1 Former NAS Moffett Field Hangar 1 Removal Action Update Bryce Bartelma, PG Navy BRAC PMO West November 3, 2011 RAB Meeting
25

Moffett Hangar One Removal Action Update

May 17, 2015

Download

Education

Steve Williams

Presented to the Moffett Restoration Advisory Board
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Moffett Hangar One Removal Action Update

1

Former NAS Moffett Field

Hangar 1 Removal Action Update

Bryce Bartelma, PG

Navy BRAC PMO West

November 3, 2011

RAB Meeting

Page 2: Moffett Hangar One Removal Action Update

2

Presentation Overview

• Project Objective

• Progress Update Continued Monitoring

and ProtectionMeasures

Historic Mitigation/CARP

Scaffolding Installation

• Schedule

• Questions

Roof, Redwood, Siding &Window Removal

Coating Inspections &Touch-ups

Moving Scaffolding

Page 3: Moffett Hangar One Removal Action Update

3

• Control release of PCBs from Hangar 1 in accordancewith EE/CA (July 2008) and Action Memorandum(December 2008)

Demolition of interior structures

Removal of contaminated siding

Application of weather-resistant coating to steel frame

Project Objective

Page 4: Moffett Hangar One Removal Action Update

4

Continued Monitoring andProtection Measures

• No observed impacts to biologicalactivity

• Continued storm water and groundsurface protection

• Navy and NASA air monitoring datademonstrates control of air emissions

Page 5: Moffett Hangar One Removal Action Update

5

EPA and Water Board Site Inspection

Page 6: Moffett Hangar One Removal Action Update

6

Hangar 1 Interactive CD

• Delay in final production. CD will contain interactivehistory and interviews but not 3-D tour.

• Navy and NASAlooking into a webbased version thatwill be hosted byNASA website andwill contain both theinteractive materialsand 3-D tour!

Page 7: Moffett Hangar One Removal Action Update

7

Continued Mansard Panel Removal

Page 8: Moffett Hangar One Removal Action Update

8

Continued Redwood Removal

Page 9: Moffett Hangar One Removal Action Update

9

Continued Silver Siding Removal(Robertson Protected Metal)

Page 10: Moffett Hangar One Removal Action Update

10

Window and Door Removal

Page 11: Moffett Hangar One Removal Action Update

11

Zone 1 Exterior Coating & Touch-ups

• Use of man lifts forlower level touch-ups

Page 12: Moffett Hangar One Removal Action Update

12

Zone 2 East Progress – September 7

Page 13: Moffett Hangar One Removal Action Update

13

Zone 2 East Progress – September 20

Page 14: Moffett Hangar One Removal Action Update

14

Zone 2 East Progress – October 12

Page 15: Moffett Hangar One Removal Action Update

15

Zone 2 West Progress – September 6

Page 16: Moffett Hangar One Removal Action Update

16

Zone 2 West Progress – October 3

Page 17: Moffett Hangar One Removal Action Update

17

Zone 2 West Progress – October 12

Page 18: Moffett Hangar One Removal Action Update

18

Removing Scaffolding in Zone 1

Page 19: Moffett Hangar One Removal Action Update

19

Interior View

Page 20: Moffett Hangar One Removal Action Update

20

Installing Systems Scaffolding& Quick Deck in Zone 6

Page 21: Moffett Hangar One Removal Action Update

21

Clam Shell Door Mechanisms

Page 22: Moffett Hangar One Removal Action Update

22

Fiber Board Removal

• Fiber boards surroundtracks of Clam Shell doors

• Recently sampled anddetermined to containcontamination

• Not structural

• Navy to remove boardsbut keep rails in-place

• NASA to considerreplacement in re-use

Page 23: Moffett Hangar One Removal Action Update

23

Special Visitor at Moffett

Page 24: Moffett Hangar One Removal Action Update

24

Schedule

• Fieldwork in zones 1 – 6Ongoing

• Complete fieldwork,confirmation samplingand demobilizeSpring/Summer 2012

• Submit After ActionCompletion ReportSummer/Fall 2012

Page 25: Moffett Hangar One Removal Action Update

25

Questions?

Point of Contact:

Scott Anderson

BRAC EnvironmentalCoordinator

(619) 532-0938

[email protected]