Top Banner
How to Build A 21st Century Facility Management Program Sunday, June 8, 2014 1:00 pm – 2:15 pm, Hidalgo Presented by: Daniel Connors, Project Manager, City of Buffalo, New York David Raffin, Senior Vice President, CannonDesign Facility Optimization Solutions Strong urban futures rarely develop on their own. Recognizing this, the City of Buffalo implemented a multi-year, multi- phase plan to update their facility management systems and create a 21st – century system capable of helping them make informed asset management decisions. This presentation details how the city and Facility Optimization Solutions developed this plan with technologies and strategies that empower the city to best manage 3.3 million square feet of civic space and drive maximum results. ABOUT THE SPEAKERS DAN CONNORS is a manager and hands-on engineer with 35 years of experience in facility management and engineering; to include project management, design engineering, construction management, operational maintenance, and energy management. He currently works for the City of Buffalo Department of Public Works/Division of Buildings, and the United States Air Force Reserves. He is the Acting Principal Engineer/Electrical Engineer for the City’s Office of Planning and Design, and Chief of Engineering Services for the 622 nd Civil Engineer Flight at Dobbins-ARB, Atlanta, Georgia. Dan led the development of the Facility Condition Assessment project for the City of Buffalo. He introduced the city to facility management practices used by the USAF, developed the RFP and FCA project contract deliverables and persuaded the city’s administration to fund the project. DAVID RAFFIN has more than 30 years of diverse experience in management, service and business development. David brings a strong knowledge of the corporate, government and education sectors to his leadership role with CANNONDESIGN’s Facility Optimization Solutions (FOS) team. He is focused on marketing the firm globally and seeking out new ideas and technologies that help the FOS team empower clients to manage their facilities and operations more efficiently, effectively and sustainably.
29

How to Build A 21st Century Facility Management Program

Nov 18, 2021

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: How to Build A 21st Century Facility Management Program

How to Build A 21st Century Facility Management Program

Sunday, June 8, 2014 ▪ 1:00 pm – 2:15 pm, Hidalgo

Presented by: Daniel Connors, Project Manager, City of Buffalo, New York

David Raffin, Senior Vice President, CannonDesign Facility Optimization Solutions Strong urban futures rarely develop on their own. Recognizing this, the City of Buffalo implemented a multi-year, multi-phase plan to update their facility management systems and create a 21st – century system capable of helping them make informed asset management decisions. This presentation details how the city and Facility Optimization Solutions developed this plan with technologies and strategies that empower the city to best manage 3.3 million square feet of civic space and drive maximum results. ABOUT THE SPEAKERS DAN CONNORS is a manager and hands-on engineer with 35 years of experience in facility management and engineering; to include project management, design engineering, construction management, operational maintenance, and energy management. He currently works for the City of Buffalo Department of Public Works/Division of Buildings, and the United States Air Force Reserves. He is the Acting Principal Engineer/Electrical Engineer for the City’s Office of Planning and Design, and Chief of Engineering Services for the 622nd Civil Engineer Flight at Dobbins-ARB, Atlanta, Georgia. Dan led the development of the Facility Condition Assessment project for the City of Buffalo. He introduced the city to facility management practices used by the USAF, developed the RFP and FCA project contract deliverables and persuaded the city’s administration to fund the project. DAVID RAFFIN has more than 30 years of diverse experience in management, service and business development. David brings a strong knowledge of the corporate, government and education sectors to his leadership role with CANNONDESIGN’s Facility Optimization Solutions (FOS) team. He is focused on marketing the firm globally and seeking out new ideas and technologies that help the FOS team empower clients to manage their facilities and operations more efficiently, effectively and sustainably.

Page 2: How to Build A 21st Century Facility Management Program
Page 3: How to Build A 21st Century Facility Management Program

Dan Connors, Project Manager

Buffalo, New York 716-851-5852 [email protected]

David Raffin, Senior Vice President Cannon Design

INTRODUCTION

Page 4: How to Build A 21st Century Facility Management Program

Project Background Strategic Goals & Objectives Project Deliverables Lessons LearnedQ&A

OBJECTIVE

Page 5: How to Build A 21st Century Facility Management Program

Facility Management Life Cycle ProcessPre-Design

Services

Architecture & Engineering Services

Post Construction

Services

FacilityManagement

Services

Budgeting &Estimating

Programming &Planning

A/E & IndustrialEngineering

Interior Design

Program & Construction Management

Commissioning& Start-up

SiteManagement

MoveManagement

Real EstateDevelopments

Operations ,Maintenance &

Energy

Asset Management& Financing

OperationsAnalysis

Fa

cil

ity

M

an

ag

em

en

t

StrategicFacilitiesPlanning

Page 6: How to Build A 21st Century Facility Management Program

Analyzed our mission

statement and business model, then created a vision on how we going to accomplish our mission going forward

Performed a gap analysis to identify challenges, and prioritized efforts

Aligned challenges to strategic goals and objectives (solutions)

PROJECT BACKGROUND

Page 7: How to Build A 21st Century Facility Management Program

GOAL 1

Develop and prepare a Comprehensive Facility Management Plan

# OBJECTIVE PROJECT DELIVERABLE

1.1

Develop and prepare a comprehensive Facility Management Plan. The plan shall include, but not limited to, the following areas: 1) Administration of the plan, 2) Planning and Assessment, 3) Building Maintenance Categories, 4) Building Maintenance Standards, 5) Work Orders, 6) Building Safety Inspection Program, and 7) Miscellaneous Provisions

Deliverable 14

STRATEGIC GOALS & OBJECTIVES

Page 8: How to Build A 21st Century Facility Management Program

Multiphase 5 year Implementation2006 20092007 2008 2010 2011

Phase 1Document

Management Phase 2Space

And Emergency

Preparedness

Phase 3Enterprise

Crisis Management

Phase 4Maintenance Management

Fleet ManagementStrategic Plan Phase 5

Strategic and Capital planningReal estate and Property

ManagementMove Management

Energy ManagementEnvironmental Sustainability

Page 9: How to Build A 21st Century Facility Management Program

A comprehensive facility condition assessment of

City owned and operated buildings

Planning, Programming, Budgeting & Construction Process

Computerized Maintenance Management System

DELIVERABLE #1

Page 10: How to Build A 21st Century Facility Management Program

Inventory system equipment recording nameplate

information by Daily Operations

Each piece of equipment was tagged with a unique bar code, then recorded in Archibus, CMMS database

Bar codes allow equipment database to be developed to retrieve drawings and reference materials by technicians in field

DELIVERABLE #2

Page 11: How to Build A 21st Century Facility Management Program

Construction cost estimate by Baer Associates

RS Means used to determine deficiency costs by the condition assessors

Normalize costs – identified proper local cost sources and factors to ensure that all estimates are appropriate for Buffalo

DELIVERABLE #3

Page 12: How to Build A 21st Century Facility Management Program

Field measurement/laser scanning of floor plans for

all City buildings by Cannon Design

Created AutoCAD floor plans for each building to AIA layering standards and level II details

Convert City’s mechanical drawings to AutoCAD

Archibus Space Management Module – Leases

DELIVERABLE #4

Page 13: How to Build A 21st Century Facility Management Program

Preventive Maintenance Plans and Manpower Report

Developed maintenance plans on all equipment inventoried for PM Program

Manpower Report details labor requirements for PM Program and corrective maintenance per IMFA standards

Report used as justification for budget increase requests

DELIVERABLE #5

Page 14: How to Build A 21st Century Facility Management Program

VFA Facility Software Training by VFA

VFA Facility online database hosted by VFA, that stores the data from our condition assessment

Allows us to customize and use the condition assessment data

DELIVERABLE #6

Page 15: How to Build A 21st Century Facility Management Program

Distressed Buildings and Disposition List

Provides a list of buildings with a Facility Condition Index (FCI) of 60% or greater to be considered for liquidation

Capital funding Return on Investment (ROI)

DELIVERABLE #7

Page 16: How to Build A 21st Century Facility Management Program

Capital Planning by Cannon Design

Recapitalization Strategy

5 Year Capital Needs List, Work Program, Distressed Buildings & Disposition List, and Executive Committee Priorities & Funding

5 Year Capital Program

DELIVERABLE #8

Page 17: How to Build A 21st Century Facility Management Program
Page 18: How to Build A 21st Century Facility Management Program

One (1) Year of Archibus maintenance and support

by Rand Corporation

Includes user technical and training support needed during the software application learning curve

DELIVERABLE #9

Page 19: How to Build A 21st Century Facility Management Program

VFA Facility Software

48 months for unlimited users

Budgeting tool – funding impact on FCI

Reports – 101, 111, & 131

DELIVERABLE #10

Page 20: How to Build A 21st Century Facility Management Program

Archibus setup by Cannon Design and Rand – Archibus

is a facility management software application used to integrate all aspects of the Division of Buildings’ operations.

Setup and organize on City’s server per the MIS Department requirements

Load data from condition assessment, equipment inventory, drawings, & photos in Archibus, and setup tables and reports

DELIVERABLE #11

Page 21: How to Build A 21st Century Facility Management Program

Operations Module setup

Web frontend for Work Wizard

On-Demand Work Orders

Preventative Maintenance Program

DELIVERABLE #11 (cont’d)

Page 22: How to Build A 21st Century Facility Management Program

Space Management setup

CAD overlay with design management

Document Management – Check in & out drawing online, and manage drawing files electronically

DELIVERABLE #11 (cont’d)

Page 23: How to Build A 21st Century Facility Management Program

VFA Facility integration to Archibus by Cannon

Design and VFA

Allows updates to VFA Facility or Archibus to be automatically in both databases

DELIVERABLE #12

Page 24: How to Build A 21st Century Facility Management Program

Annual maintenance on VFA Facility and Archibus

integration by Cannon Design and VFA

DELIVERABLE #13

Page 25: How to Build A 21st Century Facility Management Program

Planner/Scheduler services for 1 Year by EGW Personnel

Staffing

Assist the Assessment and Equipment Inventory Teams during data collection

Developed and prepared a comprehensive Facility Management Plan

Setup and operated the DOB Call Center: On-Demand work orders, PM Program, and CMMS practices & procedures

DELIVERABLE #14

Page 26: How to Build A 21st Century Facility Management Program

FMP

PLANNING & DESIGN

OPERATIONSProject Data

VFA.FACIILTY•FCA w/ Sanity Check & Cost Normalization•Budget Module•Capital Plan: 5 yr Needs List, Distressed Buildings, & 5 yr Capital Program•Reports/KPI

ARCHIBUS•Operations & Space Mgmt Modules up and running•On-Demand Work Orders w/ web interface•Call Center•Reports/KPI

• FCA•Equipment Inventor•PM Tasks•Drawings•Other (Gap Analysis)

Integration

DIVISION OF BUILDINGS

Page 27: How to Build A 21st Century Facility Management Program

Have a good stress management plan in place before

you start – it’s a long haul

Communicate, Communicate, & Communicate

Set realistic Goals & Objectives, and develop project phases – have an implementation strategy

Stay focused on the goal(s), but be adaptive

LESSONS LEARNED

Page 28: How to Build A 21st Century Facility Management Program

Ensure RFP Evaluation Team understands the alignment

of goals & objectives with project deliverables

Hire Resultants, not Consultants – understand their business model and capabilities

Be respectful – scope creep & timelines effect budgets

Understand the condition assessment methodology, and how the data will be used

LESSONS LEARNED (cont’d)

Page 29: How to Build A 21st Century Facility Management Program