Stra

ightness 1

mm. P

er 1

mtr. L

ength, 2

mm. F

or to

tal le

ngth

Level 1

mm w

ithin 1mtr.m

easured le

ngth.

Higher to

lerances a

re to

be compensated by la

ying sh

eets (b

elow panel)

Fig 1

4 : D

imension data sheet fo

r the fo

undatio

n.

In case fo

undatio

n ra

ils or fa

bric

ated channel fra

mes are embedded in

cement c

oncrete, c

are sh

ould be ta

ken to

leave open pockets below

the lo

catio

n of fix

ing holes of th

e panel fo

r tightening th

e fo

undatio

n bolts.

According t o DIN 43 661, DIN 7184 and DIN 18 202, sheet No. 3, the fo llow ing steps should be adhered to:

- For equalizat ion of all irregularit ies of the rough f loor, the screed to be applied to the f loor should be at least 10 mm higher than

the height of the foundat ion rails.

- Before applying the screed to the f loor, the foundat ion rails should be al igned, leveled and anchored to the rough f loor.

- The top edge of the foundat ion rai ls should be f lush w ith the upper surface of the f in ished floor, taking ceramic t iles, stone-

ware t iles or any other f loor coverings into account . The surface of the screed or of the f loor covering should not be h igher than

the level of the top edge of the foundat ion rails.

- The p lane def ined by the carrying surfaces of both (or several) parallel foundat ion rails has to be levelled in two d irect ions 90

degrees apart by means of a levelling instrument consist ing of two water f illed glass tubes connected by a rubber hose.

- The level tolerance, measured along a d istance of one meter, shall not exceed one m illimeter.

- The straightness to lerance shall not exceed one m illimeter per meter of length of the rails in both t he f lat and the edgew ise

posit ion of the rails.

- The top horizontal surfaces of the foundat ion rails shall be smooth (grind w elded joints smooth).

- Foundat ion rails embedded in concrete shall be fully grouted for their fu ll length and be able to support a load at any point .

The st raightness tolerances, as required by DIN

43 661 shall include the level tolerance and

shall nowhere in the complete plant to be

installed exceed 2 m illimeters.

t

U-channelreference surface

t

measuring surface

Page 14: Ht Switch Gear & Breakers Manual

13

2.4 Pack ing

As required :

(a) For shipment to in land dest inat ions each transport

unit is f ixed on a sturdy wooden pallet and

covered by plast ic sheet for surface protect ion and

packed in normal wooden case.

(b) for shipment overseas each t ransport unit may be

addit ionally packed in a seaworthy case. It is

enclosed in plast ic sheet, w hich is sealed air-t ight

and includes bags containing dessicant .

Accessory items are packed separately, or kept in the

panel t ransport unit (see dispatch advice).

2 .5 Unloading

While unloading care must be taken to see that the

panels are not rolled on its sides & they must be kept

in upright condit ion.

2.5.1 Handling equipmen t requ ired

- A mobile crane or a chain pulley block for

unloading t he transport unit .

- Lif t ing tackle

- A fork-lif t t ruck w ith a fork length of about 3.0 m tr,

for handling the sw itchgear inside the building.

- Hydraulic jacks or w inches & roller pads.

The handling/transport gear must meet the site

requirements w ith regard to its construct ion and load

bearing capacity. Refer to the weights (for raising and

t ransport ing) stated on the transport or in the

covering documents.

2 .5.2 Procedure

- Do not unpack while unloading the t ransport

units. Take care not to damage the plast ic sheet

because it protects the sw itchgear against any

environmental ef fects.

- Use of mobile crane or a forklif t t ruck.

· At tach the ropes to the wooden pallet .

· Carefully raise the t ransport unit and check to see

that it is correct ly balanced, if necessary lower the

transport unit and correct any imbalance by

reposit ioning the ropes on the lif t ing tackle.

- Unloading the sw itchgear w ith a fork-lif t t ruck.

Transport units of not more than two panels can

be unloaded w ith a fork-lif t t ruck if the access

routes permit th is. Make sure the transport units

are correct ly balanced.

· Move the t ransport units as close as possible to

the sw itch house and put them down.

· Dismant le and remove the crates.

· Move each transport unit into the building.

· Take of f the plast ic sheet immediately prior to

bolt ing the t ransport units together and also

temporarily to check them for any signs of

t ransport damage.

2.6 Exam in ing the sw it chgear against

dam age

As soon as the sw itchgear has been unloaded and

unpacked examine it to see that it is complete w ith

reference to the relevant documents. Record any

damage and its cause w ithout delay, in the presence

of the forwarding insurance agent , if the damage was

caused en route.

This report is essent ial for any damage claims.

2.6.1 St orage

- Store the units in upright posit ion only

- The units must be stored in adequet ly covered

locat ion such that they are protected from Sun,

Rain, Flood Waters & other such Natural elements

2.7 Transfer ring t he t ranspor t un it s t o their

poin t s o f in stal lat ion

- Transfer the t ransport units including their wooden

pallets to the point of their installat ion using fork

lif t rollers.

- Withdraw the t rucks out of the panels using two

wooden wedges below the ramps & close the

door.

- Put the panels down on the cleaned site or at least

immediately in front of it in the correct order,

leaving a clearance of about 25 mm between

them .

- To remove the t ransport units from their wooden

pallets

- Place four w inches under the f loor rails of outer

panels and uniform ly raise the panel.

- Remove the wooden pallet .

- Lower the transport unit as far as it w ill go & place

it on two wooden beams if it is located above its

site or place on four roller pads if it is in f ront of

the sites

- In the later case roll the units to their mount ing

posit ion. If th is means changing the direct ion of

t ravel raise the unit & reposit ion the roller pads

accordingly. Now place the planks & channels in

the foundat ion cutouts that have to be crossed.

- To raise the panels on their mounting posit ion &

removing the roller pads

- Lower the t ransport unit as far as possible & place

them on two wooden beams.

- Now, raise the units, f irst on one side & then on

the other side, using roller-type crowbars. Pull out

the planks & lower the panels onto the cleaned

foundat ion. Posit ion the crowbars only at the

Page 15: Ht Switch Gear & Breakers Manual

14

corners of the panels below the vert ical f rame

members.

2.7.1 To remove the Truck f rom t he Panel

- Open the door of the panel (Refer clause 4.6.1).

- Bring the t ruck to the test posit ion by cranking

(Refer clause 4.1.3.1)

- Disconnect the LV plug (4.5, Fig. 4) & place it its

holder (4.9, Fig. 4) on the door.

- Mark the t ruck & their panel numbers for

ident if icat ion.

- Lif t & turn the Levers (4.13, Fig. 4) on the f ront

interlocking plate (4.8, Fig. 4) by 90º

ant iclockw ise. (upto 15kV) OR

- Unscrew the f ront interlocking plate (for 24kV).

- Slow ly move the t ruck away from the panel. The

tw o ramps drop automat ically enabling free &

easy w ithdraw al of the t ruck.

- Put back the ramps to normal posit ion & close the

door.

2.8 Assem bling t he sw it chboard

Carry out the work described under clauses 2.7.1 and

2.8.1 to 2.8.4.

Keep the bolts loose, not fu lly t ightened, t ill all the

bolts for sect ions are in posit ion. Then t ighten the

joining bolts, followed by Busbar bolts, followed by

Foundat ion bolts.

2.8.1 Bolt ing t he panels together

It is assumed that the f irst t ransport unit is in its f inal

posit ion and that the other unit s are posit ioned on the

foundat ion rails in the correct order but w ith an

adequate clearance between them .

It is alw ays preferable to install the central panel f irst .

This pract ice should invariably be adopted for a board

w ith 20 or more panels. Af ter installing the central

panel, the other panels can be installed on it s lef t &

right in proper sequence.

· Procedu re

- Centrally align the f irst t ransport unit on its

foundat ion. The panels must be at the correct level

(refer Fig. 14) and be absolutely vert ical. If

necessary place shims.

- under the frame uprights and

- under the bot tom rails near the 30 mm x 30 mm

cutouts for the foundation bolts.

- Remove the bolts f it ted at the lef t hand end of

each panel, as viewed from the f ront.

- Move up the second panel.

- Align this second panel on the foundat ion, raise it

to the correct level and make sure the panels stand

vert ically.

Use shims as for the f irst panel.

- Using the nuts & bolts join the adjoining panels.

- Check to see w hether the panels are t ruly ver t ical.

If necessary slacken the screw s and seal the gaps

w ith rubber.

- Move up the other panels in sequence, align them

and bolt them together.

16.1. Breaker Compartment door

16.2. Upper metallic shut ter

16.3. Lower metallic shut ter

16.4. Heater

4.5 LV socket

Fig16: View into Circuit Breaker cubicle after removing the

drawout t ruck

Fig 15 : Procedure for bolt ing the panels together

16.1

16.2

16.3

16.4

4.5

Page 16: Ht Switch Gear & Breakers Manual

15

2.8.2 Fix ing the Sw it chboards to the

Foundat ion

The panels bot tom plate has four 30 mm x 30 mm

cutouts (refer Fig 15) for f ixing purposes.

· Weld ing

Weld the bottom plate to the foundat ion at the

cutouts. Insert shims (refer clause 2.8.1) where

necessary to avoid having to weld across air gaps.

Coat the weld w ith enamel paint .

· Bo lt ing Dow n

Embed anchor-bolts in the foundat ion (through the

30 mm x 30 mm cutout ) or drill the appropriate holes

in the foundat ion rails (false f loor).

Insert shims between the foundation and the bottom

rails near the cutouts.

Tighten the screw w ithout distort ing the panels.

2.8.3 Bolt ing the Busbars together

Start working on the busbars only af ter panel units

have been adjusted correct ly and interconnected.

Access to the busbars are f rom the rear side or f rom

the top side by opening the Explosion Vents. All

necessary hardware is supplied on the the main

busbars.(5.4, Fig. 5)

1 . Brush the contact faces criss-cross w ise unt il

bright , & w ipe using a clean cloth. (applicable only

for bare Alum inium Busbars)

2. Square neck, round head, coach bolts are used for

busbar joints. These bolts do not rotate in their

slots & hence can be t ightened f rom one side.

Recommended torque is 70 Nm.

3 . Allow the joint to set t le down in 24 hrs & check

the value of the torque w ith the torque w rench.

4. The busbars of adjacent units must be joined

together using the busbars & hardw are supplied.

While insert ing coach bolts ensure that the round

head of coach bolt is facing sheet metal structural

parts. That means the nuts w ill alw ays be towards

the live parts such as busbars/feeder connect ions.

The busbars (5.4, f ig. 5) of the panel forming a

t ransport unit are already bolted.

5 . Refix the upper rear cover af ter the busbars are

bolted.

2.8 .4 Bol t ing t he Main Ear t h Bar sect ions

toget her

The main earth bars of the t ransport units must be

linked together. One of the two parts to be bolted

together is already f it ted w ith a link. This must be

undone, passed through the part it ion and bolted to

the two adjacent earth bar sect ions. The cover on the

side wall should be properly adjusted af ter joining the

earth bars.

2.9 Making HV Cable connect ions

The cable connect ion pieces are provided w ith Hex.

Headed bolts M16 w ith washers., spring washers &

5.1. Upper Contact Bushing

17.1. Fixed Contacts (Upper)

6.2. Lower Contact Bushing

17.2. Fixed Contacts (Lower)

17.3. Truck ear thing Srip

16.4. Space Heater

Fig 17: View into circuit breaker compartment w ith shutter

held open

6.1

18.218.1

6.6

6.1. Ear th Busbar

18.2. Eathing St r ip (from CB

chamber)

Fig 18: Earth Busbar Assembly

5.1

17.1

6.2

17.2

17.3

16.4

18.1. Extension Links

6.6. Bottom Covers

Page 17: Ht Switch Gear & Breakers Manual

16

hex. Nuts for mount ing the cable lugs of the

conductors.

Three part bottom cable cover is supplied f itted w ith

the sw itchboard. Of these, the outer most cover has

to be removed & cutouts to be made of the size as

per the instruct ions given by cable kit manufacturer.

2.10 Eart h ing t he Sw itchboard

Connect the earth term inals of at least one or two

panels to the stat ion earth. This could be done to suit

the local guidelines. Terminat ion facility for earth

connect ion is provided on the earth busbar mounted

in the cable chamber.

2.11 Other work to be carr ied ou t

2.11.1 Checking the HV Connect ions

On all HV cables, check

- the bolts for t ightness

- the sealing and earthing

- the core spacing on three core cables and the ant i-

magnet ic clips on single-core cables.

2.11.2 Checking t he Bolted Jo in t s

- Check the power and auxiliary circuit connect ions

of the sw itching devices at random . Examine all

the terminal block connections, making sure that

the blocks are correct ly labeled and replace any

missing labels by referring to the circuit diagram.

- The torque values of all the busbar joints must be

checked

2.11.3 Cleaning t he Sw it chboard

- Clean all the post insulators, Bushings and Busbars

in all the compartments using sof t dry cloth.

Do not use any abrasive chem icals or detergen ts to

clean in stal led par t s.

Use on ly d ist i l led water i f necessary. Ensure that al l

par ts are dr ied up before applying any vo lt age.

16.2, 16.3. Shut ters

19.1. Shut ter operat ing rod

19.2. Roller Guide Angle

19.3. Truck guide

Fig 19: View inside circuit breaker compartment w ithout

w ithdrawable t ruck.

16.1. Breaker compartment Door

2.5. Breaker Truck

Fig 20: Insert ion of trolley in the panel

16.2

16.3

19.119.2 19.3

16.1 2.5

Page 18: Ht Switch Gear & Breakers Manual

17

2.11.4 Inser t ing the w it hdraw able par t s

- open the front door (16.1, Fig. 20)

- put down the ramps (4.7, Fig. 4)

- place the breaker t ruck in front of the

corresponding panels.

- Transfer the t ruck inside the panel and push it as

far as it w ill go.

- Fix the racking mechanism / interlocking plate to

structure f rame by using lif t & turn levers

(upto 15kV) & by using bolts (for 24kV)

- Fix the ramps back in the posit ion

- Close the door (16.1, Fig 20)

- Inser t all other drawout t rucks in the same

manner.

2.11.5 Protect ing the panels against

env ironmen tal ef fect s

(a) Damaged sect ions of the paint f inish may only be

touched up w ith original paint.

(b) Fit the parts supplied to protect against the ingress

of rept iles. Check in case they are removed during

installat ion.

(c) Close all the doors & covers properly.

(d) Any opening that is lef t open af ter installat ion

should be closed & sealed to make it t ruly

verm inproof .

2.12 In terpanel Wir ing

The w ire have been lef t loose in the LV compartment

of certain panels.

These w ires must be connected from panel to panel

as per approved w iring diagrams.

Page 19: Ht Switch Gear & Breakers Manual

18

3. Put t ing the sw itchgear in to serv ice

For details of operat ion refer sect ion 4

3.1 Test operat ions

3.1.1 Wi th door open

- The motor operat ing mechanism start as soon as

the LV plug is inserted and control supply is

available (If the VCB is not already charged)

- Open & close the breaker several t imes.

- Pull off the LV plug. Charge the breaker closing

spring by hand (refer clause 4.2)

- Operate the circuit breaker

- Refit the LV cable Plug.

3.1.2 With door closed

Each sw itchpanel should be tested as follows:

- Transfer the w ithdrawable truck to the

disconnected posit ion (see 4.1).

- Sw itch ON the auxiliary and control supply.

- Transfer the w ithdrawable part to the connected

posit ion.

4.3. View ing w indow for t ruck position

4.11. Opening for charging handle for charging the breaker

closing spring

4.12. Trip mechanism for operat ing the circuit breaker in the

connected posit ion .

7.1. LV compartment door

16.1. Breaker compartment door

21.2. ON & OFF Push But ton (On HT Door)

21.3. Window for the indicators of the w ithdrawable part

- Number of operat ions (Operat ion Counter)

- Closing Spring of the circuit breaker

- Charged - Lable w ith spring symbol

- Discharged - Blank Lable

- Indicator for circuit breaker sw itch ing status

- Circuit Breaker Closed - " I "

Tripped - " O "

21.4. Opening for Double Bit Key for locking the t ransfer

operat ing mechanism

21.5. Opening for racking handle for racking the breaker truck

21.6. Opening for defeat ing in terlock

21.7. Door Handle

Fig. 21: Opening Elements (upto 15kV Panel)

16.1

4.12

21.2

21.3

4.11

21.4

21.5

7.1

21.6 21.7

4.3

4.3. View ing w indow for truck posit ion

4.11. Opening for charging handle for charging the breaker

closing spring

4.12. Trip mechanism for operat ing the circuit breaker in the

connected posit ion.

7.1. LV compartment door

16.1. Breaker compartment door

21.1. Ball grip

21.2. ON & OFF Push But ton (On HT Door)

21.3. Window for the indicators of the w ithdrawable part

- Number of operat ions (Operat ion Counter)

- Closing Spring of the circuit breaker

- Charged - Lable w ith spring symbol

- Discharged - Blank Lable

- Indicator for circuit breaker sw itching status

- Circuit Breaker Closed - " I "

Tripped - " O "

21.4. Opening for Double Bit Key for locking the transfer

operat ing mechanism

21.5. Opening for racking handle for racking the breaker t ruck

21.6. Opening for defeat ing interlock

21.8. Bolts for door locking

Fig. 21a: Opening Elements (for 24kV Panel)

21.1

4.3

4.12

21.2 21.34.11

21.4

21.5

7.1

21.6

21.8

Page 20: Ht Switch Gear & Breakers Manual

19

- Open and close the breaker as long as no high

voltage is applied.

- Without using force check all mechanical and

electromechanical interlocks for sat isfactory

funct ioning. Check to see whether the sw itching

states are indicated correct ly in the control room.

- Check whether the posit ion of the w ithdrawable

t ruck is indicated correct ly (if the appropriate

posit ion sw itches are f it ted refer to the circuit

d iagrams).

3 .2 Checking t he Accessory It em s

The accessory items required must be easily available

in the Sw itchgear Room or an adjacent room . They

include one Hand Crank for t ransferring the t ruck and

for charging the breaker closing spring, a Double Bit

Key for locking the hand-operat ing mechanism , the

basic circuit diagram , Operat ing Instruct ions, Castell

Lock Key (opt ional) and Earthing Sw itch Handle

(Opt ional)

The Hand Crank for t ransferring the t ruck is also

suitable for all M8 bolts.

3.3 Revising t he Circu it d iagrams

If circuits have to be modif ied during installat ion t he

exist ing circuit diagrams are marked up. When work

has been completed make sure that the original

diagrams are revised.

3.4 Space Heaters

For panels installed in hum id atmosphere, space

heaters are f itted in the circuit breaker & cable

compartments. The thermostat controlled heaters

should be sw itched "ON" before taking the panels into

service. The thermostat shall be set to cut of f supply

to heaters at about 5º higher than the maximum

ambient temperature.

Heaters must always be kept "ON" in all the condit ions

(even during maintenance)

Page 21: Ht Switch Gear & Breakers Manual

20

s

BRIEF OPERATING INSTRUCTIONS FOR 8BK80 SWITCHGEAR

Fig 22 : Label on door of breaker compartment

FOR DETAILED DESCRIPTION OF ABOVE OPERATIONS &SPRING CHARGING OF CB,

OPENING OF DOOR, ETC.

REFER CLAUSE 4 OF THIS MANUAL FOR OPERATIONS

Page 22: Ht Switch Gear & Breakers Manual

21

In detail:

- Make sure that the circuit breaker is open, the LV

plug(3.3, fig. 3) and socket connector has been

put together and lock it . The breaker compartment

door is closed.

- The castell key can be re,moved in this posit ion

also for any interlocked operat ions w hich are to be

performed w ith circuit breaker in open posit ion.

- Fit the hand crank (8.2, f ig. 8)to the hexagon

shank in opening (21.5, fig. 21) turn it clockw ise

as far as it w ill go and pull it of f.

- Insert the castell key if it was removed for

interlocked operat ions. Turn the key clockw ise

through 90 degrees f rom posit ion "Manual

Racking" to "Connected posit ion(locked)" and pull it

of f .

4.1.3 Transferr ing t he w ithdraw able par t f rom

the connected posit ion t o the test /

d isconnected posit ion m anually

4.1.3.1 Normal Operat ions

In brief

1st Step 2nd Step 3rd Step

Turn double-bit key Insert and Turn double-bit key

turn hand

crank

as far it w ill

f rom by to go and pull from by to

it of

90° 90°

Fig. 23b

In detail:

- Make sure that the circuit breaker is open.

- insert the double bit key in lock (21.4, f ig. 21) and

turn it ant i-clockw ise through 90 degrees f rom

"connected posit ion (locked)" to "Manual Racking".

The hexagon shank opening (21.5, f ig. 21).is now

accessible. The hand racking mechanism is

unlatched.

- Fit the hand crank (8.2, f ig 8) to the hexagonal

shank in opening (21.5, fig. 21) turn it ant i-

clockw ise as far as it w ill go and pull it of f .

- Turn the double-bit key anti-clockw ise through 90

degrees from the posit ion "Manual Racking" to

"Disconnected posit ion (locked)" and pull it of f .

Opening (21.5, f ig. 21) is now closed.

The hand racking mechanism is now locked.

4. Operat ions

Each row of cubicles is provided w ith brief operat ing

instruct ions. Refer to fig. 22.

4 .1 Withdraw able t ruck

4.1.1 Posit ions o f the w i thdraw able t ruck

Refer clause 1.2.2 for Circuit breaker Chamber

· Service posit ion (connected posit ion )

The circuit breaker is connected w ith the busbars and

the outgoing circuit Auxiliary circuit is connected

through LV plug and socket.

· Test posit ion

The circuit breaker is disconnected from the busbars

and the outgoing circuit . Segregat ion as specified in

IEC 60298 is maintained. The LV circuits are

connected through LV plug and socket .

Disconnected posit ion

The circuit breaker is disconnected from the busbars

and the outgoing circuit . LV circuits are disconnected

by pulling out the LV socket from the plug.

- When the LV plug and socket are connected the

follow ing funct ions can be carried out.

· The breaker can be tested / operated, also from

the control room.

· The breaker compartment door can be opened.

· Funct ions such as ON / OFF indicat ion and

elect rical interlocks can be tested.

- When the LV plug and socket are disconnected.

· The breaker compartment door cannot be

closed. Hence the truck cannot be inserted.

4.1.2 Transferr ing t he w ithdraw able par t f rom

the Test /Disconnected Posit ion m anually

4.1.2.1 Norm al operat ion

In brief :

1st Step 2nd Step 3rd Step

Turn double-bit key Insert and Turn double-bit key

turn hand

crank

as far it w ill

from by to go and pull from by to

it of

90° 90°

Fig. 23a

Page 23: Ht Switch Gear & Breakers Manual

22

4.2 Circu it -breaker operat ing m echanism

The operat ing mechanism is of the stored energy

type. For elect rically operated breakers, motor

automat ically charges the closing spring af ter each

sw it ching operat ion. If the motor supply should fail

the closing spring can also be charged by hand. The

tripping spring is charged each t ime the breaker is

closed.

4.3 Circu it -breaker Operat ion

4.3.1 Charg ing t he closing spring by hand

· Procedu res

If the breaker compartment door

is closed (connected

posit ion) turn plate

(21.6, f ig. 21) so that it

clears opening (21.7,

f ig. 21) inser t the hand

crank and f it it into the

breaker

is open (disconnected

posit ion) f it the hand

crank direct ly to the

breaker operat ing

mechanism in opening

(21.7, f ig. 21).

· Operat ing M echan ism

- Turn the crank unt il t he symbol "spring charge"

appears in view ing w indow (21.3, f ig.21) on

indicator. The operator is not at risk if the motor

supply recovers,because the hand crank f ree-

wheels and detaches in the anti-clockw ise

direct ion.

- Pull the crank off .

4.3.1.1 Breaker ON and OFF

4.3.1.2 Mechan ical ly (locally by means of push

button)

· In the connected posit ion :

Trip mechanism (4.12, Fig. 4 & 21) as far as it w ill

go, hold it there, press but tons "ON" and "OFF"

(21.2, Fig 21) and then release the grip.

· In the disconnected posit ion w ith the door closed :

Press buttons "ON"and "OFF" (21.2, Fig 21) on the

breaker compartment door.

· In the disconnected posit ion w ith the door open :

Press buttons "ON"(4.14, Fig 4) and "OFF" (4.15,

Fig 4) on the breaker t ruck

4.3.1.3 Elect r i cal ly (f rom the control room or

locally)

by means of push but ton/sw itches in the control room

or on the LV compartment door. If the control supply

fails the breaker can always be t ripped mechanically

(see above)

4.1.3.2 Cast el l Key Operat ions (Opt ional)

1st Step 2nd Step 3rd Step

Turn castell key Trun castell key

as far it w ill

from by to go and pull f rom by to

it of

90° 90°

Fig. 23c

In detail:

- Make sure that the circuit breaker is open.

- Turn the castell key (which is trapped in the

mechanism ) ant i-clockw ise through 90º from

"Connected posit ion (locked)" to "Manual Racking".

- In th is posit ion the castell key can be removed for

any interlocked operat ions which are to be

performed w ith circuit breaker in open condit ion.

The hexagon shank opening(21.7,f ig.21)is now

accessible. The hand racking mechanism is

un latched.

- Fit the hand crank (8.2, f ig.8) to the hexagonal

shank in opening (21.5, f ig.21) turn it ant i-

clockw ise as far as it w ill go and pull it of f .

- Inser t t he castell key if it was removed for

interlocked operat ions. Turn the double-bit key

ant i-clockw ise through 90 degrees from the

posit ion "Manual Racking" to "Disconnected

Posit ion(locked)" and pull it of f .

- The castell key can also be removed in th is

posit ion to facilitate the opening of the HT

compartment door and / or other interlocked

operat ions.

4.1 .4 Disconnect ing the LV Plug

- Transfer the w ithdrawable part to the

disconnected posit ion(in accordance w ith clause

4.1.3) and lock it .

- Open the breaker compartment door (refer clause

4.6.1).

- Unlock the LV plug (3.3, f ig. 3) and LV socket (4.5,

f ig. 4 & 16) by turning down the clip.

- Pull of f the plug and at tach it to the holder (4.9,

f ig. 4) which is fixed to the door.

4.1.5 Connect ing t he LV Plug

- Put the LV plug (3.3, f ig.3) and LV socket (4.5,

f ig. 4 & 16) together and lock it w ith the clip.

- Close the breaker compartment door (refer clause

4.6.2).

Page 24: Ht Switch Gear & Breakers Manual

23

4.3.2 Sw itch ing St ate Ind icat ion

In the m iddle part of view ing w indow (21.3, Fig 21)

O' means "OFF", I' means "ON".

DangerPrecau t ions for Safe Working

High Voltage !

Touching live parts w ill result in severe personnel

injury and / or death.

This equipment shall be operated only by qualif ied

personnel w ho have become thoroughly familiar

w ith the operat ing instruct ions manual and in

part icular all the safety inst ruct ions.

4 .5 Ear th ing

4.5.1 Eart h ing of Busbars and Cables

4.5.1.1 Direct Ear th ing of Busbars w i t h

conductors

- Sw itch of f all breakers feeding to the busbars.

- Open upper rear bolted cover & inside covers (of

busbar chamber). Touch all phases w ith an

earthing conductor mounted on the long

insulat ing pole.

- Shor t all the phases w ith a conductor and bolt it to

earth.

- Place necessary warning plates at all not iceable

locat ions.

4.5.1.2 Ear th ing o f Cables w it h conductors

- Sw itch of f the breaker in the panel where cable

earthing is desired.

- Ensure that the cables are not get t ing the supply

f rom the other end.

- Remove the lower rear cover of the cable chamber.

- Follow the procedure described for busbar

earthing.

4 .5.1.3 Rem oving Ear th ing Connect ions

- Disconnect and remove the short ing and earthing

conductors.

- Close the rear cover and bolt it f irm ly.

- Remove the warning plates.

24.1. Fixed Contacts (E sw itch)

24.2. Moving Contact (E sw itch)

24.3. Earthing Sw itch Shaf t

24.4. Operating Link

6.1. Earthing Busbar

Fig 24: Earth sw itch Arrangement on cable side

(Side view )

(Rear view )

6.1 24.3

24.1

24.224.4

Page 25: Ht Switch Gear & Breakers Manual

24

4.5.2 Ear th ing o f Busbars or cab les w it h a

Draw out Truck

Separate drawout Trucks can be supplied opt ionally

for busbar and cable earthing. In case fault making

capacity is required, a circuit breaker is mounted on

such drawout trucks.

· Procedu re

- Remove the circuit breaker or the link drawout

t ruck f rom the panel where earthing is to be done

(refer clause 2.8.1)

- Insert the desired earthing drawout t ruck i.e. cable

or busbar earthing drawout t ruck in the panel

(refer clause 2.11.4)

- Connect the LV plug and socket (refer clause 4.1.5)

- Close the panel door (refer clause 4.5.2)

- Ensure that there is no voltage available on the

parts to be earthed when earthing drawout t ruck

w ithout making capacity is used.

- Transfer the drawout unit to the connected

posit ion (refer clause 4.1.3). In case the earht ing

drawout t ruck has an elect ro-mechanical interlock

unit mounted on it , the t ransfer is possible only

af ter all the interlocking condit ions are sat isfied.

- Lock it in the connected posit ion.

- In case the drawout t ruck has a circuit breaker

mounted on it sw itch "ON" (refer clause 4.2 & 4.3).

- Place the warning plates at all necessary locat ions.

4.5.2.1 Disconnect ion of Eart h ing Draw out t ru ck

- Sw itch "OFF" the breaker in case of earthing

drawout truck w ith making capacity (refer clause

4.3).

- Transfer it to the disconnected posit ion (refer

clause 4.1.3)

- Disconnect the LV plug (refer clause 4.1.4)

- Open the HT compartment door (refer clause

4.6.1)

- Remove warning plates.

- Inser t the original drawout t ruck of the circuit

breaker or l ink drawout truck in the panel (refer

clause 2.11.4)

- Connect the LV plug (refer clause 4.1.5)

- Close the door (refer clause 4.5.2)

- The original drawout truck is now ready for

t ransfer to connected posit ion.

4.5 .3 Ear th ing t he Busbars or Cables w ith

Ear th ing Sw it ch

4.5.3.1 Ear th ing t he Busbars w ith Ear t h ing

Sw it ches

- Sw itch of f the supply to the main busbars.

- Ensure that the supply to the main busbars cannot

be sw itched "ON" from remote points.

- In case the elect ro-magnet ic interlocks, ensure that

all the interlocking condit ions are sat isf ied.

Otherw ise the earthing sw itch cannot be closed.

- Close the ear thing sw itch by insert ing the earthing

sw itch handle in posit ion and turning it in the

clockw ise direct ion t ill stop. Withdraw the handle.

- Place the w arning plates at all necessary locat ions.

4.5 .3.2 Ear th ing Cables w ith Ear t h ing Sw it ch

(f ig .24)

- Move the t ruck to test / disconnected posit ion.

Earthing sw itch cannot be closed unt il this posit ion

is reached.

- Ensure that the cables cannot be energized from

the other end.

- Follow the procedure for Busbar earthing sw itch.

4.5 .3.3 Disconnect ion o f Ear t h ing Sw it ches

- Insert the earthing sw itch handle in posit ion. Turn

it in the ant i-clockw ise direct ion t ill stop. Withdraw

the handle.

- Remove warning plates f rom all the locat ions

4.5.4 Ear th ing t he Busbars or Cables w it h Truck

4.5.4.1 Ear th ing t he Busbars w it h Bus Ear t h ing

Truck

- Sw itch of f the supply to the main busbars.

- Ensure that the supply to the main busbars cannot

be sw itched "ON" from remote points.

- Rack ou the breaker to diconnected posit ion.

- Diengage the LV plug & socket.

- Drawout the nreaker t ruck completely out of the

panel.

- Insert the Bus earthing t ruck in the panel to

diconnected posit ion.

- Connect the LV plug to socket.

- Rack in t he truck to service posit ion.

- Place the w arning plates at all necessary locat ions.

Page 26: Ht Switch Gear & Breakers Manual

25

4.5.4 .2 Ear th ing t he Cables w it h Cable Ear t h ing

Truck

- Move the t ruck to test / disconnected posit ion

- Ensure that the cables cannot be energized f rom

the other end.

- Follow the procedure for Busbar earthing sw itch.

4 .5 .4 .3 Link Type Eat h ing Truck

- Sw itch of f the supply to the main busbars.

- Ensure that the supply to the main busbars cannot

be sw itched "ON" f rom remote points.

- Ensure that the cables cannot be energized f rom

the other end.

- Follow the procedure for Busbar earthing sw itch.

4 .6 Breaker Compartment Door

The door can be opened & closed when the t ruck is in

the disconnected posit ion and the plug & socket

connector for LV cables has been connected together.

The door interlock can be defeated as described

under clause 5.5 below.

4.6.1 To open the door

- Rotate the handle ant i-clockw ise to open the door.

(For upto 15kV)

- Unscrew the door closing bolts of HT compartment

door. The bolts are capt ive (for 24kV Panel)

- Open the door.

4.6 .2 To close t he door

- Shut the door.

- Rotate the handle clockw ise t ill it gets closed. (For

upto 15kV)

- Tighten the capt ive screw in case of bolted door.

4 .7 Door to LV Compar tm en t

4.7.1 To open the door

- Rotate the turnlocks w ith a key in ant i-clockw ise

direct ion or unscrew the capt ive bolts in case of

bolted door.

- Open the door.

4.7 .2 To close t he door

- Shut the door.

- Rotate the turnlock in clockw ise direct ion or

t ighten the bolts in case of bolted door.

Page 27: Ht Switch Gear & Breakers Manual

26

5. Main tenance

DangerPrecaut ions for Safe Work ing

Maintenance, repair and subsequent conversion or

extension work shall be carried out only by

specially trained personnel in accordance w ith the

operat ing instruct ions and/or special conversion

instruct ions. Training and informat ion sessions for

personnel w ill be provided by the competent

Siemens department .

Before start ing any w ork on the panels references

must be made to local regulat ions for high voltage

sw itchgear. Sw itch of f the power supply, close/

open the breaker manually to ensure that the

closing spring of t he breaker is discharged. Then

rack out the truck from service to test posit ion.

Control term inals in the LV compartment must not

be touched if the cont rol supply is not

disconnected.

Non observance w ill result in death and / or severe

personnel in jury or substantial damage to

proper ty.

5.1 Inspect ion Schedu le

- Each year

· Make a general visual check.

· Check whether the accessories are complete

and in proper order.

· Clean and lubricate the wheels as well as

moving parts of the truck and interlocking

plate.

· Relays to be tested for their funct ionality.

· Clean t he Panels (refer clause 5.2)

- Every f ive years

· Transfer the w ithdrawable t ruck to t he

disconnected posit ion.

· Test-operate the circuit-breakers.

· Remove the w ithdrawable t rucks (refer clause

2.7.1) and carry out all maintenance work, also

on the sw itching devices.

· Clean the panels (refer clause 5.2) and check

the connect ions.

· Lubricate all bearing surfaces, bearings and

art iculated jo ints.

· Reinsert the w ithdraw able t rucks.

· Check the sw itchpanel funct ions and put the

board back into service.

If work has to be carried out in the panels; isolate the

board, make sure that it cannot be made live again,

check its isolated state and earth and short-circuit the

feeders and where applicable, the busbars. Adhere to

all regulat ions and safety measures, maintain and

service the built -in equipment , e.g. circuit -breakers,

voltage t ransformers, current t ransformers, relays,

meters, protect ive devices, etc. in accordance w ith

their operat ing inst ruct ions.

Before removing the front plate of the breaker

operat ing mechanism discharge the closing and

tripping springs. Follow the instruct ions given on the

mechanism housing.

Only standard tools are required. Put the sw itchgear

back into service as described under clause 3 above.

Service t he sw itchgear at shor t er in tervals i f the ai r

is very moist or f u l l o f dust or is otherw ise

pol luted. The cause of any disturbance or short-

circuit must be determ ined immediately and

damaged parts replaced, irrespect ive of whether an

inspect ion is due or not.

5.2 Clean ing

Caut ionFor Safet y

For safety reasons, cleaning of panels shall be

taken up only when the shutdown of Main &

Auxilliary Power supply is taken, the breaker is in

the open state, closing spring of the breaker is

discharged & the breaker t ruck is removed out of

the panel.

Cleaning Agents

Perchlorethylene, 1.1.1 t richloroethane, small

brushes, dusters and vacuum cleaner for sheet metal

parts.

Note:

Trichlorethylene, perchloroethylene and

tetrachloroethylene have a harmful ef fect on cast

resin parts and must not come into contact w ith

them .

Cast resin parts should be cleaned w ith dist illed w ater

on ly.

Silver plated and other contact surfaces to be cleaned

w ith clean cloth.

Page 28: Ht Switch Gear & Breakers Manual

27

5.3 Lubricat ion

Immediately af ter cleaning:

- Lubricate the isolat ing contacts and their mat ing

contacts w ith neutral grease.

- apply a film of neut ral grease to the bearings and

art iculated joints of the operat ing mechanisms, to

the w ithdrawable parts and shutters, and to the

door hinges and locks.

Recommended neutral greases are:

( i) SERVOGEM 2 (mult ipurpose) of Indian Oil

Corporat ion make

(ii) Mult ipurpose grease H' of Hindustan Petroleum

Ltd. make

(ii i) Any other chem ically neutral grease which can

w ithstand temperature up to 15° C.

5.4 Replacemen t Par t s

Items such as post insulators, bushings mating

contacts, measuring inst ruments, current

t ransformers etc., can be replaced. If replacement is

likely to prove dif f icult ask the nearest Siemens

representat ive in good t ime for deputat ion of suitable

personnel. The representat ive w ill also assist you in

deciding w hat spare parts to keep in stock.

When ordering spare parts and units give the

follow ing details:

- Type and Serial No. of the sw itchboard (see

nameplate).

- Exact descript ion of the unit or part , referring to

the appropriate operat ing instruct ions w here

applicable, or to a draw ing; sketch or circuit

diagram. Use reference list of items in Sect ion 8.

DangerPrecau t ions for Safe Working

High Voltage !

Touching live parts w ill result in severe personnel

injury and / or death.

This equipment shall be operated only by qualif ied

personnel w ho have become thoroughly familiar

w ith the operat ing instruct ions manual and in

part icular all the safety inst ruct ions.

5.5 Defeat ing t he Door In ter lock o f HV

Compar tm en t

Caut ion : Take utm ost care w hi le defeat ing any

in ter lock as t he defeat operat ion leads to access t o

the areas / par t s w h ich are l ikely to be l ive.

5.5.1 Draw out Un it in Connected Posit ion

The breaker compartment door interlock should only

be cancelled if the truck cannot be transferred to the

disconnected posit ion and the situat ion cannot be

cleared in any way.

- Sw itch of f the circuit -breaker.

- Make sure that the busbars are not live.

- Insert a small screw driver in the opening (21.6,

f ig. 21) and screw -in the grub screw visible

through the opening.t ill it falls out inside the

panel.

- Open the door by turning the door handle.(refer

clause 4.5.1).

5.5.2 Draw out Un it in disconnected posit ion

- Press the interlocking lever on interlocking plate by

hand.

- Insert the double-bit key in lock(21.4, fig.21) and

turn it ( locked) to "Manual Racking".

- Fit the hand crank (8.2, f ig. 8) to the hexagon

shank in opening turn it clockw ise as far as it w ill

go and pull it of f(21.5, f ig.21).

Turn the double-bit key clockw ise through 90º f rom

posit ion "Manual Racking" to "Connected

Posit ion(locked)" and pull it of f .

5.5.3 Restoring the Door In terlocks

Af ter carrying out the operat ions to defeat the door

interlock as described in clause 5.5.1 or clause 5.5.2,

the door of the HV compartment can be closed and

interlocks can be restored by follow ing the

procedures in clause 5.5.1 in the reverse sequence.

Page 29: Ht Switch Gear & Breakers Manual

28

6. Disposal of Product

This product is environmentally compat ible.

The follow ing materials have been used to make up

the device : Steel, Copper, Alum inium, Cast-resin

glass-f ibre-reinforced thermoplast ics, rubber,

porcelain, greases & sim ilar materials. PVC is used as

an insulat ion material for control w ires.

In disposal, priorit y must be given to re-use of the

materials which can be recycled.

In as-supplied-condit ion, the product does not

incorporate any hazardous substances.

In operat ion, the product does not emit any

hazardous materials or gases.

During disposal of the product , care must be taken to

dismantle as far as possible in more environmentally

accepted way as Recyclable & Non-cyclable scraps i.e

steel, copper, alum inium, rubber, PVC, cast-resin &

glass-f ibre-reinforced materials to be segregated

properly.

The Re-cyclable materials like Steel, Copper,

Alum inium can be reused.

Non cyclable materials like Cast-resins, glass-f ibre-

reinforced etc can be broken in to pieces & can be

used as secured land f illing materials.

Rubber being biodegradable material must be

recycled through authorized contractors.

PVC material should not be burnt as they may release

Halogenated hydrocarbons which can af fect the

ozone layer. Therefore, PVC must be recycled through

authorized contractors.

Local Siemens of f ice can answer any questions

concern ing disposal.

Page 30: Ht Switch Gear & Breakers Manual

29

7 Summary of Import ant Inst ruct ions-

DON'Ts

(1) Do not leave any equipments or tools in the

panel.

(2) Do not put hands or tools in operat ing

mechanism when electrically operated.

(3) Do not operate the breaker during cleaning

process.

(4) Do not use any other chem ical or grease for

clearing or lubricat ing other than mentioned

in these inst ruct ions.

DOs

During Inst al lat ion & Comm ission ing Stages :-

(1) Brush t he contact surfaces properly before

bolt ing busbars. Also grease the jo ints &

apply proper torque on the bolts.

(2) Check rated voltages of equipments such as

motor, closing & tripping releases mounted

in the operat ing mechanism w ith the

available auxiliary supply to be connected

to these equipments in the substat ion.

(3) Ensure that all the foundation bolts are

t ightened along w ith the square washer and

also seal of all control and power cable

cutouts to prevent verm in entry.

During ser vice l if e of the panel-

(4) Keep door & covers f irm ly closed to prevent

entry of dust, moisture, insects etc.

(5) Ensure spring charging handle & manual

handle are available easily.

(6) Decide maintenance schedule based upon

(a) no. of short circuit operat ions,

(b) frequency of breaker ON/OFF operat ions,

(c) pollut ion level (d) hum idity, etc.

(7) Isolate & earth the breaker before carrying

out maintenance & ensure it is in OFF

posit ion & springs are discharged

completely before cleaning.

(8) Ensure that the shut ters are close and pad

locked before start ing the maintenance or

cleaning of the panels.

(9) Depending on site condit ions, inspect

- the interior of the panels for dust ,

cobwebs etc. & clean them.

- porcelain insulators & clean them ,

- operat ing mechanism parts such as

plungers of releases, moving joint s etc. &

clean them , and

- funct ioning of space heaters.

(10) Lubricate moving par ts w ith lubricants

provided for the breaker.

(11) Check insulat ion resistance w ith a megger

before putt ing the breaker back into service.

(12) Keep a log-book for each panel.

(13) Follow inst ruct ions given in the operat ing

manual.

(14) Ensure panel operat ions, maintenance etc.

is done by t rained persons.

(15) Operate the defeat interlock of CB door only

in case of emergency.

Page 31: Ht Switch Gear & Breakers Manual

30

8 Addit ional In format ion

8.1 Reference List o f Items

6.2 Bushings of lower mating contact Fig 6, 17

6.3 Current Transformer Fig 6

6.4 Cable Connect ion Pieces Fig 6

6.5 Wiring Cover Fig 6

6.6 Gland Plate for Poer Cables Fig 6, 18

7.1 LV Compartment Door Fig 7, 21, 21a

8.1 Charging Handle Fig 8

8.2 Cranking Handle Fig 8

8.3 Double Bit Key Fig 8

8.4 Rod Trap Key Fig 8

8.5 Earthing Sw itch Handle Fig 8

10.1 End Covers Fig 14

10.2 Pressure relief channel for

cable terminat ion compartment Fig 14

10.3 Pressure Relief f laps Fig 14

16.1 Breaker Compartment door Fig 16, 20,

21, 21a

16.2 Upper metallic shutter Fig 16, 19

16.3 Lower metallic shut ter Fig 16, 19

16.4 Space Heater Fig 16, 17

17.1 Fixed Contacts (Upper) Fig 17

17.2 Fixed Contacts (Lower) Fig 17

17.3 Earthing Strip Truck Fig 17

18.1 Extension Links Fig 18

18.2 Earthing strip from CB Chamber Fig 18

19.1 Shutter operating rod Fig 19

19.2 Roller Guide Angle Fig 19

19.3 Truck guide Fig 19

21.1 Ball grip Fig 21a

21.2 ON & OFF Push Button

(On HT Door) Fig 21, 21a

21.3 Window for the indicators of

the breaker truck Fig 21, 21a

21.4 Opening for Double Bit Key Fig 21, 21a

21.5 Opening for the cranking handle

for racking the breaker truck Fig 21, 21a

21.6 Opening for defeat ing interlock Fig 21, 21a

21.7 Door Handle Fig 21

21.8 Door locking bolts (for 24kV Panel) Fig 21a

24.1 Fixed Contacts (E. Sw itch) Fig 24

24.2 Moving Contact (E. Sw itch) Fig 24

24.3 Earthing Sw itch Shaf t Fig 24

24.4 Operating Link Fig 24

2.1 Circuit Breaker Compartment Fig 2

2.2 Cable & CT Compartment Fig 2

2.3 Busbar Compartment Fig 2

2.4 Low Voltage Compartment Fig 2

2.5 Breaker Truck Fig. 2, 20

3.1 Vacuum Interrupter Fig 3

3.2 Insulat ing Sw itching Rod Fig 3

3.3 LV Socket on truck Fig 3

3.4 Contact Arm Fig 3

3.5 Truck Handle Fig 3

3.6 Cast Resin Insulator Fig 3

3.7 Guide Roller on t ruck Fig. 3

3.8 PP Tube Fig. 3

3.1.1 Pole Flange (Upper) Fig 3.1

3.1.2 Pole Flange (Lower) Fig 3.1

3.1.3 PT on the truck Fig. 3.1

3.2.1 Mechanical ON' Push Button Fig. 3.2

3.2.2 Mechanical ON' Push Button Fig. 3.2

3.2.3 Spring Charging Opening Fig 3.2

3.2.4 Spring Charge Indicat ion Fig 3.2

3.2.5 Mechanical ON & OFF' Indication Fig 3.2

3.2.6 Mechanical Operat ion Counter Fig 3.2

3.2.7 Earthing Pin for Truck Fig 3.2

4.1 Door Locking hinge pin Fig 4, 21

4.2 Door close interlock Fig 4

4.3 View ing w indow for truck posit ion Fig 4

4.4 View ing w indow for Spring charge

Indicator and Mechanical Counter Fig 4

4.5 LV connection Plug Fig 4

4.6 Drive Mechanism housing Fig 4

4.7 Ramp Fig 4

4.8 Interlocking Plate (Drive Box) Fig 4

4.9 Holder for LV Socket Fig 4

4.10 Clip for locking LV Plug to Breaker Fig 4

4.12 Trip mechanism for operat ing the

breaker in service posit ion Fig 4

4.13 Rod Lever Fig 4

5.1 Bushings of upper mating contact Fig 5, 17

5.2 Cast resin insulator Fig 5

5.3 Feeder connections Fig 5

5.4 Busbars Fig 5

6.1 Main Earth Busbar Fig 6, 18

Page 32: Ht Switch Gear & Breakers Manual

31

8.2 Join t ing Torques

Sr. No. Type of Join t Torque (Nm ) ± 10%

Size of Bolt M8 M10 M12 M20

Property Class 6.6 8.8 8.8 8.8

1 Steel to Steel 32 65 115 -

2 Steel w ith Insulator 16 32 77 170

3 Busbar Joint 20 40 70 -

4 Busbar w ith Steel 20 40 70 -

Note: The Values given in the table above are for Tigh t en ing Torques. For test ing the joint 70% of above

values are to be considered as Checking Torque.

When ordering spare parts state the follow ing:

1. Type designat ion, Rat ing, Year of manufacturing of the panel as stated on the rat ing plate.

2 . The designat ion of part , as located from the photograph or sketch given in this manual.

3 . The descript ion of the part as given in the reference list on page 29.

4. In case the item is not listed below or is not shown in any of the photograph or sketch, please communicate

w ith, brief descript ion of the part and its locat ion in the panel.

5 . Alternat ively, a sample may be submit ted.

Page 33: Ht Switch Gear & Breakers Manual

Siemens Ltd.PTD-03-152-015

This replaces PTD-03-152-003

Siemens Lt d.

Power Transm ission & Distr ibut ion Division

Medium Voltage Switchgear

Thane Belapur Road,

Thane 400 601.

Tel. : +91-22-760 0135

Fax : +91-22-760 0134 Order No. 4-XXBXX-03-17231-101

'Product development is a continuous process. Consequent ly, the

data indicated in this Booklet is subject to change w ithout prior

not ice. For the latest informat ion please contact our Sales Of fices.'

030001

Page 34: Ht Switch Gear & Breakers Manual

s

Page 35: Ht Switch Gear & Breakers Manual
Page 36: Ht Switch Gear & Breakers Manual
Page 37: Ht Switch Gear & Breakers Manual

s

Page 38: Ht Switch Gear & Breakers Manual
Page 39: Ht Switch Gear & Breakers Manual
Page 40: Ht Switch Gear & Breakers Manual
Page 41: Ht Switch Gear & Breakers Manual
Page 42: Ht Switch Gear & Breakers Manual
Page 43: Ht Switch Gear & Breakers Manual
Page 44: Ht Switch Gear & Breakers Manual
Page 45: Ht Switch Gear & Breakers Manual
Page 46: Ht Switch Gear & Breakers Manual
Page 47: Ht Switch Gear & Breakers Manual
Page 48: Ht Switch Gear & Breakers Manual
Page 49: Ht Switch Gear & Breakers Manual
Page 50: Ht Switch Gear & Breakers Manual
Page 51: Ht Switch Gear & Breakers Manual
Page 52: Ht Switch Gear & Breakers Manual
Page 53: Ht Switch Gear & Breakers Manual
Page 54: Ht Switch Gear & Breakers Manual
Page 55: Ht Switch Gear & Breakers Manual
Page 56: Ht Switch Gear & Breakers Manual
Page 57: Ht Switch Gear & Breakers Manual
Page 58: Ht Switch Gear & Breakers Manual
Page 59: Ht Switch Gear & Breakers Manual
Page 60: Ht Switch Gear & Breakers Manual
Page 61: Ht Switch Gear & Breakers Manual
Page 62: Ht Switch Gear & Breakers Manual
Page 63: Ht Switch Gear & Breakers Manual
Page 64: Ht Switch Gear & Breakers Manual
Page 65: Ht Switch Gear & Breakers Manual
Page 66: Ht Switch Gear & Breakers Manual
Page 67: Ht Switch Gear & Breakers Manual
Page 68: Ht Switch Gear & Breakers Manual
Page 69: Ht Switch Gear & Breakers Manual
Page 70: Ht Switch Gear & Breakers Manual
Page 71: Ht Switch Gear & Breakers Manual
Page 72: Ht Switch Gear & Breakers Manual
Page 73: Ht Switch Gear & Breakers Manual