Hindmarsh Drive Intersections(Eggleston Crescent, Launceston Street and
Tuggeranong Parkway Southbound Off-Ramp)
Neil Pincombe – Strategic Planning & DevelopmentKarl Cloos – Strategic Planning & DevelopmentJohn Hillman – Capital Works Design & Delivery
John Randall - Indesco
Background
• Hindmarsh Drive• Increasing traffic volume• Speed of traffic 80 kph• Three lanes in each direction
• Launceston Street / Eggleston Crescent• Increasing number of crashes• Difficult to access / exit suburbs
• Growing number of complaints• ACTION redirecting bus services
• Close Eggleston Crescent / Reopen McDonald Street• Impacts on local residents in MacDonald Street• Delays on Hindmarsh Drive (4-way signals)• Additional works on adjacent road network
(i.e. MacDonald Street / Eggleston Crescent)
• Provide accelerations lanes• Safety concerns when merging at high speed• Insufficient distance to cross three lanes
Options AnalysisEggleston / Launceston
• Roundabouts • Do not work with dominant traffic flows• Not enough space
• Reducing Hindmarsh Drive to two lanes• Large reduction in traffic flow on arterial route• Increased congestion / journey time• Increased congestion = decreased safety
• Traffic Signals (using existing intersection layouts)• Considered feasible
Recommended OptionTuggeranong P/Way
DRAFTDESIGN
Recommended OptionLaunceston Street
DRAFTDESIGN
Recommended OptionEggleston Crescent
DRAFTDESIGN
Way Forward
• Preliminary Sketch Plan – May 2016• Public Presentation (WVCC) – May 2016• Complete Detailed Design – July 2016• Bid for construction funding already submitted
• Subject to receiving construction funding• Construction anticipated late 2016 / early 2017