  • 8/12/2019 Globul Project TP and External Alarm Connection and Test Guide_ver.2

    1/34

    HUAWEI TECHNOLOGIES CO., LTD.

    Globul Project TP and External Alarm

    connection and test guide

  • 8/12/2019 Globul Project TP and External Alarm Connection and Test Guide_ver.2

    2/34

    Page 2HUAWEI TECHNOLOGIES CO., LTD.

    TP and external alarm solution & cable connect

    Ethernet cable connection from TP SMU02B to

    Outdoor TP cabinet sensor installation

    Existing DDF sensor side alarm cable connecti

    TP and external alarm test procedure

    Content

  • 8/12/2019 Globul Project TP and External Alarm Connection and Test Guide_ver.2

    3/34

    Page 3HUAWEI TECHNOLOGIES CO., LTD.

    TP indoor with generator

    TP indoor without generator

    Reuse of existing indoor PSS

    TP outdoorTP outdoor installed in shelter without generator

    TP outdoor installed in shelter with generator

    TP and external alarm solution & cable

    connectiontypical scenarios

  • 8/12/2019 Globul Project TP and External Alarm Connection and Test Guide_ver.2

    4/34

    Page 4HUAWEI TECHNOLOGIES CO., LTD.

    Scenario 1 TP Indoor site with Generator

    BTS BBU

    Existing DDF Box

    Door Temperature

    &humidity

    Smoke Air-condi

    TP SMU

    R-Phase down

    S-Phase down

    T-Phase down / AC Main failure

    (R+S+T phase down)

    Rectifier failure

    TP48200B

  • 8/12/2019 Globul Project TP and External Alarm Connection and Test Guide_ver.2

    5/34

    Page 5HUAWEI TECHNOLOGIES CO., LTD.

    ALM No. Globul ALM Requirement Existing DDF to BBU New TP SMU to BBU

    ALM1 High/Low Temperature High/Low Temperature

    ALM2 Fire/Smoke Fire/Smoke

    ALM3 Door open / Tamper/Intrude Door open / Tamper/Intrude

    ALM4 Air conditioner failure Air conditioner failure

    ALM5 R-phase down / Low fuel level Low fuel level R-phase down

    ALM6 S-phase down / Backup generator running Backup generator running S-phase down

    ALM7 T-phase down / AC Main failure (R+S+T phase down) Spare T-phase down / AC Main failure (

    ALM8 Rectifier failure Spare Rectifier failure

    Scenario 1 TP Indoor site with Generator

  • 8/12/2019 Globul Project TP and External Alarm Connection and Test Guide_ver.2

    6/34

    Page 6HUAWEI TECHNOLOGIES CO., LTD.

    Scenario 2 TP Indoor site without Generator

    BTS BBU

    Krone DDF Box

    Door Temperature

    &humidity

    Smoke Air-condi

    TP SMU

    R-Phase down

    S-Phase down

    T-Phase down / AC Main failure

    (R+S+T phase down)

    Rectifier failure

    TP48200B

  • 8/12/2019 Globul Project TP and External Alarm Connection and Test Guide_ver.2

    7/34

    Page 7HUAWEI TECHNOLOGIES CO., LTD.

    Scenario 2TP Indoor site without GeneratorALM No. Globul ALM Requirement Existing DDF to BBU New TP SMU to BBU

    ALM1 High/Low Temperature High/Low Temperature

    ALM2 Fire/Smoke Fire/Smoke

    ALM3 Door open / Tamper/Intrude Door open / Tamper/Intrude

    ALM4 Air conditioner failure Air conditioner failure

    ALM5 R-phase down / Low fuel level R-phase down

    ALM6 S-phase down / Backup generator running S-phase down

    ALM7 T-phase down / AC Main failure (R+S+T phase down) T-phase down / AC Main failure

    ALM8 Rectifier failure Rectifier failure

  • 8/12/2019 Globul Project TP and External Alarm Connection and Test Guide_ver.2

    8/34

    Page 8HUAWEI TECHNOLOGIES CO., LTD.

    Scenario 3 Reuse existing power system Indoor

    BTS BBU

    Krone DDF Box

    Door Temperature

    &humiditySmoke Air-condition

    R-Phase down/Low fuel

    DG.Runnig/ S-Phase down

    T-Phase down/AC Main failure

    Rectifier failure

  • 8/12/2019 Globul Project TP and External Alarm Connection and Test Guide_ver.2

    9/34

    Page 9HUAWEI TECHNOLOGIES CO., LTD.

    Scenario 3 Reuse existing power system IndoorALM No. Globul ALM Requirement Existing Krone DDF to BBU

    ALM1 High/Low Temperature High/Low Temperature

    ALM2 Fire/Smoke Fire/Smoke

    ALM3 Door open / Tamper/Intruder Door open / Tamper/Intruder

    ALM4 Air conditioner failure Air conditioner failure

    ALM5 R-phase down / Low fuel level R-phase down / Low fuel levelALM6 S-phase down / Backup generator running S-phase down / Backup generator running

    ALM7 T-phase down / AC Main failure (R+S+T phase down) T-phase down / AC Main failure (R+S+T phase down)

    ALM8 Rectifier failure Rectifier failure

  • 8/12/2019 Globul Project TP and External Alarm Connection and Test Guide_ver.2

    10/34

    Page 10HUAWEI TECHNOLOGIES CO., LTD.

    Scenario 4 TP Outdoor Site

    BTS BBU

    Door Temperature

    &humidity

    Smoke

    TP SMU

    R-Phase down

    S-Phase down

    T-Phase down / AC M

    (R+S+T phase down)

    Rectifier failure

    TP482

  • 8/12/2019 Globul Project TP and External Alarm Connection and Test Guide_ver.2

    11/34

    Page 11HUAWEI TECHNOLOGIES CO., LTD.

    Scenario 4 TP Outdoor SiteALM No. Globul ALM Requirement New TP SMU to BBU

    ALM1 High/Low Temperature High/Low Temperature

    ALM2 Fire/Smoke Fire/Smoke

    ALM3 Door open / Tamper Door open / Tamper

    ALM4 Air conditioner failure Spare (No Air conditioner)

    ALM5 R-phase down / Low fuel level R-phase down (No generator)ALM6 S-phase down / Backup generator running S-phase down (No generator)

    ALM7 T-phase down / AC Main failure (R+S+T phase down) T-phase down / AC Main failure (R+S+T phase down)

    ALM8 Rectifier failure Rectifier failure

  • 8/12/2019 Globul Project TP and External Alarm Connection and Test Guide_ver.2

    12/34

    Page 12HUAWEI TECHNOLOGIES CO., LTD.

    Appendix 1 Communication cable for BBU side

  • 8/12/2019 Globul Project TP and External Alarm Connection and Test Guide_ver.2

    13/34

    Page 13HUAWEI TECHNOLOGIES CO., LTD.

    Appendix 2

    Communication cable for TP SMU and existing DDF

    8-Pin Cable 1 8-Pin Cable 2

    ALM1+ ALM1- ALM2+ ALM2- ALM3+ ALM3- ALM4+ ALM4- ALM5+ ALM5- ALM6+ ALM6- ALM7+ ALM7-

    Orange&

    White OrangeGreen

    &White GreenBlue&

    White BlueBrown&

    White BrownOrange

    & White OrangeGreen

    &White GreenBlue&

    White Blue

    TP UIM

  • 8/12/2019 Globul Project TP and External Alarm Connection and Test Guide_ver.2

    14/34

    Page 14HUAWEI TECHNOLOGIES CO., LTD.

    Appendix 3 Globul project alarm setting guide attach

  • 8/12/2019 Globul Project TP and External Alarm Connection and Test Guide_ver.2

    15/34

    Page 15HUAWEI TECHNOLOGIES CO., LTD.

    TP and external alarm solution & cable connect

    Ethernet cable connection from TP SMU02B to

    Outdoor TP cabinet sensor installation

    Existing DDF sensor side alarm cable connecti

    TP and external alarm test procedure

    Content

  • 8/12/2019 Globul Project TP and External Alarm Connection and Test Guide_ver.2

    16/34

    Page 16HUAWEI TECHNOLOGIES CO., LTD.

    EthernetCable from SMU02B to BBU for all sites

    TP48200A/200B

    SMU02B

    Ethernet cable

    UPEU

    Step detail:

    Connect IOOI on SMU02B and MON0 on BBU U

    with provided Ethernet cable. (If MON0 has been us

    use MON1 instead.

  • 8/12/2019 Globul Project TP and External Alarm Connection and Test Guide_ver.2

    17/34

    Page 17HUAWEI TECHNOLOGIES CO., LTD.

    TP and external alarm solution & cable connect

    Ethernet cable connection from TP SMU02B to

    Outdoor TP cabinet sensor installation

    Existing DDF sensor side alarm cable connectio

    TP and external alarm test procedure

    Content

  • 8/12/2019 Globul Project TP and External Alarm Connection and Test Guide_ver.2

    18/34

    Page 18HUAWEI TECHNOLOGIES CO., LTD.

    Outdoor TP Smoke sensor installationInstall the smoke sensor on the top of the cabinet

    O

  • 8/12/2019 Globul Project TP and External Alarm Connection and Test Guide_ver.2

    19/34

    Page 19HUAWEI TECHNOLOGIES CO., LTD.

    Outdoor TP temperature and humidity sensor instaInstall the temperature sensor on the left rack in the cabinet

  • 8/12/2019 Globul Project TP and External Alarm Connection and Test Guide_ver.2

    20/34

    Page 20HUAWEI TECHNOLOGIES CO., LTD.

    TP and external alarm solution & cable connect

    Ethernet cable connection from TP SMU02B to

    Outdoor TP cabinet sensor installation

    Existing DDF Sensor side alarm cable connectio

    TP and external alarm test procedure

    Content

    S E i BTS ith SMT EAS

  • 8/12/2019 Globul Project TP and External Alarm Connection and Test Guide_ver.2

    21/34

    Page 21HUAWEI TECHNOLOGIES CO., LTD.

    Scenario 1 Ericsson BTS with SMT EASExt ALM

    CODETEXT STRING

    New ALM

    Need

    Sensor side connection change for

    New TP

    Sensor side c

    Reusing

    ALM1 HIGH TEMPERATURE ALM1 Series Connect to ALM1 Port Series Con

    ALM2 FLOOD None Remove ALM cable Remo

    ALM3

    EXTERNAL ALARM SYSTEM LOW

    BATTERY None Remove ALM cable Remo

    ALM4

    EXTERNAL ALARM SYSTEM 220V AC

    MAIN BREAKDOWN / low battery alternator None Remove ALM cable Remo

    ALM5 TAMPER ALM3 Series Connect to Ext ALM3 Port Series Conn

    ALM6 FIRE / SMOKE ALM2 Connect to Ext ALM2 Port Connect

    ALM7 INTRUDER ALM3 Series Connect to Ext ALM3 Port Series Conn

    ALM8 R PHASE BREAKDOWN / R or S or T ALM5 No need Connect

    ALM9

    S PHASE BREAKDOWN / high engine

    temperature / gen running ALM6 No need Connect

    ALM10 T PHASE BREAKDOWN /low fuel level ALM7 No need Series ConnALM11 AIR CONDITIONING ALM4 Connect to Ext ALM4 Port Connect

    ALM12 ALARM SYSTEM OFF None No need

    ALM13 LOW TEMPERATURE ALM1 Series Connect to Ext ALM1 Port Series Conn

    ALM14

    AVIATION LIGHT / intruder in generator

    section None No need

    ALM15 LOW BATTERY BTS None No need

    ALM16 MAINS 220V AC BREAKDOWN ALM7 No need Series Conn

    S i 2 M t l BTS ith SMT EAS

  • 8/12/2019 Globul Project TP and External Alarm Connection and Test Guide_ver.2

    22/34

    Page 22HUAWEI TECHNOLOGIES CO., LTD.

    Scenario 2 Motorola BTS with SMT EAS

    Ext ALM

    CODE TEXT STRING

    New ALM

    Need

    Sensor side connection change for

    New TP

    Sensor side

    Reusin

    ALM1 HIGH / LOW TEMPERATURE ALM1 No need

    ALM2 FIRE/SMOKE ALM2 No need

    ALM3 INTRUDER ALM3 Series Connect to Ext ALM3 Port Series Con

    ALM4 LOW DC VOLTAGE None Remove ALM cable Rem

    ALM5 R PHASE BREAKDOWN ALM5 No need

    ALM6 FLOOD None No need Rem

    ALM7 AC MAINS FAILURE ALM7 No need Series Con

    ALM8 AVIATION LIGHT FAILURE None No need Rem

    ALM9 TAMPER ALM3 Series Connect to Ext ALM3 Port Series Con

    ALM10 AIR CONDITIONER FAILURE ALM4 Connect to Ext ALM4 Port Connec

    ALM11 S PHASE BREAKDOWN ALM6 No need Connec

    ALM12 T PHASE BREAKDOWN ALM7 No need Series Con

    ALM13 RECTIFIER FAILURE ALM8 No need Connec

    ALM14 ALARM SYSTEM LOW BATTERY None No need

    ALM15 ALARM SYSTEM MAINS AC DOWN None No need

    ALM16

    PERSONNEL ON SITE /Alarm system

    status/ None No need

    S i 3 BTS ith A C S EAS

  • 8/12/2019 Globul Project TP and External Alarm Connection and Test Guide_ver.2

    23/34

    Page 23HUAWEI TECHNOLOGIES CO., LTD.

    Scenario 3 BTS with A.C.S EASExt ALM

    CODETEXT STRING

    New ALM

    Need

    Sensor side connection change for

    New TP

    Sensor side

    Reusi

    ALM1 HIGH / LOW TEMPERATURE ALM1 No need

    ALM2 FIRE/SMOKE ALM2 No need

    ALM3 DOOR OPEN ALM3 Series Connect to Ext ALM3 Port Series Co

    ALM4 LOW DC VOLTAGE (psu1, psu2) None Remove ALM cable Re

    ALM5 R or S or T PHASE DOWN ALM5 Series Connect to Ext ALM5 Port Series Co

    ALM6 FLOOD None No need Re

    ALM7 AC MAINS FAILURE (R and S and T down) ALM7 No need

    ALM8 AVIATION LIGHT FAILURE None No need Re

    ALM9 TAMPER ALM3 Series Connect to Ext ALM3 Port Series Co

    ALM10 AIR CONDITIONER FAILURE ALM4 Connect to Ext ALM4 Port Conne

    ALM11 BACKUP GENERATOR RUNNING ALM6 No need Conne

    ALM12 SPARE (FREE COOLING ALARM) None No need ALM13 RECTIFIER FAILURE (PSU1, PSU2,) ALM8 No need Conne

    ALM14 LOW FUEL LEVEL ALM5 Series Connect to Ext ALM5 Port Series Co

    ALM15 FUEL TANK ALARM (where applicable) ALM3 Series Connect to Ext ALM3 Port Series Co

    ALM16 PERSONNEL ON SITE None No need

    Existing DDF/OVP type on sites

  • 8/12/2019 Globul Project TP and External Alarm Connection and Test Guide_ver.2

    24/34

    Page 24HUAWEI TECHNOLOGIES CO., LTD.

    Existing DDF/OVP type on sitesNew type Ericsson Old type Ericsson DDF

    For indoor sites with new TP, make ALM1~ALM4 ports of existing DDF 16 ports to report the 4 existin

    to Huawei BTS, ALM5~ALM8 from new TP to Huawei BTS.

    For indoor sites reusing existing power, make ALM1~ALM8 ports of existing DDF 16 ports to report t

    from DDF to Huawei BTS.

    In case of New type Ericsson DDF on site

  • 8/12/2019 Globul Project TP and External Alarm Connection and Test Guide_ver.2

    25/34

    Page 25HUAWEI TECHNOLOGIES CO., LTD.

    In case of New type Ericsson DDF on site

    Use the provided by Huawei Ethernet cables for making RG45 connection between BBU/Upper UPEU a

    DDF/OVP box without cutting them one cable in case of TP indoor and two cables in case of reusing ex

    In this case the sequence of cable connections for external sensors changes as it is shown on the pictur

    with yellow labels .

    Existing DDF type on sites

  • 8/12/2019 Globul Project TP and External Alarm Connection and Test Guide_ver.2

    26/34

    Page 26HUAWEI TECHNOLOGIES CO., LTD.

    Existing DDF type on sites

    Existing DDF on 2123 site Existing DDF on 20

    For indoor sites with new TP, make ALM1~ALM4 ports of

    existing DDF 16 ports to report the 4 existing alarms from DDF to

    Huawei BTS, ALM5~ALM8 from new TP to Huawei BTS.

    For indoor sites reusing existing power, make ALM1~ALM8 ports of existing DDF 16 ports to report

    from DDF to Huawei BTS.

    Existing DDF connection reusing existing Guardian

  • 8/12/2019 Globul Project TP and External Alarm Connection and Test Guide_ver.2

    27/34

    Page 27HUAWEI TECHNOLOGIES CO., LTD.

    Existing DDF connection reusing existing Guardian

    Existing DDF sensor side cable connection when reusing existing Gu

    without generator.

    Short circuit

    Alarm 6 port.

    Because Gua

    dont support

    phase down

  • 8/12/2019 Globul Project TP and External Alarm Connection and Test Guide_ver.2

    28/34

    Page 28HUAWEI TECHNOLOGIES CO., LTD.

    TP and external alarm solution & cable connect

    Ethernet cable connection from TP SMU02B to

    Outdoor TP cabinet sensor installation

    Existing DDF Sensor side alarm cable connectio

    TP and external alarm test procedure

    Content

    AC Mains failure alarm test procedure (Necessary)

  • 8/12/2019 Globul Project TP and External Alarm Connection and Test Guide_ver.2

    29/34

    Page 29HUAWEI TECHNOLOGIES CO., LTD.

    AC Mains failure alarm test procedure (Necessary)1. Power on the system normally with battery back up;

    2. Switch off the AC input breaker and wait several minutes, view the active alarm informatio

    and view the alarm information on M2000 to check if the alarm is reported;

    3. Switch on the AC input breaker, view the active alarm information on LCD, and view the alaon M2000 to check if the alarm disappeared.

    Indoor TP (TP48200B) Outdoor TP (TP4820

    Rectifier failure alarm test procedure (Necessary)

  • 8/12/2019 Globul Project TP and External Alarm Connection and Test Guide_ver.2

    30/34

    Page 30HUAWEI TECHNOLOGIES CO., LTD.

    Rectifier failure alarm test procedure (Necessary)1. Insert a plastic stick to stop the rectifier fan and wait several minutes to check the rectifier

    active alarm information on the LCD, and view the alarm information on M2000 to check if the

    2. Remove the stick. View the active alarm information on LCD, and view the alarm informatio

    check if the alarm disappeared.

    Smoke alarm test procedure (Optional)

  • 8/12/2019 Globul Project TP and External Alarm Connection and Test Guide_ver.2

    31/34

    Page 31HUAWEI TECHNOLOGIES CO., LTD.

    Smoke alarm test procedure (Optional)Below is described the usual way to check this alarm but in this project it will be not checked

    1. Spray the smoker sensor to check if the alarm is reported with OMC if they view the alarm

    on M2000.

    2. Wait several minutes after the alarm is active and check with OMC if the alarm is disappear

    Temperature and Door open alarm test procedure

  • 8/12/2019 Globul Project TP and External Alarm Connection and Test Guide_ver.2

    32/34

    Page 32HUAWEI TECHNOLOGIES CO., LTD.

    Temperature and Door open alarm test procedure

    High temperature alarm test (Optional)

    1. Carefully heat the temperature sensor with heat-air-gun to reach the threshold value. Kee

    from plastic details and cabinet insulation. View the active alarm information on the LCD

    information on M2000 to check if the alarm is reported.

    2. Cool the temperature sensor or wait the temperature to be normal, view the alarm informa

    check if the alarm is disappeared.

    Door open alarm test (Necessary)

    1. Open the door of Cabinet or shelter to check the active alarm information on M2000 with O

    2. Close the door of Cabinet or shelter to check if the alarm is disappeared on M2000 with O

    Air conditioner failure and D.G running alarm test p

  • 8/12/2019 Globul Project TP and External Alarm Connection and Test Guide_ver.2

    33/34

    Page 33HUAWEI TECHNOLOGIES CO., LTD.

    Air conditioner failure and D.G running alarm test p

    Air conditioner failure alarm test (Necessary)

    1. Shut down the precision air conditioner ( Floor mounted) or heat the temperature sensor o

    Conditioner to check if there is a right alarm information on M2000 with OMC.

    2. Start the precision air conditioner again and check with OMC if the alarm is disappeared o

    D.G (Generator) running alarm test (Optional)

    1. Start the generator to check with OMC if the alarm is reported on M2000.

    2. Shut down the generator to check with OMC if the alarm is disappeared on M2000.

  • 8/12/2019 Globul Project TP and External Alarm Connection and Test Guide_ver.2

    34/34

    Thank youwww.huawei.com

    If you have any problem, please contact the persons as be

    Nikolay +359 896878010

    Neil +359 893332347