Top Banner
1 Former NAS Moffett Field Hangar 1 Removal Action Update Bryce Bartelma, PG Navy BRAC PMO West May 10, 2012 RAB Meeting
14
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Hangar One Update to Moffett RAB May 10, 2012

1

Former NAS Moffett Field

Hangar 1 Removal Action Update

Bryce Bartelma, PG

Navy BRAC PMO West

May 10, 2012

RAB Meeting

Page 2: Hangar One Update to Moffett RAB May 10, 2012

2

• Control release of PCBs from Hangar 1 in accordancewith EE/CA (July 2008) and Action Memorandum(December 2008)

Demolition of interior structures

Removal of contaminated siding

Application of weather-resistant coating to steel frame

Project Objective

Page 3: Hangar One Update to Moffett RAB May 10, 2012

3

Continued Monitoring andProtection Measures

• Increased biological activity

• Increased storm water and groundsurface protection during rainy season

• Navy and NASA air monitoring datademonstrates control of air emissions

Page 4: Hangar One Update to Moffett RAB May 10, 2012

4

Increased Biological Activity & Mitigation

• No Burrowing Owls

• Discourage IncipientNest Building byRavens and HouseFinches

• Brandt’s CormorantRescue

Page 5: Hangar One Update to Moffett RAB May 10, 2012

5

Increased Storm Water Management

Protection of Grassy Areas withHeavy Plastic Sheeting

Runoff Pumped to Holding Tanksand Treatment System

Page 6: Hangar One Update to Moffett RAB May 10, 2012

6

RAB Tour – March 14, 2012

Page 7: Hangar One Update to Moffett RAB May 10, 2012

7

Permanent Roof Access

• Roof Ridge Access for FAA Beacon and Holiday Star

• Mock-up Display for Navy and NASA Engineers

Page 8: Hangar One Update to Moffett RAB May 10, 2012

8

Progress – January 23

Page 9: Hangar One Update to Moffett RAB May 10, 2012

9

Progress – April 26

Page 10: Hangar One Update to Moffett RAB May 10, 2012

10

Mansard Panel Removal Completed

Page 11: Hangar One Update to Moffett RAB May 10, 2012

11

Zone 6 – Siding Removal

Page 12: Hangar One Update to Moffett RAB May 10, 2012

12

Palo Alto Perspective

Page 13: Hangar One Update to Moffett RAB May 10, 2012

13

Schedule

• Fieldwork in zones 1 – 3

Nearly Complete

• Fieldwork in zones 4 – 6

Ongoing

• Complete mezzanine andtouch-ups, confirmationsampling and demobilize

September 2012

• Submit After ActionCompletion Report

Winter 2012

Page 14: Hangar One Update to Moffett RAB May 10, 2012

14

Questions?

Point of Contact:

Scott Anderson

BRAC EnvironmentalCoordinator

(619) 532-0938