Top Banner
Getting SAP Business Suite and BW Ready for HANA
31

Getting SAP Business Suite and BW Ready for HANA...Response times on most SAP supplied interactive transactions 50% to 1000% improvement Some transactions blisteringly fast MB51 before

Mar 14, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Getting SAP Business Suite and BW Ready for HANA...Response times on most SAP supplied interactive transactions 50% to 1000% improvement Some transactions blisteringly fast MB51 before

Getting SAP Business Suite and BW Ready for HANA

Page 2: Getting SAP Business Suite and BW Ready for HANA...Response times on most SAP supplied interactive transactions 50% to 1000% improvement Some transactions blisteringly fast MB51 before

AGENDA

Proceed a brief introduction

Rightsizing on the way to HANA

Why it is important

Case Study Business Suite & BW

Q&A

Page 3: Getting SAP Business Suite and BW Ready for HANA...Response times on most SAP supplied interactive transactions 50% to 1000% improvement Some transactions blisteringly fast MB51 before

ABOUT PROCEED

We are SAP Data Management Specialists

250+ Customers in the UK

Many FTSE 100 clients

Barclays,Burberry, Capita, GKN, GSK, Kingfisher,

M&S, National Grid, Serco, Vodafone, Severn Trent

A portfolio of Data Management projects in most industries

Page 4: Getting SAP Business Suite and BW Ready for HANA...Response times on most SAP supplied interactive transactions 50% to 1000% improvement Some transactions blisteringly fast MB51 before

THE ROAD TO HANA

Page 5: Getting SAP Business Suite and BW Ready for HANA...Response times on most SAP supplied interactive transactions 50% to 1000% improvement Some transactions blisteringly fast MB51 before

THE QUESTION IS“DOES SIZE MATTER”

IN THE CASE OF HANA IT DOES

Page 6: Getting SAP Business Suite and BW Ready for HANA...Response times on most SAP supplied interactive transactions 50% to 1000% improvement Some transactions blisteringly fast MB51 before

RIGHTSIZING FOR HANA – WHY IT IS IMPORTANT?

Not spending money on appliances that are not needed

Getting the sizing right first time

Migration times

Your best opportunity of getting the business to buy into data management

Page 7: Getting SAP Business Suite and BW Ready for HANA...Response times on most SAP supplied interactive transactions 50% to 1000% improvement Some transactions blisteringly fast MB51 before

RIGHTSIZING HANA – WHY IS IT IMPORTANT?

With HANA you get some fantastic compression ratios

1TB of tables in Oracle in HANA 200GB to 150GB depending on which tables

Some tables vanish completely

SAP Note 1872170 shows memory and disk requirements for Business Suite

SAP provides many tools to enable customers to size Hana here is the link to one of them: https://websmp109.sap-ag.de/quicksizer

Page 8: Getting SAP Business Suite and BW Ready for HANA...Response times on most SAP supplied interactive transactions 50% to 1000% improvement Some transactions blisteringly fast MB51 before

SAP S/4 HANA massively reduces complexity in IT landscapes

BSEGACDOCA MSEG MARCMaster

Data

MSEG

New

Traditional database SAP HANA platform SAP S/4HANA

593 GB

118.6 GB

42.4 GB

BKPF BSIS BSIK BSET

COBK COEPLFC1 GLT0 COSP

MSTQH MSTEH

MSTBH

MSSQH MSSAHMSPRHMSLBH MSKUH

MSKAH

MKOLH

MCHBH

MARDH

MARCH

MSTQ MSTE

MSTB MSSQ MSSA

MSPR MSLB

MSKU MSKA MKOL

MCHBMKPF MARD

Logistics with aggregates and indexesSAP Simple LogisticsFinance with aggregates and indexesSAP Simple Finance

Simplified data model

Semantically rich data model

Drop performance workarounds

Keep all information

Page 9: Getting SAP Business Suite and BW Ready for HANA...Response times on most SAP supplied interactive transactions 50% to 1000% improvement Some transactions blisteringly fast MB51 before

RIGHTSIZING HANA – WHY IS IT IMPORTANT?

We see many large customers with ECC6 systems in excess of 20TB

Talked to a customer recently BW 261TB

It is really important to get your Hana sizing correct

Undersized:

Performance problems

You will need to buy more memory

Oversized:

Waste of Resources

Useful Link:

http://news.sap.com/users-guide-journey-sap-s4hana-six-steps/

Page 10: Getting SAP Business Suite and BW Ready for HANA...Response times on most SAP supplied interactive transactions 50% to 1000% improvement Some transactions blisteringly fast MB51 before

RIGHTSIZING FOR HANA – HANA APPLIANCE COSTS

The great news is that Hana appliance costs are coming down all the time

Example prices based on Intel E7 Ivy Bridge processors:

256GB Single-node HANA Appliance from: £32K

512GB Single-node HANA Appliance from: £37K

1TB Single-node HANA Appliance from: £62K

2TB Single-Node HANA Appliance from: £122K

3TB Single-Node HANA Appliance from: £148K

4TB Scale-out Cluster (3+1) HANA from: £363K

8TB Scale-out Cluster (7+1) HANA from: £632K

Then multiply by the landscape you need

DR, PreProd, QA, TST, DEV

Page 11: Getting SAP Business Suite and BW Ready for HANA...Response times on most SAP supplied interactive transactions 50% to 1000% improvement Some transactions blisteringly fast MB51 before

RIGHTSIZING FOR HANA – MIGRATION TIMES

Hana needs your data to be Unicode

So if on non Unicode at point of migration you can do conversation

The larger the database the longer migration will take

The more heavily fragmented your source tables the longer it will take

Example CDCLS at 850GB (Cluster Table) from Oracle 11g Heavily fragmented

Unicode 12.2 hours

Non-Unicode 15.1 hours

No fragmentation

Unicode 3.6 hours

Non-Unicode 4.7 hours

Great news! cluster tables go in Hana

Page 12: Getting SAP Business Suite and BW Ready for HANA...Response times on most SAP supplied interactive transactions 50% to 1000% improvement Some transactions blisteringly fast MB51 before

One of the Worlds largest brewer

21 Billion euros revenue 2014

1.7 Billion euro profit

165 breweries in over 70 countries

Employ in excess of 90,000 people

CASE STUDY

Page 13: Getting SAP Business Suite and BW Ready for HANA...Response times on most SAP supplied interactive transactions 50% to 1000% improvement Some transactions blisteringly fast MB51 before

CASE STUDY

SAP Landscape

In excess of 300 productive SAP Servers

Most on ECC6 and BW 7

Most use Oracle

Looking to rationalise onto smaller number of servers

Hana employed for some BW systems

Looking towards Hana for larger businesses – reasons

Reduction in Hardware Costs

Complexity of landscape

Month end closing issues – takes up to 15 days to close

Page 14: Getting SAP Business Suite and BW Ready for HANA...Response times on most SAP supplied interactive transactions 50% to 1000% improvement Some transactions blisteringly fast MB51 before

OUR CHALLENGE – HANA POC ECC6

1st Qtr 2015

Given a copy of one of their larger ECC6 systems – 21TB

System had been running since 1999

No data management done

So in this landscape 1 full copy for DR, Pre Prod, ½ size copies for 2 X QA, Dev and Test

Full suite FI/CO, SD, MM, PP, WM, QM

Given a 1TB Hana box

Told get system into Hana

you have 12 weeks

no reduction in access to data

this had to be a repeatable exercise

Page 15: Getting SAP Business Suite and BW Ready for HANA...Response times on most SAP supplied interactive transactions 50% to 1000% improvement Some transactions blisteringly fast MB51 before

RIGHTSIZING FOR HANA

THE ANALOGY↓

Moving from a 5 bedroom house into a luxury studio flat!

Page 16: Getting SAP Business Suite and BW Ready for HANA...Response times on most SAP supplied interactive transactions 50% to 1000% improvement Some transactions blisteringly fast MB51 before

January 2015

Analysed the ECC6 system in GB’s

Calculated what this would be on Hana 3.7TB

We needed to get 21TB down to 5.6TB

Table Size

Basis 9,210

Bespoke 232

FI/CO 7,210

LO 421

MM 788

PP 475

QM 27

SD 1,729

Various 648

Total 20,739

RIGHTSIZING HANA – WHAT WE DID

Page 17: Getting SAP Business Suite and BW Ready for HANA...Response times on most SAP supplied interactive transactions 50% to 1000% improvement Some transactions blisteringly fast MB51 before

WHAT WE DID

January to February 2015

Installed Open Text Archive Server

Moved 2.2TB of SAP Office to OpenText

Installed SAP ILM using Sybase IQ

Deleted 2.6TB data more than 10 years old

Archived 11.1TB to ILM and moved archive indexes to Sybase

Calculated what was left on ECC6 to Hana 512GB

Migrated data to Hana in 38 hours using Database Migration Option (DMO)

Page 18: Getting SAP Business Suite and BW Ready for HANA...Response times on most SAP supplied interactive transactions 50% to 1000% improvement Some transactions blisteringly fast MB51 before

WHAT WE FOUND

Response times on most SAP supplied interactive transactions 50% to 1000% improvement

Some transactions blisteringly fast MB51 before 20 seconds with Hana .2 of a second

Why SAP have rewritten thousands of transactions to optimise for Hana ----- You must test

Custom code a DISASTER transaction A55 before 4.5 seconds with Hana 11.2 seconds

Need to optimise custom code typically the SQL calls + Bad design OR rewrite

We optimised A55 .8 seconds

SAP supplied dialogue programs (what was batch programs) tuned for Hana

Page 19: Getting SAP Business Suite and BW Ready for HANA...Response times on most SAP supplied interactive transactions 50% to 1000% improvement Some transactions blisteringly fast MB51 before

WHAT WE FOUND

Page 20: Getting SAP Business Suite and BW Ready for HANA...Response times on most SAP supplied interactive transactions 50% to 1000% improvement Some transactions blisteringly fast MB51 before

SAP Fiori – intuitive user experience and a responsive designToday

Functional-based applications

TargetRole-based applications

To: One entry point for the user and a user experience

that follows common design directions

From: Multiple entry points for the user and an inconsistent

user experience

From: One transaction for multiple roles with too

much complex functionality

To: Decomposed apps for each role with simple functions

Disclaimer: This is the current state of planning and may be changed by SAP at any time.

Page 21: Getting SAP Business Suite and BW Ready for HANA...Response times on most SAP supplied interactive transactions 50% to 1000% improvement Some transactions blisteringly fast MB51 before

WHAT WE FOUND

Not all users happy with the new interface

See: https://websmp209.sap-ag.de/~sapidb/011000358700000215472013E.pdf

Systems needed thorough testing and users trained in the new interface

Did some further archiving on Hana – 22 times faster than Oracle and we could archive in the production window and no reorganisation's needed of the database.

Also used TDMS to create smaller 256GB systems for QA, TST and DEV

Page 22: Getting SAP Business Suite and BW Ready for HANA...Response times on most SAP supplied interactive transactions 50% to 1000% improvement Some transactions blisteringly fast MB51 before

RIGHTSIZING HANA ANALYSIS TOOL

Software to install on the customers ECC6 to provide what if analysis

What can be deleted

What are the easiest tables to archive

What archive objects to use

What is the smallest I can get my database to if I just delete

What is the smallest I can get my database to if I delete and archive

If I have this size Hana device what do I need to delete and or archive

If I just delete the technical tables what size can I get my database to

What sequence to delete and or archive to shrink my database the quickest

Once the customer had decided the best fit for their “rightsize” a blueprint is automatically created on what needs to be completed. This automated process speeds up the analysis phase by up to 80% of doing it the normal way.

Page 23: Getting SAP Business Suite and BW Ready for HANA...Response times on most SAP supplied interactive transactions 50% to 1000% improvement Some transactions blisteringly fast MB51 before

RIGHTSIZING HANA ANALYSIS TOOL

Page 24: Getting SAP Business Suite and BW Ready for HANA...Response times on most SAP supplied interactive transactions 50% to 1000% improvement Some transactions blisteringly fast MB51 before

RIGHTSIZING HANA ANALYSIS TOOL

Page 25: Getting SAP Business Suite and BW Ready for HANA...Response times on most SAP supplied interactive transactions 50% to 1000% improvement Some transactions blisteringly fast MB51 before

22.2 TB

7.9TB Infocubes

9.7TB DataStoreObjects

4.6TB PSA Data

12 Infocubes larger then 200GB

27 DSO’s larger than 200GB

24 PSA tables larger than 200GB

Infocubes held 8 years of data analysed access:

Younger than 24 months 83% access

25 to 36 months 11% access

37 to 50 months 6% access

3.7TB never accessed

CASE STUDY – WE ALSO LOOKED AT BW

Page 26: Getting SAP Business Suite and BW Ready for HANA...Response times on most SAP supplied interactive transactions 50% to 1000% improvement Some transactions blisteringly fast MB51 before

WE ALSO LOOKED AT BW

We moved the following to NLS

9.7TB DSO

3.7TB of Infocubes

Total 13TB compressed to 1.4TB in NLS on Sybase IQ

Archived 4.6TB of PSA Data to 800GB of Archive

Reconnected the NLS to Hana

Moved the rest to a 256GB Hana box

Page 27: Getting SAP Business Suite and BW Ready for HANA...Response times on most SAP supplied interactive transactions 50% to 1000% improvement Some transactions blisteringly fast MB51 before

PERFORMANCE

On average queries 16 times faster than on Oracle

Query that took 32 seconds down to 2 seconds with Hana

Fastest we saw was 696 seconds before down to 2.3 seconds

Stats using NLS

32 million rows

Without NLS and Hana on Oracle Query time 37 seconds

Split 16 million rows in Hana and 16 million in NLS

Query time from Hana .7 seconds from NLS 1.9 seconds

Page 28: Getting SAP Business Suite and BW Ready for HANA...Response times on most SAP supplied interactive transactions 50% to 1000% improvement Some transactions blisteringly fast MB51 before

LESSONS LEARNT

RightSize the source systems first

Look at custom code

Gain experience on HANA – give it to someone who knows what they are doing

If you have BW start with that first

Do some form of POC, to gain knowledge

Its not as simple as a database migration

HANA gives you great flexibility, but it needs looking after – its not easy you need to understand it

Testing and Training needed

Page 29: Getting SAP Business Suite and BW Ready for HANA...Response times on most SAP supplied interactive transactions 50% to 1000% improvement Some transactions blisteringly fast MB51 before

Q&A

Page 30: Getting SAP Business Suite and BW Ready for HANA...Response times on most SAP supplied interactive transactions 50% to 1000% improvement Some transactions blisteringly fast MB51 before

THANK YOU !

Page 31: Getting SAP Business Suite and BW Ready for HANA...Response times on most SAP supplied interactive transactions 50% to 1000% improvement Some transactions blisteringly fast MB51 before

T: +44 (0) 121 629 7830

F: +44 (0) 121 629 7701

E: [email protected]

W: proceedgroup.com

Proceed Group Headquarters

Regus House

Fort Dunlop

Fort Parkway

Birmingham

B24 9FE

UK