Growing the Grid The Wind Farm to Market Highway Nebraska Wind Power Conference November 16, 2011 Paul Malone
12

Growing the Grid The Wind Farm to Market Highway

Feb 25, 2016

Download

Documents

Chance

Growing the Grid The Wind Farm to Market Highway. Nebraska Wind Power Conference November 16, 2011 Paul Malone. Topics. Transmission Planning on an Interregional or Interconnection -wide basis FERC Order 1000 directives. 150,000 MW. 55,000 MW. 750,000 MW. - PowerPoint PPT Presentation
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Growing the Grid The Wind Farm to Market Highway

Growing the GridThe Wind Farm to Market Highway

Nebraska Wind Power ConferenceNovember 16, 2011

Paul Malone

Page 2: Growing the Grid The Wind Farm to Market Highway

Topics

• Transmission Planning on an Interregional or Interconnection -wide basis

• FERC Order 1000 directives

Page 3: Growing the Grid The Wind Farm to Market Highway

3

150,000 MW

55,000 MW 750,000 MW 3

Page 4: Growing the Grid The Wind Farm to Market Highway

4

Page 5: Growing the Grid The Wind Farm to Market Highway

Interconnection-wide Transmission Studies

• Joint Coordinated System Plan (JCSP)– Sponsored by the Regional Transmission Organizations– Completed 2008

• Eastern Wind Integration and Transmission Study (EWITS) – Sponsored by the National Renewable Energy Lab– Report published 2010

• Eastern Interconnection Planning Collaborative (EIPC) – Sponsored by the Department of Energy– To be completed in 2012

Page 6: Growing the Grid The Wind Farm to Market Highway

6

Eastern Wind Integration and

Transmission Study

Page 7: Growing the Grid The Wind Farm to Market Highway
Page 8: Growing the Grid The Wind Farm to Market Highway
Page 9: Growing the Grid The Wind Farm to Market Highway
Page 10: Growing the Grid The Wind Farm to Market Highway
Page 11: Growing the Grid The Wind Farm to Market Highway

Seams Steering Committee• FERC Order 1000 pertaining to seams

– Interregional Planning– Interregional Cost Allocation

• SPP staff will review current seams agreements and JOAs

11

Page 12: Growing the Grid The Wind Farm to Market Highway

Questions?