GOVERNMENT OF INDIA MINISTRY OF RAILWAYS RAILWAY BOARD No. 2013/RSF/649/2/RP-11/RWF New Delhi, dt. i g .07.13 The Chief Mechanical Engineer, Rail Wheel Factory, Bangalore — 560 064. The Controller of Stores, All India Railways & P/Units. Sub:- Minutes of the Quarterly WTA Meeting for the planning of items for the period 11/2013-14 (July - September, 2013). Minutes of quarterly WTA meeting for the period II/2013-14 (July - September, 2013) held with the representatives of RWF and Zonal Railways/PUs in Rail Bhawan, New Delhi on 11.07.13 has been uploaded on Indian Railway's website www.indianrailways.gov.in . To access the Minutes kindly click on "Ministry of Railways. Then click on "Railway Board". Then click on "About Indian Railways" Tab. Then click on " Railway Board Directorates". Then click on "Stores". Then click on "Conferences / Meetings" to open the page containing the minutes of the meeting. Please ensure that the statement of requirements of WTA items for the Quarter III/2013- 14 (October - December, 2013) should reach this office latest by 15.09.13 positively. The exact date and venue of the meeting would be advised later on. (Hindi version will follow.) Encl.:- As above. ( Sa isra ) Director, Railway Stores (F) Railway Board. Copy of the Minutes of the meeting together with allocation statement is forwarded for information and necessary action please. 1. The Chief Mechanical Engineers, All India Railways and Production Units. 2. The Comptroller & Auditor General of India, Room No.222, Rail Bhawan, New Delhi. 3. M/s Jessop & Co. Ltd., 21 & 22, Jessore Road, Kolkata — 700 028. 4. M/s Bharat Earth Movers Ltd., "BEML SOUDHA", 23/1, 4 th Main, S.R. Nagar, Bangalore-560 027. 5. M/s Titagarh Wagons Ltd.,113, Park Street, Kolkata — 700 016. 6. M/s Bharat Heavy Electrical Ltd., (Transportation Business Deptt.), Integrated Office Complex, Lodhi Road, New Delhi-110 003. 7. Adv.(RS), AM(ME), AM(PU), Adv(L)/RS, EDRS(C ), EDRS(P), EDME(Chg.), EDME(W), EDME (Tr.), EDEE(RS), DME(PU), DME(P)-1, DEE/G, DRS(W), DRS(M), DF(S)-1 and RS(WTA) Branches of Railway Board. 8. CWM, Eastern Railway, Kancharapara.
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
GOVERNMENT OF INDIA MINISTRY OF RAILWAYS
RAILWAY BOARD
No. 2013/RSF/649/2/RP-11/RWF New Delhi, dt. i g .07.13
The Controller of Stores, All India Railways & P/Units.
Sub:- Minutes of the Quarterly WTA Meeting for the planning of items for the period 11/2013-14 (July - September, 2013).
Minutes of quarterly WTA meeting for the period II/2013-14 (July - September, 2013) held with the representatives of RWF and Zonal Railways/PUs in Rail Bhawan, New Delhi on 11.07.13 has been uploaded on Indian Railway's website www.indianrailways.gov.in . To access the Minutes kindly click on "Ministry of Railways. Then click on "Railway Board". Then click on "About Indian Railways" Tab. Then click on " Railway Board Directorates". Then click on "Stores". Then click on "Conferences / Meetings" to open the page containing the minutes of the meeting.
Please ensure that the statement of requirements of WTA items for the Quarter III/2013-14 (October - December, 2013) should reach this office latest by 15.09.13 positively. The exact date and venue of the meeting would be advised later on.
(Hindi version will follow.) Encl.:- As above.
( Sa isra ) Director, Railway Stores (F)
Railway Board.
Copy of the Minutes of the meeting together with allocation statement is forwarded for information and necessary action please.
1. The Chief Mechanical Engineers, All India Railways and Production Units. 2. The Comptroller & Auditor General of India, Room No.222, Rail Bhawan, New Delhi. 3. M/s Jessop & Co. Ltd., 21 & 22, Jessore Road, Kolkata — 700 028. 4. M/s Bharat Earth Movers Ltd., "BEML SOUDHA", 23/1, 4 th Main, S.R. Nagar,
Bangalore-560 027. 5. M/s Titagarh Wagons Ltd.,113, Park Street, Kolkata — 700 016. 6. M/s Bharat Heavy Electrical Ltd., (Transportation Business Deptt.), Integrated Office
Plants : CME & COS/RWF, Bangalore, DGM/SAIL/DSP. No representation from RWP/Bela
Railway Units : COSs/CMMs/JAGs Officers of Zonal Railway & Production Units, CWEs & other Officers of Mechanical Department of Zonal Railways & Production Units.
RWF/Banalore
• In 1 st quarter of 2013-14, RWF supplied 50342 wheels (including wheels for wheelsets), 16261 wheelsets and 22,232 axles (including axles for wheelsets).
• RWF has started reconciliation of pending purchase orders. Oldest purchase order should be closed first and details uploaded on the net so that Zonal Railways/PUs can reconcile their position..
• Supply of WTA items are to be regulated as per the Purchase orders placed by Railway Board. CME/RWF requested for the placement of Purchase orders for some of the items so that quantity supplied can be regularised.
SAIL/DSP
• SAIL/DSP supplied 12023 wheels and 1982 axles in last quarter. SAIL/DSP was reminded about their commitment to fully switch over from plate type loco wheels to S-type loco wheels from 2014-15.
• WAG-9 loco wheel is being developed by SAIL/DSP. Forging of 10 wheels has been completed. SAIL/DSP has been requested to expedite the supply of ordered quantity of 500 nos. in 2nd quarter.
• SAIL/DSP is developing LHB wheels also. Out of the above two wheels priority for development should be of WAG-9 wheels.
• DGM/SAIL stated that in 2013-14 SAIL/DSP will be in a position to supply 50,000 wheels(approx) and 8000 axles.
RWP/Bela
• AM/PU stated production of wheels at RWP/Bela Plant has started on 27 th May and plant could be operated satisfactorily for 3 weeks. AM/PU stated that RWP/Bela will not only meet the target of 10000 wheels in 2013-14 but also exceed the same. Adequate availability of scrap for RWP/Bela is to be ensured for continuous &.enhanced level of production at RWP/Bela.
Submission of Indents.
• Due date of submission of Indents for 2015-16 for WTA items is 31/07/2013. Provision of Buffer stock of 6 months for imported items and 3 months for indigenous items is to be ensured while assessing the requirement.
WTA Meeting 2 nd quarter -11 th July, 2013/RWF
EMU Wheels • Railway units were advised again to ensure judicious use of EMU wheels (Forged & Cast). For
Trailor Coaches, cast wheels are to be utilized and use of forged wheels should be restricted for Motor Coaches. Supply for forged wheels through import is not expected in near future.
The position regarding supplies made by RWF during the previous quarter i.e. April - June, 2013 was discussed. The same is tabulated as under:-
SUPPLIES DURING APRIL - JUNE, 2013
No. Item Quantity Planned (April -
June., 2013)
Actual Supplies (April - June, 2013)
Variation (+) excess (-) shortfall
Total Supplies from April, 2013 to June, 2013
A LOOSE WHEELS (i) BOX 'N' Wheels
W/WL-4764/R 6600 4940 -1660
(ii) MG Chg. Wheels MG/T-0.-1-004 (W/WL-770/R)
(WAP-W-031)
0 0 0
(iii) BG Chg. Wheels W/WL-1660/R
11900 11293 -607
(iv) BG Loco Wheels W/WL-4984/R
0 0 0
(v) 840 mm dia wheels for BLC Wagons
1948 1587 -361
(vi) EMU/DMU Wheels to Drg. No. K-4004
0 0 0
(vii) Wheels for BVZC Wagons to Drg. No. W/WL-4747
0 0 0
TOTAL WHEELS 20448 17820 -2628 B LOOSE AXLES (i) Nos. 6040 5971 -69 (ii) Equated Box 'N' Units 7800 7661 -139 C WHEELSETS (i) 16T BG Chg. Wheelsets 450 432 -18 (ii) Wheelsets for BCN 0 0 0 (iii) BOX 'N' W/sets including
Wagon Builders & BLC Wagons
15750 15829 -79
(iv) EMU W/sets for Trailer Coaches
0 0 0
TOTALWHEELSETS 16200 16261 -61
The detailed supply position (Railway wise/Consignee wise) is given in the enclosed Annexure-l.
The item-wise planning for July - September, 2013 is shown in Annexure - II.
2nd quarter, 2013-14/RWF
I I I IANNEXURE - I ' I Position regarding quantities planned vis a - vis actua supplies made by RWF/Bangaiore during the 1st Quarter (April - June, 2013).
400-TPTY SER 800 KGP SECR 150 RWSS SWR 500 300-UBL
200-AP 200 CWM/UBL Against RSP
WR 300 250-PL 50-BVP
300 CWM/PL Against RSP WCR 300 BPL ICF 2300 RCF 2300 Total 14550
2nd quarter, 2013-14/RWF
3 840 dia wheel for BLC CR 80 PR wagon ER 60 LLH
NR 1000 JUDW NCR 300 JHS SR 84 CW/PER SCR 99 CWM/RYPS SWR 80 AP WR 50 DHD Total 1753
4 EMU/DEMU Wheels to Drg. No. K-4004
CR 404 MTN, ER 900 HLR NR 313 250-GZB
63-CB SR 500 CW/PER SCR 100 LGD SER 250 KGP WR 100 DHD RCF 100 BEML 282 CWM/MYSS/SWR. Texmaco 16 KPA/ER Total 2965
TOTAL WHEELS 27618
AXLES
1 BG DSL Loco axle to Drg. No.D/WL-4973/R (WAP/SK/MA-245)
ER 55 KPA
SR 66 LW/PER
Total 121
2 Axle for WDG-2 A (Axle RT (with light wt. 5002 FZ) to Drg. No. TPL-5868 Alt. 'b' part No. 11231622
DMW 300
Total 300
3 Axle rough turned for WAP-4 Loco to Drg. No.03/2/11/55
CLW 47 Total 47
4 Axle driving rough turned for WDM-3A Locos to Drg. No. D/WL-5058/R Alt. NIL
DMW 200 SMM/D Ph-II, DMW
Total 200
2nd quarter, 2013-14/RWF
5 Axle rough machined for WDG-2. WDG-3A, WDM-
NFR 10 NBQ
3D Locos to Drg. No. TPL-6292
Total 10
6 Axle rough machined for WDG-2 & WAG-7 to Drg.
CR 19 BSL
No.06/2/11/2 ER 48 KPA NR 6 CNB SCR 20 10-ELS/BZA
10-ELS/KZJ BHEL 125 JHS
Total 218
7 Axle rouh GM Loco to EMD Pt. No.40077315 (Geared) & DLW Pt. No.17230019
DLW 300
Total 300
8 Axles for WAG-9 & WAP- 7 (Rough machined) to CLW's Drg. No. 1209-01- 011-002 Alt.
CLW 350
CR 38 BSL ER 42 KPA
SER 6 KGP
Total 436
9 Axle rough GM Loco to EMD Pt. No.40076350 & DLW Part No.17230011
SCR 6 Sr. DME/DSL/ Gooty
Total 6
10 Axle (3 Phase) for WAP- 5 Loco to CLW Drg. No.1210-01-311-025
CLW 53
Total 53
11 Axle rough machined for TAO-659 Hitachi type wheelset to Drg. No. SKEL-4516
CR 25 BSL WR 30 DHD BHEL 100 JHS
Total 155 TOTAL AXLES (1) TO (11) IN NOS.
1846
TOTAL AXLES IN EQUATED NOS.
3507
12 BG EMU MTR Coach Axles to Drg. No. DC/EMU-M-0-1-005
NR 25 CB Total 25
13 Axle for AC Motor Coach to Drg. No.EMU/MC-1- n7.5
ER 108 KPA
Total 108
2nd quarter, 2013-14/RWF
14 EMU Axles for Motor NR 10 CB Coaches to Drg. No. AC/DC/EMU/B-02-002 Alt. A/2 item 1 (WAP-A-087)
Total 10
15 Axle for MEMU/DMC to RCF 52 DRg. No. EMU/M-0-1- 025
Total 52
16 Axle rough turned for MEMU Motor Coach to Drg. No. EMU/M-8-1-025
SCR 10 LGD
Total 10
TOTAL EMU AXLES IN NOS.
205
TOTAL EMU AXLES IN EQUATED NOS. (X by 1.21=
246
17 BG MEMU TC Axles to Drg. No. WTAC3-0-2-303 AIt.F
ER 10 HLR
NR 15 GZB
SCR 4 LGD
Total 29
18 Axle for BOX 'N'/BCN Wagon to Drg. No.WD- 92039/S-1 Item-1, Alt.-2
SWR 48 AP WR 150 DHD WCR 78 BPL Total 276
19 BOX 'N' Axles to Drg. No. W/WL-4901/R (WD- 89025/SL-2)
ER 71 JMP
NR 240 JUDW
NFR 110 NBQ
SCR 100 RYPS
SECR 150 RWSS
SWR 12 UBL
Total 683
20 20T powered axles for DHMU/DPC as per ICF's Drg. No.DHMU/DPC/0-2- 001 item KPC 733-804-01-50 alt (A)
SCR 26 LGD
Total 26
2nd quarter, 2013-14/RWF
21 Finish turned axle for DHMU/DPC power axle to Drg. No. DHMU/DPC-0• 20991 Alt. b 2
SCR 8 LGD Total 8
22 Axles for LHB Coaches to Drg. No.LW 021049
RCF 500 ER 150 LLH Total 650
23 16 T BG Coaching Axles to Drg. No. CG-K 6015
CR 100 MTN
ER 400 250-HLR 150-LLH
NR 100 AMV 150 CWM/ASR Against RSP
NER 50 GKP NFR 110 NBQ SR 100 CW/PER
SWR 50 AP
200 UBL For BVZI
WR 66 PL
150 CWM/PL For BEML Wheelsets
WCR 150 BPL
ICF 1000
RCF 1000
Total 3626
TOTAL AXLES S.NOS. 17 to 23 IN NOS.
5298
GRAND TOTAL AXLES IN NOS.=
7349
GRAND TOTAL AXLES IN EQUATED UNITS =
9051
WHEELSETS
1 16T BG Coaching W/sets BEML 600 Will be sent to Hubli for machining.
NFR 50 NBQ Total 650
2nd quarter, 2013-14/RWF
2 BOX 'N' Wheelsets Wagon Builders
10000 Consignee to be advised by DRS(W)
NR 100 CWM/ASR NFR 50 NBQ Total 10150
3 Wheelsets for Cast Steel Bogie of BLC Wagon to Drg. No.CONTR-9404- S/12 Alt.3
CONCOR 600 NR
66 JUDW Total 666
TOTAL WHEELSETS 11466
GOVERNMENT OF INDIA MINISTRY OF RAILWAYS
RAILWAY BOARD No. 2013/RSF/649/2/RP-II/DSP New Delhi, dt )Z.07.13
1. M/s Steel Authority of India Ltd., Central Marketing Organisation, S&RM Division, Ispat Bhawan, 40-Jawahar Lal Nehru Marg, Kolkata — 700 071.
2 The Controller of Stores, All India Railways & P/Units.
Sub:- Minutes of the Quarterly WTA Meeting for the planning of WTA items for the period 11/2013-14 (July - September, 2013).
Minutes of quarterly WTA meeting for the period II/2013-14 (July - September, 2013) held with the representatives of DSP in Rail Bhawan, New Delhi on 11.07.13 has been uploaded on Indian Railway's website www.indianrailways.gov.in . To access the Minutes kindly click on "Ministry of Railways. Then click on "Railway Board". Then click on "About Indian Railways" Tab. Then click on " Railway Board Directorates". Then click on "Stores". Then click on "Conferences / Meetings" to open the page containing the minutes of the meeting.
Please ensure that the statement of requirements of WTA items for the Quarter 111/2013-14 (October - December, 2013) should reach this office latest by 15.09.13 positively. The exact date and venue of the meeting would be advised later on.
d-1 (1-'3-aljee\TI---vlisra )
Director, Railway Stores (F) Railway Board.
Copy to: 1. The Chief Mechanical Engineers, All Indian Railways/Production Units. 2. The Comptroller & Auditor General of India, Room No.222, Rail Bhawan, New Delhi. 3. GM (BBM & WAP), M/s SAIL/DSP, Durgapur — 713203. 4. The DGM I/C, WAP, M/s SAIL/DSP, Durgapur — 713203. 5. The Chief Marketing Manager, M/s SAIL/DSP, SCOPE MINAR (17th floor), North Block,
Laxmi Nagar District Centre, Delhi — 110 092. 6. Shri Vinay Kumar, Dy.GM, M/s SAIL/DSP, SCOPE MINAR (20th floor), North Block,
Laxmi Nagar District Centre, Delhi — 110 092. 7. GM(1), M/s RITES (ER), Quality Assurance Division, Central Station Building (Metro), 56,
CME & COS/RWF, Bangalore, DGM/SAIL/DSP. No representation from RWP/Bela
COSs/CMMs/JAGs Officers of Zonal Railway & Production Units, CWEs & other Officers of Mechanical Department of Zonal Railways & Production Units.
• In 1 st quarter of 2013-14, RWF supplied 50342 wheels (including wheels for wheelsets), 16261 wheelsets and 22,232 axles (including axles for wheelsets).
• RWF has started reconciliation of pending purchase orders. Oldest purchase order should be closed first and details uploaded on the net so that Zonal Railways/PUs can reconcile their position..
• Supply of WTA items are to be regulated as per the Purchase orders placed by Railway Board. CME/RWF requested for the placement of Purchase orders for some of the items so that quantity supplied can be regularised.
SAIL/DSP
• SAIL/DSP supplied 12023 wheels and 1982 axles in last quarter. SAIL/DSP was reminded about their commitment to fully switch over from plate type loco wheels to S-type loco wheels from 2014-15.
• WAG-9 loco wheel is being developed by SAIL/DSP. Forging of 10 wheels has been completed. SAIL/DSP has been requested to expedite the supply of ordered quantity of 500 nos. in 2 nd quarter.
• SAIL/DSP is developing LHB wheels also. Out of the above two wheels priority for development should be of WAG-9 wheels.
• DGM/SAIL stated that in 2013-14 SAIL/DSP will be in a position to supply 50,000 wheels(approx) and 8000 axles.
RWP/Bela
• AM/PU stated production of wheels at RWP/Bela Plant has started on 27 th May and plant could be operated satisfactorily for 3 weeks. AM/PU stated that RWP/Bela will not only meet the target of 10000 wheels in 2013-14 but also exceed the same. Adequate availability of scrap for RWP/Bela is to be ensured for continuous &.enhanced level of production at RWP/Bela.
Submission of Indents • Due date of submission of Indents for 2015-16 for WTA items is 31/07/2013. Provision of Buffer
stock of 6 months for imported items and 3 months for in, igenous items is to be ensured while assessing the requirement.
oil
WTA Meeting 2 nd quarter - 11 t July, 2013 (SAIL/DSP)
EMU Wheels
• Railway units were advised again to ensure judicious use of EMU wheels (Forged & Cast). For Trailor Coaches, cast wheels are to be utilized and use of forged wheels should be restricted for Motor Coaches. Supply for forged wheels through import is not expected in near future.
The position regarding supplies made by M/s SAIL/DSP during the previous quarter i.e. April- June, 2013 was discussed. The same is tabulated as under:-
SUPPLIES DURING APRIL - JUNE, 2013
S.Nos. Item Quantity Planned (April -
June, 2013)
Actual Supplies
(April - June, 2013)
Variation (+) excess (-) shortfall
Total Supplies from April, 2013 —
A ASSEMBLED WHEELSETS
(i) 16T BG Coaching Wheelsets
300 0 -300 0
B LOOSE WHEELS
(i) BG Chg. Wheels W/WL-1660/R
7880 4980 -2900 4980
(ii) BG Loco Wheels W/WL-4948/R
6005 5029 -976 5029
(iii) BG Loco Wheels "S" Shaped
2300 1450 -850 1450
WAG-9 Loco wheels
500 0 -500 0
(iv) MG Loco Wheels W/WL-4955/R
703 564 -139 564
(v) EMU/DEMU Wheels to Drg. No.K-4004
0 0 0 0
TOTAL WHEELS
17388 12023 -5365 12023
C LOOSE AXLES (i) 16T BG Coaching
Axles CG-K-6015 2487 1982 -505 1982
(ii) Axles forgings (heat treated and tempered but without machining)
0 0 0 0
TOTAL AXLES 2487 1982 -505 1982
The detailed supply position (Railway wise/Consignee wise) is given in the enclosed Ann - ure-1.
The item-wise planning for July - September, 2013 is shown in Annexure - II.
2nd quarter, 2013-14 (SAIUDSP)
I I I IANNEXURE - I 1 Position regarding quantities planned vis a - vis actua supplies made by M/s SAIL/DSP during the 1st Quarter (April - June, 2013). S.NOS. DRAWING &
I I I IANNEXURE - II Allocation sheet for supply of WTA items for the Ilnd quarter i.e. July - September, 2013 on M/s SAIUDSP.
S.NOS. DRAWING & DESCRIPTION
RLYS./PUs QTY. PLANNED (JULY -
SEPTEMBER, 20131
Consignee Remarks
AXLES 1 BG Chg. Axles to Drg. No.
WTAC-3-02-303 CR 100 MTN ER 300 LLH NR 150 CWM/ASR Against RSP SR 150 CW/PER SECR 60 RWSS ICF 800 RCF 800 TOTAL 2360
WHEELS 1 BG Chg. Wheels to Drg.
No.WNVL-1660/R CR 500 MTN ER 600 500-LLH
100-H LR Eco.R 300 MCS NR 600 300-AMV
250-JUDW 50-ASR
NER 400 50-IZN 350-GKP
NFR 200 100-DBRT 100-NBQ
NWR 500 300-All 200-JU
SR 900 400-CW/PER 500-GOC
SCR 600 300-TPTY 300-LGD
SER 400 KGP
SWR 300 100-UBL 200-AP
WR 100 50-BVP 50-PL
WCR 300 BPL ICE 600 RCF 600 TOTAL 6900
2 BG Loco Wheels /DSL Mono Block Rough machined WDM2, WDM3 and WAG5 to Drg. No. W/WL-4948/R
CR 1000 600-BSL 400-PR
ER 500 300-JMP 150-KPA
NR 1200 700-CB 500-ASR
NCR 150 CNB NFR 50 NBQ NWR 75 All
SR 1100 500-GOC 600-LW/PER
2nd quarter, 2013-14 (SAIUDSP)
SCR 500 100-GTPL 100-CRSfTPTY
100-ELS/BZA 200-LGD
SER 360 TATA SECR 160 RWSS SWR 100 AP CLW 1100 DMW 500 BHEL 300 TOTAL 7095
4 BG Loco Wheels "S" Shaped to Drg. No. D/WL-5060/R
CR 100 PR
NER 60 GKP WR 300 DHD
122 DHD Against RSP DLW 204 DMW 400 TOTAL 1186
5 BG Loco Wheel "S" Shaped to DLW's Drg. No. 17230251 'C'
NR 48 CB
SCR 50 GTPL
SWR 100 UBP
DLW 450
TOTAL 648 6 WAG-9 Loco Wheels to
Drg. No. 1209.0.111.003 CLW 500
TOTAL 500 TOTAL WHEELS 16329
GOVERNMENT OF INDIA MINISTRY OF RAILWAYS
RAIL WAY BOARD
No. 2013/RSF/649/2/RP-11/BELA New Delhi, dt. 3'.07.13
The CAO/WP, Ministry of Railways, CHAMBER BHAWAN, 1 st Floor, J.C. Road, Patna-800 001
Sub:- Minutes of the Quarterly WTA Meeting for the planning of items for the period 11/2013-14 (July — September, 2013).
Minutes of quarterly WTA meeting for the period II/2013-14 (July — September, 2013) held with the representatives of RWF and Zonal Railways/PUs in Rail Bhawan, New Delhi on .11.07.13 has been uploaded on Indian Railway's website www.indianrailways.gov.in . To access the Minutes kindly click on "Ministry of Railways. Then click on "Railway Board". Then click on "About Indian Railways" Tab. Then click on " Railway Board Directorates". Then click on "Stores". Then click on "Conferences / Meetings" to open the page containing the minutes of the meeting.
Please ensure that the statement of requirements of WTA items for the Quarter 111/2013-14 (October - December, 13) should reach this office latest by 15.09.13 positively. The exact date and venue of the meeting would be advised later on.
Encl.:- As above.
(Hindi version will follow.)
( Sa Misra ) Direct r, Railway Stores (F)
Railway Board. 1. The Chief Mechanical Engineers, ER, NR, NCR & SCR. 2. The Controller of Stores, ER, NR, NCR & SCR. 3. The Comptroller & Auditor General of India, Room No.222, Rail Bhawan, New Delhi. 4. AM(ME), Adv.(RS), Adv(L)/RS, EDRS(C ), Adv.RS(P), EDME(Chg.), EDME(W), EDME (Tr.),
EDEE(RS), DME(PU), DME(P)-1, DEE/G, DRS(W), DRS(M), DF(S)-1 and RS(WTA) Branches of Railway Board.
CME & COS/RWF, Bangalore, DGM/SAIL/DSP. No representation from RWP/Bela
COSs/CMMs/JAGs Officers of Zonal Railway & Production Units, CWEs & other Officers of Mechanical Department of Zonal Railways & Production Units.
RWF/Banalore
• In 1 st quarter of 2013-14, RWF supplied 50342 wheels (including wheels for wheelsets), 16261 wheelsets and 22,232 axles (including axles for wheelsets).
• RWF has started reconciliation of pending purchase orders. Oldest purchase order should be closed first and details uploaded on the net so that Zonal Railways/PUs can reconcile their position..
• Supply of WTA items are to be regulated as per the Purchase orders placed by Railway Board. CME/RWF requested for the placement of Purchase orders for some of the items so that quantity supplied can be regularised.
SAIL/DSP
• SAIL/DSP supplied 12033 wheels and 1982 axles in last quarter. SAIL/DSP was reminded about their commitment to fully switch over from plate type loco wheels to S- type loco wheels from 2014-15.
• WAG-9 loco wheel is being developed by SAIL/DSP. Forging of 10 wheels has been completed. SAIL/DSP has been requested to expedite the supply of ordered quantity of 500 nos. in 2"d quarter.
• SAIL/DSP is developing LHB wheels also. Out of the above two wheels priority for development should be of WAG-9 wheels.
• DGM/SAIL stated that in 2013-14 SAIL/DSP will be in a position to supply 50,000 wheels(approx) and 8000 axles.
RWP/Bela
• AM/PU stated production of wheels at RWP/Bela Plant has started on 27 th May and plant could be operated satisfactorily for 3 weeks. AM/PU stated that RWP/Bela will not only meet the target of 10000 wheels in 2013-14 but also exceed the same. Adequate
WTA Meeting 2 nd quarter -11 th July, 2013/BELA
availability of scrap for RWP/Bela is to be ensured for continuous &.enhanced level of production at RWP/Bela.
Submission of Indents.
• Due date of submission of Indents for 2015-16 for WTA items is 31/07/2013. Provision of Buffer stock of 6 months for imported items and 3 months for indigenous items is to be ensured while assessing the requirement.
EMU Wheels
• Railway units were advised again to ensure judicious use of EMU wheels (Forged & Cast). For Trailor Coaches, cast wheels are to be utilized and use of forged wheels should be restricted for Motor Coaches. Supply for forged wheels through import is not expected in near future.
The detailed supply position (Railway wise/Consignee wise) is given in the enclosed Annexure-I.
The item-wise planning for July - September, 2013 is shown in Annexure - II.
2nd quarter, 2013-14 (SAIL/DSP)
I I I LANNEXURE I I Position regarding quantities planned vis a - vls actual supplies made by RWF/Beia during the IST Quarter (April- June, 2013).