Top Banner
HAMPSTEAD SCHOOL DISTRICT January 14, 2013 PUBLIC HEARING ON THE PROPOSED 2013- 14 BUDGET AND WARRANT ARTICLES The mission of the Hampstead School District is to provide challenging education experiences that enable all students to succeed to their individual potential in a rapidly changing global community.
22

HAMPSTEAD SCHOOL DISTRICT January 14, 2013 PUBLIC HEARING ON THE PROPOSED 2013-14 BUDGET AND WARRANT ARTICLES The mission of the Hampstead School District.

Mar 31, 2015

Download

Documents

Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: HAMPSTEAD SCHOOL DISTRICT January 14, 2013 PUBLIC HEARING ON THE PROPOSED 2013-14 BUDGET AND WARRANT ARTICLES The mission of the Hampstead School District.

HAMPSTEAD SCHOOL DISTRICTJanuary 14, 2013

PUBLIC HEARING ON THE PROPOSED 2013-14 BUDGET AND WARRANT ARTICLES

The mission of the Hampstead School District is to provide challenging education experiences that enable all students to succeed to their individual potential in a rapidly

changing global community.

Page 2: HAMPSTEAD SCHOOL DISTRICT January 14, 2013 PUBLIC HEARING ON THE PROPOSED 2013-14 BUDGET AND WARRANT ARTICLES The mission of the Hampstead School District.

2013 SCHOOL DISTRICT WARRANTTo the inhabitants of the School District of the Town of Hampstead, New Hampshire, qualified to vote in District affairs: 

First Session of Annual Meeting (Deliberative)You are hereby notified to meet at the Hampstead Middle School, 28 School Street, Hampstead, New Hampshire, on Tuesday, the 5th day of February 2013, at 7:00 p.m. This session shall consist of explanation, discussion, and debate of warrant articles number 2 through 9. Warrant articles may be amended subject to the following limitations: (a) warrant articles whose wording is prescribed by law shall not be amended, (b) warrant articles that are amended shall be placed on the official ballot for a final vote on the main motion, as amended, and (c) no warrant article shall be amended to eliminate the subject matter of the article. 

Second Session of Annual Meeting (Voting)Voting on warrant articles number 1 through 9 will be conducted by official ballot to be held in conjunction with town meeting voting to be held on Tuesday, the 12th day of March, 2013 at the Hampstead Middle School, 28 School Street, Hampstead, New Hampshire. Polls will be open from 8:00 a.m. and remain open until 8:00 p.m. 

Article 1 – Election of OfficersTo choose the following school district officers:  

School Board Member 3-year term

Page 3: HAMPSTEAD SCHOOL DISTRICT January 14, 2013 PUBLIC HEARING ON THE PROPOSED 2013-14 BUDGET AND WARRANT ARTICLES The mission of the Hampstead School District.

ARTICLE 2 – OPERATING BUDGETShall the Hampstead School District raise and appropriate as an operating budget, not including appropriations by special warrant articles and other appropriations voted separately, the amounts set forth on the budget posted with the warrant, for the purposes set forth therein, totaling $23,773,024? Should this article be defeated, the operating budget shall be $23,898,613, which is the same as last year, with certain adjustments required by previous action of the Hampstead School District or by law; or the governing body may hold one special meeting, in accordance with RSA 40:13, X and XVI, to take up the issue of a revised operating budget only. Note: Warrant Article 2 (Operating Budget) does not include appropriations proposed under any other warrant articles. (MAJORITY VOTE REQUIRED)

2013-14 PUBLIC HEARING ON BUDGET

Page 4: HAMPSTEAD SCHOOL DISTRICT January 14, 2013 PUBLIC HEARING ON THE PROPOSED 2013-14 BUDGET AND WARRANT ARTICLES The mission of the Hampstead School District.

BUDGET PRESENTATION• District Goals

• Budget Drivers

• Budget Highlights by Function

• Increases / (decreases)

• Overall Budget Proposal

• Default Budget

2013-14 PUBLIC HEARING ON BUDGET

Page 5: HAMPSTEAD SCHOOL DISTRICT January 14, 2013 PUBLIC HEARING ON THE PROPOSED 2013-14 BUDGET AND WARRANT ARTICLES The mission of the Hampstead School District.

DISTRICT BUDGET GOALS• Review staff levels and program needs, and adjust appropriately

where feasible, while maintaining high quality of instructional programs

• Continue implementation of Common Core State Standards with focus on Mathematics

• Support ongoing professional development and teacher training in Reading and Spelling instruction

• Upgrade existing technology hardware and continue integration of technology across all curriculum areas

• Improve academic progress monitoring in Math (for grades 3-7) and Language Arts (for grades 5-7)

• Keep operating budget increases to less than 1% over fiscal year 2013 budget

• Successfully negotiate contract agreements with HEA and HSPA

Page 6: HAMPSTEAD SCHOOL DISTRICT January 14, 2013 PUBLIC HEARING ON THE PROPOSED 2013-14 BUDGET AND WARRANT ARTICLES The mission of the Hampstead School District.

BUDGET DRIVERSEmployee Salaries and Benefits• Teacher contract and custodial contract on separate Warrant Article• NH State Retirement increase: $200,352• Health Insurance increase: $159,834• Teacher (1 FTE) and Administrative (0.2 FTE) reduction: ($60,000)

Curriculum and Instruction• Update Math curriculum materials at HCS: $104,000• Technology integration: $35,500• Tuition, regular and special education: ($49,423)

Facilities and Operations• Reduction in maintenance budget: ($121,880)• Transportation contract: $9,625• SAU Budget: $9,637

Other• Federal sequestration/reduction in federal grants ($38,000)

Page 7: HAMPSTEAD SCHOOL DISTRICT January 14, 2013 PUBLIC HEARING ON THE PROPOSED 2013-14 BUDGET AND WARRANT ARTICLES The mission of the Hampstead School District.

BUDGET HIGHLIGHTSIncreases/(Decreases) by Function

1100 Regular Education $108,9741200 Special Education ($21,107)21xx Support Services - Students $2,614221x Support Services - Staff & Admin $4,900222x Library/Media Services $4,6472320 SAU 55 $9,6372410 Office of the Principal ($935)26xx Operation & Maintenance of Plant ($11,880)272x Transportation ($9,625)2900 Support Services - Benefits $365,436 4600 Building Improvements ($110,000)5250 Capital Reserve & Federal Grants ($113,000)

2013-2014 Budget Increase $223,152

Page 8: HAMPSTEAD SCHOOL DISTRICT January 14, 2013 PUBLIC HEARING ON THE PROPOSED 2013-14 BUDGET AND WARRANT ARTICLES The mission of the Hampstead School District.

DEFAULT BUDGETShould the proposed budget be defeated, the Default Budget would be: $23,898,613

Default: $23,898,603Proposed: $23,773,024

Difference: ($125,589)

2013-14 PUBLIC HEARING ON BUDGET

Page 9: HAMPSTEAD SCHOOL DISTRICT January 14, 2013 PUBLIC HEARING ON THE PROPOSED 2013-14 BUDGET AND WARRANT ARTICLES The mission of the Hampstead School District.

BUDGET DISTRIBUTION

Tuition 28.5%Salaries 37.0%Benefits 20.5%Fund Transfer 3.1%Transportation 3.6%Utilities & Repair 2.8%Supplies & Equipment 4.5%

FY 14 BUDGET - $23,773,024

2013-14 PUBLIC HEARING ON BUDGET

Page 10: HAMPSTEAD SCHOOL DISTRICT January 14, 2013 PUBLIC HEARING ON THE PROPOSED 2013-14 BUDGET AND WARRANT ARTICLES The mission of the Hampstead School District.

OVERALL BUDGET PROPOSAL

$23,773,024

2013-14 2011-12 Difference

$23,773,024 $23,549,872 $223,1520.95%

2013-14 PUBLIC HEARING ON BUDGET

Page 11: HAMPSTEAD SCHOOL DISTRICT January 14, 2013 PUBLIC HEARING ON THE PROPOSED 2013-14 BUDGET AND WARRANT ARTICLES The mission of the Hampstead School District.

FUTURE LARGE PROJECTS

• Central School Repaving $189,000

• Middle School Repaving $170,000

• Central School Roof $150,000

• Middle School Roof $100,000

• Middle School Boilers $100,000

2013-14 PUBLIC HEARING ON BUDGET

Page 12: HAMPSTEAD SCHOOL DISTRICT January 14, 2013 PUBLIC HEARING ON THE PROPOSED 2013-14 BUDGET AND WARRANT ARTICLES The mission of the Hampstead School District.

ANTICIPATED PROJECTS 2013-14Project Description Location Estimate

1 Front entry concrete slab replacement HCS $62,000

2 So. wing corridor window removal/infill HCS $8,000

3 Restroom flooring, rooms 118, 222 HCS $1,000

4 Painting, non classroom Both $7,000

5 Storage rooms partitioning HCS $20,000

6 Gym floor paint, resurfacing HMS $6,000

7 Well tank, piping, controls HMS $20,000

8 Replace 1940’s bldg shingle roof HCS $20,000

9 Scrape/repaint exterior south wing HCS $10,000

T O T A L $154,000Budgeted FY 2014 $160,000

Page 13: HAMPSTEAD SCHOOL DISTRICT January 14, 2013 PUBLIC HEARING ON THE PROPOSED 2013-14 BUDGET AND WARRANT ARTICLES The mission of the Hampstead School District.

ARTICLE 3 – COLLECTIVE BARGAINING AGREEMENT - HSPAShall the Hampstead School District vote to approve the cost items included in the collective bargaining agreement reached between the Hampstead School Board and the Hampstead Support Personnel Association, which calls for the following increases in salaries and benefits at the current staffing levels over the amount paid in the prior fiscal year:

and further to raise and appropriate the sum of $10,978 for the 2013-14 fiscal year, such sum representing the additional costs attributable to the increase in salaries and fringe benefits required by the new agreement over those that would be paid at current staffing levels? (MAJORITY VOTE REQUIRED)

 

 

Cost Distribution Year 1 Year 2 Year 3 Year 4

Salaries $18,872 $18,872 $18,872 $20,220

Uniform Clean/Maintenance (4,229) 0 0 0

FICA 1,444 1,444 1,444 1,547

NH State Retirement 2,033 2,033 2,033 2,178

Insurance (7,142) 0 0 0

TOTAL $10,978 $22,348 $22,348 $23,945

Page 14: HAMPSTEAD SCHOOL DISTRICT January 14, 2013 PUBLIC HEARING ON THE PROPOSED 2013-14 BUDGET AND WARRANT ARTICLES The mission of the Hampstead School District.

ARTICLE 4 – COLLECTIVE BARGAINING AGREEMENT - HEAShall the Hampstead School District vote to approve the cost items included in the collective bargaining agreement reached between the Hampstead School Board and the Hampstead Educators Association, which calls for the following increases in salaries and benefits at the current staffing levels over the amount paid in the prior fiscal year:

 

and further to raise and appropriate the sum of $99,881 for the 2013-14 fiscal year, such sum representing the additional costs attributable to the increase in salaries and fringe benefits required by the new agreement over those that would be paid at current staffing levels? (MAJORITY VOTE REQUIRED)

Cost Distribution Year 1 Year 2 Year 3 Year 4

Salaries $83,969 $135,271 $154,704 $164,695

Insurance 0 0 0 (56,924)

FICA 6,424 10,348 11,835 12,599

NH State Retirement 9,488 19,154 21,906 23,321

TOTAL $99,881 $164,773 $188,445 $143,691

Page 15: HAMPSTEAD SCHOOL DISTRICT January 14, 2013 PUBLIC HEARING ON THE PROPOSED 2013-14 BUDGET AND WARRANT ARTICLES The mission of the Hampstead School District.

ARTICLE 5 – AUTHORIZATION FOR SPECIAL MEETING ON COST ITEMS

Shall the Hampstead School District, if Article 3 or Article 4 is defeated, authorize the Hampstead School Board to call a special meeting, at its option, to address the Article 3 and/or Article 4 cost item only? (MAJORITY VOTE REQUIRED) (Without this article, the District would have to petition the Superior Court for a Special School District Meeting. This saves the District the expense of attorney fees and court costs.)

2013-14 PUBLIC HEARING ON BUDGET

Page 16: HAMPSTEAD SCHOOL DISTRICT January 14, 2013 PUBLIC HEARING ON THE PROPOSED 2013-14 BUDGET AND WARRANT ARTICLES The mission of the Hampstead School District.

ARTICLE 6 – CAPITAL RESERVE FUNDShall the Hampstead School District raise and appropriate up to $75,000 to be placed in the School Renovation, Reconstruction and Capital Improvement Capital Reserve Fund established in 2006, with such amount to be transferred from the June 30, 2013 unreserved fund balance (surplus) in excess of $150,000? (MAJORITY VOTE REQUIRED) (The first $150,000 of surplus will be returned to the taxpayers. The next $75,000 of the surplus will be placed in the Capital Reserve Fund. Any additional surplus will be returned to the taxpayers. The funds from this article come from the 2012-13 school budget surplus, not from additional taxes.)

2013-14 PUBLIC HEARING ON BUDGET

Page 17: HAMPSTEAD SCHOOL DISTRICT January 14, 2013 PUBLIC HEARING ON THE PROPOSED 2013-14 BUDGET AND WARRANT ARTICLES The mission of the Hampstead School District.

ARTICLE 7 – FUND BALANCE RETENTION (SURPLUS)

Shall the Hampstead School District vote to authorize, indefinitely until rescinded, the retention of year-end unassigned general funds in an amount not to exceed, in any fiscal year, 2.5 percent of the current fiscal year’s net assessment, for the purpose of having funds on hand to use as a revenue source for emergency expenditures and over-expenditures under RSA 32:11, or to be used as a revenue source to reduce the tax rate, all in accordance with RSA 198:4-b, II? (MAJORITY VOTE REQUIRED)

2013-14 PUBLIC HEARING ON BUDGET

Page 18: HAMPSTEAD SCHOOL DISTRICT January 14, 2013 PUBLIC HEARING ON THE PROPOSED 2013-14 BUDGET AND WARRANT ARTICLES The mission of the Hampstead School District.

ARTICLE 8 – GENERAL ACCEPTANCE OF REPORTS

Shall the Hampstead School District accept reports of agents, auditors, and committees as written in the 2012 Annual Report? (MAJORITY VOTE REQUIRED)

2013-14 PUBLIC HEARING ON BUDGET

Page 19: HAMPSTEAD SCHOOL DISTRICT January 14, 2013 PUBLIC HEARING ON THE PROPOSED 2013-14 BUDGET AND WARRANT ARTICLES The mission of the Hampstead School District.

ARTICLE 9 – SAU BUDGET ON WARRANT PETITION BY JORGE MESA-TEJADA ET AL

Shall the voters of the Hampstead School District within School Administrative Unit number 55 adopt the provisions of RSA 194-C:9-b to allow for insertion of the school administrative unit budget as a separate warrant article at annual school district meetings? (MAJORITY VOTE REQUIRED)

2013-14 PUBLIC HEARING ON BUDGET

Page 20: HAMPSTEAD SCHOOL DISTRICT January 14, 2013 PUBLIC HEARING ON THE PROPOSED 2013-14 BUDGET AND WARRANT ARTICLES The mission of the Hampstead School District.

DELIBERATIVE SESSION

TUESDAY, FEBRUARY 5, 2013

HAMPSTEAD MIDDLE SCHOOL

7:00 PM

Page 21: HAMPSTEAD SCHOOL DISTRICT January 14, 2013 PUBLIC HEARING ON THE PROPOSED 2013-14 BUDGET AND WARRANT ARTICLES The mission of the Hampstead School District.
Page 22: HAMPSTEAD SCHOOL DISTRICT January 14, 2013 PUBLIC HEARING ON THE PROPOSED 2013-14 BUDGET AND WARRANT ARTICLES The mission of the Hampstead School District.

    Prior Year Reductions &

Increases

Minus    PURPOSE OF APPROPRIATIONS Adopted 1-Time DEFAULT BUDGET

Acct.# (RSA 32:3,V)Operating

Budget Appropriations  

  INSTRUCTION        

1100-1199 Regular Programs

RSA 40:13, IX (b) "Default budget" as used in this subdivision means the amount of the same appropriations as contained in the operating budget authorized for the previous year, reduced and increased, as the case may be, by debt service, contracts, and other obligations previously incurred or mandated by law, and reduced by one-time expenditures contained in the operating budget. For the purposes of this paragraph, one-time expenditures shall be appropriations not likely to recur in the succeeding budget, as determined by the governing body, unless the provisions of RSA 40:14-b are adopted, of the local political subdivision.

DEFAULT BUDGET OF THE SCHOOLOF: Hampstead School District, NH

Fiscal Year From July 1, 2011 to June 30, 2012 IS THIS PERIOD CORRECT?