Hospitality Division. Prefab Panel System. Luxury Bath and Flooring. PREFAB PANEL. Aluminum Honeycomb. Aluminum Sheet. Aluminum Sheet. Natural marble. Prefab Panel with Honeycomb Backing Usage: Wall Panel, Cladding, Curved Panel. PREFAB PANEL. Prefab Panel with Fiberstone Backing - PowerPoint PPT Presentation
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Hospitality  Division

Hospitality Division

Luxury Bath and FlooringPrefab Panel System

Page 2: Hospitality  Division

PREFAB PANEL Prefab Panel with Honeycomb

Backing Usage: Wall Panel, Cladding, Curved

PanelAluminum

Sheet

Aluminum Honeycomb

Aluminum Sheet

Natural marble

Page 3: Hospitality  Division

PREFAB PANEL Prefab Panel with Fiberstone

Backing Usage: Floor Panel, Pattern flooring,

high-strength requested

Page 4: Hospitality  Division

SYSTEM ADVANTAGES Light-weight panels

Ease handling for semi-skilled workers Watertight

Suitable for shower & bath Adapt to your design vision.

More stone choices to use such as limestone, sandstone, marble, granite & onyx

Match with site tolerances Proven high speed production

300 bathrooms per month

Page 5: Hospitality  Division

INSTALATION ADVANTAGES

Major work done in factory

Reduce Site work Fast installation Improve workmanship No wet work on site No waste/debris on site

Page 6: Hospitality  Division

ECONOMICAL ADVANTAGES

Early back to business Short installation lead time Clean & Quiet site Renovation along with normal business operation is possible

Better Quality Highest standards of workmanship Easily retrofitted

Save building cost Less building weight (Only drywall needed) Less natural stone used Less site debris Less experienced labor required Less transportation cost

Page 7: Hospitality  Division

GENERAL COMPARISON

Page 8: Hospitality  Division

PRODUCTION PROCESS

Page 9: Hospitality  Division

INSTALLATION SEQUENCE

Page 10: Hospitality  Division

SITE INSTALLATION

Bath Tub & Frame

Page 11: Hospitality  Division

INSTALLATION: 4-DAY CYCLEAM PM AM PM AM PM AM PM AM PM

INSTALLATION PERIOD

PREPARATORY WORKS

MATERIAL PACKAGING

SITE PROGRESSFOR 5 WORKERS' TEAM STEP 0

2 CARPENTERS LEVELLING SCREED

1 STONELAYER1 PAINTER

1 MEP WORKER STEP 1

1. TUB/FRAME NEXT ROOM

ADVANTAGES: 2. CONNECT PIPES

1. ONLY 30% OF CONVENTIONAL SITE LABOR 3. PRESSURE TEST STEP 2 STEP 0 NEXT RM

2. ONLY 30% OF CONVENTIONAL SITE TIME 4. VANITY WALLS 1. WALL PANELS LEVELLING SCREED

3. FACTORY STANDARD WORKMANSHIP 2. MIRRORS

3. TUB APRON STEP 3

4. GLASS RAILS 1. CEILING PANELS

5. VANITY COUNTER 2. CORNICES STEP 4

6. SHOWER TRAY 3. FLOOR PANELS 1. PAINT FINAL COAT

4. SKIRTING 2. JOINT REPAIR STEP 5

5. DOOR FRAMES 3. WALL COVERING 1. SANITARY WARES

6. MEP WIRING 4. GLASS DOORS 2. FITTING STEP 6

5. WOOD DOORS 3. ACCESSORIES 1. CLEANING

4. LIGHTINGS 2. PROTECTION

5. SOCKET/SWITCH 3. HANDOVER

AM PM AM PM AM PM AM PM AM PMDATE:2005-9-20 DAY 3 DAY 4-DAY 5 -DAY 1 DAY 1 DAY 2

DESCRIPTION -DAY 5 -DAY 1 DAY 1PREPARATORY PERIOD INSTALLATION PERIOD

DAY 2 DAY 3 DAY 4

PREPARATORY

STEP 1

START

1. Dry walls OK2. Anchor bolts3. MEP lead-ins4. Waterproofing

PACKAGE 0LEVELLING SCREED

+ TOOLS

PACKAGE 11.BATH TUB/FRAME

2.PLUMB PIPES3.VANITY WALLS4.INSTALL TOOLS

PACKAGE 21.WALL PANELS2.BATH APRON

3.VANITY4.SHOWER TRAY

5.GLASS RAIL6.MIRROR

7.GLUE/TOOLS

PACKAGE 31.CEILING PANELS

2.CORNICES3.FLOOR PANELS

4.SKIRTING5.DOOR FRAME6.MEP WIRING

7.ACCESSORIES8.TOOLS

PACKAGE 41.CEILING PAINT FINAL COAT

2.REPAIR WALL JOINTS3.LAY WALL COVERING

4.INSTALL GLASS DOORS5.INSTALL WOOD DOORS6.ACCESSORIES/TOOLS

PACKAGE 51.SANITARY WARES

2.FITTINGS3.LIGHTINGS

4.SOCKET/SWITCH3.ACC/TOOLS

waterprooftest OK

INSTALLATION PERIOD=4 DAYS

STEP 2 STEP 3 STEP 4 STEP 5 STEP 0STEP 0

Page 12: Hospitality  Division

FINISHED PROJECT: Macau Ponte 16 Resort

Installation of 404 bathrooms in just 48 days.

Product Used: Prefab with honeycomb; wall & flooring

Comparison Conventional

Method:160 Skilled Workers50 Cleaners

Prefab System:40 Semi-Skilled

Workers8 Skilled Workers10 Cleaners

Page 13: Hospitality  Division

MACAU PONTE 16 RESORT

Page 14: Hospitality  Division

MACAU PONTE 16 RESORT

Page 15: Hospitality  Division

FINISHED PROJECT: Singapore Marina Bay Sands

Installation of 2797 bathrooms in just 69 days.

Product Used: Prefab with honeycomb; wall & flooring

Comparison Conventional

Method:762 Skilled Workers60 Cleaners

Prefab System:122 Semi-Skilled

Workers61 Skilled Workers20 Cleaners

Page 16: Hospitality  Division

SINGAPORE MARINA BAY SANDS

Page 17: Hospitality  Division

SINGAPORE MARINA BAY SANDS

Page 18: Hospitality  Division

FINISHED PROJECT: Venetian, Macau

Installation of 1,200 m2 Waterjet Pattern in just 15 days.

Product Used: Prefab panel with fiberstone; flooring

Comparison Conventional

Method:10 Skilled Workers2 Cleaners

Prefab System:2 Semi-Skilled

Workers2 Skilled Workers1 Cleaners

Page 19: Hospitality  Division

VENETIAN, MACAU

Page 20: Hospitality  Division

MORE PREFAB STONE PRODUCTS

1.5 mm thk Slate Veneer 3 mm thk semi transparent Onyx

Panel Floor / Wall Panel

Patterns or Inlays Hairline / 1 mm Joint

Shower Panel Curved Panel

1/5 weight to original 30mm stone

Page 21: Hospitality  Division

For more information visit us at:www.terracorepanels.com

2030 Irving BlvdDallas, Texas 75207

(214) 749-0999