International Management & Construction Consultants BOQ For AFRED Cairo Festival City Kidzania 05 June 2011
Oct 25, 2014
International
Management &
Construction Consultants
BOQ
For
AFRED
Cairo Festival City
Kidzania
05 June 2011
KIDZANIAAFRED - Cairo Festival City
PROJECT: Cairo Festival City Issue Date: 27-Apr-2011Scheme: Retail Boxes Update: 5-Jun-2011Sheet: Kidzania Rev 1.0
Section Description Total Cost /m² % of Cost
A Preliminaries 0 #REF!B Site Work
B/9 Excavation 0 #REF!B/11 Disposal 0 #REF!B/12 Filling 0 #REF!B/19 Underground Drainage 0 #REF!B/20 Paving and Surfacing 0 #REF!B/22 Landscaping 0 #REF!
C Concrete WorkC/2 Poured Concrete 0 #REF!C/3 Reinforcement 0 #REF!C/4 Shuttering 0 #REF!D Masonry
D/2 Walls and piers 0 #REF!E Metal Work General
E/1 Metal Work General - #REF!E/2 Structural Metalwork 0 #REF!E/3 Non-Structural Metalwork 0 #REF!G Thermal and Moisture Protection
G/2 Coverings and linings #REF! #REF!G/3 Damp-proof courses #REF! #REF!G/4 Insulation #REF! #REF!H Doors and Windows
H/1 Doors #REF! #REF!H/2 Windows #REF! #REF!H/4 Ironmongery #REF! #REF!J Finishes
J/2 Backgrounds #REF! #REF!J/3 Finishings #REF! #REF!J/5 Suspended Ceiling #REF! #REF!N Special Construction
N/3 Installations #REF! #REF!P Conveying Systems
P/1 Generally #REF! #REF!Q Mechanical Engineering Installations
Q/2 Pipework and Gutter Work #REF! #REF!Q/3 Duct Work #REF! #REF!Q/4 Equipment #REF! #REF!Q/5 Automatic Controls #REF! #REF!Q/6 Connections to supply mains #REF! #REF!Q/7 Insulation #REF! #REF!Q/9 Work incidental to mechanical engineering installations #REF! #REF!R Electrical Engineering Installations
R/2 Main Circuits 0 #REF!R/3 Sub-main circuits 0 #REF!R/4 Final sub-circuits and auxiliary installations 0 #REF!R/5 Accessories 0 #REF!R/6 Control Gear 0 #REF!R/7 Equipment 0 #REF!
Sub Total #REF! #REF! #REF!Add Social Insurance 2.50% #REF! #REF!Add Construction sales tax 2.90% #REF! #REF!Sub Total Before Contingency #REF! #REF! #REF!Add Contingency 10% #REF! #REF!
GEFA Areas/m²
KIDZANIAAFRED - Cairo Festival City
PROJECT: Cairo Festival City Issue Date: 27-Apr-2011Grand Total #REF! #REF! #REF!
FESTIVAL LIVINGAFRED - Cairo Festival City
0 - Summary Of Prelims 4
Section A General Requirements EGP
A/0 Preamble 0
A/1 Conditions of Contract 0
A/2 Specification 0
A/3 Restrictions 0
A/4 Contractor's Administrative Arrangements 0
A/5 Construction Plant 0
A/6 Employer's Facilities
A/7 Contractor's Facilities 0
A/8 Temporary Works 0
A/9 Sundry Items 0
Sub Total 0
Add Construction sales tax 2.90% 0
Grand Total 0
FESTIVAL LIVINGAFRED - Cairo Festival City
A0 - Preamble 5
Qty Unit Rate EGP
A0 - PREAMBLE
Generally;
This bill is to be read in conjunction
with all other tender/contract
documents;
General notes
A Compliance with all the Tender
Requirements and Tender Instructions F 1 item incl
B The Technical Specifications
describe the Works which cannot be
readily indicated on the Drawings, and
it is not intended to mention every item
of the work in the Technical Specification
which can be adequately shown on the
Drawings. F 1 item incl
C The Bills of Quantities herein form an
integral part of the Contract Documents.
The items listed are intended to
describe the entire Works. The
Contractor is required to familiarise
himself of the full content of the
Contract Documents, including the
Form of Agreement, Bonds, Guarantees,
Specifications, Drawings, Programme,
General Conditions, Particular
Conditions, General Requirements, etc.
in order to allow for the type, quality and
standards required to complete the
Works. F 1 item incl
D The following notation is used in the
General Requirements:
F = Fixed Cost
T= Time=Related Cost F 1 item incl
E Time related periods, in weeks( wks), are to
be completed by the contractor F 1 item incl
FESTIVAL LIVINGAFRED - Cairo Festival City
A0 - Preamble 6
Qty Unit Rate EGP
Carried to Collection -
A The Works have been measured and
quantified generally in accordance with
The Principles of Measurement
(International) of Works of Construction,
June 1979, ("POMI"). F 1 item incl
B Unless otherwise stated, all works have
been measured net and fitted and/or
fixed in place. F 1 item incl
C The following are applicable to all kinds
of work in the Contract and are deemed
to be included in the Contractor's rates
and prices
- Materials, equipment, labour, handling,
attendance, storage, protection and
making good;
- transport, hoisting, lifting;
- Work in any classification, in any
location, width or area and at any depth
of height;
- scaffolding and tools;
- assembling and jointing together;
- fixing in place and adjustment, including
supports and all accessories;
- temporary works;
- forming to shape;
- coordination with different trades;
- cleaning down and preparing surfaces;
- multiple handling;
- samples;
- shopdrawings and as-built drawings;
- wastage and cutting;
- protection;
- work in small and/or isolated quantities;
- sealants and making good;
- raking, sloping, uneven surfaces;
- overhead and profit
- testing and commissioning F 1 item incl
FESTIVAL LIVINGAFRED - Cairo Festival City
A0 - Preamble 7
Qty Unit Rate EGP
Carried to Collection -
-
A Page 1
B Page 2 -
FESTIVAL LIVINGAFRED - Cairo Festival City
A0 - Preamble 8
Qty Unit Rate EGP
Carried to Summary -
FESTIVAL LIVINGAFRED - Cairo Festival City
A1 - Conditions of Contract 9
Qty Unit Rate EGP
A1 - CONDITIONS OF CONTRACT
Generally;
This bill is to be read in conjunction
with all other tender/contract
documents;
Conditions of contract;
compliance with the conditions of
contract included within the tender and / or
contract documents
A The Form of Agreement F 1 item incl
B The Schedules F 1 item incl
C The Conditions of Contract - General
Conditions F 1 item incl
D The Conditions of Contract - Particular
Conditions F 1 item incl
E The Conditions of Contact - Appendices F 1 item incl
F Performance Bond F 1 item N/A
G Bank Guarantee F 1 item -
H Project Insurances F 1 item -
FESTIVAL LIVINGAFRED - Cairo Festival City
A1 - Conditions of Contract 10
Qty Unit Rate EGP
Carried to Collection -
A Page 1 -
FESTIVAL LIVINGAFRED - Cairo Festival City
A1 - Conditions of Contract 11
Qty Unit Rate EGP
Carried to Summary -
FESTIVAL LIVINGAFRED - Cairo Festival City
A2 - Specification 12
Qty Unit Rate EGP
A2 - SPECIFICATION
Generally;
This bill is to be read in conjunction
with all other tender/contract
documents;
Specifications and employer's requirements;
the contractor is deemed to have taken
account of all specification documents,
both text and drawn, as well as the
employer's requirements included within
the tender / contract documents;
the contractor must check and report any
errors, omissions or conflicts
A Generally, compliance with the
specifications and employer's requirements F 1 item -
Independent Bill
List here the particulars, if applicable and /
or necessary, of any measures taken
to comply with the specifications and / or
employer's requirements
B List of particulars:
PPE & HSE materials F 200 nr -
Induction & security passes F 1 item -
Safety Harnessess F 30 nr -
FESTIVAL LIVINGAFRED - Cairo Festival City
A2 - Specification 13
Qty Unit Rate EGP
Carried to Collection -
A Page 1 -
FESTIVAL LIVINGAFRED - Cairo Festival City
A2 - Specification 14
Qty Unit Rate EGP
Carried to Summary -
FESTIVAL LIVINGAFRED - Cairo Festival City
A3 - Restrictions 15
Qty Unit Rate EGP
A3 - RESTRICTIONS
Generally;
This bill is to be read in conjunction
with all other tender/contract
documents;
The contractor must:
have visited site and taken account
of all existing features of the site, its
surrounding areas and access/egress to
and from the site and is to make all
provisions necessary for carrying out the
works, including all temporary works
and facilities;
Restrictions;
at the discretion of the contractor having
visited site, reviewed all tender / contract
documents and having requested and
reviewed all other documents pertaining to
the works;
make appropriate allowance, where
applicable and / or necessary for the
following;
A Access to and possession of the site F 1 item -
Borehole tests - building plot F 1 item -
Borehole tests - carpark F 1 item -
Borehole tests - outbuilding F 1 item -
Site level survey & transfer coordinates F 1 item -
B Limitation of working space F 1 item incl
C Limitations of working hours F 1 item incl
D Maintenance of existing services on, under F 1 item incl
or over the site
E The execution or completion of the work
in any specific order F 1 item N/A
FESTIVAL LIVINGAFRED - Cairo Festival City
A3 - Restrictions 16
Qty Unit Rate EGP
Carried to Collection -
A Existing features, adjoining site and / or
adjoining works F 1 item incl
B Items of a like nature F 1 item incl
C Permits and licences F 1 item incl
FESTIVAL LIVINGAFRED - Cairo Festival City
A3 - Restrictions 17
Qty Unit Rate EGP
Carried to Collection
A Page 1 -
B Page 2
FESTIVAL LIVINGAFRED - Cairo Festival City
A3 - Restrictions 18
Qty Unit Rate EGP
Carried to Summary -
FESTIVAL LIVINGAFRED - Cairo Festival City
A4 - Administrative Arrangement 19
Qty Unit Rate EGP
A4 - CONTRACTOR'S ADMINISTRATIVE ARRANGEMENTS
Generally;
This bill is to be read in conjunction
with all other tender/contract
documents;
The contractor shall provide a detailed
organisation chart showing names / roles,
rates and period of deployments for
all supervision and administrative staff
summarised as follows:
A Site project management T 58 wks
B Site / trade supervision T 58 wks
C Health and safety T 58 wks
D Quality management T 58 wks
E Commercial and procurement T 58 wks
F Office administration T 58 wks
G Site and office security T 58 wks
H Site, welfare and office attendant labour T 58 wks
I Transport and banksmen T 58 wks
J Shop drawings / design T 58 wks
K Surveys and reports T 58 wks
FESTIVAL LIVINGAFRED - Cairo Festival City
A4 - Administrative Arrangement 20
Qty Unit Rate EGP
Carried to Collection -
Office and administration facilities;
at the contractor's discretion provide all
equipment, hardware, software,
consumables and office facilities to
perform the administration, management
supervision and security of the site
A Establish administration facilities F 1 item -
B Maintain and provide facilities T 43 wks
C Hand-over to the employer or remove
as directed administration facilities F 1 item -
List here all facilities, supplies and
equipment provided by the contractor:
D Contractor to list here:
FESTIVAL LIVINGAFRED - Cairo Festival City
A4 - Administrative Arrangement 21
Qty Unit Rate EGP
Carried to Collection -
A Page 1 -
B Page 2 -
FESTIVAL LIVINGAFRED - Cairo Festival City
A4 - Administrative Arrangement 22
Qty Unit Rate EGP
Carried to Summary -
FESTIVAL LIVINGAFRED - Cairo Festival City
A5 - Construction Plant 23
Qty Unit Rate EGP
A5 - CONSTRUCTION PLANT
Generally;
This bill is to be read in conjunction
with all other tender/contract
documents;
Provide all common-user and shared
plant and equipment;
include all plant not in rates elsewhere;
plant provided at the discretion of the
contractor as appropriate for the nature
of the site and works and as required
by the contractor to comply with the
programme, sequence and operation of
the works
A Provide small plant and tools T 58 wks -
B Erect scaffold F 1 item -
C Maintain, adapt and modify scaffold T 58 wks -
D Remove scaffold F 1 item -
E Erect tower cranes F 1 item -
F Maintain and operate tower cranes T wks -
G Remove tower cranes F 1 item -
H Mobile cranes T 13 wks -
I Hoists and lifting equipment T 31 wks -
J Site transportation T 58 wks
FESTIVAL LIVINGAFRED - Cairo Festival City
A5 - Construction Plant 24
Qty Unit Rate EGP
Carried to Collection -
Plant required for specific trades and / or
site operations
A Generally; contractor to list here T wks -
Roller 5 ton T 18 wks -
Mini-Loader T 18 wks -
Plate Compactor (3) T 18 wks -
Bar bending machine 36 mm T 18 wks -
Cutting machine 36 mm T 18 wks -
Chop saw T 11 wks -
Bench saw T 15 wks -
Total Station T 39 wks -
180 CFM Compressor c/w tools T 37 wks -
Pokers engines (3) T 26 wks -
Pokers (6) T 26 wks -
Diesel for plant T 47 wks -
Water bowser T 37 wks -
FESTIVAL LIVINGAFRED - Cairo Festival City
A5 - Construction Plant 25
Qty Unit Rate EGP
Carried to Collection -
A Page 1 -
B Page 2 -
FESTIVAL LIVINGAFRED - Cairo Festival City
A5 - Construction Plant 26
Qty Unit Rate EGP
Carried to Summary -
FESTIVAL LIVINGAFRED - Cairo Festival City
A6 - Employer's Facilities 27
Qty Unit Rate EGP
A6 - EMPLOYER'S FACILITIES
Generally;
This bill is to be read in conjunction
with all other tender/contract
documents;
Provide all employer's, engineers,
supervisors and / or consultant facilities
and accommodation as directed by the
tender / contract documents or by the
employer's requirements;
pay all bills
Temporary site accommodation;
as directed
A Establish temporary accommodation F 1 item N/A
B Maintain temporary accommodation T wks N/A
C Remove temporary accommodation F 1 item N/A
List here the nature, number and size
of temporary accommodation
D Contractor to list here: N/A
FESTIVAL LIVINGAFRED - Cairo Festival City
A6 - Employer's Facilities 28
Qty Unit Rate EGP
Carried to Collection -
Temporary facilities for the employer.
engineer, supervisor and / or consultants
as directed
A Establish temporary facilities F 1 item N/A
B Maintain temporary facilities T wks N/A
C Hand to employer temporary facilities F 1 item N/A
List here the nature, number and size
of temporary accommodation
D Contractor to list here: N/A
FESTIVAL LIVINGAFRED - Cairo Festival City
A6 - Employer's Facilities 29
Qty Unit Rate EGP
Carried to Collection
A Page 1
B Page 2
FESTIVAL LIVINGAFRED - Cairo Festival City
A6 - Employer's Facilities 30
Qty Unit Rate EGP
Carried to Summary
FESTIVAL LIVINGAFRED - Cairo Festival City
A7 - Contractor's Facilities 31
Qty Unit Rate EGP
A7 - CONTRACTOR'S FACILITIES
Generally;
This bill is to be read in conjunction
with all other tender/contract
documents;
At the discretion of the contractor provide
temporary works and facilities where
applicable and/or required by the nature
of the site, the works, the specification
the employer's requirements or by
statutory or other requirements;
the contractor must allow for the
establishment, maintenance, removal of
any temporary works or facilities as well as
the reinstatement of any features or other
works, buildings or installations affected
by any temporary works or facilities as
appropriate;
pay all bills
Temporary site accommodation;
including buildings for offices, laboratories
compounds, stores, mess rooms and / or
living accommodation;
A Establish temporary accommodation F 1 item -
B Maintain temporary accommodation T 45 wks -
C Remove temporary accommodation F 1 item -
List here the nature, number and size
of temporary accommodation
D Contractor to list here:
FESTIVAL LIVINGAFRED - Cairo Festival City
A7 - Contractor's Facilities 32
Qty Unit Rate EGP
Carried to Collection -
Temporary fencing;
including hoardings, screens, roofs and
guardrails;
unless otherwise directed by the
tender / contract documents provide
temporary fencing appropriate for the
nature of the site and works
A Erect site perimeter fencing / gates F 1 item
B Maintain site perimeter fencing / gates F 1 item -
C Remove site perimeter fencing / gates F 1 item
D Erect hoarding for the works F 1 item -
E Maintain hoarding for the works T wks -
F Remove hoarding for the works F 1 item -
G Erect temporary screens for the works F 1 item -
H Maintain temporary screens for the works T wks -
I Remove temporary screens for the works F 1 item -
J Erect temporary roofs or coverings F 1 item -
K Maintain temporary roofs or coverings T wks -
L Remove temporary roofs or coverings F 1 item -
M Erect guardrails / edge protection F 1 item -
N Maintain / modify guardrails / edge protection T wks -
O Remove guardrails / edge protection F 1 item -
FESTIVAL LIVINGAFRED - Cairo Festival City
A7 - Contractor's Facilities 33
Qty Unit Rate EGP
Carried to Collection -
Temporary roads;
including roads, pavements, hardstandings
and crossings;
unless otherwise directed by the
tender / contract documents provide
temporary roads appropriate for the
nature of the site and works
A Establish temporary roads / pavements F 1 item -
B Maintain temporary roads / pavements F 1 item -
C Remove temporary roads / pavements F 1 item -
D Establish temporary hardstandings F 1 item incl -
E Maintain temporary hardstandings T wks incl
F Remove temporary hardstandings F 1 item incl
G Establish secure crossings F 1 item
H Maintain secure crossings T wks
I Remove temporary crossings F 1 item
FESTIVAL LIVINGAFRED - Cairo Festival City
A7 - Contractor's Facilities 34
Qty Unit Rate EGP
Carried to Collection -
Water for the works;
supplied by the contractor;
including all arrangements, meters,
supply networks and distribution;
including all waste water provision
A Establish temporary water facilities F 1 item -
B Maintain and pay all water costs T 58 wks -
C Remove temporary water facilities F 1 item incl -
Lighting and power for the works;
supplied by the contractor;
including all arrangements, meters,
supply networks and distribution;
D Establish temporary lights and power F 1 item -
E Maintain, adapt and pay all power costs T 58 wks -
F Remove temporary lights and power F 1 item -
Temporary telephones and communications;
supplied by the contractor;
including all arrangements, meters,
supply networks and distribution;
G Establish site communications networks F 1 item -
H Maintain, adapt and pay all costs T 40 wks
I Remove site communications networks F 1 item -
Site signage;
General, directional and site signage
J Site sign as directed by the employer F 1 item -
FESTIVAL LIVINGAFRED - Cairo Festival City
A7 - Contractor's Facilities 35
Qty Unit Rate EGP
K Safety and site signage F 1 item -
L Remove all signage F 1 item -
Carried to Collection -
A Page 1 -
B Page 2 -
C Page 3 -
D Page 4 -
FESTIVAL LIVINGAFRED - Cairo Festival City
A7 - Contractor's Facilities 36
Qty Unit Rate EGP
Carried to Summary -
FESTIVAL LIVINGAFRED - Cairo Festival City
A8 - Temporary Works 37
Qty Unit Rate EGP
A8 - TEMPORARY WORKS
Generally;
This bill is to be read in conjunction
with all other tender/contract
documents;
At the discretion of the contractor provide
temporary works and facilities where
applicable and/or required by the nature
of the site, the works, the specification
the employer's requirements or by
statutory or other requirements;
the contractor must allow for the
establishment, maintenance, removal of
any temporary works or facilities as well as
the reinstatement of any features or other
works, buildings or installations affected
by any temporary works or facilities as
appropriate
A Traffic diversion F 1 item N/A
B Maintenance / operation of traffic diversions T wks N/A
C Access roads F 1 item incl
D Maintenance of access roads T wks incl
E Piling mats F 1 item N/A
F Maintenance of piling mats T wks N/A
G Bridges F 1 item N/A
H Maintenance of bridges T wks N/A
FESTIVAL LIVINGAFRED - Cairo Festival City
A8 - Temporary Works 38
Qty Unit Rate EGP
Carried to Collection
Temporary works and /or facilities continued
A Cofferdams F 1 item N/A
B Maintenance of cofferdams T wks N/A
C Pumping F 1 item N/A
D Maintenance of pumping T wks N/A
E Dewatering installations F 1 item N/A
F Maintenance of dewatering installations T wks N/A
G Compressed air for tunnelling F 1 item N/A
H Maintenance of compressed air T wks N/A
FESTIVAL LIVINGAFRED - Cairo Festival City
A8 - Temporary Works 39
Qty Unit Rate EGP
Carried to Collection
Temporary works generally;
the contractor shall list here all other
temporary works required to carry out the
works and to comply with the tender and/or
contract requirements
A Contractor to list here: N/A
FESTIVAL LIVINGAFRED - Cairo Festival City
A8 - Temporary Works 40
Qty Unit Rate EGP
Carried to Collection
A Page 1
B Page 2
C Page 3
FESTIVAL LIVINGAFRED - Cairo Festival City
A8 - Temporary Works 41
Qty Unit Rate EGP
Carried to Summary
FESTIVAL LIVINGAFRED - Cairo Festival City
A9 - Sundries 42
Qty Unit Rate EGP
A9 - SUNDRIES
Generally;
This bill is to be read in conjunction
with all other tender/contract
documents
In compliance with all specification
and other construction and/or
statutory requirements the contractor
is required to make all due allowance
for the following
Testing of materials; either on site or
off site in specialist facilities, as required
and producing all testing certificates
and documentation
A Soil tests F 1 item incl
B Concrete tests F 1 item incl
C Reinforcement steel tests F 1 item incl
D Blockwork tests F 1 item incl
E Glazing tests F 1 item incl
F Electrical tests F 1 item incl
G Mechanical tests F 1 item incl
H Public health / plumbing tests F 1 item incl
I Other tests required by the contractor or
specification;
contractor to list here:
F 1 item incl
FESTIVAL LIVINGAFRED - Cairo Festival City
A9 - Sundries 43
Qty Unit Rate EGP
Carried to Collection
Testing of the works
A Generally, test the works as required
by the specification F 1 item -
All Testing
Protecting the works from inclement
weather
B Generally, external protection to the works
as required by the specification F 1 item -
Protection Material
Removal of building and general debris
and rubbish off site or as directed by the
specification;
maintaining the works in good and clean
order
C Generally, rubbish removal F 1 item incl
D Maintain the site and works T 32 wks -
10 General Laborers
E Final clean of the works T 4 wks -
15 Cleaners
Traffic regulations
F Establish and maintain traffic, materials and
pedestrian management systems T wks N/A
Public and private highways
G Maintain all public and private highways
and roads affected by the works F 1 item N/A
Drying the works
H Generally, maintain the works T wks incl
FESTIVAL LIVINGAFRED - Cairo Festival City
A9 - Sundries 44
Qty Unit Rate EGP
Carried to Collection -
Control of noise and pollution
A Generally, maintain the works F 1 item incl
All statutory obligations
B Generally, comply with all prevailing
statutory obligations F 1 item incl
FESTIVAL LIVINGAFRED - Cairo Festival City
A9 - Sundries 45
Qty Unit Rate EGP
Carried to Collection
Overhead and profit allowances;
the contractor shall note here, as rates
only, the following allowances included
within the contractor's price
A Head office overhead contribution %
B Profit margin %
FESTIVAL LIVINGAFRED - Cairo Festival City
A9 - Sundries 46
Qty Unit Rate EGP
Sundries generally;
the contractor shall list here all other
sundry items required to carry out the works
and to comply with the tender and/or
contract requirements
FESTIVAL LIVINGAFRED - Cairo Festival City
A9 - Sundries 47
Qty Unit Rate EGP
Carried to Collection
A Page 1 -
B Page 2 -
C Page 3 -
D Page 4 rates only
E Page 5 -
FESTIVAL LIVINGAFRED - Cairo Festival City
A9 - Sundries 48
Qty Unit Rate EGP
Carried to Summary -
KIDZANIAAFRED - Cairo Festival City
B-Site Work 49
Item Gleeds Unit Rate Total (EGP)
B9 - EXCAVATION
Generally;This bill is to be read in conjunctionwith all other tender/contractdocuments;
Main Building
A26,676 m³ -
B Excavate for soil replacement 5,227 m³ -
Utilities Building
C 163 m³ -
External Works
D1,300 m³ -
Water Tank
J1,963 m³ -
Carried to Collection -
Excavation; including supporting sides of excavation. No classification according to kinds of excavation and type of soil the work shall be from the actual surface of existing soil to the required excavation levels shown on drawings and according to geotechnical report.
Excavation in any type of soil as determine by the engineer on site for the subgrade level of roads
Excavation in any type of soil as determine by the engineer on site for the subgrade level of roads
Excavation in any type of soil as determine by the engineer on site for the subgrade level of roads
Excavation in ordinary soil and transporting the surplus materials to the public dumping areas
KIDZANIAAFRED - Cairo Festival City
B-Site Work 50
Item Gleeds Unit Rate Total (EGP)
B11 - DISPOSAL
Generally;This bill is to be read in conjunctionwith all other tender/contractdocuments;Disposal of material arising from excavation on site and offsite.
Main Building
A Disposal on site, backfilled into excavation 5,227 m³ -
Utilities Building
B Disposal off site 163 m³ -
External Works
C Disposal on site, backfilled into excavation 1,300 m³ -
Water Tank
D Disposal off site 1,963 m³ -
Carried to Collection -
KIDZANIAAFRED - Cairo Festival City
B-Site Work 51
Item Gleeds Unit Rate Total (EGP)
B12 - Filling
Generally;This bill is to be read in conjunctionwith all other tender/contractdocuments;
Main Building
A Soil replacement with sand 2,015 m³ -
B Soil replacement with sand and aggregate mix 3,213 m³ -
C Backfilling with compacted clean sand 3,105 m³ -
Utilities Building
D Backfilling with compacted clean sand 86 m³ -
External Works
F4,200 m³ -
Carried to Collection -
Filling with suitable materials from Excavation after approval of the engineering on the site for the subgrade level of roads
KIDZANIAAFRED - Cairo Festival City
B-Site Work 52
Item Gleeds Unit Rate Total (EGP)
B19 - UNDERGROUND DRAINAGE
Generally;This bill is to be read in conjunctionwith all other tender/contractdocuments;Main Building
Drainage System Underground UPVC pipes and Fittings
A 160 mm 96 m -
B 110 mm 276 m -
C 75 mm 33 m -
D 50 mm 10 m -
Concrete beds and coverings for pipes including formworkE 160 mm 96 m -
F 110 mm 276 m -
G 75 mm 33 m -
H 50 mm 10 m -
I Gully Trap (GT) 6 nr -
J Grease Interceptor (GI) 1 nr -
Inspection chambers K Inspection chamber (IC)(60cm*60cm) 10 nr -
L Inspection chamber (IC)(60cm*90cm) 1 nr -
External Works
Drainage System Underground UPVC pipes and Fittings
M 160 mm ( UPVC ) (10bar) 24 m -
N 110 mm ( UPVC ) (10bar) 834 m -
P 75 mm ( UPVC ) (10bar) 18 m -
Q 63 mm ( UPVC ) (10bar) 54 m -
Carried forward -
Drain accessories including concrete surrounds and additional excavation
KIDZANIAAFRED - Cairo Festival City
B-Site Work 53
Item Gleeds Unit Rate Total (EGP)
Brought forward -
A 50 mm (UPVC ) (10bar) 372 m -
B 40 mm ( UPVC ) (10bar) 72 m -
C 32 mm ( UPVC ) (10bar) 3,162 m -
Concrete beds and coverings for pipes including formworkD 160 mm ( UPVC ) (10bar) 24 m -
E 110 mm ( UPVC ) (10bar) 834 m -
F 75 mm ( UPVC ) (10bar) 18 m -
G 63 mm ( UPVC ) (10bar) 54 m -
H 50 mm (UPVC ) (10bar) 372 m -
I 40 mm ( UPVC ) (10bar) 72 m -
J 32 mm ( UPVC ) (10bar) 3,162 m -
Combined sewage and storm water network
K UPVC spigot and socket 200 mm Dia PN 6 348 m - L UPVC spigot and socket 250 mm Dia PN 6 190 m -
M
26 m -
N Hose connection / inspection chamber 12 nr -
Carried forward -
Gravity Pipes, depth up to 3500 mm ,Are classified according to material and diameter to the depth indicated on Drawings. Rates shall include supply of pipes, jointing materials, excavation of pipe trenches to the grade shown on Drawings, dewatering, shoring grading and leveling of excavation bottom, furnishing, placing and compacting bedding material , lowering pipes into trench, placing concrete supports, pipe surrounding, pipe crossing protection, road crossing protection, laying out, aligning, jointing pipes, testing installed work, flushing, cleaning, backfilling granular bedding well compacted to existing ground surface
UPVC spigot and socket 250 mm Dia PN 6 with depth up to 3500 mm ,Are classified according to material and diameter to the depth indicated on Drawings. Rates shall include supply of pipes, jointing materials, excavation of pipe trenches to the grade shown on Drawings, dewatering, shoring grading and leveling of excavation bottom, furnishing, placing and compacting bedding material , lowering pipes into trench, placing concrete supports, pipe surrounding, pipe crossing protection, road crossing protection, laying out, aligning, jointing pipes, testing installed work, flushing, cleaning, backfilling granular bedding well compacted to existing ground surface
KIDZANIAAFRED - Cairo Festival City
B-Site Work 54
Item Gleeds Unit Rate Total (EGP)
Brought forward -
Tie in pipes - Catch Basin pipes
A
nrManhole construction
B20 nr -
C1 nr -
Catch basin
D
12 nr -
Carried forward -
uPVC 160 mm connecting building's tie in, Catch basin pipes with combined sewage and storm network with maximum length 25 m
Manhole measured by type, rates include submittals and drawings as required, furnishing materials and necessary equipment, tools, and labor excavation, dewatering, shoring, backfilling, cast - in situ plain concrete walls and base covered with precast slab rested on 50 mm cement mortar, blinding concrete, supporting concrete, inside concrete benching, 1 heavy duty frame and cover class D 400, internal and external coating, ramp backdrop including all required fittings and concrete surroundings, typical vertical backdrop including all required fittings and concrete surrounding, concrete backfill, concrete cradle, rocker pipe, cast iron step iron and all required materials and fittings for complete construction of the manhole
Manhole with internal diameter 1000 mm and outer diameter 1500 mm, base thickness 350 mm and depth up to 2500 mm
Manhole with internal diameter 1200 mm and outer diameter 1700 mm, base thickness 350 mm and depth up to 3500 mm
Plain concrete measured by type, rates include submittals and drawings as required, furnishing materials and necessary equipment, tools, and labor excavation, dewatering, shoring, backfilling, Cast - in situ plain concrete walls and base covered with precast slab rested on 50 mm cement mortar Blinding concrete, Supporting concrete, 1 medium duty grating frame and cover class C 250, internal and external coating, concrete backfill, concrete cradle, rocker pipe, supply and install cast iron trap and all required materials and fittings for complete construction of catch basin and installation for all accessories inside the catch basin
Plain concrete catch basin with internal dimension 600 mm and outer dimension,1100 mm with depth up to 1000 mm
KIDZANIAAFRED - Cairo Festival City
B-Site Work 55
Item Gleeds Unit Rate Total (EGP)
Brought forward -
A
4 nr -
Gully Gutter Drainage Channel
B
9 m -
Water Tank
Drainage System Underground UPVC pipes and Fittings
C 110mm 7 m -
Upvc pipes and fittings High pressureD 75mm 5 m -
E Trench grate 300 mm width (TG1) 15 m - F Retarding Chamber, RCH 1 nr - G Trench Drain, 110 mm (TD1) 2 nr - H Floor Cleanout, 110 mm (FCO) 1 nr - I Sump Pump SP1 (A&B), P5 (A&B) 1 nr -
Carried to Collection -
Plain concrete double catch basin with internal dimension 1000 mm x 1200 mm and outer dimension 1500 mm x 1700 mm with depth up to 1000 mm, are measured by type, rates include submittals and drawings as required, furnishing materials and necessary equipment, tools, and labor excavation, dewatering, shoring, backfilling, cast - in situ plain concrete walls and base covered with precast slab rested on 50 mm cement mortar Blinding concrete, Supporting concrete, 2 medium duty grating frame and cover class C 250, internal and external coating, concrete backfill, concrete cradle, rocker pipe, supply and install cast iron trap and all required materials and fittings for complete construction of double catch basin and installation for all accessories inside the chamber
R.C concrete drainage channel, with internal width (200 mm) and internal depth up to 500mm, are measured by meter length, rates include submittals and drawings as required, furnishing materials and necessary equipment, tools, and labor excavation, dewatering, shoring, backfilling, cast - in place reinforced concrete walls and base covered with RC slab rested on 50 mm cement mortar, cast - in place blinding concrete, 1 heavy duty linear grating frame and cover class D 400, internal and external coating,. rate shall include laying out, aligning, testing installed work, flushing, cleaning, backfilling granular bedding well compacted to existing ground surface and all required material and fittings for complete installation
Drain accessories including concrete surrounds and additional excavation
KIDZANIAAFRED - Cairo Festival City
B-Site Work 56
Item Gleeds Unit Rate Total (EGP)
B20 - PAVING AND SURFACING
Generally;This bill is to be read in conjunction with all other tender/contract documents;
External Works
A 16,850 m² -
B14,800 m² -
C14,800 m² -
D
14,800 m² -
E14,800 m² -
F
0 m² -
I2,550 m -
J Road markings using thermoplastic reflective paints for lane.
K460 m² -
L Traffic Direction Arrows 44 m² -
M
10 nr -
N Rubber setting 620 m² -
O Interlocking Concrete Pavers : Light Gray (100x100x80mm ) 245 m² -
P Interlock Concrete Pavers : Dark Red (100 x 100 x 60 mm ) 1000 m² -
Q Interlock Concrete Pavers : Light Gray (100 x 100 x 60 mm) 1550 m² -
Carried forward -
Furnishing and constructing graded crushed aggregate base course of 25cm thickness after compaction.
Prime coat to the base course surface at a rate of 1.5 kg./m2 of liquid asphalt grade MC-30
Apply and spread of asphalt base course layer with thickness of 5 cm after compaction
Furnishing and applying a tack coat to the top of the binder course at a rate of 0.50 kg./m2 of liquid asphalt grade RC-3000
Apply and spread of asphalt wearing course layer with thickness of 5 cm after compaction
Rigid pavement using reinforcement concrete tiles with dimension (4m*4m) and 25cm Thickness including the expansion joints & damp-proof
Supply and install precast concrete curbs for roads with dimensions of (50*30*15-12.5)
Lane Marking, Center Line Marking, Pedestrian Crossing, Stop Lines & Stop Marking
Traffic signs with different types (Mandatory, Prohibitory, Warning and Guide signs) according to the details shown on the drawings. The item include sign aluminum face, sign poles, fixing and supporting features. The contractor has to submit sample for engineer approval.
KIDZANIAAFRED - Cairo Festival City
B-Site Work 57
Item Gleeds Unit Rate Total (EGP)
Brought forward -
A1100 m² -
B Loose gravel 50-80 mm mulch 440 m² -
C Cast in situ concrete curbs (1000x250x150/125mm) 1592 m -
D Basalt Cobble Pavers: Light Gray ( 100 X 100 X 80 mm ) 20 m² -
E Natural Stone Straight Cut (600 X 600 X 40 mm ) 425 m² -
Carried to Collection -
Interlock Concrete Pavers : light white (1000x250x150/125mm)
KIDZANIAAFRED - Cairo Festival City
B-Site Work 58
Item Gleeds Unit Rate Total (EGP)
B22 - LANDSCAPING
Generally;This bill is to be read in conjunctionwith all other tender/contractdocuments;
External Works
Palms
A Washingtonia robusta / Mexican Fan Palm 3-4 m high 6 nr -
Trees
B Jacaranda mimosifolia / Jacaranda 31 nr -
C Albizia Lebeek 56 nr -
Shrubs
D22 nr -
E16 nr -
F199 nr -
Ground cover
G Carissa grandiflora / Natal Plum 290 m² -
H Dimorphotheca aurantiaca / African Daisy 305 m² -
I Wedelia trilobata / Wedelia 71 m² -
Grass
J Paspalum sod / Bahia Grass 3,600 m² -
Carried to Collection -
Bougainvillea glabra / Paper Flower, 2 Nr in planter size (1000 mm width X 600 mm depth)
Hibiscus rosa-sinensis / Chinese Hibiscus, 3 Nr in planter size (1000 mm width X 600 mm depth)
Tecomaria capensis / Cape Honeysuckle,5 Nr in planter size (1000 mm width X 600 mm depth)
KIDZANIAAFRED - Cairo Festival City
C-Concrete Work 59
Item Qty Unit Rate Total (EGP)
C2 - POURED CONCRETE
Generally;
This bill is to be read in conjunction
with all other tender/contract
documents;
Main Building
A Plain concrete for isolated footing
971 m³ -
B Plain concrete under retaining wall
181 m³ -
C Plain concrete under tie beams
302 m³ -
D Plain concrete under slab on grade
285 m³ -
Utilities Building
E Plain concrete for isolated footing
21 m³ -
F Plain concrete under slab on grade
24 m³ -
G Plain concrete under tie beams
Supply, placing, finishing curing and testing of plain concrete, Grade C, minimum cement content 250 kg/cm 3, average compressive strength 200 kg/cm 2 at 28 days including embedded items and concrete surface repair with ordinary portland cement (Ordinary and Rapid-Hardening) according to ES 373 and as per drawings and specification
Plain concrete for isolated footings 500 mm thick, Grade C with average concrete cube strength 200 kg/cm2, footing dimensions as shown on drawing CFC/ECG/CR007/SB/DRG/000802
Plain concrete for retaining wall footing 500 mm thick, Grade C with average concrete cube strength 200 kg/cm2 as shown in General details drawing CFC/ECG/CR007/SB/DRG/000802
Plain concrete under tie beams 100 mm thick, Grade C with minimum concrete cube strength 200 kg/cm2 as shown in General details drawing CFC/ECG/CR007/SB/DRG/000002
Plain concrete for tie beams 50 mm thick, Grade C with minimum concrete cube strength 200 kg/cm2 as shown in General details drawing CFC/ECG/CR007/SB/DRG/000002
Plain concrete for isolated footings 300 mm thick, Grade C with average concrete cube strength 200 kg/cm2 as shown on drawing CFC/ECG/CR007/SB/DRG/000805
Plain concrete for tie beams 100 mm thick, Grade C with minimum concrete cube strength 200 kg/cm2
KIDZANIAAFRED - Cairo Festival City
C-Concrete Work 60
Item Qty Unit Rate Total (EGP)
3 m³ -
Carried forward -
Brought forward -
External Works
A
0 m³ -
B0 m³ -
C Plain concrete under, Natural stepping stone 16 m³ -
Water tank
D
30 m³ -
Plain concrete under tie beams 100 mm thick, Grade C with average concrete cube strength 200 kg/cm2
Plain concrete 100 mm thick, Grade C with average concrete cube strength 200 kg/cm2
light weight sloped concrete 100 mm thick, Grade C with average concrete cube strength 200 kg/cm2
Plain concrete for foundation100 mm thick, Grade C with average concrete cube strength 200 kg/cm2 as shown on drawing CFC/ECG/CR007/SF/DRG/000207
KIDZANIAAFRED - Cairo Festival City
C-Concrete Work 61
Item Qty Unit Rate Total (EGP)
Carried forward -
Brought forward -
Main Building
Reinforced concrete for isolated footing
A
1,101 m³ -
Reinforced concrete footing for retaining wall
B
280 m³ -
Reinforced concrete for tie beams
C
227 m³ -
Reinforced concrete for slab on grade
D
854 m³ -
Reinforced concrete for suspended slabs
E
2,791 m³ -
Reinforced concrete for flat roofs
F
205 m³ -
Reinforced concrete for retaining wall
Supply, placing, finishing curing and testing of reinforced concrete for substructure and superstructure, Grade A, minimum cement content 350 kg/cm 3, average compressive strength 400 kg/cm 2 at 28 days including embedded items and concrete surface repair with ordinary portland cement (Ordinary and Rapid-Hardening) according to ES 373 and as per drawings and specification
Reinforced concrete for isolated footings 500 mm thick, Grade A with average concrete cube strength 400 kg/cm2, footing dimensions as shown on drawing CFC/ECG/CR007/SB/DRG/000802
Reinforced concrete footing for retaining wall RW1, 600 mm thick, Grade A with average concrete cube strength 400 kg/cm2 as shown in General details drawing CFC/ECG/CR007/SB/DRG/000802
Reinforced concrete for tie beams, Grade A with average concrete cube strength 400 kg/cm2
Reinforced concrete for slab on grade 150 mm thickness, indoor slab concrete Grade D with average concrete cube strength 250 kg/cm2 as shown in General details drawing CFC/ECG/CR007/SB/DRG/000801
Reinforced concrete for suspended slab 400 mm thickness, Grade A with average concrete cube strength 400 kg/cm2 as shown in General details drawing CFC/ECG/CR007/SB/DRG/000801
Reinforced light weight sloped concrete for flat roof slab 120 mm thickness, density 1200 kg/m3 as shown on Detail 3 drawing CFC/ECG/CR007/SB/DRG/000209
KIDZANIAAFRED - Cairo Festival City
C-Concrete Work 62
Item Qty Unit Rate Total (EGP)
H
280 m³ -
Reinforced concrete for core walls
I
28 m³ -
Carried forward -
Brought forward -
A
32 m³ -
Reinforced concrete for columns
B233 m³ -
Reinforced concrete for Beams
C
97 m³ -
Reinforced concrete for stairs
D71 m³ -
Utilities Building
Reinforced concrete for isolated footing
E
19 m³ -
Reinforced concrete for slab on grade
F
48 m³ -
Reinforced concrete for solid slabs
H
39 m³ - Reinforced concrete for roof
I48 m³ -
Reinforced concrete for tie beams
J27 m³ -
Reinforced concrete for retaining wall RW1 300 mm thick, Grade A with average concrete cube strength 400 kg/cm2 as shown in General details drawing CFC/ECG/CR007/SB/DRG/000802
Reinforced concrete for core walls WR1 250/300 mm thick, Grade A with average concrete cube strength 400 kg/cm2 as shown on drawing CFC/ECG/CR007/SB/DRG/000801
Reinforced concrete for core walls WR2 200 mm thick, Grade A with average concrete cube strength 400 kg/cm2 as shown drawing CFC/ECG/CR007/SB/DRG/000801
Reinforced concrete for columns, Grade A with average concrete cube strength 400 kg/cm2
Reinforced concrete for beams, Grade A with average concrete cube strength 400 kg/cm2
Reinforced concrete for stairs160 mm thick, Grade A with average concrete cube strength 400 kg/cm2
Reinforced concrete for isolated footing Grade A with minimum concrete cube strength 400 kg/cm2
Reinforced concrete for slab on grade 200 mm thickness, indoor slab concrete Grade D with average concrete cube strength 250 kg/cm2 as shown in General details drawing CFC/ECG/CR007/SB/DRG/000801
Reinforced concrete for suspended slab 160 mm thickness, Grade A with average concrete cube strength 400 kg/cm2
Reinforced light weight sloped concrete, density 900 kg/m3 for roof slab 200 mm thickness, strength 40 Kg/cm2
Reinforced concrete for tie beams, Grade A with average concrete cube strength 400 kg/cm2
KIDZANIAAFRED - Cairo Festival City
C-Concrete Work 63
Item Qty Unit Rate Total (EGP)
Reinforced concrete for columns
K20 m³ -
Reinforced concrete for Beams
L30 m³ -
Reinforced concrete for ParapetM
11 m³ -
Carried forward -
Brought forward -
Reinforced concrete for Electrical Trench walls and floorsA
15 m³ -
Water tank
B
153 m³ -
C
6 m³ -
D
0 m³ -
E
198 m³ -
F
0 m³ -
Reinforced concrete for columns, Grade A with average concrete cube strength 400 kg/cm2
Reinforced concrete for beams, Grade A with average concrete cube strength 400 kg/cm2
Reinforced concrete for parapet, Grade A with average concrete cube strength 400 kg/cm2
Reinforced concrete walls and floors; 200 mm thickness, concrete Grade D with average concrete cube strength 250 kg/cm2 as shown in General details drawing CFC/ECG/CR007/SB/DRG/000801
Supply, placing, finishing curing and testing of reinforced concrete for water structure, Grade B, minimum cement content 250 kg/cm3, average compressive strength 400 kg/cm 2 at 28 days including embedded items and concrete surface repair with ordinary portland cement (Ordinary and Rapid-Hardening) according to ES 373 and as per drawings and specification
Reinforced concrete for foundation 600 mm thick, Grade B with minimum concrete cube strength 400 kg/cm2 as shown on drawing CFC/ECG/CR007/SF/DRG/000207
Reinforced concrete for foundation 300 mm thick, Grade B with minimum concrete cube strength 400 kg/cm2 as shown on drawing CFC/ECG/CR007/SF/DRG/000207
Reinforced concrete for tank walls 500 mm thick, Grade B with minimum concrete cube strength 400 kg/cm2 as shown on drawing CFC/ECG/CR007/SF/DRG/000207
Reinforced concrete for tank walls 400 mm thick, Grade B with minimum concrete cube strength 400 kg/cm2 as shown on drawing CFC/ECG/CR007/SF/DRG/000207
Reinforced concrete for tank walls 300 mm thick, Grade B with minimum concrete cube strength 400 kg/cm2 as shown on drawing CFC/ECG/CR007/SF/DRG/000207
KIDZANIAAFRED - Cairo Festival City
C-Concrete Work 64
Item Qty Unit Rate Total (EGP)
F
76 m³ -
G
35 m³
Carried to Collection -
C3 - Reinforcement
Main Building
F Steel reinforcement for footings Y16-Y25 97 t -
H Steel reinforcement for tie beams 27 t -
I Steel reinforcement for slab on grade 42.70 t -
J Steel reinforcement for suspended slabs 535 t -
K Steel reinforcement for flat roof 40 t -
A Steel reinforcement for columns 51 t -
B Steel reinforcement for retaining wall RW1 28 t -
C Steel reinforcement for core walls 9 t -
D Steel reinforcement for beams 14 t -
E Steel reinforcement for stairs 7 t -
F Mesh reinforcement for flat roof B785 13.01 t -
Utilities Building
H Steel reinforcement for footings 1.17 t -
Reinforced concrete for tank roof slab 300 mm thick, Grade B with minimum concrete cube strength 400 kg/cm2 as shown on drawing CFC/ECG/CR007/SF/DRG/000207
Reinforced concrete for tank walls 250 mm thick, Grade B with minimum concrete cube strength 400 kg/cm2 as shown on drawing CFC/ECG/CR007/SF/DRG/000207
High yield deformed bars according to the ASTM 625 with a manumit proof stress of 4000 Kg/cm 2
KIDZANIAAFRED - Cairo Festival City
C-Concrete Work 65
Item Qty Unit Rate Total (EGP)
I 16.60 t -
J Steel reinforcement for tie beams 3.24 t -
K Steel reinforcement for solid slabs 5.23 t -
L Steel reinforcement for columns 3.00 t -
M Steel reinforcement for beams 3.59 t -
N Steel reinforcement for parapet 0.69 t -
Carried forward -
Brought forward -
External Works
Water tank
A Steel reinforcement for raft foundation 15.14 t -
B Steel reinforcement for roof slab 10.35 t -
C Steel reinforcement for walls 30.00 t -
Steel reinforcement for slab on grade and duct walls
KIDZANIAAFRED - Cairo Festival City
C-Concrete Work 66
Item Qty Unit Rate Total (EGP)
Carried to Collection -
C4 - Shuttering
Main Building
A771 m² -
B1,023 m² -
C20 m² -
D61 m² -
E117 m² -
F154 m² -
G1,867 m² -
H Shuttering to sides of reinforced concrete for core walls 828 m² -
I213 m² -
Shuttering to sides of plain concrete foundations 500 mm thickness
Shuttering to sides of reinforced concrete foundations 600 - 1100 mm high
Shuttering to sides of slab on grade plain concrete 50 mm high
Shuttering to sides of slab on grade reinforced concrete 150 mm high
Shuttering to sides of plain concrete footings for retaining wall RW1 500 mm high
Shuttering to sides of reinforced concrete footings for retaining wall RW1 600 mm high
Shuttering to sides of reinforced concrete for retaining wall RW1 6100 mm high
Shuttering to soffits and sides of ground beams plain concrete 100 mm high
KIDZANIAAFRED - Cairo Festival City
C-Concrete Work 67
Item Qty Unit Rate Total (EGP)
J1,142 m² -
K Shuttering to soffits and sides of beams 300-1200 mm high 740 m² -
L Shuttering to sides of columns reinforced concrete 1,372 m² -
M5,846 m² -
N Shuttering to soffits and sides of flat roof slabs 120 mm high 1,738 m² -
O117 m² -
P9 m² -
Q Shuttering to soffits and sides of stairs 199 m² -
Carried forward -
Brought forward -
Utilities Building
AShuttering to sides of plain concrete foundations 300 mm high 38 m² -
B57 m² -
C7 m² -
D14 m² -
E58 m² -
F190 m² -
G223 m² -
H131 m² -
I Shuttering to soffits and sides of solid slabs 160 mm high 0 m² -
Shuttering to sides of ground beams reinforced concrete 800 -100 mm high
Shuttering to soffits and sides of upper ground slab 400 mm high
Shuttering to soffits and sides of stairs flat roof slabs 200 mm high
Shuttering to soffits and sides of core flat roof slabs 200 mm high
Shuttering to sides of reinforced concrete foundations 500 mm high
Shuttering to sides of slab on grade plain concrete 100 mm high
Shuttering to sides of slab on grade reinforced concrete 200 mm high
Shuttering to soffits and sides of ground beams plain concrete 100 mm high
Shuttering to sides of ground beams reinforced concrete 500 - 800 mm high
Shuttering to soffits and sides of beams reinforced concrete 500 - 800 mm high
Shuttering to sides of columns reinforced concrete 5950 mm high
KIDZANIAAFRED - Cairo Festival City
C-Concrete Work 68
Item Qty Unit Rate Total (EGP)
J Shuttering to soffits and sides of solid slabs 200 mm high 255 m² -
K Shuttering to sides of parapet 113 m² -
L Shuttering to sides of electrical trench wall 96 m³ -
Water Tank
M Shuttering to sides of plain concrete foundations 100 mm high7 m² -
N Shuttering for reinforced concrete raft 500 mm high 35 m² -
O Shuttering to reinforced concrete for tank walls 1,398 m² -
P Shuttering for reinforced concrete tank roof slab 300 mm high 201 m² -
Q 4 nr
Carried to Collection -
Pre-Cast Concrete removable units 200mm thick over pump room
KIDZANIAAFRED - Cairo Festival City
D-Masonry 69
Item Qty Unit Rate Total (EGP)
Section D - Masonry
D1 - Generally
D2 - Walls and piers
Main Building
A Concrete hollow block wall 200 mm thick 270 m³ -
B Concrete solid block wall 100 mm thick 550 m² -
C Concrete solid block wall 100 mm thick, fire rated 2 hour 480 m² -
D Concrete solid block wall 200 mm thick, fire rated 1hour 26 m³ -
E Concrete solid block wall 100 mm thick, fire rated 1 hour 500 m² -
Utilities Building
F Concrete hollow block wall 200 mm thick 0 m³ -
G Fluted external brick wall 178 m² -
H 200mm blockwork internal partitions 114 m² -
I 300mm blockwork cavity wall (100mm cavity) 37 m² -
J Gypsum moveable partition 7 m² -
KIDZANIAAFRED - Cairo Festival City
D-Masonry 70
Item Qty Unit Rate Total (EGP)
Carried to Collection -
KIDZANIAAFRED - Cairo Festival City
E-Metalworks 71
Item Qty Unit Rate Total (EGP)
E1 - Metal Work General
Generally;
This bill is to be read in conjunctionwith all other tender/contract
documents;A
B
C
D All space frame steel structure should be fire rated for 1 hour
E
F
The contractor shall submit all design calculations and details for all connections of steel members, detailed shop drawings prepared by specialized company for steel construction.
Structural steel members shall be standard grade ST 37 conforming to Egyptian standard No. 260 unless notes otherwise
All bolts material shall be standard grade ST 37 conforming to Egyptian standard No. 205, 2001 unless notes otherwise
Fabricate ladders for locations shown, with dimensions, spacings, details, and anchorages as indicated.
Comply with ANSI A14.3, unless otherwise indicated
Fabricate handrails and railings to comply with requirements indicated for design, dimensions, member sizes and spacing, details, finish, and anchorage, but not less than that required to support structural loads.
KIDZANIAAFRED - Cairo Festival City
E-Metalworks 72
Item Qty Unit Rate Total (EGP)
Carried to Collection -
E2 - Structural Metalwork
Generally;
This bill is to be read in conjunction
with all other tender/contract
documents;
Main Building
Structural steel Grade 43 (S275)
A Structural steel columns 79.79 t -
B Portal frame (roof) 89.13 t -
C Flat roof frame (roof) 60.48 t -
D Elevation steel work 9.62 t -
E Elevation cladding steel work 26.67 t -
F Feature tower steel work 5.54 t -
G Base plates 3.70 t -
H Edge plates 2.10 t -
Structural steel Grade 52 (S355)I Structural steel columns 18.25 t -
J Flat roof frame (roof) 26.70 t -
K Elevation cladding steel work 0.86 t -
L Feature tower steel work 3.43 t -
M16.31 t -
N Purlin type P1, Multi beam 200/160 at inclined roof 2,694 m -
O 326.27 t -
rate includes fabrication, shipping, custom duties, and erection on site
Structural steel for connection, high strength bolts grade 10.9, ordinary bolts steel Grade 37, Anchor bolts steel Grade 52, splices an alike.
Intumescent paint for exposed steel structure which is not concealed
KIDZANIAAFRED - Cairo Festival City
E-Metalworks 73
Item Qty Unit Rate Total (EGP)
Carried forward -
Brought forward -
A Aluminum box section 100X200 mm at elevation 105 m -
B Aluminum box section 150X600 mm at elevation - PPC 119 m -
C Aluminum composite cladding at elevations 1,015 m² -
D Stainless steel cladding over structure steel at elevations 105 m² -
E Stainless steel handrail height 1000 mm 125.00 m -
F 1,708 m² -
G5,285 m² -
H 312 m² -
I 47 m² -
J 12 m² -
L4,060 m² -
M
160 m² -
N
340 m -
Utilities Building
K
1 nr -
Corrugated sheets for flat concrete roof as shown on Detail 3 drawing CFC/ECG/CR007/SB/DRG/000209
Sandwich panels 100 mm thick including fixation to steel sub-structure and any other required item to finish the work, at elevations
Structural glazing system all as specified and as shown on drawings - Glass type GL01
Structural glazing system all as specified and as shown on drawings - Glass type GL02
Structural glazing system all as specified and as shown on drawings - Glass type GL02 - horizontal
Sandwich panels 100 mm thick, for roofing including steel sub-structure, fixations & any other required item to finish the work
Metal flashing with stiffeners on elevation fixed to external walls block work as per drawing no (CFC\ECG\CR007\AE\DRG\00301)
Galvanized steel flashing for roof 0.7 mm thick, sheets shall be secured to horizontal or vertical surfaces and any other required items needed to accomplish the work
Supply and install painted galvanized steel vertical fixed ladder 5300 mm high ,including steel side rails,floor and side brackets,extruded steel treads,anchors and connectors and any other required items needed to accomplish the work as per dwg. No. (DA-5512)
KIDZANIAAFRED - Cairo Festival City
E-Metalworks 74
Item Qty Unit Rate Total (EGP)
L
40 m -
M
71 m -
Carried to Collection -
E3 - Non-Structural Metalwork
Generally;
This bill is to be read in conjunction
with all other tender/contract
documents;
Utilities Building
A 1 nr -
B 1 nr -
C 1 nr -
D 2 nr -
E 1 nr -
F 1 nr -
Water Tank
G Access hatches 800 x 800mm 6 nr -
H SS Ship Ladder 5600mm high 3 nr -
I SS Ship Ladder 4550mm high 2 nr -
J Galvanised steel ship ladder 1700mm high 1 nr -
Checkered plate cover 800 mm width the thickness shall not be less than 6 mm. Raised lugs shall be diamond shaped and shall have an angled and opposed pattern.
Galvanized steel flashing for roof 0.7 mm thick, sheets shall be secured to horizontal or vertical surfaces and any other required items needed to accomplish the work
Steel louvers type (1) , size (2800X1000) , Sand trap movable louvers
Steel louvers type (2) , size (1800X1000) ,Sand trap with motorized damper
Steel louvers type (3) , size (1200X1000) ,Sand trap with motorized damper
Steel louvers type (4) , size (600X1000) ,Sand trap with motorized damper
Steel louvers type (5) , size (800X1000) ,Sand trap with motorized damper
Steel louvers type (6) , size (2400X1000) ,Sand trap with motorized damper
KIDZANIAAFRED - Cairo Festival City
E-Metalworks 75
Item Qty Unit Rate Total (EGP)
Carried to Collection -
KIDZANIAAFRED - Cairo Festival City
R-Electrical Eng Installations 76
Item Qty Unit Rate
R2 - MAIN CIRCUITS
Generally;
This bill is to be read in conjunction
with all other tender/contract
documents;
Utilities Building
22KV, Equipment
A 22 kV Ring main unit (RMU) 1 nr
B8 m
Low Voltage Switchboards
C Main distribution board (MDB) 1 nr
D Main distribution board (EMDB) 1 nr
External Works
Electrical Work In Connection With Irrigation System
E1 nr
Low Voltage Switchboards
F Distribution board (DB-SI) 1 nr
G Distribution board (DB-PAR) 1 nr
H Distribution board (EDB-PAR) 1 nr
Medium voltage cables, AL/XLPE/STA/PVC, 22kV, 3x240mm2 , + 150 mm pvc conduit
Cabling outside including pull boxes, power supply cables and cabling between solenoids and controller
KIDZANIAAFRED - Cairo Festival City
R-Electrical Eng Installations 77
Item Qty Unit Rate
Carried to Collection
R3-Sub-main circuits
Main Building
Low Voltage SwitchboardsA Sub main distribution board (SMDB-R) 1 nr
B Sub main distribution board (DBS-S1) 1 nr
C Distribution board (DB-S) 2 nr
D Distribution board (EDB-S) 1 nr
E Distribution board (UP-S) 1 nr
Enclosed Bus AssembliesF
18 m
G18 m
H8 m
I9 m
J9 m
K9 m
L13 m
M7 m
N12 m
O16 m
1000A copper feeder busway system for connection between SMDB-R and Retails.
600A copper feeder busway system for connection between SMDB-R and Retails.
400A copper feeder busway system for connection between SMDB-R and Retails.
320A copper feeder busway system for connection between SMDB-R and Retails.
200A copper feeder busway system for connection between SMDB-R and Retails.
125A copper feeder busway system for connection between SMDB-R and Retails.
100A copper feeder busway system for connection between SMDB-R and Retails.
80A copper feeder busway system for connection between SMDB-R and Retails.
63A copper feeder busway system for connection between SMDB-R and Retails.
40A copper feeder busway system for connection between SMDB-R and Retails.
KIDZANIAAFRED - Cairo Festival City
R-Electrical Eng Installations 78
Item Qty Unit Rate
Carried forward
Brought forward
Utilities Building
L.V. Cables
A (3x95 + 50) mm2 57 m
B (3x120 + 70)mm2 42 m
C 1x70mm2 42 m
D 1x95mm2 57 m
Enclosed Bus AssembliesE
6 m
F ACB; 40 air circuit breaker motorized 3200A 1 nr
600/1000 V, multi core copper conductor, PVC/PVC, cables sizes as the following:
600/1000 V, single core copper conductor, PVC/PVC, cables sizes as the following:
3200A, 380V,55kA, copper feeder busway system for connection between transformer and MDB.
KIDZANIAAFRED - Cairo Festival City
R-Electrical Eng Installations 79
Item Qty Unit Rate
Carried to Collection
R4-Final sub-circuits and auxiliary installations
Main Building
Wiring for LightingA
297 nr
Lighting Fixtures Lighting fixtures completely installed :
B Type F1 13 nr
C Type F2 19 nr
D Type F2, equipped with 3 hours battery 1 nr
E Type F3 31 nr
F Type F4 138 nr
G Type F4, equipped with 3 hours battery 13 nr
H Type F5 19 nr
I Type F6 5 nr
J Type F7 5 nr
K Type F9 12 nr
L Type F11 25 nr
M Type F13 6 nr
N Type F23 7 nr
O Type F24 3 nr
Wiring of Power OutletsP
58 nr
Q For power socket outlet For SSR 1 nr
Wiring for one interior lighting outlet including wires 3(1x3) mm2, conduits, junction boxes from panel to lighting fixtures and switches outlet
Wiring for one power outlet including, outlet wires 3(1x4mm2), conduits, cable tray, junction boxes, flush floor,trunking, outlet boxes from panel to outlet
KIDZANIAAFRED - Cairo Festival City
R-Electrical Eng Installations 80
Item Qty Unit Rate
R For hand dryer outlet 3 nr
S For FCU unit outlet 5 nr
T For camera unit outlet 9 nr
U For WI-FI unit outlet 3 nr
Carried forward
Brought forward
A Ditto, but using 3(1x6mm2) wires for IT rack outlet 9 nr
Power Outlets FittingsSocket Outlets
B Socket type SO1 13 nr
C Socket type SO2 15 nr
D Socket type SO3 3 nr
E Socket type SO4 8 nr
F Socket type SO5 1 nr
G Socket type SO6 5 nr
H Socket type SO7 10 nr
I Connect to Hand dryer 3 nr
L.V. Cables
J 4x16mm2 300 m
K 4x25mm2 200 m
L (3x50 + 25) mm2 16 m
M (3x35 + 16) mm2 339 m
N (3x70 + 35) mm2 359 m
O (3x240 + 120) mm2 972 m
P 4x25mm2 172 m
600/1000 V, multi core copper conductor, PVC/PVC, cables sizes as the following:
600/1000 V, multi core copper conductor, XLPE/PVC,armoured, cables sizes as the following:
600/1000 V, single core copper conductor, PVC/PVC, cables sizes as the following:
KIDZANIAAFRED - Cairo Festival City
R-Electrical Eng Installations 81
Item Qty Unit Rate
Q 1x16mm2 500 m
R 1x25mm2 16 m
S 1x16mm2 511 m
T 1x35mm2 359 m
U 1x240mm2 256 m
Carried forward
Brought forward
Data Networking Active ComponentsModular Multi-layer Stackable Data switch including:
A
3 nr
B WI-FI access point 3 nr
C IT operation workstation c/w 19" LCD 1 nr
D Local Printer 1 nr
Structured Cabling and switching Network SystemE
9 nr
F6 nr
G
2 nr
H9 nr
I3 nr
J ATM data outlet 1 nr
K Patch panel UTP cat 6, 24 port 3 nr
L Consolidation point box 4 port RJ45 UTP Cat 6 7 nr
600/1000 V, single core copper conductor, PVC/PVC, cables sizes as the following:
- 24x10/100/1000 BaseTX- 2x1000 Base - LX Modules upgradable to 10GbE (without changing the switch)- Redundant power supply- Stacking Cables
RJ45 cat 6 outlet for data including cables, cabling, conduits, pipes, cable trays, pulling boxes, …etc
RJ45 cat 6 outlet for telephone including cables, cabling, conduits, pipes, cable trays, pulling boxes, …etc
RJ45 cat 6 outlet for wall mounted IP telephone including cables, cabling, conduits, pipes, cable trays, pulling boxes, …etc
RJ45 cat 6 outlet for camera including cables, cabling, conduits, pipes, cable trays, pulling boxes, …etc
RJ45 cat 6 outlet for WIFI including cables, cabling, conduits, pipes, cable trays, pulling boxes, …etc
KIDZANIAAFRED - Cairo Festival City
R-Electrical Eng Installations 82
Item Qty Unit Rate
M Wall mounted Fiber Optic enclosure (4 Cores) 13 nr
N Patch cord UTP cat 6, 3 m length for the workstation 8 nr
P Patch cord UTP cat 6, 1.8m 21 nr
Q Patch cord UTP cat 6, 2.7m 42 nr
R Fiber optic 24 cores patch panel LC type (loaded) 4 nr
S Fiber optic 48 cores patch panel LC type (loaded) 1 nr
T Single mode Fiber optic cables (4 cores) 560 m
Carried forward
Brought forward
A Single mode Fiber optic cables (12 cores) 20 m
B5 nr
C Racks 1 item
D Connection with outdoor network 1 item
External Works
Wiring for LightingE
372 nr
F
67 nr
Lighting Fixtures Lighting fixtures completely installed :
G Type F12 180 nr
H Type F14 109 nr
I Type F15 9 nr
J Type F19 6 nr
K Type F20 3 nr
L Type F21 25 nr
M Type F22 30 nr
Patch cord fiber optic single mode duplex connector LC to LC 3 m length
Wiring for one external lighting outlet including wires 3(1x6)mm2, conduits, junction boxes from panel to lighting fixtures
Wiring for one external lighting outlet including wires 5(1x10)mm2, conduits, junction boxes from panel to lighting fixtures
KIDZANIAAFRED - Cairo Festival City
R-Electrical Eng Installations 83
Item Qty Unit Rate
N Type F** 12 nr
L.V. Cables
O (4x16) mm2 164 m
P (4x25) mm2 164 m
Q 1x16mm2 328 m
Carried forward
Brought forward
Grounding SystemA 1 item
Utilities Building
B Structured cabling and switching Network System1 nr
C 2 nr
Water Tank
Wiring for LightingD
6 nr
Lighting Fixtures Lighting fixtures completely installed :
E Type F1 6 nr
L.V. Cables
F (4x16) mm2 141 m
600/1000 V, multi core copper conductor, XLPE/PVC,armoured, cables sizes as the following:
600/1000 V, single core copper conductor, PVC/PVC, cables sizes as the following:
Complete earthing system including main earthing networks (power , lightning and clean earth) equipotential bars, cables, taps, bonding,pits, boxes, clamps, rods, covers, cadwelds, exothermic connections, etc & all necessary earthing accessories as per drawings & specs.
RJ45 cat 6 outlet for camera including all cables, cabling conduits, pipes, cable trays, pulling boxes etc
RJ45 cat 6 outlet for telephone including all cables, cabling conduits, pipes, cable trays, pulling boxes etc
Wiring for one interior lighting outlet including wires 3(1x3) mm2, conduits, junction boxes from panel to lighting fixtures and switches outlet
600/1000 V, multi core copper conductor, XLPE/PVC,armoured, cables sizes as the following:
KIDZANIAAFRED - Cairo Festival City
R-Electrical Eng Installations 84
Item Qty Unit Rate
G 4 x 16 mm2 138 m
H (3x240 + 120) mm2 67 m
I 1x16mm2 141 m
J 1x16mm2 138 m
K 1x120mm2 67 m
Structured cabling and switching Network SystemL 1 nr
Carried to Collection
R5-Accessories
Main Building
Lighting SwitchesA Switch type S1 9 nr
B Switch type S2 16 nr
C Switch type S4 12 nr
Load Break SwitchD TYPE LS1 (40A) 1 nr
E TYPE LS1 (63A) 1 nr
F Ditto, as above but (80A) 2 nr
G Ditto, as above but (100A) 1 nr
H Ditto, as above but (125A) 2 nr
I Ditto, as above but (160A) 1 nr
J Ditto, as above but (200A) 1 nr
K Ditto, as above but (320A) 1 nr
L Ditto, as above but (2500A) 1 nr
M TYPE IS2 (63A) 1 nr
600/1000 V, multi core copper conductor, MICA/XLPE/STA/LSHF, cables sizes as the following:
600/1000 V, single core copper conductor, PVC/PVC, cables sizes as the following:
600/1000 V, single core copper conductor, MICA/XLPE/STA/LSUF, cables sizes as the following:
RJ45 cat 6 outlet for telephone including all cables, cabling conduits, pipes, cable trays, pulling boxes etc
KIDZANIAAFRED - Cairo Festival City
R-Electrical Eng Installations 85
Item Qty Unit Rate
N TYPE IS3 (20A) 6 nr
O 63A 3P 1 nr
Utilities Building
Wiring for LightingP
30 nr
Lighting Fixtures Lighting fixtures completely installed :
Q Type F1 30 nr
Lighting SwitchesR Switch type S2 3 nr
D Switch type S3 4 nr
Carried forward
Brought forward
Wiring of Power OutletsA
13 nr
Power Outlets FittingsSocket Outlets
B Socket type SO2 12 nr
C Socket type SO4 1 nr
Water Tank
Lighting SwitchesD Switch type S2 1 nr
Wiring of Power OutletsE
6 nr
F Ditto, but for industrial power socket outlet wires 5(1x4mm2) 1 nr
G Ditto, but for LBS outlet for overhead crane wires 5(1x4mm2) 1 nr
Power Outlets FittingsSocket Outlets
Wiring for one interior lighting outlet including wires 3(1x3) mm2, conduits, junction boxes from panel to lighting fixtures and switches outlet
Wiring for one power outlet including, outlet wires 3(1x4mm2), conduits, cable tray, junction boxes, flush floor,trunking, outlet boxes from panel to outlet
Wiring for one power outlet including, outlet wires 3(1x4mm2), conduits, cable tray, junction boxes, flush floor,trunking, outlet boxes from panel to outlet
KIDZANIAAFRED - Cairo Festival City
R-Electrical Eng Installations 86
Item Qty Unit Rate
H Socket type SO2 5 nr
I Socket type SO8 1 nr
Carried to Collection
R6-Control GearGenerally;This bill is to be read in conjunctionwith all other tender/contractdocuments;Main Building
Lighting Control PanelsA (LCP) Equipped with 29 push buttons (ON-OFF) & indication lamps 1 nr
Fire Alarm SystemB Intelligent addressable Fire alarm control panel (3 loops) 1 item
C System printer 1 nr
D Automatic telephone dialer 1 nr
E Addressable smoke detector 23 nr
F Monitor module connected to fire lighting flow switch 10 nr
G Monitor module connected to fire lighting flow per suite 10 nr
H Fire alarm interface unit 6 nr
I Addressable manual station 6 nr
KIDZANIAAFRED - Cairo Festival City
R-Electrical Eng Installations 87
Item Qty Unit Rate
J Siren 6 nr
K Strobe light 6 nr
L Control module 9 nr
M Ditto but weatherproof 3 nr
N Monitor module 3 nr
O Addressable smoke detector above false ceiling 12 nr
P Ditto but weatherproof 6 nr
Q Signal control Module 3 nr
R Fault isolation module 1 item
S Connection with outdoor network 1 item
Spare partsT Addressable smoke detector 3 nr
U Addressable manual station 1 nr
V Siren 1 nr
Carried forward
Brought forward
A Strobe light 1 nr
B Control module 1 nr
C Monitor module 1 nr
D Signal control Module 1 nr
Building Management System (BMS)E
1 item
F 2 nr
G Dot matrix printer 1 nr
H A4 laser printer 1 nr
I
1 item
Main BMS redundant hot standby servers c/w all hardware, software, protocol interfaces and all necessary accessories
Computer workstation c/w 19" LCD, keyboard, mouse, interfaces and all necessary accessories
Direct Digital Controller (DDC) and local (Automatic) control panel c/w interfaces to BACnet/TCP/IP protocols to cover all required as per input/output points schedule
KIDZANIAAFRED - Cairo Festival City
R-Electrical Eng Installations 88
Item Qty Unit Rate
J1 item
K1 item
L Field devices as per input/output data summary point schedules 1 item
M Connection with outdoor network 1 item
Utilities Building
Automatic Transfer SwitchN 380V,4P, 400A, ATS 1 nr
Fire Alarm SystemO Addressable smoke detector 4 nr
P Weatherproof Addressable manual station 1 nr
Q Weatherproof Siren 1 nr
R Weatherproof Strobe light 1 nr
D Control module 2 nr
T Monitor module 7 nr
U Signal control Module 1 nr
Carried forward
Brought forward
A Fault isolation module 1 item
B Connection with outdoor network 1 item
Spare partsC Addressable smoke detector 1 nr
Building Management System (BMS)D
1 item
E1 item
F1 item
G Field devices as per input/output data summary point schedules 1 item
Gateway c/w integration protocols BACnet/TCP/IP and covered required points as per input/output points schedule
Integration/interface with third party systems as per specifications and system architecture
Direct Digital Controller (DDC) and local (Automatic) control panel with interfaces to BACnet/TCP/IP protocols to cover all required as per input/output points schedule
Gate Way with integration protocols BACnet/TCP/IP and covered required points as per input/output points schedule
Integration/interface with third party systems as per specifications and system architecture
KIDZANIAAFRED - Cairo Festival City
R-Electrical Eng Installations 89
Item Qty Unit Rate
External Work
Fire Alarm SystemJ
17 m
K 4 x Ø55mm for utility entrance 6 m
L4 m
M 2 x 110 UPVC ducts 126 m
N 3 x 110 UPVC ducts 100 m
O Hand holes 10 nr
P Single Mode Fiber Optic cable (24 Cores - outdoor type) 450 m
Q Single Mode Fiber Optic cable (4 Core - outdoor type) 280 m
Main BuildingR Utilities Building 110 m
S ditto of item 4 except 3x55 12 m
Irrigation Programme ControllerT 12 Stations 1 nr
Carried forward
Brought forward
Water Tank
Load Break SwitchA TYPECS1 (20A) 1 nr
B TYPELS2 (20A) 30v 3phase 1 nr
Fire Alarm SystemB Addressable Smoke Detector 2 nr
C Weatherproof Monitor module 24 nr
D Weatherproof control module 3
E Fault isolation module 1 item
F Connection with outdoor network 1 item
Concrete duct bank including No. of (4 x Ø55mm) UPVC conduits directly buried encased with reinforced concrete for road crossings including warning taps, spacers and all related civil works (excavation, refilling..etc)
(6xØ55mm) UPVC conduits for building entrance directly buried including warning taps, spacers and all related civil works (excavation, refilling..etc)
KIDZANIAAFRED - Cairo Festival City
R-Electrical Eng Installations 90
Item Qty Unit Rate
Building Management System (BMS)J
1 item
H1 item
I1 item
J Water Tank 1 item
Carried to Collection
R7-Equipment
Main Building
UPS SystemA 30 kVA, 380/380V, 15 minutes, with sealed lead acid 1 nr
IP Closed Circuit Television System (IP-CCTV)B CCTV management server 1 item
C Network Video Recorder unit/server 1 item
D Workstation c/w 19" LCD 2 nr
E Local Printer 1 nr
Direct Digital Controller (DDC) and local (Automatic) control panel with interfaces to BACnet/TCP/IP protocols to cover all required as per input/output points schedule
Gate Way with integration protocols BACnet/TCP/IP and covered required points as per input/output points schedule
Integration/interface with third party systems as per specifications and system architecture
KIDZANIAAFRED - Cairo Festival City
R-Electrical Eng Installations 91
Item Qty Unit Rate
F Indoor fixed IPCCTV camera (wall mounted type) 8 nr
G Outdoor fixed dome IPCCTV camera 1 nr
Spare partsH Indoor fixed IPCCTV camera (wall mounted type) 1 nr
Public Address SystemI Audio Mixer (8x1) 1 item
J Paging microphone (1 zone) 1 nr
K Surveillance and automatic changeover unit 1 nr
L Digital Message recorder 1 nr
M Monitor panel (1 zone) 1 nr
N Power amplifier 240 watt 2 nr
O CD player (5 Discs) 1 nr
P FM/AM tuner 1 nr
Q Ceiling speaker (6 watt), fire rated 25 nr
R Rack 1 item
Spare parts S Ceiling speaker (6 watt), fire rated 2 nr
Utilities Building
Distribution TransformerT Dry type, Dyn11, 22/0.4kV. 2000 KVA 1 nr
Carried forward
Brought forward
Packaged Engine GeneratorA
1 nr
IP Closed Circuit Television System (IP-CCTV)B Outdoor fixed dome IPCCTV camera 1 nr
Stand by diesel generator system 50HZ, 380V, 200 KVA , 1500 rpm
KIDZANIAAFRED - Cairo Festival City
R-Electrical Eng Installations 92
Item Qty Unit Rate
Carried to Collection
KIDZANIAAFRED - Cairo Festival City
R-Electrical Eng Installations 93
Total (EGP)
-
-
-
-
-
-
-
-
KIDZANIAAFRED - Cairo Festival City
R-Electrical Eng Installations 94
Total (EGP)
-
-
-
-
-
-
-
-
-
KIDZANIAAFRED - Cairo Festival City
R-Electrical Eng Installations 95
Total (EGP)
-
-
-
-
-
-
-
KIDZANIAAFRED - Cairo Festival City
R-Electrical Eng Installations 96
Total (EGP)
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
KIDZANIAAFRED - Cairo Festival City
R-Electrical Eng Installations 97
Total (EGP)
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
KIDZANIAAFRED - Cairo Festival City
R-Electrical Eng Installations 98
Total (EGP)
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
KIDZANIAAFRED - Cairo Festival City
R-Electrical Eng Installations 99
Total (EGP)
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
KIDZANIAAFRED - Cairo Festival City
R-Electrical Eng Installations 100
Total (EGP)
-
-
-
-
-
-
-
-
-
-
KIDZANIAAFRED - Cairo Festival City
R-Electrical Eng Installations 101
Total (EGP)
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
KIDZANIAAFRED - Cairo Festival City
R-Electrical Eng Installations 102
Total (EGP)
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
KIDZANIAAFRED - Cairo Festival City
R-Electrical Eng Installations 103
Total (EGP)
-
-
-
-
-
-
-
-
-
-
-
-
KIDZANIAAFRED - Cairo Festival City
R-Electrical Eng Installations 104
Total (EGP)
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
KIDZANIAAFRED - Cairo Festival City
R-Electrical Eng Installations 105
Total (EGP)
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
KIDZANIAAFRED - Cairo Festival City
R-Electrical Eng Installations 106
Total (EGP)
-
-
-
-
-
-
-
-
-
-
-
-
KIDZANIAAFRED - Cairo Festival City
R-Electrical Eng Installations 107
Total (EGP)
-
-
-
-
-
-
-
-
-
-
KIDZANIAAFRED - Cairo Festival City
R-Electrical Eng Installations 108
Total (EGP)
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
KIDZANIAAFRED - Cairo Festival City
R-Electrical Eng Installations 109
Total (EGP)
-