Grass Residence Construction Update
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Grass construction update

Amenities:Others

*Bridgeway

*Perimeter fence

*Landscapes

Page 2: Grass construction update

Amenities:Swimming Pools

Page 3: Grass construction update

Amenities: Main Clubhouse

Page 4: Grass construction update

Carpark Building A:Badminton Courts

Page 5: Grass construction update

Tower 2: Top view

Page 6: Grass construction update

Tower 2:Rebar works

Page 7: Grass construction update

Tower 2:Excavation works

Page 8: Grass construction update

Tower 3:Elevation Views

*View from Nueva Vizcaya St.

*View from the amenity area

*View from Misamis St.

Page 9: Grass construction update

Tower 3:Structural Works

*Slab zone at the 22nd floor

*Column and shear wall works at the 22nd floor

*Stairs at the 20th floor

Page 10: Grass construction update

Tower 3: Wall Installation

*Zocalo works for wall panels at the 17th floor

*Installed wall panels up to the 15th floor

Page 11: Grass construction update

Tower 1:Elevation views

*View from EDSA

*View from the amenity area

Page 12: Grass construction update

Tower 1:Residential Floors

Page 13: Grass construction update

Tower 1:Common

Areas*Basement parking

*Admin Office

*Prop. Management office

*Elevated water tank and pumps

*Main lobby

Page 14: Grass construction update

StructuralArchitectural

12F17F

6F 6F6F

MEPFS

Tower 3Tower 1

23F

Carpark A

41F41F38F

Tower Actual Accomplishment

Tower 1 98%

Tower 2 5%

Tower 3 37%

Carpark A 99%

Carpark B 0%

Construction Accomplishment (as of Apr. 30, 2011)