Top Banner
Headquarters Air Mobility Command Enabling the “Global” in “Global Vigilance, Reach and Power!” Sport Bike Concept of Operations
27

Headquarters Air Mobility Command Enabling the Global in Global Vigilance, Reach and Power! Sport Bike Concept of Operations.

Mar 26, 2015

Download

Documents

Julian Fraser
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Headquarters Air Mobility Command Enabling the Global in Global Vigilance, Reach and Power! Sport Bike Concept of Operations.

Headquarters Air Mobility Command

Enabling the “Global” in “Global Vigilance, Reach and Power!”

Sport Bike Concept of Operations

Page 2: Headquarters Air Mobility Command Enabling the Global in Global Vigilance, Reach and Power! Sport Bike Concept of Operations.

2Enabling the “Global” in “Global Vigilance, Reach and Power!”

This Contains Privileged Safety Information Unauthorized Use Or Disclosure Can Subject You To

Criminal Prosecution, Termination Of Employment, Civil Liability, Or Other Adverse Actions

See AFI 91-204, Chapter 2 For Restrictions Destroy IAW AFMAN 37-139 When No Longer Needed

For Mishap Prevention Purposes

Note: Do Not Remove “For Official Use Only” From Any Slide

FOR OFFICIAL USE ONLYNote: This Slide is Mandatory

Page 3: Headquarters Air Mobility Command Enabling the Global in Global Vigilance, Reach and Power! Sport Bike Concept of Operations.

3Enabling the “Global” in “Global Vigilance, Reach and Power!”

Background of PMV2 training & AFSAS query Class A Class B Class C Trends Significant interest items Recommendations ConOps

OVERVIEW

Page 4: Headquarters Air Mobility Command Enabling the Global in Global Vigilance, Reach and Power! Sport Bike Concept of Operations.

4Enabling the “Global” in “Global Vigilance, Reach and Power!”

DEVELOPMENT TEAM

OIC Maj Eric Haussermann (AFRC)

NCOIC SSgt David Grant

Page 5: Headquarters Air Mobility Command Enabling the Global in Global Vigilance, Reach and Power! Sport Bike Concept of Operations.

5Enabling the “Global” in “Global Vigilance, Reach and Power!”

RESEARCH BACKGROUND

Unable to determine rate• No registration numbers for sport bike operators vs. non-sport

bike operators• Motorcyclists first, sport bike operator second

2005, had 6 fatalities• Male, young, same type of motorcycle

Query• Single, Collision

Collision is one or more vehicle, animal, human contacted or caused PMV2 to lose control

Must be clear indication rider was at fault (PMV2 attempting to pass a PMV4 which was passing another PMV4)

• Type of training is broken into BRC, ERC, RSS, Unknown Unknown is no known training, or type training / date

• Mishap location Curve, straight, intersection

Page 6: Headquarters Air Mobility Command Enabling the Global in Global Vigilance, Reach and Power! Sport Bike Concept of Operations.

6Enabling the “Global” in “Global Vigilance, Reach and Power!”

DoDDI 6055.4, AFI 91-207

DoDDi 6055.4 & AFI 91-207 mandates training & PPE

• No cost to member, or leave is charged

• Course must include knowledge and task evaluations

• Mandates “no skin below the chin” PPE Reflective vest NOT specifically stated

Page 7: Headquarters Air Mobility Command Enabling the Global in Global Vigilance, Reach and Power! Sport Bike Concept of Operations.

7Enabling the “Global” in “Global Vigilance, Reach and Power!”

CLASS A; AF OVERVIEW

Total reviewed, 1 Oct 05-1 Oct 01 85

• Single / Collision 51 / 34 PMV2 at-fault 8 of 35 Time of year April – August

• Trained / Unknown 50 / 36 BRC / ERC / RSS 12 / 16 / 21

• Mishap location Corner 39 Straight 29 Intersection 18

• Notes: CC denied training due to duty performance; FM directed

no training due to budget; 4 collisions PPE worn

Page 8: Headquarters Air Mobility Command Enabling the Global in Global Vigilance, Reach and Power! Sport Bike Concept of Operations.

8Enabling the “Global” in “Global Vigilance, Reach and Power!”

CLASS B; AF OVERVIEW

Total reviewed, 1 Oct 05-1 Oct 01 8

• Single / Collision 3 / 5 PMV2 at-fault 0

• Trained / Unknown 5 / 3 BRC / ERC / RSS 0 / 3 / 2

• Mishap location Corner 3 Straight 4 Intersection 1

• Notes: Scheduled for ERC; class cancelled by wing SEG; 1 PMV4

hit 2 PMV2’s; BAC .23, known drinker; PMV4 failed to yield right of way

Page 9: Headquarters Air Mobility Command Enabling the Global in Global Vigilance, Reach and Power! Sport Bike Concept of Operations.

9Enabling the “Global” in “Global Vigilance, Reach and Power!”

CLASS C; AF OVERVIEW

Total reviewed, 1 Oct 05-30 Sep 03 243

• Single / Collision 145 / 98 PMV2 at-fault 13 Time of year March – October

• Trained / Unknown 152 / 92 BRC / ERC / RSS 76 / 51 / 25

• Mishap location Corner 99 Straight 91 Intersection 53

• Note: 5 collisions were caused by animals, 1 bicyclist

Page 10: Headquarters Air Mobility Command Enabling the Global in Global Vigilance, Reach and Power! Sport Bike Concept of Operations.

10Enabling the “Global” in “Global Vigilance, Reach and Power!”

TRENDS

Failure to negotiate curve Collision with PMV4 or other object Failure to successfully traverse roadway hazard Trained to AFI and Dodo requirements

Page 11: Headquarters Air Mobility Command Enabling the Global in Global Vigilance, Reach and Power! Sport Bike Concept of Operations.

11Enabling the “Global” in “Global Vigilance, Reach and Power!”

CLASS A; AMC OVERVIEW

Total reviewed, 30 Sep 95 - 1 Oct 05 29

• Single / Collision 16 / 13 PMV2 at-fault 7 Time of year May – October

• Trained / Unknown 16 / 12 BRC / ERC / RSS 1 / 7 / 8

• Mishap location Corner 12 Straight 9 Intersection 8

• Note: PMV4 total of 54, same time period No Class A’s from Oct 99 – Apr 02 61% have occurred from Apr 02 to Oct 05

Page 12: Headquarters Air Mobility Command Enabling the Global in Global Vigilance, Reach and Power! Sport Bike Concept of Operations.

12Enabling the “Global” in “Global Vigilance, Reach and Power!”

CLASS A LEADERS

Bases ‘95-’05

• McGuire 5

• Travis 4

• Andrews 4

• McConnell 4

• MacDill 4

• Pope 2

• Kadena 2

• Scott 1

• Little Rock 1

• Yokota 1

• Aviano 1

Since ’02

• Travis 4(100%)

• Andrews4(100%)

• McConnell 3(75%)

• McGuire3(60%)

• MacDill 2(50%)

• Scott 1(100%)

Page 13: Headquarters Air Mobility Command Enabling the Global in Global Vigilance, Reach and Power! Sport Bike Concept of Operations.

13Enabling the “Global” in “Global Vigilance, Reach and Power!”

CLASS C; AMC OVERVIEW

Total reviewed, 1 Oct 99 – 30 Sep 05 163• Single / Collision 99 / 64

PMV2 at-fault 20 Time of year March – October

• Trained / Unknown 91 / 72 BRC / ERC / RSS 25 / 19 / 47

• Mishap location Corner 79 Straight 65 Intersection 19

• Note: RSS phased out ’01 – ’02; replaced with BRC Estimated Costs FY 05-$285K; FY 02-$162K AFSAS online in ’01; data different previous to that date

Page 14: Headquarters Air Mobility Command Enabling the Global in Global Vigilance, Reach and Power! Sport Bike Concept of Operations.

14Enabling the “Global” in “Global Vigilance, Reach and Power!”

CLASS C LEADERS

Bases

• Travis 32

• Dover 18

• Andrews 17

• Pope 14

• Charleston 11

• McGuire 10

• McChord 9

• MacDill 8

• McConnell 8

• Little Rock 7

• Grand Forks 6

• Fairchild 5

• All others <3

Units

• AMS/AGS/AMXS 30

• MXS 23

• AS 20

• LRS/SUPS/TRNS 12

• CES 11

• COMM 10

• APS 10

• SFS 8

• AMSS 5

• OSS 5

• All others <3

Page 15: Headquarters Air Mobility Command Enabling the Global in Global Vigilance, Reach and Power! Sport Bike Concept of Operations.

15Enabling the “Global” in “Global Vigilance, Reach and Power!”

SIGNIFICANT INTEREST

Population, Age, Training, Alcohol, PPE,

• Unknown total motorcycle operator population

• Average age was 27 for Class A & C mishaps

• Average since last known training to mishap was 3.2 years for both Class A & C mishaps

• 41% unknown training, no data on length of wait for training

• No QA of current training courses

• No/limited PPE use in numerous Class C mishaps

• Alcohol listed in 3 Class A’s. Greater frequency of alcohol use in Class C mishaps

Page 16: Headquarters Air Mobility Command Enabling the Global in Global Vigilance, Reach and Power! Sport Bike Concept of Operations.

16Enabling the “Global” in “Global Vigilance, Reach and Power!”

RECOMMENDATIONS

Population• Coordinate through Pass & Id total motorcycles registered on

base, semi-annually through host SEG

• Coordinate with unit’s to enroll members into sport bike program

Training: Life-long learning, supplemental material• Initial, MSF Basic Rider Course

• Refresher, MSF License Waiver Course (ERC suite)

• Recurring for all motorcyclists

• 0, 18, 36, 72 month cycle. Sport bike, 36 months after refresher All motorcyclists, 72 month cycle 12 month window for scheduling (6 prior, 6 post)

Page 17: Headquarters Air Mobility Command Enabling the Global in Global Vigilance, Reach and Power! Sport Bike Concept of Operations.

17Enabling the “Global” in “Global Vigilance, Reach and Power!”

RECOMMENDATIONS

PPE already covered in existing courses Alcohol awareness is already covered in existing courses Toolbox for motorcyclists’• ORM self assessment for individual to asses risk level, and what can

be altered to lower risk

• Presentations on cornering, braking Tools completed• ORM rider assessment sheet

• Four-part Cornering presentation

• New motorcyclist pamphlet Tools in development• Observed ride checklist for mentors

• Braking presentation

• Developed / commercial-off-the-shelf handout

Page 18: Headquarters Air Mobility Command Enabling the Global in Global Vigilance, Reach and Power! Sport Bike Concept of Operations.

18Enabling the “Global” in “Global Vigilance, Reach and Power!”

RECOMMENDATIONS

Sport bike program has foundation in existing motorcycle training

• Motorcyclist first, sport bike operator second

• Support existing program via funding TDY for Rider Coaches to AMC installations to reduce backlog

Page 19: Headquarters Air Mobility Command Enabling the Global in Global Vigilance, Reach and Power! Sport Bike Concept of Operations.

19Enabling the “Global” in “Global Vigilance, Reach and Power!”

RECOMMENDATIONS

Need to make motorcyclists WANT to do the program

• Must not appear to be directed from AMC/SE SE merely facilitates recommendations by those in

motorcycle rider training Fund a Rider Coach Trainer (RCT) to accomplish the

following Serves as example for others QA installations and Rider Coaches during a class Track number members trained, cost, accidents Assists in investigating PMV2 Class A mishaps Hold bi-annual Rider Coach learning centers

Page 20: Headquarters Air Mobility Command Enabling the Global in Global Vigilance, Reach and Power! Sport Bike Concept of Operations.

20Enabling the “Global” in “Global Vigilance, Reach and Power!”

RECOMMENDATIONS

Sport Bike Proficiency program

• Enrolled through unit MSR Type training, date trained, Next training due and date Provide handbook from host SE

• Complete initial, refresher, recurring training. Recurring at 36 month interval Substitute another course at members expense

Page 21: Headquarters Air Mobility Command Enabling the Global in Global Vigilance, Reach and Power! Sport Bike Concept of Operations.

21Enabling the “Global” in “Global Vigilance, Reach and Power!”

CONOPS

Interim guidance

• Concept of Operations Classroom Range On-base, street evaluation Mentor ride

• Host SEG Start scheduling Designate Lead

RiderCoach

• RiderCoach Develop Classroom test Designate route

On-base, off-base

Page 22: Headquarters Air Mobility Command Enabling the Global in Global Vigilance, Reach and Power! Sport Bike Concept of Operations.

22Enabling the “Global” in “Global Vigilance, Reach and Power!”

RECOMMENDATIONS

Interim guidance

• Motorcyclist Schedule as soon as

possible Grandfathered if ERC has

been taken within last year Does not remove from

riding

• En-routes, GSU’s, all others ERC and presentations Work with host SEG

Page 23: Headquarters Air Mobility Command Enabling the Global in Global Vigilance, Reach and Power! Sport Bike Concept of Operations.

23Enabling the “Global” in “Global Vigilance, Reach and Power!”

RECOMMENDATIONS

Classroom

• Basic Rider’s Course handbook 1-9

• RETS modules

• Cornering presentation

• Braking presentation

• ORM assessment Develop test

• 80% passing

• Basis in areas of BRC handbook & RETS

Page 24: Headquarters Air Mobility Command Enabling the Global in Global Vigilance, Reach and Power! Sport Bike Concept of Operations.

24Enabling the “Global” in “Global Vigilance, Reach and Power!”

RECOMMENDATIONS

Range, ERC exercises

• Exercise 3, Stopping Quickly

• Exercise 5, Cornering Judgment

• Exercise 6, Cornering Finesse

• Exercise 9, Multiple Curves

• ERC evaluation optional

Page 25: Headquarters Air Mobility Command Enabling the Global in Global Vigilance, Reach and Power! Sport Bike Concept of Operations.

25Enabling the “Global” in “Global Vigilance, Reach and Power!”

RECOMMENDATIONS

On-street, on-base

• Pre-run route

• SEG & JAG review

• Checklist provided

• Clearly drawn map of route

• Minimum areas to be reviewed

Page 26: Headquarters Air Mobility Command Enabling the Global in Global Vigilance, Reach and Power! Sport Bike Concept of Operations.

26Enabling the “Global” in “Global Vigilance, Reach and Power!”

RECOMMENDATIONS

Mentor ride

• Pre-run route

• SEG & JAG review

• Checklist provided

• Clearly draw map of route

• Include pre-ride brief of route, hazards, obstacles, emergency signals, feedback stops

Page 27: Headquarters Air Mobility Command Enabling the Global in Global Vigilance, Reach and Power! Sport Bike Concept of Operations.

27Enabling the “Global” in “Global Vigilance, Reach and Power!”

COMMENTS?