Group IV Project The Rain Garden 2009 – 2010 School Year by Merritt Perry, Ted Parker, Jordan Gwyn, Marc Fleischhaue r
6

Group IV Project – The Rain Garden 2009 – 2010 School Year by Merritt Perry, Ted Parker, Jordan Gwyn, Marc Fleischhauer.

Jan 05, 2016

Download

Documents

Nancy Cox
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Group IV Project – The Rain Garden 2009 – 2010 School Year by Merritt Perry, Ted Parker, Jordan Gwyn, Marc Fleischhauer.

Group IV Project – The Rain Garden

2009 – 2010 School Year

by

Merritt Perry,

Ted Parker, Jordan Gwyn,

Marc Fleischhauer

Page 2: Group IV Project – The Rain Garden 2009 – 2010 School Year by Merritt Perry, Ted Parker, Jordan Gwyn, Marc Fleischhauer.

The Rain Garden

• Located in the CCES Upper School Parking lot

• Started by the IB Class of 2009• Created to help filter the runoff

water from the CCES parking lot which eventually flows into the Reedy River

• 2009 Class planted many native plants which have thrived in the garden.

Page 3: Group IV Project – The Rain Garden 2009 – 2010 School Year by Merritt Perry, Ted Parker, Jordan Gwyn, Marc Fleischhauer.

Goals of the Rain Garden Project

• Improve the current drainage system of the existing Rain Garden

• Maintain the native plants of the garden

• Weed the garden• Find the pH of the soil• Find the slope of the

garden• Find the flow rate of

the garden

Page 4: Group IV Project – The Rain Garden 2009 – 2010 School Year by Merritt Perry, Ted Parker, Jordan Gwyn, Marc Fleischhauer.

Measurements of the Garden

– Width of the Garden: 16’6”

– Height: 1’– % slope:

6.06060606060606060606060.

– Recommended soil depth: 6-7 inches

– pH results: 7.4 (nearly neutral)

Page 5: Group IV Project – The Rain Garden 2009 – 2010 School Year by Merritt Perry, Ted Parker, Jordan Gwyn, Marc Fleischhauer.

Drainage System

• Makeshift system using existing pipes and cinder block

• Rain Barrel • The Rain Garden

only receives runoff water from the faculty parking lot

• The student parking lot drains to another drain on the far side of the parking lot.

Page 6: Group IV Project – The Rain Garden 2009 – 2010 School Year by Merritt Perry, Ted Parker, Jordan Gwyn, Marc Fleischhauer.

Future Goals for the Rain Garden

• Rain Barrel• Greater Sustainability• Improved Drainage

System• Introduction of more

native plants• A second Rain Garden

located on the other side of the parking lot