Hazard Mitigation Grant Program - Northern California …eerinc.org/old/quake06/local_government/Rentschler_Distribution_of... · – Subpart N Hazard Mitigation Grant Program ...

Aug 05, 2018

Download

Documents

lykiet
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Hazard Mitigation Grant Program - Northern California …eerinc.org/old/quake06/local_government/Rentschler_Distribution_of... · – Subpart N Hazard Mitigation Grant Program ...

1

Page 2: Hazard Mitigation Grant Program - Northern California …eerinc.org/old/quake06/local_government/Rentschler_Distribution_of... · – Subpart N Hazard Mitigation Grant Program ...

2

PresentationPresentation

I. HMGP Overview II. Application Review ProcessIII. Post Obligation InformationIV. Common Errors

Page 3: Hazard Mitigation Grant Program - Northern California …eerinc.org/old/quake06/local_government/Rentschler_Distribution_of... · – Subpart N Hazard Mitigation Grant Program ...

3

Hazard Mitigation Grant Hazard Mitigation Grant Program (HMGP)Program (HMGP)

Activities that will reduce or eliminate future impacts from all disaster types

• Implemented only after a federally declared disaster

• Amount =7.5% of recovery costs to FEMA• For State, Local Governments and select

private non-profit (PNP)• Cost sharing program-no state funding

Page 4: Hazard Mitigation Grant Program - Northern California …eerinc.org/old/quake06/local_government/Rentschler_Distribution_of... · – Subpart N Hazard Mitigation Grant Program ...

4

IV.IV. HMGP OVERVIEWHMGP OVERVIEW

• Regulations• Roles and Responsibilities• Eligibility

Page 5: Hazard Mitigation Grant Program - Northern California …eerinc.org/old/quake06/local_government/Rentschler_Distribution_of... · – Subpart N Hazard Mitigation Grant Program ...

5

RegulationsRegulations

• Title 44 Code of Federal Regulations (44 CFR)

• Office of Management and Budget (OMB) Circulars

Page 6: Hazard Mitigation Grant Program - Northern California …eerinc.org/old/quake06/local_government/Rentschler_Distribution_of... · – Subpart N Hazard Mitigation Grant Program ...

6

RegulationsRegulations

44 CFR• Part 206 – Federal Disaster Assistance for

disasters declared on or after November 23, 1989 – Subpart N Hazard Mitigation Grant Program

(206.430 to 206.440) • Part 13 - Uniform Administrative

Requirements for Grants and Cooperative Agreements to State and Local Governments

Page 7: Hazard Mitigation Grant Program - Northern California …eerinc.org/old/quake06/local_government/Rentschler_Distribution_of... · – Subpart N Hazard Mitigation Grant Program ...

7

RegulationsRegulations

44 CFR (cont.)• Part 9 - Floodplain Management and

Protection of Wetlands• Part 10 – Environmental Considerations• Part 11 – Claims• Part 14 – Administration of Grants: Audits of

States and Local Governments

Page 8: Hazard Mitigation Grant Program - Northern California …eerinc.org/old/quake06/local_government/Rentschler_Distribution_of... · – Subpart N Hazard Mitigation Grant Program ...

8

RegulationsRegulations

OMB Circulars• OMB A-21: Cost Principles for Educational

Institution• OMB A-87: Cost Principles for State, Local,

and Indian Tribal Governments• OMB A-94: Economic Principles and Methods

to determine the cost-effectiveness of funded projects

• OMB A-102: Grants and Cooperative Agreement with State and Local Governments

Page 9: Hazard Mitigation Grant Program - Northern California …eerinc.org/old/quake06/local_government/Rentschler_Distribution_of... · – Subpart N Hazard Mitigation Grant Program ...

9

RegulationsRegulations

OMB Circulars (cont.)• OMB A-110: Uniform Administrative

Requirements for Grants and Agreements with Institution of Higher Education, Hospitals, etc.

• OMB A-122: Nonprofit Organization• OMB A-128: Audits of States and Local

Governments

Page 10: Hazard Mitigation Grant Program - Northern California …eerinc.org/old/quake06/local_government/Rentschler_Distribution_of... · – Subpart N Hazard Mitigation Grant Program ...

10

Roles and ResponsibilityRoles and Responsibility

• Applicants/Subgrantees• Grantee (OES)• Grantor (FEMA)

Page 11: Hazard Mitigation Grant Program - Northern California …eerinc.org/old/quake06/local_government/Rentschler_Distribution_of... · – Subpart N Hazard Mitigation Grant Program ...

11

Roles and ResponsibilityRoles and Responsibility(Applicant/(Applicant/SubgranteesSubgrantees))

• Develop eligible projects- Scope of work, work schedule, and budget

• Complete the project as approved

Page 12: Hazard Mitigation Grant Program - Northern California …eerinc.org/old/quake06/local_government/Rentschler_Distribution_of... · – Subpart N Hazard Mitigation Grant Program ...

12

Roles and ResponsibilityRoles and Responsibility(Applicant/(Applicant/SubgranteesSubgrantees))

• Submit progress reports on quarterly basis

• Notify OES of changes to the project and seek approval prior to change

• Notification of project completion• Maintain records for possible audit

Page 13: Hazard Mitigation Grant Program - Northern California …eerinc.org/old/quake06/local_government/Rentschler_Distribution_of... · – Subpart N Hazard Mitigation Grant Program ...

13

Roles and Responsibility Roles and Responsibility (Grantee)(Grantee)

OES• Establish priorities• Solicit projects• Conduct screening of applications/NOI• Prioritize projects• Recommend projects for FEMA approval• Perform benefit/cost analysis

Page 14: Hazard Mitigation Grant Program - Northern California …eerinc.org/old/quake06/local_government/Rentschler_Distribution_of... · – Subpart N Hazard Mitigation Grant Program ...

14

Roles and Responsibility Roles and Responsibility (Grantee)(Grantee)

• Monitor projects• Submit progress reports on quarterly

basis• Review requests for changes to the

project• Request close out of the grant

Page 15: Hazard Mitigation Grant Program - Northern California …eerinc.org/old/quake06/local_government/Rentschler_Distribution_of... · – Subpart N Hazard Mitigation Grant Program ...

15

Roles and ResponsibilityRoles and Responsibility((Grantor)Grantor)

(FEMA)• Set the funding limit• Approve or deny applications• Monitor grantee• Approve requests for changes to project• Approve closeout of grant• Close the program

Page 16: Hazard Mitigation Grant Program - Northern California …eerinc.org/old/quake06/local_government/Rentschler_Distribution_of... · – Subpart N Hazard Mitigation Grant Program ...

16

EligibilityEligibility• Applicant• Planning• Project Criteria• Activities• Matching Funds

Page 17: Hazard Mitigation Grant Program - Northern California …eerinc.org/old/quake06/local_government/Rentschler_Distribution_of... · – Subpart N Hazard Mitigation Grant Program ...

17

EligibilityEligibility

Applicant• State and local governments • Select private non-profit (PNP)• Indian tribes

Page 18: Hazard Mitigation Grant Program - Northern California …eerinc.org/old/quake06/local_government/Rentschler_Distribution_of... · – Subpart N Hazard Mitigation Grant Program ...

18

EligibilityEligibility

Planning• For disasters after November 1, 2004,

all subgrants must have an approved local mitigation plan to receive HMGP funding

Page 19: Hazard Mitigation Grant Program - Northern California …eerinc.org/old/quake06/local_government/Rentschler_Distribution_of... · – Subpart N Hazard Mitigation Grant Program ...

19

EligibilityEligibility

Project Criteria• Must conform with State and local mitigation

plans• Must conform with Floodplain Management

and Protection of Wetlands (44 CFR Part 9) and Environmental Considerations (44 CFR Part 10)

• Solve a problem Independently• Be cost-effective and substantially reduce

future damage

Page 20: Hazard Mitigation Grant Program - Northern California …eerinc.org/old/quake06/local_government/Rentschler_Distribution_of... · – Subpart N Hazard Mitigation Grant Program ...

20

EligibilityEligibility

Project Criteria (Part 9)• Is the proposed project in a wetland or

floodplain?• Will the proposed project impact a wetland or

floodplain?• National Flood Insurance Program (NFIP)• Flood Insurance Rate Maps (FIRM)• Conditional Letter of Map Revision/ Letter of

Map Revision (CLOMR/ LOMR)

Page 21: Hazard Mitigation Grant Program - Northern California …eerinc.org/old/quake06/local_government/Rentschler_Distribution_of... · – Subpart N Hazard Mitigation Grant Program ...

21

EligibilityEligibility

Project Criteria (Part 10)• Environmental• Historical• Archaeological• Cultural

Page 22: Hazard Mitigation Grant Program - Northern California …eerinc.org/old/quake06/local_government/Rentschler_Distribution_of... · – Subpart N Hazard Mitigation Grant Program ...

22

EligibilityEligibility

Project Criteria (Part 10)- Environmental• Project is subject to all federal, state, and local

environmental laws- National Environmental Policy Act (NEPA) - California Environmental Quality Act (CEQA)

• NEPA review categories- Statutory Exclusion- Categorical Exclusion (CATEX)- Environmental Assessment (EA)- Environmental Impact Statement (EIS)

Page 23: Hazard Mitigation Grant Program - Northern California …eerinc.org/old/quake06/local_government/Rentschler_Distribution_of... · – Subpart N Hazard Mitigation Grant Program ...

23

EligibilityEligibility

Project Criteria (Part 10)- Historical• Designed to insure that historic properties are

considered during Federal project planning and execution

• Building 50 years old or older• Will the proposed project change

characteristics of the historic property?• Does the project area contain any prehistoric,

historic, archeological or cultural resources?

Page 24: Hazard Mitigation Grant Program - Northern California …eerinc.org/old/quake06/local_government/Rentschler_Distribution_of... · – Subpart N Hazard Mitigation Grant Program ...

24

EligibilityEligibility

Project Criteria Cost-effective• Benefit must be equal to or greater than the

project cost (BCA>1)• Preformed by the FEMA-approved BCA

models- Very Limited Data Module- Limited Data Module- Full Data Module- Earthquake Module- Safe Room Module

Page 25: Hazard Mitigation Grant Program - Northern California …eerinc.org/old/quake06/local_government/Rentschler_Distribution_of... · – Subpart N Hazard Mitigation Grant Program ...

25

EligibilityEligibility

Activities• Planning• Projects• Support Activities

Page 26: Hazard Mitigation Grant Program - Northern California …eerinc.org/old/quake06/local_government/Rentschler_Distribution_of... · – Subpart N Hazard Mitigation Grant Program ...

26

EligibilityEligibilityProject Types• Acquisition/Elevation/Relocation• Planning• Education• Codes & Standards• Warning Systems• Watershed Management• Vegetation Management• Structural/ Non-Structural Retrofit

Page 27: Hazard Mitigation Grant Program - Northern California …eerinc.org/old/quake06/local_government/Rentschler_Distribution_of... · – Subpart N Hazard Mitigation Grant Program ...

27

Eligibility Eligibility

Matching Funds25% of the cost of the activityNon-Federal SourcesCertificationPresent when funds obligatedSoft Match ok

Page 28: Hazard Mitigation Grant Program - Northern California …eerinc.org/old/quake06/local_government/Rentschler_Distribution_of... · – Subpart N Hazard Mitigation Grant Program ...

28

Packaging of ProgramsPackaging of Programs

• HMGP funds may be used in combination with other Federal authorities to develop a comprehensive mitigation solution

• HMGP funds cannot be used a match for other Federal funds

Page 29: Hazard Mitigation Grant Program - Northern California …eerinc.org/old/quake06/local_government/Rentschler_Distribution_of... · – Subpart N Hazard Mitigation Grant Program ...

29

HMGP Priorities for DRHMGP Priorities for DR--15051505

• Projects- Seismic Mitigation Projects- Flood Mitigation Projects

Page 30: Hazard Mitigation Grant Program - Northern California …eerinc.org/old/quake06/local_government/Rentschler_Distribution_of... · – Subpart N Hazard Mitigation Grant Program ...

30

HMGP PrioritiesHMGP Priorities

• Planning (limited funding)- Multi-jurisdictional local multi-hazard

mitigation plans- Local multi-hazard mitigation plans

Page 31: Hazard Mitigation Grant Program - Northern California …eerinc.org/old/quake06/local_government/Rentschler_Distribution_of... · – Subpart N Hazard Mitigation Grant Program ...

31

HMGP Priorities (cont.)HMGP Priorities (cont.)

• Supporting Measures (Limited funding)- Fire and flood protection codes and

standards- Mitigation education programs- Hazard Identification and analysis to

support mitigation plans

Page 32: Hazard Mitigation Grant Program - Northern California …eerinc.org/old/quake06/local_government/Rentschler_Distribution_of... · – Subpart N Hazard Mitigation Grant Program ...

32

Keys to SuccessKeys to Success

Clear Descriptions of Eligible, Priority Activities in terms of

• Time • Scope• Money

Page 33: Hazard Mitigation Grant Program - Northern California …eerinc.org/old/quake06/local_government/Rentschler_Distribution_of... · – Subpart N Hazard Mitigation Grant Program ...

33

IV. Application Review IV. Application Review ProcessProcess

• Notice of Interest (NOI)• HMGP Application

Page 34: Hazard Mitigation Grant Program - Northern California …eerinc.org/old/quake06/local_government/Rentschler_Distribution_of... · – Subpart N Hazard Mitigation Grant Program ...

34

Notice of Interest (NOI)Notice of Interest (NOI)

• Applicant submittal of NOI• Electronic Form: oes.ca.gov

• See Hazard Mitigation Forms• Initial Screening of NOI by OES• Response within 48 hours during work

week

Page 35: Hazard Mitigation Grant Program - Northern California …eerinc.org/old/quake06/local_government/Rentschler_Distribution_of... · – Subpart N Hazard Mitigation Grant Program ...

35

HMGP ApplicationHMGP Application

• Applicant submittal of HMGP application• OES Recommends an eligible projects• OES Forwards project to FEMA for review

and approval of funding• FEMA Forwards approved (obligated) project

to OES for disbursement• FEMA can deny a project recommended by

OES • An eligible applicant may appeal FEMA’s

determination

Page 36: Hazard Mitigation Grant Program - Northern California …eerinc.org/old/quake06/local_government/Rentschler_Distribution_of... · – Subpart N Hazard Mitigation Grant Program ...

36

HMGP ApplicationHMGP Application

Remember:

Requests for advances must be included in the application. OES will not consider requests for advances after the grant has been approved by FEMA and the funds obligated.

Page 37: Hazard Mitigation Grant Program - Northern California …eerinc.org/old/quake06/local_government/Rentschler_Distribution_of... · – Subpart N Hazard Mitigation Grant Program ...

37

Approval, Funding, PaymentsApproval, Funding, Payments

Notification by letter from OESFEMA may notify Congressional firstFunds are paid as reimbursements to costs.OES will withhold 10% of grantPayment can be suspended

Page 38: Hazard Mitigation Grant Program - Northern California …eerinc.org/old/quake06/local_government/Rentschler_Distribution_of... · – Subpart N Hazard Mitigation Grant Program ...

38

V. Post Obligation V. Post Obligation

• Implementation • Closeout

Page 39: Hazard Mitigation Grant Program - Northern California …eerinc.org/old/quake06/local_government/Rentschler_Distribution_of... · – Subpart N Hazard Mitigation Grant Program ...

39

ImplementationImplementation• Request reimbursement for eligible incurred project

costs• Manage project• Submit project’s progress reports on quarterly basis• Notify OES, in writing, when there are changes in

the status of the project- Scope of work- Work schedule- Budget

Page 40: Hazard Mitigation Grant Program - Northern California …eerinc.org/old/quake06/local_government/Rentschler_Distribution_of... · – Subpart N Hazard Mitigation Grant Program ...

40

CloseoutCloseout

• Notify OES upon completion of the project• Submit complete closeout documents

a. Final Claim Formb. Project Accomplishmentsc. Project Budgetd. Inspection Reports (if applicable)e. Planned Maintenance Activities Report (if

applicable)f. Project Photographs/Materials (if applicable)

Page 41: Hazard Mitigation Grant Program - Northern California …eerinc.org/old/quake06/local_government/Rentschler_Distribution_of... · – Subpart N Hazard Mitigation Grant Program ...

41

CloseoutCloseout

• Maintain auditable records • Organize Records by project

Page 42: Hazard Mitigation Grant Program - Northern California …eerinc.org/old/quake06/local_government/Rentschler_Distribution_of... · – Subpart N Hazard Mitigation Grant Program ...

42

VI. Common ErrorsVI. Common Errors

• Submittal of Ineligible Projects• Incomplete Project Description• Failure to Identify Matching Fund• Missed Deadlines• Incomplete Forms• Not Considering Historic/Environmental

Impacts• Verbal agreements• Lack of Auditable Documentation• Lack of Single Point of Contact

Page 43: Hazard Mitigation Grant Program - Northern California …eerinc.org/old/quake06/local_government/Rentschler_Distribution_of... · – Subpart N Hazard Mitigation Grant Program ...

43

ContactContact

Sacramento OfficeJohn Rowden

State Hazard Mitigation OfficerP.O. Box 419023

Rancho Cordova, CA95741-9023

(916) 845-8150

Page 44: Hazard Mitigation Grant Program - Northern California …eerinc.org/old/quake06/local_government/Rentschler_Distribution_of... · – Subpart N Hazard Mitigation Grant Program ...

44