1 Former NAS Moffett Field Hangar 1 Removal Action Update Bryce Bartelma, PG Navy BRAC PMO West November 3, 2011 RAB Meeting
May 17, 2015
1
Former NAS Moffett Field
Hangar 1 Removal Action Update
Bryce Bartelma, PG
Navy BRAC PMO West
November 3, 2011
RAB Meeting
2
Presentation Overview
• Project Objective
• Progress Update Continued Monitoring
and ProtectionMeasures
Historic Mitigation/CARP
Scaffolding Installation
• Schedule
• Questions
Roof, Redwood, Siding &Window Removal
Coating Inspections &Touch-ups
Moving Scaffolding
3
• Control release of PCBs from Hangar 1 in accordancewith EE/CA (July 2008) and Action Memorandum(December 2008)
Demolition of interior structures
Removal of contaminated siding
Application of weather-resistant coating to steel frame
Project Objective
4
Continued Monitoring andProtection Measures
• No observed impacts to biologicalactivity
• Continued storm water and groundsurface protection
• Navy and NASA air monitoring datademonstrates control of air emissions
5
EPA and Water Board Site Inspection
6
Hangar 1 Interactive CD
• Delay in final production. CD will contain interactivehistory and interviews but not 3-D tour.
• Navy and NASAlooking into a webbased version thatwill be hosted byNASA website andwill contain both theinteractive materialsand 3-D tour!
7
Continued Mansard Panel Removal
8
Continued Redwood Removal
9
Continued Silver Siding Removal(Robertson Protected Metal)
10
Window and Door Removal
11
Zone 1 Exterior Coating & Touch-ups
• Use of man lifts forlower level touch-ups
12
Zone 2 East Progress – September 7
13
Zone 2 East Progress – September 20
14
Zone 2 East Progress – October 12
15
Zone 2 West Progress – September 6
16
Zone 2 West Progress – October 3
17
Zone 2 West Progress – October 12
18
Removing Scaffolding in Zone 1
19
Interior View
20
Installing Systems Scaffolding& Quick Deck in Zone 6
21
Clam Shell Door Mechanisms
22
Fiber Board Removal
• Fiber boards surroundtracks of Clam Shell doors
• Recently sampled anddetermined to containcontamination
• Not structural
• Navy to remove boardsbut keep rails in-place
• NASA to considerreplacement in re-use
23
Special Visitor at Moffett
24
Schedule
• Fieldwork in zones 1 – 6Ongoing
• Complete fieldwork,confirmation samplingand demobilizeSpring/Summer 2012
• Submit After ActionCompletion ReportSummer/Fall 2012
25
Questions?
Point of Contact:
Scott Anderson
BRAC EnvironmentalCoordinator
(619) 532-0938