GREEN STORMWATER INFRASTRUCTURE DESIGN PROCESS WORKFLOW PACKET Last Updated: May 15, 2015 1
33

GREEN STORMWATER INFRASTRUCTURE DESIGN PROCESS WORKFLOW ...phillywatersheds.org/doc/GSI/GSI_Design_Process_Workflow_Packet_… · green stormwater infrastructure design process workflow

Sep 02, 2018

Download

Documents

dangcong
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: GREEN STORMWATER INFRASTRUCTURE DESIGN PROCESS WORKFLOW ...phillywatersheds.org/doc/GSI/GSI_Design_Process_Workflow_Packet_… · green stormwater infrastructure design process workflow

 

 

 

 

 

 

GREEN STORMWATER INFRASTRUCTURE DESIGN PROCESS WORKFLOW PACKET

 

Last Updated: May 15, 2015

1

Page 2: GREEN STORMWATER INFRASTRUCTURE DESIGN PROCESS WORKFLOW ...phillywatersheds.org/doc/GSI/GSI_Design_Process_Workflow_Packet_… · green stormwater infrastructure design process workflow

GSI Design Process Workflow     

 

Introduction This packet provides summary workflows, detailed workflows, and expanded process descriptions that describe the design process for Green Stormwater Infrastructure (GSI) projects funded and/or maintained by the Philadelphia Water Department (PWD). The following information is to be referenced by PWD staff, providers of professional engineering services hired by PWD, and other agencies/partner organizations that are working with PWD. These workflows represent the typical process for typical projects. The process may vary on a case‐by‐case basis due to project‐specific circumstances. The workflows are divided into three “tracks”: 

Track 1: GSI Design on Water/Sewer Project:  GSI is added to an existing PWD Design Branch water/sewer project. Because this type of project is regularly done in‐house by PWD engineers, the workflow summary covers both in‐house design and consultant design processes, while the detailed workflow and expanded process descriptions cover consultant design specifically. These projects are managed by the Design Branch, with Office of Watersheds (OOW) involvement at concept and final metrics stages.   

Track 2: Non‐Water/Sewer GSI Design (Contract Managed by Design Branch): A GSI project package is designed by a consultant under a contract with PWD managed by the Design Unit. This type of project is no longer being initiated, but the workflow is still included because some projects are still in design.  

Track 3: GSI Design (Contract Managed by OOW): A GSI project package is designed by a consultant under a contract with PWD managed by OOW.  

While these workflows are primarily for consultant designed projects, most of the information they present applies to in‐house projects as well. If using the workflows for in‐house projects, be aware of these main differences in the design process from consultant designed projects:  

Survey performed by PWD Survey Unit 

Baseplan drafting performed by Design Branch or OOW 

Engineering and drafting performed by Design Branch or OOW 

Plans sent through GPIS approval system at utility review 

The workflows are presented in increasing detail. Summary workflows cover the broader steps and can 

be used for a quick reference. The detailed workflows show each process step along the design track 

and which group is responsible for that step. The detail of each of those steps (e.g. the who, what, 

when, how) cannot be shown clearly in the workflow, so expanded process descriptions corresponding 

to each numbered step are included in the pages following each detailed workflow. 

 

Note on Partner Projects: While the workflows within this packet touch on coordination with partners (public or private entities that work with PWD to implement GSI), PWD has developed separate documentation that provides more details on partner coordination. This information is included in Attachment D of the GSI Design Requirements & Guidelines Packet: Partner Project Review Guidelines and, if the project disturbance triggers compliance with Philadelphia Stormwater Regulations, the submission process guidance in the Philadelphia Stormwater Management Guidance Manual. Both those resources, which may be used in addition to the workflows in this packet, are mentioned in the “Relationships with Other Resources and References” section below. The PWD project manager can provide further project‐specific guidance. 

2

Page 3: GREEN STORMWATER INFRASTRUCTURE DESIGN PROCESS WORKFLOW ...phillywatersheds.org/doc/GSI/GSI_Design_Process_Workflow_Packet_… · green stormwater infrastructure design process workflow

GSI Design Process Workflow     

 

Revision History Regular updates will be made to this packet to reflect changes to the GSI design process. Users should consistently make sure they are using the latest version by checking the GSI Design Resources page: http://www.phillywatersheds.org/GSI_Design_Resources. Revisions to this document are recorded here: 

No. Effective Date 

Description of Revision 

1  11/18/2013 

Addition of expanded process descriptions General changes for clarity and consistency between workflows   Use of terms: concept check, substantially complete design, and plans, specs, and estimate (PS&E) design

2  12/12/2013  Clarifying edits made to track 2 workflow summary: OOW approves baseplan, 30% design, and 70% design, and coordinates utility comments with Design Consultant 

3  5/15/2015 

Clarifying edits made to intro and EPDs Responsibility for management of GSI on water/sewer projects shifted to Design Branch, with OOW involvement at concept and final metrics stages 

Landscape plans on OOW‐managed projects sent to GSI Maintenance for review 

PlanIT database updates added   PWD project manager coordinates reviews with other PWD units (Construction Unit, GSI Maintenance, Collector Systems Unit). PS&E plans reviewed internally by other PWD units as needed.

Roles and Responsibilities The following are descriptions of key roles that appear in this packet and the general responsibilities associated with those roles. Where these roles appear in the packet, they are capitalized.  

Design Branch – Any member of PWD’s Water & Sewer Design Branch who performs duties related to the design or management of track 1 projects.  

Design Branch Administrator – PWD Design Branch employee who assigns work numbers to projects when they are initiated.  

Design Branch Contract Manager – Manager of PWD Design Branch design contracts. Provides final approval on proposal and invoices for track 1 and 2 projects. 

Design Branch Engineer – Engineer in PWD’s Design Branch who is assigned to review designs and track project package in CAPIT, and submits project package to Projects Control. Manages track 1  projects as main point of contact with design consultant. Applies only to tracks 1 and 2. 

Design Consultant – Engineering firm under a general services contract with PWD. Performs survey,  geotechnical investigation if required, and engineering design services for the project.  

Geotechnical Consultant – Geotechnical engineering firm under a general services contract with PWD’s Design Branch to perform geotechnical testing for PWD projects. In some cases, tasked with geotechnical investigation for GSI projects. 

3

Page 4: GREEN STORMWATER INFRASTRUCTURE DESIGN PROCESS WORKFLOW ...phillywatersheds.org/doc/GSI/GSI_Design_Process_Workflow_Packet_… · green stormwater infrastructure design process workflow

GSI Design Process Workflow     

 

Geotech Contract Manager – PWD employee who manages the Design Branch geotechnical testing contract. Reviews geotechnical investigation requests, coordinates work with Geotechnical Consultants, and transmits testing results to PWD personel. 

Office of Watersheds (OOW) – Any member of PWD’s Office of Watersheds, generally in the GSI Implementation Program, who performs duties related to the design or management of PWD GSI projects. Duties include coordinating with Design Consultant to establish scope of work, performing reviews, tracking project metrics and status, answering Design Consultant questions, and submitting track 3 project packages to Projects Control. 

P&R Supervisor  – Member of PWD’s Planning and Research (P&R) group who identifies WSSPUs, bundles them into Work Numbers, authorizes water/sewer design projects, reviews and approves baseplans, and performs hydraulic evaluations.    

Project Partners – Entities who are partnered with PWD on the project (PP&R, Schools, PHS, private organizations, etc.). 

Definitions The following are definitions of key terms that appear in this packet. Where these terms appear in the packet, they are capitalized. 

CAPIT – Capital Program Integrated Tracking System. PWD database that tracks project schedule and budget, among other information. Tracks GSI project packages from when they receive a Work Number through construction. Acts as a communication center, informing all parties of important project information. 

GreenIT – PWD database developed to track GSI project metrics. Updated by OOW. Links to CAPIT. 

GPIS – Guaranteed Pavement Information System. Database developed by the Philadelphia Streets Department to track all projects resulting in street openings on the city.  

Project Monitoring Table (PMT) – Table prepared by Design Consultant based off a template provided by OOW when preparing the proposal for a GSI project under an OOW‐managed contract (applies to track 3 only). Serves as the proposed schedule for the project, then is updated monthly by the Design Consultant and submitted to OOW for project schedule tracking. 

Proposal – Documents prepared by Design Consultant and approved by PWD prior to start of the project. Includes scope of work, project schedule (PMT if OOW‐managed contract), and costs.  

Water/Sewer Special Planning Unit (WSSPU) – Signifies a street where water and /or sewer design and construction are required. Usually, a WSSPU is represented by a single street bounded by the cross streets on either end of it.  

Work Number – Number assigned by PWD to a project package once it is initiated in CAPIT. Used to identify the project package through construction. 

4

Page 5: GREEN STORMWATER INFRASTRUCTURE DESIGN PROCESS WORKFLOW ...phillywatersheds.org/doc/GSI/GSI_Design_Process_Workflow_Packet_… · green stormwater infrastructure design process workflow

GSI Design Process Workflow     

 

Relationships with Other Resources and References The publication of the PWD GSI Design Process Workflow Packet follows a number of related resources.  These related resources should be used by the designer for reference and additional contextual information.  Always refer to the most current resources. 

 

 

1. Philadelphia Water Department. 2015. Green Stormwater Infrastructure Design Requirements & Guidelines Packet. 

This packet provides requirements and guidelines to be used in the design of GSI projects funded and/or maintained by PWD. Attachment D: Partner Project Review Guidelines contains information relevant to the workflow for partner projects.  http://phillywatersheds.org/doc/GSI/GSI_Design_Requirements_&_Guidelines_ Packet_5‐15‐2015.pdf  

 

2. Philadelphia Water Department. 2013. Green Stormwater Infrastructure Drawing Requirements Packet and the OOW GSI CAD Standards. 

This packet provides requirements to be used in the drawing of GSI projects funded and/or maintained by PWD.  The Office of Watersheds (OOW) has also developed a GSI CAD Standard that includes all necessary files for drawing to these PWD GSI standards.  

http://phillywatersheds.org/doc/GSI/GSI_Drawing_Requirements_10‐21‐2013.pdf http://phillywatersheds.org/doc/GSI/GSI_CAD_Standards_10‐7‐13.zip 

 

3. Philadelphia Water Department. 2014. Water & Sewer Design Manual. 

This manual promotes uniformity in the presentation of water and sewer plans by establishing a general format and outlining detailed information required for the preparation of complete water and sewer contract drawings.    http://www.phillywaterdesign.org/ 

 

Note on Other “Packets”:  The PWD GSI Design Process Workflow Packet is one of three main “Packets” that describe the requirements for GSI projects funded and/or maintained by PWD:  the GSI Design Process Workflow Packet, the GSI Design Requirements & Guidelines Packet, and the GSI Drawing Requirements Packet.  

5

Page 6: GREEN STORMWATER INFRASTRUCTURE DESIGN PROCESS WORKFLOW ...phillywatersheds.org/doc/GSI/GSI_Design_Process_Workflow_Packet_… · green stormwater infrastructure design process workflow

GSI Design Process Workflow     

 

4. Philadelphia Water Department, Philadelphia Streets Department, and Mayor’s Office of Transportation and Utilities. 2014. City of Philadelphia Green Streets Design Manual. 

This manual, known as the GSDM, provides guidance for public and private entities, specifically design professionals, interested in incorporating GSI within a given right‐of‐way.  The GSDM references this packet and provides applicable users (those designing right‐of‐way GSI projects not initiated by PWD) with design standards, guidance on siting, information on elemental flexibility within SMPs, and an implementation process to guide users through the various steps of planning, design and construction of a green street. The GSDM follows and complements the Complete Streets Design Handbook.   http://www.phillywatersheds.org/gsdm 

 5. Philadelphia Water Department. 2011. Stormwater Management Guidance Manual. 

This manual was created to assist developers in meeting the requirements of the Philadelphia Stormwater Regulations. The manual provides guidance for the entire site design process, beginning with initial site design considerations, through the post‐construction stormwater management plan submittal elements, and ultimately the acquisition of stormwater plan approval.  

http://www.pwdplanreview.org/StormwaterManual.aspx  

 

 

6

Page 7: GREEN STORMWATER INFRASTRUCTURE DESIGN PROCESS WORKFLOW ...phillywatersheds.org/doc/GSI/GSI_Design_Process_Workflow_Packet_… · green stormwater infrastructure design process workflow

PROJECT INITIATION

IN DESIGN

BASEPLANS

BY PWD DESIGN BRANCH

OR DESIGN CONSULTANT

HYDRAULIC EVALUATION

BY P&R AND

GREEN REVIEW BY OOW

GSI ADDED? NOTIFICATION

GSI DESIGN

SCOPE AGREEMENT

DESIGN BY

DESIGN BRANCH OR

CONSULTANT

DESIGN REVIEWED

BY UTILITIES AND

AGENCIES

PLANS, SPECIFICATIONS,

AND ESTIMATE DESIGN

SUBMIT FINAL BID

DOCUMENTS

PROJECTS

CONTROL AND

BIDDING

YES

NO

WORKFLOW SUMMARY

Track 1 - GSI Design on Water/Sewer Project

Water/Sewer project enters Design Branch from Planning & Research (P&R). A new work number is assigned

and plans are requested through PA ONE-CALL.

The base plan shows all physical features obtained by a field survey, curb and manhole elevations, all existing

underground utility information, a cross section and profile of the existing sewer (sewer projects only).

Completed baseplan is forwarded to P&R for hydraulic review (pipe sizing and limits of replacement).

Baseplans in combined sewer areas are also forwarded to the Office of Watersheds (OOW) to evaluate

feasibility of green storm water infrastructure (GSI) to manage street runoff. Upon approval from P&R and

Design Branch, Design Consultant invoices for baseplan (consultant-designed only).

Determined that GSI will not be added to water/sewer project. OOW notifies Design

Branch, who notifies consultant (if not in-house). Design proceeds according to standard

water/sewer design process.

Where GSI is deemed suitable for project site, OOW provides a design concept to Design Branch for

implementation on the water/sewer project and communicates any information regarding pilot or partner

coordination items. For consultant projects, the GSI concepts will be distributed by the Design Branch

engineer, and a proposal for the GSI work will be submitted to Design Branch for approval.

Design Branch (if in-house) or Design Consultant develops water/sewer and GSI designs in accordance with

the Water & Sewer Design Manual and GSI Design Requirements & Guidelines Packet.

Once 70% design has been approved, plans are sent out for utility review following Attachment G of the GSI

Design Requirements & Guidelines Packet and the requirements of the Water & Sewer Design Manual. For

PWD in-house projects, this is done using GPIS approval system.

Upon receipt of utility responses, Design Consultant (Design Branch for in-house) addresses comments and

resolves any conflicts. When Design Branch determines that GSI design meets standards for 90% (PS&E)

design, as defined in Attachment A of the GSI Design Requirements & Guidelines Packet, OOW reviews GSI

design metrics. OOW’s comments are addressed and Design Branch issues final approval for entire project.

Design Consultant prepares the final design bid package for Projects Control, and submits it to Design Branch

(if in-house, Design Branch prepares packages). Project package is logged out of design and transmitted to

Projects Control with OOW cc’d. Design Branch applies for street opening permit through GPIS.

Initiation

PWD 70% (Substantially

Complete Design)

PWD 90% (PS&E Design)

Final Design

PWD 30% (Baseplan)

This workflow covers the process for in-house and consultant-designed Track 1 projects. It mirrors the “Water & Sewer Contract Progression Flow Chart”

in Appendix I of the Water & Sewer Design Manual, but is presented here for continuity and consistency with terms found throughout this packet.

DESIGN REVIEWED BY

DESIGN BRANCH,

OPERATIONS, PLANNING,

AND GSI MAINTENANCE

Once Design Branch Engineer is satisfied with water/sewer/GSI design, it is submitted to Design Branch

supervising engineer for review and comment. Plans are also forwarded by Design Branch to P&R, Operations

Unit, and GSI Maintenance for review and comment. Upon receiving comments from Operations, the Design

Branch Supervisor gives the okay to send the job out for utility review.

7

Page 8: GREEN STORMWATER INFRASTRUCTURE DESIGN PROCESS WORKFLOW ...phillywatersheds.org/doc/GSI/GSI_Design_Process_Workflow_Packet_… · green stormwater infrastructure design process workflow

Tra

ckin

gO

ffic

e o

f W

ate

rsh

ed

s (

OO

W)

De

sig

n B

ran

ch

De

sig

n C

on

su

lta

nt

Pla

nn

ing

an

d R

ese

arc

h (

P&

R)

WSSPUs

Bundled

Under Work

No.

“Green

Contact”

Assigned to

Water/Sewer

Project

Prepare and

Submit

Baseplan

Prepare and

Transmit

Hydraulic Info

and Baseplan

Approval Letter

1-2 months 2-4 months

CA

PIT

Sta

tus U

pda

ted b

y D

esig

n

(“D

esig

n S

tart

ed

”)

Prepare and

Transmit

Baseplan/

Design Project

Authorization

Review/

Approve

Baseplan

Baseplan

Review and

Hydraulic

Evaluation

Submit

Baseplan

Invoice

CA

PIT

Sta

tus U

pda

ted b

y D

esig

n

(“30

% C

om

ple

te”)

Review/Approve

Baseplan Invoice

and Issue Payment

Green

Review

Green

Added?

Notify Design

Branch of “No

Green”

Prepare/Transmit

Green Concept

Coordinate

Scoping Meeting

with Design

Consultant

(if needed)

Meet to Discuss

Green Concept

and Proposal

Request

(if needed)

Prepare

and Submit

Proposal and

Geotechnical

Testing

Request

GR

EE

NIT

Up

da

ted b

y O

OW

(Upd

ate

pre

limin

ary

de

sig

n m

etr

ics)

Review/

Approve

Proposal

Prepare/Transmit

Green Design

Authorization

NO

YES

1

5

2

3

4

6

10

11

12

13

8

16

17

1820

CA

PIT

Upd

ate

d b

y D

esig

n B

ranch

(Work

Type

)

( “G

” S

uffix

ad

de

d t

o W

ork

No

.)

LAST REVISED: 05/15/2015

Detailed Workflow

Track 1 – GSI Design on Water/Sewer Project

Project Initiation through Green Design Start

GR

EE

NIT

Re

vie

w C

onta

ct

Assig

ned

by O

OW

Coordinate

Geotechnical Testing

with Geotechnical

Consultant

19

GREEN DESIGN STARTPROJECT INITIATION

PROJECT INITIATION GREEN DESIGN START

Prepare/

Transmit

Green Design

Proposal

Request

15

14

7

PWD 30%

PWD 30%

1-2 months

Gre

en

IT u

pd

ate

d b

y O

OW

(No

Gre

en)

Review/Develop

Green Concept

9

PLA

NIT

Pro

ject

Cre

ate

d b

y O

OW

Gre

en

IT u

pd

ate

d b

y O

OW

(Cre

ate

new

wa

ter/

se

wer

pro

ject)

(En

ter

pre

limin

ary

desig

n m

etr

ics)

(Sta

tus to

“T

ran

sfe

r to

Desig

n”)

8

Page 9: GREEN STORMWATER INFRASTRUCTURE DESIGN PROCESS WORKFLOW ...phillywatersheds.org/doc/GSI/GSI_Design_Process_Workflow_Packet_… · green stormwater infrastructure design process workflow

Tra

ckin

gO

the

r P

WD

Units

Utilit

ies a

nd

Ext

Age

ncie

s

Offic

e o

f W

ate

rshe

ds

(OO

W)

Desig

n B

ran

ch

De

sig

n C

on

su

ltan

t

2-4 months 3-5 months 1-2 months

CA

PIT

Sta

tus U

pd

ate

d b

y D

esig

n

(“7

0%

Co

mp

lete

”)

Submit Job

for Utility/

Agency

Review

Plans Meet

Substantially

Complete Design

Requirements?

Review/

Comment on

Substantially

Complete

Design

Review/

Comment on

Substantially

Complete

Design

Prepare

and Submit

Final

Design

Prepare/

Revise and

Submit

PS&E

Design

Provide

Project

Approval

Final

PackagingTransmit to Projects

Control and OOW

CA

PIT

Sta

tus U

pd

ate

d b

y D

esig

n

(“In

Pro

jects

Con

trol”

)

GPIS Review/

Comment

26

27

24

29

32

33

34

37

35

Detailed Workflow

Track 1 – GSI Design on Water/Sewer Project

Green Design Start through Final DesignLAST REVISED: 05/15/2015

GR

EE

NIT

Up

da

ted

by O

OW

(Desig

n M

etr

ics)

Review/

Distribute

Geotech

Submission

21

Utility

Response

Required?NO

Respond

to Utility

Comments

28

YES

PWD 70%

(SUBSTANTIALLY COMPLETE DESIGN)

FINAL

DESIGNGREEN DESIGN

START

Prepare/

Revise and

Submit

Substantially

Complete

Design

22

NO

Review

Substantially

Complete

Design

23

YES

Approve

Substantially

Complete

Design

25

NO

Plans Meet

PS&E Design

Requirements?

Review

PS&E

Design

30

Compliance

Review

31

Enter GPIS

Offsets

36

Geotechnical

Consultant

Prepares

Submission

PWD 90%

(PLANS, SPECS, & ESTIMATE DESIGN)

GREEN DESIGN

START

PWD 70%

(SUBSTANTIALLY COMPLETE DESIGN)

FINAL

DESIGN

YES

PWD 90%

(PLANS, SPECS, & ESTIMATE DESIGN)

GR

EE

NIT

Up

da

ted

by O

OW

(Fin

al D

esig

n M

etr

ics)

Major

Design Change

Required?

YES

NO

YES

9

Page 10: GREEN STORMWATER INFRASTRUCTURE DESIGN PROCESS WORKFLOW ...phillywatersheds.org/doc/GSI/GSI_Design_Process_Workflow_Packet_… · green stormwater infrastructure design process workflow

GSI Design Process Workflow Packet Track 1 – GSI on Water/Sewer Project

Track 1 Expanded Process Descriptions

1 WSSPUs Bundled Under Work No.

In this preliminary phase, P&R Supervisor identifies WSSPUs and bundles them into a project. This process occurs on a continual basis. Design Branch Administrator assigns a work number and updates the CAPIT status to “Design Started”.

2 Prepare and Transmit Baseplan/Design Project Authorization

P&R Supervisor has primary responsibility for preparing and transmitting this authorization to Design Consultant. Letter is signed by Design Branch and sent to the Design Consultant with OOW copied.

3 Prepare and Submit Baseplan

Design Consultant performs survey and prepares baseplan as specified in Baseplan/Design Project Authorization, then submits baseplan to Design Branch, P&R, and OOW. If project is anticipated to involve ADA ramp or curb reconstruction, Design Consultant must request a benchmark and proposed curb elevations from the City District Surveyor, providing the PWD Work Number with the request.

4 Review/Approve Baseplan

Design Branch Engineer reviews baseplan. If there are issues with the submission, Design Branch Engineer sends comments back to Design Consultant for resubmission.

5 “Green Contact” Assigned to Water/Sewer Project

OOW assigns a Green Contact to the project, who will develop the green concept and advise on GSI design throughout the project.

6 Green Review

OOW checks with Design Branch Engineer that the water/sewer baseplans submitted by the consultant are accurate, then reviews them to identify potential opportunities for adding GSI into the project. If GSI is recommended for the project, OOW prepares preliminary concepts and/or direction about the GSI to be added.

7 Notify Design Branch of “No Green”

OOW recommends that GSI will not be added to water/sewer project and notifies Design Branch Engineer. Design proceeds according to standard water/sewer design process per the latest version of the Water & Sewer Design Manual. At time of project bidding, or other appropriate point, Design Branch will notify Philadelphia Parks and Recreation (PP&R) that project location would be a good candidate for street tree installation by PP&R at completion of water/sewer construction.

10

Page 11: GREEN STORMWATER INFRASTRUCTURE DESIGN PROCESS WORKFLOW ...phillywatersheds.org/doc/GSI/GSI_Design_Process_Workflow_Packet_… · green stormwater infrastructure design process workflow

GSI Design Process Workflow Packet Track 1 – GSI on Water/Sewer Project

8 Prepare/Transmit Green Concept

OOW sends green concept and review tracking spreadsheet to Design Branch Engineer. OOW communicates any information regarding pilot or partner coordination items to Design Branch. OOW creates a new water/sewer project in PlanIT and GreenIT and updates GreenIT status to “Transfer to Design”. Project continues following this workflow if there is no pilot element.

9 Review/Develop Green Concept

Design Branch Engineer reviews green concept and develops it further if needed. If bump-outs/roadside swales are part of the concept, Design Branch coordinates review of these systems by Streets Dept. If there are partners on the project, Design Branch conducts any correspondence needed in order to further develop green concept. Design Branch coordinates additional survey if needed.

10 Baseplan Review and Hydraulic Evaluation

P&R Supervisor reviews the baseplan and performs hydraulic evaluation (sewer and water main sizing and limits of replacement). Design Consultant is asked to resubmit if baseplan is not acceptable.

11 Prepare and Transmit Hydraulic Info and Baseplan Approval Letter

P&R Supervisor prepares a Baseplan Approval Letter, which includes a note informing Design Consultant that green review is being completed and information regarding the addition of GSI to the project is forthcoming. This letter is transmitted, along with planning-level details about the repairs to be made to water/sewer infrastructure, to Design Consultant, copying Design Branch.

12 Submit Baseplan Invoice

After receiving baseplan approval and authorization to proceed with the water/sewer project, Design Consultant submits baseplan invoice to PWD.

13 Review/Approve Baseplan Invoice and Issue Payment

Invoice processed by Finance and Design Branch, then reviewed by Design Branch Engineer, who either approves invoice or identifies an error and asks for resubmission. Approved invoice is sent back to Finance, who issues payment. Design Branch updates CAPIT status to “30% Complete”.

14 Prepare/Transmit Green Design Proposal Request

Design Branch prepares a green design proposal request and transmits it to Design Consultant. Design Branch also updates work type in CAPIT and adds “G” suffix to Work Number. Design Branch sends OOW an updated copy of the green concept and review spreadsheet. OOW updates preliminary design metrics if Design Branch has made any changes to the concept.

15 Coordinate Scoping Meeting with Design Consultant (if needed)

This step involves the coordination of a meeting to discuss green concept and proposal request. If a meeting is needed, Design Branch Engineer schedules and facilitates the meeting.

11

Page 12: GREEN STORMWATER INFRASTRUCTURE DESIGN PROCESS WORKFLOW ...phillywatersheds.org/doc/GSI/GSI_Design_Process_Workflow_Packet_… · green stormwater infrastructure design process workflow

GSI Design Process Workflow Packet Track 1 – GSI on Water/Sewer Project

16 Meet to Discuss Green Concept and Proposal Request (if needed)

Design Branch Engineer facilitates meeting with key PWD and Design Consultant staff. Project details, PWD requirements, and submission of the project proposal are discussed.

17 Prepare and Submit Proposal and Geotechnical Testing Request

Design Consultant is responsible for preparing the proposal, consisting of scope, costs, and schedule, and the geotechnical testing request. Materials should be submitted to Design Branch Contract Manager.

18 Review/Approve Proposal

Design Branch reviews the project proposal developed by the Design Consultant. If revisions must be made, Design Branch Contract Manager sends comments to Design Consultant who addresses them and sends back updated files.

19 Coordinate Geotechnical Testing with Geotechnical Consultant

Design Branch Engineer transmits geotechnical testing request to Geotech Contract Manager using input received from the Design Consultant’s proposal. Geotech Contract Manager reviews request and submits it to one of PWD’s Geotechnical Contractors.

20 Prepare/Transmit Green Design Authorization

Design Branch Contract Manager transmits final approval of the proposal to Design Consultant, copying Design Branch Engineer. This authorizes Design Consultant to proceed with the project.

21 Review/Distribute Geotech Submission

Once Geotechnical Consultant has submitted geotechnical investigation results, Geotech Contract Manager transmits submission to Design Branch Engineer. Design Branch Engineer reviews geotechnical testing data for quality and forwards it to the Design Consultant to include in their design. This may occur at various points during the development of the baseplan.

22 Prepare/Revise and Submit Substantially Complete Design

Design Consultant prepares substantially complete design submission in accordance with the approved scope and GSI design and drawing requirements. Informal interim submissions and check-ins before the substantially complete design submission may be arranged. Submission is made to Design Branch Engineer. If Design Branch Engineer responds to the substantially complete design submission with comments that must be resolved before approval, Design Consultant makes necessary revisions and resubmits the design, along with a letter responding to each comment.

23 Review Substantially Complete Design

Design Branch Engineer reviews the substantially complete design submission. If there are issues with the submission, Design Branch Engineer sends comments back to Design Consultant for resubmission.

12

Page 13: GREEN STORMWATER INFRASTRUCTURE DESIGN PROCESS WORKFLOW ...phillywatersheds.org/doc/GSI/GSI_Design_Process_Workflow_Packet_… · green stormwater infrastructure design process workflow

GSI Design Process Workflow Packet Track 1 – GSI on Water/Sewer Project

24 Review/Comment on Substantially Complete Design

Operations Unit, P&R, GSI Maintenance, and other PWD units as needed review plans and send approval/comments back to Design Branch Engineer. Design Branch Engineer coordinates comments and asks for revisions from Design Consultant if major design changes are required.

25 Approve Substantially Complete Design

Design Branch Engineer responds to Design Consultant’s latest submission by confirming that the substantially complete design is approved and the project is ready for submission to utilities.

26 Submit Job for Utility/Agency Review

Once substantially complete design has been approved, plans are prepared and submitted by Design Consultant to external utilities/agencies and other PWD units.

Design Consultant should reference the Green Stormwater Infrastructure Review Contacts table (Attachment G of the GSI Design Requirements and Guidelines Packet), which provides information on what utilities/agencies should be submitted to, what their submission requirements are, and where submissions should be sent. Design Consultant is encouraged to ask Design Branch Engineer about any utility submission details. One copy of the full submission, along with copies of all transmittals to utilities/agencies, should be provided to Design Branch Engineer.

Design Branch Engineer updates CAPIT status to “70% Complete”. Design Branch may submit plans to other partners it deems necessary.

27 Review/Comment on Substantially Complete Design

Utilities/Agencies review plans and send approval/comments back to Design Consultant. Design Consultant must be proactive in checking on the status of review and be in close contact with PWD if it appears there is a delay in any particular review. Design Consultant can contact Design Branch Engineer with any questions.

28 Respond to Utility Comments

If a utility/agency does not approve design, Design Consultant addresses comments at the advisement of the Design Branch Engineer and resubmits plans to the utility/agency.

29 Prepare/Revise and Submit PS&E Design

Design Consultant addresses any comments from utilities/agencies. Design Consultant works with Design Branch Engineer to resolve any issues. Once all reviewer comments have been addressed, Design Consultant prepares and submits the Plans, Specs, and Estimate (PS&E) design in accordance with the approved project scope and GSI design and drawing requirements.

If Design Branch Engineer responds to PS&E submission with comments that must be resolved before approval, Design Consultant makes necessary revisions and resubmits the design, along with a letter responding to each comment.

13

Page 14: GREEN STORMWATER INFRASTRUCTURE DESIGN PROCESS WORKFLOW ...phillywatersheds.org/doc/GSI/GSI_Design_Process_Workflow_Packet_… · green stormwater infrastructure design process workflow

GSI Design Process Workflow Packet Track 1 – GSI on Water/Sewer Project

30 Review PS&E Design

Design Branch Engineer reviews the PS&E design submission. If there are issues with the submission, Design Branch Engineer sends comments back to Design Consultant for resubmission. If the design meets PS&E design requirements, Design Branch Engineer forwards the submission, including at least the following items, to OOW for Compliance Review:

Full plan set (single .PDF)

Project narrative (.PDF or .DOCX)

GreenIT Data Entry Application Metrics Report (.PDF and .CSV)

Supporting design calculations and modeling (.XLSX)

Drainage area maps (.PDF) Design Branch Engineer should estimate the date the project will go to PC and provide any indication that once there it might move faster or slower than a typical project.

31 Compliance Review Back

OOW completes Compliance Review to inform Compliance tracking metrics. OOW reviews the design report deliverables, confirms the managed area/Greened Acres, and tracks the schedule of the project. This is not a technical review. OOW provides comments/approval to Design Branch Engineer and enters design metrics into GreenIT.

32 Provide Project Approval

Ater receiving OOW feedback and resolving any outstanding issues with OOW or the Design Consultant, Design Branch Engineer responds to Design Consultant’s latest submission by confirming that the PS&E design is approved and the project is ready for final submission. Design Branch Engineer Updates CAPIT status to 95%.

33 Prepare and Submit Final Design

Upon project package approval, Design Consultant prepares and sends the final design submission in accordance with the approved project scope and design and drawing requirements.

34 Final Packaging

Once the final design is received from Design Consultant and a supervising engineer in the Design Branch signs off on the project, Design Branch Engineer compiles all needed materials into a project package to be sent to PC. OOW should be able to access the following on ProjectWise:

Full plan set (single .PDF and .DWG or .DGN)

Project narrative (.PDF or .DOCX)

GreenIT Data Entry Application Metrics Report (.PDF, .CSV, and .GREENIT formats)

Supporting design calculations and modeling (.XLSX)

Drainage area maps (.PDF and .DWG or .DGN)

35 Transmit to Projects Control and OOW

Once all needed materials have been compiled into the project package, Design Branch Engineer transmits package to Projects Control with OOW cc’d on the cover letter. Once project package is

14

Page 15: GREEN STORMWATER INFRASTRUCTURE DESIGN PROCESS WORKFLOW ...phillywatersheds.org/doc/GSI/GSI_Design_Process_Workflow_Packet_… · green stormwater infrastructure design process workflow

GSI Design Process Workflow Packet Track 1 – GSI on Water/Sewer Project

delivered, Design Branch Engineer updates CAPIT status to “In Projects Control”. OOW enters final design metrics into GreenIT if any changes have been made since Compliance Review.

36 Enter GPIS Offsets

After final design is submitted, Design Branch enters data into GPIS for review and, if project is on a state route, prepares and submits PennDOT HOP application.

37 GPIS Review/Comment

Utilities review and approve proposed infrastructure work in GPIS. This should be about 25 days after PWD has entered offsets into GPIS.

15

Page 16: GREEN STORMWATER INFRASTRUCTURE DESIGN PROCESS WORKFLOW ...phillywatersheds.org/doc/GSI/GSI_Design_Process_Workflow_Packet_… · green stormwater infrastructure design process workflow

PROJECT

PACKAGE

INITIATION

30% DESIGN

REVIEW AND

APPROVAL

70% DESIGN

REVIEW AND

APPROVAL

DESIGN REVIEWED

BY UTILITIES AND

AGENCIES

90% DESIGN

SUBMISSION

FINAL BID

DOCUMENT

SUBMISSION

PROJECTS

CONTROL AND

BIDDING

WORKFLOW SUMMARY

Track 2 – Non-Water/Sewer GSI Design

(Contract Managed by Design Branch)

OOW develops concepts for GSI projects. Initiation in design occurs when OOW assembles concept locations into

a project package (with approval/advice from Design Branch) and enters the package into CAPIT. Work number

assigned, then proposal requested by OOW, negotiated between Design Consultant and PWD (OOW and Design

Branch), and approved officially by Design Branch. Geotechnical investigation request also prepared by OOW

(with input from Design Consultant) and provided to Design Branch, who coordinates testing through PWD’s

geotechnical contracts.

Design Consultant prepares and submits 70% (substantially complete) design to both Design Branch and OOW

for review and comment. If there are any new prototype or irregular systems, materials, or devices used, OOW

discusses with PWD Collector Systems and/or Construction units. Design Branch sends comments and/or

approval for utility submission to OOW, who communicates this information along with any OOW comments to

Design Consultant. OOW and Design Consultant sends job out for utility review only once OOW provides

approval.

OOW sends design plans to other PWD units (Design Branch, GSI Maintenance, Collector Systems, and

Construction) and Design Consultant sends plans to external utilities/agencies following Attachment G of the GSI

Design Requirements & Guidelines Packet. Design Consultant copies OOW on submissions (one copy of drawings

and all transmittals).

Utility/agency/PWD responses are received and resolved. Design Consultant prepares and submits 90% (PS&E)

design, as defined in Attachment A of the GSI Design Requirements & Guidelines Packet, to both the Design

Branch and OOW.

Design Branch sends comments on 90% submission to OOW, who communicates this information along with any

OOW comments to Design Consultant. Once OOW and Design Branch have no further comments, OOW

coordinates a final consensus meeting with Design Branch. Design Branch issues final approval to Design

Consultant. Design Consultant forwards final design bid package, in accordance with the Final Design Package

Checklist (located on PWD’s GSI Design Resources Website and shown in Attachment B of the GSI Design

Requirements and Guidelines Packet), to Design Branch (OOW copied). OOW applies for the street opening

permit through GPIS and completes final metrics tracking. Project package is logged out of design and forwarded

to Projects Control for bidding by Design Branch.

Initiation

PWD 70% (Substantially

Complete Design)

Final

Design

Geotechnical consultant submits testing results to Design Branch, who distributes them to OOW. If a survey and

design Proposal has been negotiated, 30% design (baseplan and concept check) is the first submission. If only a

survey Proposal has been negotiated, the baseplan is submitted by Design Consultant to OOW, who conducts

review. OOW communicates approval of baseplan to Design Branch, who authorizes payment by notifying the

Design Consultant of approval. Concept is then updated by OOW according to information from the baseplan and

geotechnical test results, and a design proposal is negotiated. For 30% design approval, baseplan and concept

check (if necessary) must be submitted by Design Consultant and approved by PWD. Before 30% approval, OOW

coordinates with partners as necessary to confirm concept.

PWD 30% (Baseplan/

Concept Check)

PWD 90% (PS&E Design)

16

Page 17: GREEN STORMWATER INFRASTRUCTURE DESIGN PROCESS WORKFLOW ...phillywatersheds.org/doc/GSI/GSI_Design_Process_Workflow_Packet_… · green stormwater infrastructure design process workflow

Off

ice

of

Wa

ters

he

ds (

OO

W)

De

sig

n B

ran

ch

Tra

ckin

gD

esig

n C

on

su

lta

nt

Suggest

Project

Package

DESIGN INITIATION

Approve/

Advise on

Project

Packaging

PWD 30% (BASEPLAN / CONCEPT CHECK)

Time Varies 1-2 months 3-6 months

2

3

LAST REVISED: 05/15/2015

Detailed Workflow

Track 2 – Non-Water/Sewer GSI Design (Contract Managed by Design Branch)

Planning through 30%

GR

EE

NIT

Up

da

ted

by O

OW

(ente

r pre

limin

ary

de

sig

n m

etr

ics)

Create

Project

Package

4

CA

PIT

Pro

ject

Cre

ate

d b

y O

OW

Assign

Work No.

5

Transmit

Geotechnical

Request

Transmit

Proposal

Request

6 12

Coordinate

Geotechnical

Request

13

Meet to

Discuss

Proposal

Request

(if needed)

7

Prepare and

Submit Proposal

and Geotechnical

Testing Request

8

Review/

Approve

Proposal

10 Prepare/

Transmit

Project

Authorization

11

Prepare

and Submit

Baseplan

Finalize Concept

Design/Sketches

and Design

Proposal Request

Review/

Approve

Baseplan

Review/

Distribute

Geotech

Submission

Meet to

Discuss

Design

Proposal

Request

(if needed)

19

Prepare

and Submit

Design

Proposal

20

Prepare/

Transmit

Design

Authorization

23

Review/

Approve

Design

Proposal

22

CA

PIT

Sta

tus U

pda

ted b

y D

esig

n

(“30

% C

om

ple

te”)

If n

ot

do

ne

pre

vio

usly

15

16

18

Review/

Confirm

Proposal

9

Review/

Confirm

Design

Proposal

21

Geotechnical Consultant

Prepares Submission

Planning/

Concept

Development/

Project

Grouping

1

Authorize

Baseplan

Payment

14

Design

Proposal

Established?

No

Prepare/Revise

and Submit

Baseplan/

Concept Check

24

No

Yes

Concept

Check

Needed?

Issues?

Yes

Review

Baseplan/

Concept

Check

Submission

Yes

26

No

Check-In

Coordination

with Project

Partners

(if needed)

27

Approve

Baseplan/

Concept

Check

28

Review

Baseplan/

Concept

Check

Submission

PLANNING COMPLETE

1725

DESIGN INITIATION PWD 30% (BASEPLAN / CONCEPT CHECK)PLANNING COMPLETE

CA

PIT

Sta

tus U

pda

ted b

y D

esig

n

(“30

% C

om

ple

te”)

Send

Plans to

Other PWD

Units as

Needed

29

GR

EE

NIT

Sta

tus U

pda

ted

by O

OW

(“T

ransfe

r to

De

sig

n”)

GR

EE

NIT

Up

da

ted

by O

OW

(ente

r pre

limin

ary

de

sig

n m

etr

ics)

Pu

blic

Affa

irs N

otified

by O

OW

, if r

eq

uir

ed

PL

AN

IT U

pda

ted b

y O

OW

(Pro

ject

tra

nsfe

rre

d t

o G

RE

EN

IT)

17

Page 18: GREEN STORMWATER INFRASTRUCTURE DESIGN PROCESS WORKFLOW ...phillywatersheds.org/doc/GSI/GSI_Design_Process_Workflow_Packet_… · green stormwater infrastructure design process workflow

Tra

ckin

gO

the

r P

WD

Un

its

Utilit

ies a

nd

Ext

Ag

en

cie

sD

esig

n C

on

su

lta

nt

De

sig

n B

ran

ch

Off

ice

of

Wa

ters

he

ds (

OO

W)

LAST REVISED: 05/15/2015

Detailed Workflow

Track 2 – Non-Water/Sewer GSI Design (Contract Managed by Design Branch)

30% through Final Design

2-4 months

Review/

Comment on

Substantially

Complete

Design

Prepare/Revise

and Submit

PS&E Design

36

Deliver to

Projects

Control

2-4 months 2-3 months

CA

PIT

Sta

tus U

pda

ted

by D

esig

n

(“70

% C

om

ple

te”)

GR

EE

NIT

Upd

ate

d b

y O

OW

(ente

r up

da

ted d

esig

n m

etr

ics)

GR

EE

NIT

Upd

ate

d b

y O

OW

(Fin

al D

esig

n M

etr

ics)

CA

PIT

Sta

tus U

pda

ted

by D

esig

n

(“In

Pro

jects

Con

tro

l”)

NO

OK for Utility

Submission?

OK for Utility

Submission?

Review

Substantially

Complete

Design

Submission

NO

Prepare/Revise

and Submit

Substantially

Complete Design

30

31

YES

Compile

Comments on

Substantially

Complete

Design

33

Review

PS&E

Design

Revisions

Required?

YES

NOReview

PS&E

Design

40

Revisions

Required?

NO

Compile

Comments on

PS&E Design

42

41

YES

Consensus

Meeting

44

GPIS

Review/

Comment

Prepare

and Submit

Final

Design

50

Provide

Project

Package

Approval

Final

Packaging

4547

46

48

Submit job

for Utility

Review

35

Authorize

Utility

Submission

34

YES

39

NO

Respond

to Utility

Comments

38

Utility

Response

Required?

YES

Review

Substantially

Complete

Design

Submission

32

Review/

Comment on

Substantially

Complete

Design

37

Enter GPIS

Offsets

49

PWD 70%

(SUBSTANTIALLY COMPLETE DESIGN)

PWD 30%

(BASEPLAN/CONCEPT CHECK)FINAL DESIGN

PWD 90%

(PLANS, SPECS, & ESTIMATE DESIGN)FINAL DESIGN

PWD 30%

(BASEPLAN/CONCEPT CHECK)

PWD 70%

(SUBSTANTIALLY COMPLETE DESIGN)

Review/

Comment on

PS&E Design

43

PWD 90%

(PLANS, SPECS, & ESTIMATE DESIGN)

18

Page 19: GREEN STORMWATER INFRASTRUCTURE DESIGN PROCESS WORKFLOW ...phillywatersheds.org/doc/GSI/GSI_Design_Process_Workflow_Packet_… · green stormwater infrastructure design process workflow

GSI Design Process Workflow Packet Track 2 – GSI Design (Contract Managed by Design Branch)

Track 2 Expanded Process Descriptions

1 Planning/Concept Development/Project Grouping

In this preliminary phase, OOW identifies sites, groups them, and prepares a concept project package. This process occurs on a continual basis in order to maintain a surplus of projects available for design. Planning is complete when OOW transfers the project from PlanIT to GreenIT.

2 Suggest Project Package

OOW submits request to Design Branch Contract Manager to use Design Branch consultant for project.

3 Approve/Advise on Project Packaging

Design Branch reviews request to use Water/Sewer Design Unit consultant, and either approves or advises on changes to be made.

4 Create Project Package

OOW initiates the project in CAPIT. OOW updates the GreenIT status code to “Transfer to Design”.

5 Assign Work No.

This process is performed by Design Branch Administrator upon request from OOW. Once Work Number is assigned, Design Branch Administrator updates CAPIT with the number and creates a project folder in ProjectWise.

6 Transmit Proposal Request

OOW transmits proposal request to Design Consultant, copying Design Branch Engineer and Design Branch Contract Manager.

7 Meet to Discuss Proposal Request (if needed)

Whether a meeting is conducted or not will have already been determined and indicated in the proposal request transmitted in Step 6. If a meeting is conducted, OOW schedules and facilitates meeting with key PWD and consultant staff. Project details, PWD requirements, and submission of the Proposal are discussed.

8 Prepare and Submit Proposal and Geotechnical Testing Request

Design Consultant is responsible for preparing and submitting Proposal, consisting of scope, costs, schedule, and the geotechnical testing request per the proposal request and by the deadline specified. Materials should be submitted to Design Branch Contract Manager with OOW copied.

19

Page 20: GREEN STORMWATER INFRASTRUCTURE DESIGN PROCESS WORKFLOW ...phillywatersheds.org/doc/GSI/GSI_Design_Process_Workflow_Packet_… · green stormwater infrastructure design process workflow

GSI Design Process Workflow Packet Track 2 – GSI Design (Contract Managed by Design Branch)

9 Review/Confirm Proposal

OOW reviews Proposal developed by Design Consultant. If revisions must be made, OOW sends comments to Design Branch Contract Manager, who reviews and forwards them to Design Consultant. Design Consultant addresses comments and resubmits updated files.

10 Review/Approve Proposal

Design Branch reviews Proposal developed by Design Consultant. If revisions must be made, Design Branch Contract Manager sends comments to Design Consultant, who addresses them and sends back updated files.

11 Prepare/Transmit Project Authorization

Design Branch Contract Manager transmits final approval of Proposal to Design Consultant, copying OOW. This authorizes Design Consultant to proceed with the project.

12 Transmit Geotechnical Request

OOW transmits geotechnical investigation request to Geotech Contract Manager using input received from Design Consultant’s Proposal.

13 Coordinate Geotechnical Request

Geotech Contract Manager reviews request and works with OOW to solve any issues. Geotech Contract Manager submits request to one of PWD’s Geotechnical Contractors.

14 Review/Distribute Geotech Submission

Once Geotechnical Consultant has submitted geotechnical investigation results, Geotech Contract Manager transmits submission to Design Branch Engineer and OOW. OOW reviews geotechnical testing data for quality and forwards it to Design Consultant. This may occur at various points during the development of the baseplan.

15 Prepare and Submit Baseplan

Design Consultant performs survey and prepares and submits baseplan as specified in the Proposal. If project is anticipated to involve ADA ramp or curb reconstruction, Design Consultant must request a bench mark and proposed curb elevations from the City District Surveyor, providing the PWD Work Number with the request.

16 Review/Approve Baseplan

OOW reviews baseplan submission. If revisions are needed, comments are sent back to Design Consultant. Once baseplan is acceptable, OOW notifies Design Branch Contract Manager.

20

Page 21: GREEN STORMWATER INFRASTRUCTURE DESIGN PROCESS WORKFLOW ...phillywatersheds.org/doc/GSI/GSI_Design_Process_Workflow_Packet_… · green stormwater infrastructure design process workflow

GSI Design Process Workflow Packet Track 2 – GSI Design (Contract Managed by Design Branch)

17 Authorize Baseplan Payment

Design Branch Contract Manager notifies Design consultant of baseplan approval, authorizing payment.

18 Finalize Concept Design/Sketches and Design Proposal Request

OOW makes changes as necessary to concept based on baseplan and geotechnical investigation and prepares design proposal request. OOW sends request to Design Consultant, copying Design Branch Engineer and Design Branch Contract Manager.

19 Meet to Discuss Design Proposal Request (if needed)

OOW facilitates meeting with key PWD and consultant staff. Project details, PWD requirements, and submission of the design Proposal are discussed.

20 Prepare and Submit Design Proposal

Design Consultant is responsible for preparing and submitting the design Proposal, consisting of scope, costs, and schedule, per the proposal request and by the deadline specified.

21 Review/Confirm Design Proposal

OOW reviews the Proposal developed by the Design Consultant. If revisions must be made, OOW sends comments to Design Consultant (copying Design Branch Contract Manager). Design consultant addresses comments and resubmits updated files.

22 Review/Approve Design Proposal

Design Branch reviews the Proposal developed by the Design Consultant. If revisions must be made, Design Branch Contract Manager sends comments to Design Consultant, who addresses them and sends back updated files.

23 Prepare/Transmit Design Authorization

Design Branch transmits final approval of the proposal to Design Consultant, copying OOW. This authorizes Design Consultant to proceed with the project.

24 Prepare/Revise and Submit Baseplan/Concept Check

Design Consultant performs survey and prepares Baseplan/Concept Check Submission in accordance with the approved scope and GSI design and drawing requirements. If project is anticipated to involve ADA ramp or curb reconstruction, Design Consultant must request a bench mark and proposed curb elevations from the City District Surveyor if they have not done so already. Design Consultant must provide the PWD Work Number with the request. Informal interim submissions and check-ins before the Baseplan/Concept Check submission are encouraged. If OOW responds to the baseplan/concept check submission with comments that must be resolved before approval, Design Consultant makes necessary revisions and resubmits the design, along with a letter responding to each comment.

21

Page 22: GREEN STORMWATER INFRASTRUCTURE DESIGN PROCESS WORKFLOW ...phillywatersheds.org/doc/GSI/GSI_Design_Process_Workflow_Packet_… · green stormwater infrastructure design process workflow

GSI Design Process Workflow Packet Track 2 – GSI Design (Contract Managed by Design Branch)

25 Review Baseplan/Concept Check Submission

Design Branch Engineer reviews the baseplan/concept check submission and notifies OOW if there are issues with the submission.

26 Review Baseplan/Concept Check Submission

OOW reviews the baseplan/concept check submission and receives input from Design Branch Engineer. If there are issues with the submission, OOW sends comments back to Design Consultant for resubmission.

27 Check-In Coordination with Project Partners (if needed)

Once it is confirmed that there are no issues with the baseplan/concept check submission, OOW provides project partners (if there are any) with an update on the status of the design that alerts them of any changes to the concept. OOW responds to comments that project partners have before approving baseplan/concept check design. This process typically takes around three weeks.

28 Approve Baseplan/Concept Check

OOW responds to Design Consultant’s latest submission by confirming that either the project is ready to move on to development of substantially complete design or the project will be ready for development of substantially complete design if consultant addresses certain comments. Design Branch updates CAPIT status to “30% Complete,” if CAPIT status was not udated previously. OOW updates preliminary design metrics in GreenIT.

29 Send Plans to Other PWD Units as Needed

On a project as-needed basis, OOW coordinates with any other necessary PWD units, including, but not limited to: GSI Maintenance, GSI Planning, Collector Systems, etc.

30 Prepare/Revise and Submit Substantially Complete Design

Design Consultant prepares substantially complete design submission in accordance with the approved scope and GSI design and drawing requirements. Design consultant may start developing ADA ramp designs in accordance with the scope or at OOW’s direction. Informal interim submissions and check-ins before the Substantially Complete Design submission are encouraged. If OOW responds to substantially complete design submission with comments that must be resolved before approval, Design Consultant makes necessary revisions and resubmits design, along with a letter responding to each comment.

31 Review Substantially Complete Design Submission

Design Branch Engineer reviews substantially complete design submission and sends any comments to OOW.

22

Page 23: GREEN STORMWATER INFRASTRUCTURE DESIGN PROCESS WORKFLOW ...phillywatersheds.org/doc/GSI/GSI_Design_Process_Workflow_Packet_… · green stormwater infrastructure design process workflow

GSI Design Process Workflow Packet Track 2 – GSI Design (Contract Managed by Design Branch)

32 Review Substantially Complete Design Submission

OOW reviews the substantially complete design submission, soliciting feedback on landscape design from GSI Maintenance, and prepares comments as necessary.

33 Compile Comments on Substantially Complete Design

If the submission requires revision, OOW adds comments to any received from Design Branch Engineer and sends a review letter to Design Consultant, requesting resubmission. This process repeats until PWD determines that the design meets substantially complete design approval requirements. Multiple submissions are typically necessary.

34 Authorize Utility Submission

Once PWD has determined that there are no outstanding issues with Substantially Complete Design, OOW responds to Design Consultant’s latest submission by confirming that the Substantially Complete Design is approved and the project is ready for submission to utilities.

35 Submit Job for Utility Review

Once substantially complete design has been approved, plans are submitted for utility review. OOW submits and coordinates review directly with other PWD units (Construction Unit, GSI Maintenance, and Collector Systems Unit) and project partners. Design Consultant submits to external utilities/agencies. OOW and Design Consultant should reference the Green Stormwater Infrastructure Review Contacts table (Attachment G of the GSI Design Requirements and Guidelines Packet), which provides information on what utilities/agencies should be submitted to, what their submission requirements are, and where the submissions should be sent. Design Consultant is encouraged to ask OOW about any utility submission details. Copies of all transmittals to utilities/agencies should be provided to OOW and Design Branch.

Once first copy of transmittal to utilities/agencies is received, Design Branch Engineer updates CAPIT status to “70% Complete”. OOW updates greened acres and SMP type in GreenIT. OOW may submit plans to other partners it deems necessary.

36 Review/Comment on Substantially Complete Design

Other PWD units and project partners review plans and send approval/comments back to OOW copied.

37 Review/Comment on Substantially Complete Design

Utilities/Agencies review plans and send approval/comments back to Design Consultant. Design Consultant must be proactive in checking on the status of review and be in close contact with PWD if it appears there is a delay in any particular review. Design Consultant can contact OOW with any questions.

23

Page 24: GREEN STORMWATER INFRASTRUCTURE DESIGN PROCESS WORKFLOW ...phillywatersheds.org/doc/GSI/GSI_Design_Process_Workflow_Packet_… · green stormwater infrastructure design process workflow

GSI Design Process Workflow Packet Track 2 – GSI Design (Contract Managed by Design Branch)

38 Respond to Utility Comments

If a utility/agency does not approve design, Design Consultant addresses comments at the advisement of the OOW and resubmits plans to the utility/agency.

39 Prepare/Revise and Submit PS&E Design

When approval is received from utilities/agencies, Design Consultant addresses any comments. Questions are presented to OOW and addressed. Once all reviewer comments have been addressed, Design Consultant prepares and submits Plans, Specs, and Estimate (PS&E) design in accordance with the approved project scope and GSI design and drawing requirements.

If OOW responds to PS&E design submittal with comments, Design Consultant makes necessary revisions and resubmits the design, along with a letter responding to each comment.

40 Review PS&E Design

OOW reviews the PS&E submission and prepares comments as necessary. OOW may submit design to other PWD units and project partners as needed.

41 Review PS&E Design

Design Branch Engineer reviews the PS&E submission and sends any comments to OOW.

42 Compile Comments on PS&E Design

If the PS&E submission requires revision, OOW adds comments to any received from Design Branch Engineer and sends a review letter to Design Consultant, requesting resubmission. This process repeats until PWD determines that the design meets PS&E design approval requirements. Multiple submissions may be necessary.

43 Review/Comment PS&E Design

Other PWD units and project partners, as needed, review design and send approval/comments back to OOW . Design Consultant makes any needed corrections to design.

44 Consensus Meeting

OOW schedules and facilitates a meeting with involved members of OOW and the Design Branch to confirm that there is a consensus to approve design.

45 Provide Project Package Approval

Once PWD has determined that the design requires no further revisions and is final, Design Branch Contract Manager prepares and sends a project package approval letter to Design Consultant.

24

Page 25: GREEN STORMWATER INFRASTRUCTURE DESIGN PROCESS WORKFLOW ...phillywatersheds.org/doc/GSI/GSI_Design_Process_Workflow_Packet_… · green stormwater infrastructure design process workflow

GSI Design Process Workflow Packet Track 2 – GSI Design (Contract Managed by Design Branch)

46 Prepare and Submit Final Design

Upon project package approval, Design Consultant prepares and submits the final design submission in accordance with the approved project scope and GSI design and drawing requirements.

47 Final Packaging

Once the final design is received from Design Consultant, Design Branch Engineer compiles all needed materials into the project package.

48 Deliver to Projects Control

Once all needed materials have been compiled into the project package, Design Branch Engineer delivers the package to Projects Control along with the project package transmittal letter. Once project package is delivered, Design Branch Engineer updates CAPIT status to “In Projects Control”. OOW enters final design metrics in GreenIT.

49 Enter GPIS Offsets

After final design is submitted to OOW, OOW enters data into GPIS for review and, if project is on a state route, prepares and submits PennDOT HOP application.

50 GPIS Review/Comment

Utilities review and approve proposed infrastructure work in GPIS, confirming earlier plan approval. This should be about 25 days after OOW has entered offsets into GPIS.

25

Page 26: GREEN STORMWATER INFRASTRUCTURE DESIGN PROCESS WORKFLOW ...phillywatersheds.org/doc/GSI/GSI_Design_Process_Workflow_Packet_… · green stormwater infrastructure design process workflow

PROJECT

PACKAGE

INITIATION

30% DESIGN

REVIEW AND

APPROVAL

70% DESIGN

REVIEW AND

APPROVAL

DESIGN REVIEWED

BY UTILITIES,

AGENCIES, AND

OTHER PWD UNITS

90% DESIGN

SUBMISSION

FINAL BID

DOCUMENT

SUBMISSION

PROJECTS

CONTROL AND

BIDDING

WORKFLOW SUMMARY

Track 3 – GSI Design (Contract Managed by OOW)

OOW develops concepts for GSI projects. Initiation in design occurs when OOW assembles concept locations

into a project package. Package is entered into CAPIT and work number is assigned. Proposal is requested and

negotiated between OOW and Design Consultant, then work is authorized to proceed. Scope of work may

include survey, geotechnical investigation, and design by Design Consultant.

Baseplan, geotechnical investigation, and concept check (if necessary) are submitted to and reviewed by OOW.

In some cases, a Proposal for only survey/geotech may be negotiated, and a separate Proposal for design

negotiated at a later date. Before 30% approval, OOW coordinates with partners as necessary to confirm

concept.

Upon approval of 30% design, Design Consultant prepares 70% (substantially complete) design and submits it to

OOW for review and comment. If there are any new prototype or irregular systems, materials, or devices used,

OOW discusses with PWD Collector Systems and/or Construction units. OOW coordinates with Design

Consultant to revise design as necessary. OOW and Design Consultant send the job out for utility review only

once OOW provides approval.

OOW sends design plans to other PWD units (Design Branch, GSI Maintenance, Collector Systems, and

Construction) and Design Consultant sends plans to external utilities/agencies following Attachment G of the

GSI Design Requirements & Guidelines Packet. Design Consultant copies OOW on submissions (one copy of

drawings and all transmittals).

Utility/agency/PWD responses are received and resolved. Design Consultant prepares and submits 90% (PS&E)

design, as defined in Attachment A of the GSI Design Requirements & Guidelines Packet, to OOW.

OOW provides comments on submission, which are addressed by Design Consultant. OOW submits design to

other PWD units or project partners as necessary. Once there are no further comments, OOW sends project

approval to Design Consultant. Design Consultant forwards final design bid package, in accordance with the

Final Design Package Checklist (located on PWD’s GSI Design Resources Website and shown in Attachment B of

the GSI Design Requirements and Guidelines Packet), to OOW. OOW applies for street opening permit through

GPIS if any streets are involved with the project package and completes final metrics tracking. OOW then

forwards job to Projects Control for bidding.

Initiation

PWD 70% (Substantially

Complete Design)

Final

Design

PWD 30% (Baseplan/

Concept Check)

PWD 90% (PS&E Design)

26

Page 27: GREEN STORMWATER INFRASTRUCTURE DESIGN PROCESS WORKFLOW ...phillywatersheds.org/doc/GSI/GSI_Design_Process_Workflow_Packet_… · green stormwater infrastructure design process workflow

De

sig

n C

on

su

lta

nt

De

sig

n B

ran

ch

Off

ice

of

Wa

ters

he

ds (

OO

W)

Tra

ckin

g

Time Varies 1-2 months

LAST REVISED: 05/15/2015

Detailed Workflow

Track 3 – GSI Design (Contract Managed by OOW)

Planning through 30%

Create

Project

Package

2

CA

PIT

Pro

ject C

rea

ted b

y O

OW

Transmit

Proposal

Request

4

Meet to

Discuss

Proposal

Request

(if needed)

Prepare

and Submit

Proposal

6

Review/

Approve

Proposal

7Prepare/

Transmit

Authorization

GR

EE

NIT

Upd

ate

d b

y O

OW

(Estim

ate

d D

A a

nd S

MP

Typ

e)

Planning/

Concept

Development/

Project

Grouping

1

Assign

Work No.

3

5

Yes

Issues?

Review

Baseplan/

Concept

Check

Submission

17

No

Prepare/Revise

and Submit

Baseplan/

Concept Check

Submission

16

Check-In

Coordination

with Project

Partners

(if needed)

18

CA

PIT

Sta

tus U

pda

ted b

y O

OW

(“3

0%

Co

mple

te”)

If n

ot d

on

e p

revio

usly

3-6 months

Approve

Baseplan/

Concept

Check

19

8

Design

Proposal

Established?Yes

Finalize Concept

Design/Sketches

and Design

Proposal Request

Review/

Approve

Baseplan

Review/

Approve

Design

Proposal

10

Prepare

and Submit

Design

Proposal

Meet to discuss

Design Proposal

Request

(if needed)

12

14 Prepare/

Transmit

Design

Authorization

13No

11

15

Concept

Check

Needed?

Yes

No

Prepare

and Submit

Baseplan

9

PLANNING COMPLETE DESIGN INITIATION PWD 30% (BASEPLAN / CONCEPT CHECK)

DESIGN INITIATIONPLANNING COMPLETE

Send Plans

to Other

PWD Units

as Needed

CA

PIT

Sta

tus U

pda

ted b

y O

OW

(“3

0%

Co

mple

te”)

20

PWD 30% (BASEPLAN / CONCEPT CHECK)

GR

EE

NIT

Sta

tus U

pd

ate

d b

y O

OW

(“T

ran

sfe

r to

Desig

n”)

GR

EE

NIT

Up

da

ted b

y O

OW

(ente

r pre

limin

ary

desig

n m

etr

ics)

Pu

blic

Affa

irs N

otifie

d b

y O

OW

, if r

eq

uir

ed

PLA

NIT

Up

da

ted

by O

OW

(Pro

ject tr

an

sfe

rred

to

GR

EE

NIT

)

27

Page 28: GREEN STORMWATER INFRASTRUCTURE DESIGN PROCESS WORKFLOW ...phillywatersheds.org/doc/GSI/GSI_Design_Process_Workflow_Packet_… · green stormwater infrastructure design process workflow

Tra

ckin

gO

the

r P

WD

Un

its

Utilit

ies a

nd

Ext

Ag

en

cie

s

De

sig

n

Bra

nch

Off

ice

of

Wa

ters

he

ds (

OO

W)

De

sig

n C

on

su

lta

nt

LAST REVISED: 05/15/2015

Detailed Workflow

Track 3 – GSI Design (Contract Managed by OOW)

30% through Final Design

2-3 months

OK For Utility

Submission?

Review

Substantially

Complete

Design

Submission

22

No

Prepare/

Revise and

Submit

Substantially

Complete

Design

21

Submit Job

for Utility

Review

24

Review/Comment

on Substantially

Complete Design

26

CA

PIT

Sta

tus U

pd

ate

d b

y O

OW

(“7

0%

Com

ple

te”)

GR

EE

NIT

Upd

ate

d b

y O

OW

(Estim

ate

d D

A a

nd

SM

P T

yp

e)

Provide

Project

Package

Approval

Require

Resubmission?

31

Yes

Prepare/Revise

and Submit

PS&E Design

No

Review

PS&E

Design

Submission

28

29

Yes

Prepare

and Submit

Final

Design

32

Final

Packaging

GPIS Review/

Comment

(if applicable)

35

Deliver to

Projects

Control

33

GR

EE

NIT

Upd

ate

d b

y O

OW

(Fin

al D

esig

n M

etr

ics)

CA

PIT

Sta

tus U

pd

ate

d b

y O

OW

(“In

Pro

jects

Co

ntr

ol”

)

2-4 months2-4 months

34

Authorize

Utility

Submission

23

YES

Respond

to Utility

Comments

Utility

Response

Required?

Review/Comment

on Substantially

Complete Design

25

NO

27

PWD 70%

(SUBSTANTIALLY COMPLETE DESIGN)

PWD 30%

(BASEPLAN / CONCEPT CHECK)

PWD 90%

(PLANS, SPECS, & ESTIMATE DESIGN)

FINAL

DESIGN

PWD 70%

(SUBSTANTIALLY COMPLETE DESIGN)

PWD 30%

(BASEPLAN / CONCEPT CHECK)

FINAL

DESIGN

Review/

Comment on

PS&E Design

30

PWD 90%

(PLANS, SPECS, & ESTIMATE DESIGN) 28

Page 29: GREEN STORMWATER INFRASTRUCTURE DESIGN PROCESS WORKFLOW ...phillywatersheds.org/doc/GSI/GSI_Design_Process_Workflow_Packet_… · green stormwater infrastructure design process workflow

GSI Design Process Workflow Packet Track 3 – GSI Design (Contract Managed by OOW)

Track 3 Expanded Process Descriptions

1 Planning/Concept Development/Project Grouping

In this preliminary phase, OOW identifies sites, groups them, and prepares a concept project package. This process occurs on a continual basis in order to maintain a surplus of projects available for design. Planning is complete when OOW transfers the project from PlanIT to GreenIT.

2 Create Project Package

OOW initiates the project in CAPIT. OOW updates the GreenIT status code to “Transfer to Design”.

3 Assign Work No.

This process is performed by Design Branch Administrator upon request from OOW. Once Work Number is assigned, Design Branch Administrator updates CAPIT with the number and creates a project folder in ProjectWise.

4 Transmit Proposal Request

OOW transmits proposal request to Design Consultant, including latest PSR and invoice packages for Design Consultant’s use.

5 Meet to Discuss Proposal Request (if needed)

Whether a meeting is conducted or not will have already been determined and indicated in the proposal request transmitted in Step 4. If a meeting is conducted, OOW schedules and facilitates meeting with key PWD and consultant staff. Project details, PWD requirements, and submission of the Proposal are discussed.

6 Prepare and Submit Proposal

Design Consultant is responsible for preparing and submitting the Proposal, consisting of scope, costs, and proposed Project Monitoring Table (PMT), per the proposal request and by the deadline specified.

7 Review/Approve Proposal

OOW reviews project proposal developed by Design Consultant. If revisions must be made, OOW sends comments to Design Consultant, who addresses them and sends back updated files.

8 Prepare/Transmit Authorization

OOW transmits final approval of Proposal to Design Consultant using the Proposal Authorization Form, which authorizes Design Consultant to proceed with the project.

29

Page 30: GREEN STORMWATER INFRASTRUCTURE DESIGN PROCESS WORKFLOW ...phillywatersheds.org/doc/GSI/GSI_Design_Process_Workflow_Packet_… · green stormwater infrastructure design process workflow

GSI Design Process Workflow Packet Track 3 – GSI Design (Contract Managed by OOW)

9 Prepare and Submit Baseplan

Design Consultant performs survey and prepares and submits baseplan as specified in the Proposal. If project is anticipated to involve ADA ramp or curb reconstruction, Design Consultant must request a bench mark and proposed curb elevations from the City District Surveyor, providing the PWD Work Number with the request.

10 Review/ Approve Baseplan

OOW reviews baseplan submission. If revisions are needed, comments are sent back to Design Consultant in the form of a review letter. Once baseplan is acceptable, OOW sends approval to Design Consultant.

11 Finalize Concept Design/Sketches and Design Proposal Request

OOW makes changes as necessary to concept based on baseplan and geotechnical investigation and prepares design proposal request. OOW sends request to Design Consultant. OOW updates CAPIT status to “30% Complete”.

12 Meet to Discuss Design Proposal Request (if needed)

Whether a meeting is conducted or not will have already been determined and indicated in the proposal request. If a meeting is conducted, OOW schedules and facilitates meeting with key PWD and consultant staff. Project details, PWD requirements, and submission of the design Proposal are discussed.

13 Prepare and Submit Design Proposal

Design Consultant is responsible for preparing and submitting the design Proposal, consisting of scope, costs, and proposed Project Monitoring Table (PMT), per the proposal request and by the deadline specified.

14 Review/Approve Design Proposal

OOW reviews the Proposal developed by the Design Consultant. If revisions must be made, OOW sends comments to Design Consultant, who addresses them and sends back updated files. 15 Prepare/Transmit Design Authorization

OOW transmits final approval of the Proposal to Design Consultant using a Project Authorization Form, authorizing the Design Consultant to proceed with design.

16 Prepare/Revise and Submit Baseplan/Concept Check Submission

Design Consultant performs survey and prepares baseplan/concept check submission in accordance with the approved scope and GSI design and drawing requirements. If project is anticipated to involve ADA ramp or curb reconstruction, Design Consultant must request a bench mark and proposed curb elevations from the City District Surveyor if they have not done so already. Design Consultant must provide the PWD Work Number with the request. Informal interim submissions and check-ins before the baseplan/concept check submission are encouraged. If OOW responds to the baseplan/concept

30

Page 31: GREEN STORMWATER INFRASTRUCTURE DESIGN PROCESS WORKFLOW ...phillywatersheds.org/doc/GSI/GSI_Design_Process_Workflow_Packet_… · green stormwater infrastructure design process workflow

GSI Design Process Workflow Packet Track 3 – GSI Design (Contract Managed by OOW)

check submission with comments that must be resolved before approval, Design Consultant makes necessary revisions and resubmits the design, along with a letter responding to each comment. Resubmissions must be recorded in the PMT.

17 Review Baseplan/Concept Check Submission

OOW reviews baseplan/concept check submission. If there are issues with the submission, OOW sends comments back to Design Consultant for resubmission.

18 Check-In Coordination with Project Partners (if needed)

Once it is confirmed that there are no issues with the baseplan/concept check submission, OOW provides project partners (if there are any) with an update on the status of the design that alerts them of any changes to the concept. OOW responds to comments that project partners have before approving baseplan/concept check.

19 Approve Baseplan/Concept Check

OOW responds to Design Consultant’s latest submission by confirming that either the project is ready to move on to development of substantially complete design or the project will be ready for development of substantially complete design if consultant addresses certain comments. OOW enters preliminary design metrics in GreenIT. OOW updates CAPIT status to “30% Complete,” if CAPIT status was not updated previously.

20 Send Plans to Other PWD Units as Needed

On a project as-needed basis, OOW coordinates with any other necessary PWD units, including, but not limited to: GSI Maintenance, GSI Planning, Collector Systems, Design Branch, etc.

21 Prepare/Revise and Submit Substantially Complete Design

Design Consultant prepares substantially complete design submission in accordance with the approved scope and GSI design and drawing requirements. Design consultant may start developing ADA ramp designs in accordance with the scope or at OOW’s direction. Informal interim submissions and check-ins before the substantially complete design submission are encouraged. If OOW responds to substantially complete design submission with comments that must be resolved before approval, Design Consultant makes necessary revisions and resubmits design, along with a letter responding to each comment. Resubmissions must be recorded in the PMT.

22 Review Substantially Complete Design Submission

OOW reviews the substantially complete design submission, soliciting feedback on landscape design from GSI Maintenance. If the submission requires revision, OOW sends comments back to Design Consultant for resubmission. This process repeats until OOW determines that the design meets substantially complete design approval requirements. Multiple submissions are typically necessary.

31

Page 32: GREEN STORMWATER INFRASTRUCTURE DESIGN PROCESS WORKFLOW ...phillywatersheds.org/doc/GSI/GSI_Design_Process_Workflow_Packet_… · green stormwater infrastructure design process workflow

GSI Design Process Workflow Packet Track 3 – GSI Design (Contract Managed by OOW)

23 Authorize Utility Submission

Once OOW has determined that there are no outstanding issues with substantially complete design, OOW responds to Design Consultant’s latest submission by confirming that the substantially complete design is approved and the project is ready for submission to utilities.

24 Submit Job for Utility Review

Once substantially complete design has been approved, plans are submitted for utility review. OOW submits and coordinates review directly with other PWD units (Construction Unit, Design Branch, GSI Maintenance, and Collector Systems Unit) and project partners. Design Consultant submits to external utilities/agencies. and other PWD units. OOW and Design Consultant should reference the Green Stormwater Infrastructure Review Contacts table (Attachment G of the GSI Design Requirements and Guidelines Packet), which provides information on what utilities/agencies should be submitted to, what their submission requirements are, and where the submissions should be sent. Design Consultant is encouraged to ask OOW about any utility submission details. Copies of all transmittals to utilities/agencies should be provided to OOW.

Once first copy of transmittal to utilities/agencies is received, OOW updates CAPIT status to “70% Complete”. OOW also updates greened acres and SMP type in GreenIT. OOW may submit plans to other partners it deems necessary.

25 Review/Comment on Substantially Complete Design

Other PWD units and project partners review plans and send approval/comments to OOW. Comments are generally addressed with 90% submission.

26 Review/ Comment on Substantially Complete Design

Utilities/Agencies review plans and send approval/comments back to Design Consultant. Design Consultant must be proactive in checking on the status of review and be in close contact with PWD if it appears there is a delay in any particular review. Design Consultant can contact OOW with any questions. 27 Respond to Utility Comments

If a utility/agency does not approve design, Design Consultant addresses comments at the advisement of OOW and resubmits plans to the utility/agency.

28 Prepare/Revise and Submit PS&E Design

Design Consultant prepares and submits PS&E design in accordance with comments from utilities/agencies/other PWD units, any outstanding comments from OOW, the approved project scope, and GSI design and drawing requirements.

If OOW responds to the PS&E design submittal with comments, Design Consultant makes necessary revisions and resubmits the design, along with a letter responding to each comment.

32

Page 33: GREEN STORMWATER INFRASTRUCTURE DESIGN PROCESS WORKFLOW ...phillywatersheds.org/doc/GSI/GSI_Design_Process_Workflow_Packet_… · green stormwater infrastructure design process workflow

GSI Design Process Workflow Packet Track 3 – GSI Design (Contract Managed by OOW)

29 Review PS&E Design

OOW reviews the PS&E Design Submission. If the submission requires revision, OOW sends comments back to Design Consultant for resubmission. OOW may submit design to other PWD units and project partners as needed. This process repeats until OOW determines that the requirements for final design are met.

30 Review/Comment on PS&E Design

Other PWD units and project partners, as needed, review plans and specifications and send approval/comments back to OOW. Design Consultant makes any needed corrections to design.

31 Provide Project Package Approval

Once OOW determines that the design requires no further revisions and is final, OOW prepares and sends a Project Approval Letter to Design Consultant.

32 Prepare and Submit Final Design

Upon project approval from OOW, Design Consultant prepares and submits the final design submission in accordance with the approved project scope and GSI design and drawing requirements.

33 Final Packaging

Once the final design is received from Design Consultant, OOW compiles all needed materials into the project package, enters data into GPIS for review, and, if project is on a state route, prepares and submits PennDOT HOP application.

34 Deliver to Projects Control

Once all needed materials have been compiled into the project package, OOW delivers the package to Projects Control along with the project package transmittal letter. Once project package is delivered, OOW updates CAPIT status to “In Projects Control” and enters final design metrics in GreenIT.

35 GPIS Review/Comment (if applicable)

Utilities review and approve proposed infrastructure offsets in GPIS, confirming earlier plan approval. This should be about 25 days after OOW has entered offsets into GPIS.

33