GEOTECHNICS OF WASTE GEOTECHNICS OF WASTE WALLBOARD MONOFILL WALLBOARD MONOFILL CLOSURE CLOSURE Lessons Learned Lessons Learned Presented By: Presented By: John M. Gardner, P.E. John M. Gardner, P.E. 2009 ASCE Annual Meeting 2009 ASCE Annual Meeting Greensboro, North Carolina Greensboro, North Carolina August 27-28, 2009 August 27-28, 2009
95

GEOTECHNICS OF WASTE WALLBOARD MONOFILL CLOSURE Lessons Learned Presented By: John M. Gardner, P.E. 2009 ASCE Annual Meeting Greensboro, North Carolina.

Dec 13, 2015

Download

Documents

Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: GEOTECHNICS OF WASTE WALLBOARD MONOFILL CLOSURE Lessons Learned Presented By: John M. Gardner, P.E. 2009 ASCE Annual Meeting Greensboro, North Carolina.

GEOTECHNICS OF WASTE GEOTECHNICS OF WASTE WALLBOARD MONOFILL WALLBOARD MONOFILL

CLOSURECLOSURE

Lessons LearnedLessons Learned

Presented By:Presented By:John M. Gardner, P.E.John M. Gardner, P.E.

2009 ASCE Annual Meeting2009 ASCE Annual MeetingGreensboro, North CarolinaGreensboro, North Carolina

August 27-28, 2009August 27-28, 2009

Page 2: GEOTECHNICS OF WASTE WALLBOARD MONOFILL CLOSURE Lessons Learned Presented By: John M. Gardner, P.E. 2009 ASCE Annual Meeting Greensboro, North Carolina.

Economic Recession has created Economic Recession has created temporary reduction in wallboard temporary reduction in wallboard demand:demand:

Increased stockpiles of FGDR at coal-fired Increased stockpiles of FGDR at coal-fired power plants (nationally over 60% of FGD power plants (nationally over 60% of FGD produced is recovered into wallboard)produced is recovered into wallboard)

Wallboard market has grown steadily since Wallboard market has grown steadily since the early 1960’sthe early 1960’s

Potential for an increase in the amount of Potential for an increase in the amount of waste wallboard on re-startwaste wallboard on re-start

Page 3: GEOTECHNICS OF WASTE WALLBOARD MONOFILL CLOSURE Lessons Learned Presented By: John M. Gardner, P.E. 2009 ASCE Annual Meeting Greensboro, North Carolina.

Increasing landfill closures and Post-Increasing landfill closures and Post-Closure Care around the countryClosure Care around the country

Post-Closure periods are increasing – Post-Closure periods are increasing – typically 10 to 30 yearstypically 10 to 30 years

On-site operations supports On-site operations supports continuing P-C Care beyond continuing P-C Care beyond regulatory limitsregulatory limits

Page 4: GEOTECHNICS OF WASTE WALLBOARD MONOFILL CLOSURE Lessons Learned Presented By: John M. Gardner, P.E. 2009 ASCE Annual Meeting Greensboro, North Carolina.

Two (2) 50-year old waste wallboard Two (2) 50-year old waste wallboard landfillslandfills

Stopped accepting off-spec wallboard Stopped accepting off-spec wallboard in 1990in 1990

Closure Plan submitted in April 1995 Closure Plan submitted in April 1995 – Approved by Regulatory Agency in – Approved by Regulatory Agency in December 1997December 1997

Page 5: GEOTECHNICS OF WASTE WALLBOARD MONOFILL CLOSURE Lessons Learned Presented By: John M. Gardner, P.E. 2009 ASCE Annual Meeting Greensboro, North Carolina.
Page 6: GEOTECHNICS OF WASTE WALLBOARD MONOFILL CLOSURE Lessons Learned Presented By: John M. Gardner, P.E. 2009 ASCE Annual Meeting Greensboro, North Carolina.
Page 7: GEOTECHNICS OF WASTE WALLBOARD MONOFILL CLOSURE Lessons Learned Presented By: John M. Gardner, P.E. 2009 ASCE Annual Meeting Greensboro, North Carolina.

GENERAL SITE CONDITIONSGENERAL SITE CONDITIONS : :

Bulk material properties of waste Bulk material properties of waste relatively unknownrelatively unknown

Adhered water Adhered water

Other plant debris Co-disposedOther plant debris Co-disposed

Unknown subsurface/groundwater Unknown subsurface/groundwater conditionsconditions

Page 8: GEOTECHNICS OF WASTE WALLBOARD MONOFILL CLOSURE Lessons Learned Presented By: John M. Gardner, P.E. 2009 ASCE Annual Meeting Greensboro, North Carolina.

Geotechnical Elements:Geotechnical Elements:

1.1. Workability/compactionWorkability/compaction

2.2. Final Cover/Closure cap Final Cover/Closure cap permeabilitypermeability

3.3. Shear strength/stabilityShear strength/stability

4.4. SettlementSettlement

5.5. Erosion/ErodibilityErosion/Erodibility

6.6. Revegetation/drainageRevegetation/drainage

Page 9: GEOTECHNICS OF WASTE WALLBOARD MONOFILL CLOSURE Lessons Learned Presented By: John M. Gardner, P.E. 2009 ASCE Annual Meeting Greensboro, North Carolina.
Page 10: GEOTECHNICS OF WASTE WALLBOARD MONOFILL CLOSURE Lessons Learned Presented By: John M. Gardner, P.E. 2009 ASCE Annual Meeting Greensboro, North Carolina.

Final closure cover was designed and specified Final closure cover was designed and specified to meet regulatory closure requirements as to meet regulatory closure requirements as follows:follows:

a. a. Final cover consisting of not less Final cover consisting of not less than 2 than 2 feet of compacted soilfeet of compacted soil

b. b. A maximum erosion rate of 5 tons A maximum erosion rate of 5 tons per per acre per yearacre per year

c. c. Final cover must have a slope of not Final cover must have a slope of not less than two percent (2%) and less than two percent (2%) and

not not greater than thirty-three greater than thirty-three percent (33%) percent (33%)

Page 11: GEOTECHNICS OF WASTE WALLBOARD MONOFILL CLOSURE Lessons Learned Presented By: John M. Gardner, P.E. 2009 ASCE Annual Meeting Greensboro, North Carolina.

General Grading/Drainage Design:General Grading/Drainage Design:

West Slope: 3:1 slopes with 1 bench; West Slope: 3:1 slopes with 1 bench; perimeter channels; rock toe drainperimeter channels; rock toe drain

East Slope: 3:1 slopes with 3 benches; East Slope: 3:1 slopes with 3 benches; perimeter channels; sediment basinperimeter channels; sediment basin

Page 12: GEOTECHNICS OF WASTE WALLBOARD MONOFILL CLOSURE Lessons Learned Presented By: John M. Gardner, P.E. 2009 ASCE Annual Meeting Greensboro, North Carolina.
Page 13: GEOTECHNICS OF WASTE WALLBOARD MONOFILL CLOSURE Lessons Learned Presented By: John M. Gardner, P.E. 2009 ASCE Annual Meeting Greensboro, North Carolina.
Page 14: GEOTECHNICS OF WASTE WALLBOARD MONOFILL CLOSURE Lessons Learned Presented By: John M. Gardner, P.E. 2009 ASCE Annual Meeting Greensboro, North Carolina.
Page 15: GEOTECHNICS OF WASTE WALLBOARD MONOFILL CLOSURE Lessons Learned Presented By: John M. Gardner, P.E. 2009 ASCE Annual Meeting Greensboro, North Carolina.

As a result of actual field conditions, As a result of actual field conditions, a revised sediment basin and a revised sediment basin and principal spillway design was principal spillway design was necessarynecessary

Page 16: GEOTECHNICS OF WASTE WALLBOARD MONOFILL CLOSURE Lessons Learned Presented By: John M. Gardner, P.E. 2009 ASCE Annual Meeting Greensboro, North Carolina.
Page 17: GEOTECHNICS OF WASTE WALLBOARD MONOFILL CLOSURE Lessons Learned Presented By: John M. Gardner, P.E. 2009 ASCE Annual Meeting Greensboro, North Carolina.
Page 18: GEOTECHNICS OF WASTE WALLBOARD MONOFILL CLOSURE Lessons Learned Presented By: John M. Gardner, P.E. 2009 ASCE Annual Meeting Greensboro, North Carolina.
Page 19: GEOTECHNICS OF WASTE WALLBOARD MONOFILL CLOSURE Lessons Learned Presented By: John M. Gardner, P.E. 2009 ASCE Annual Meeting Greensboro, North Carolina.
Page 20: GEOTECHNICS OF WASTE WALLBOARD MONOFILL CLOSURE Lessons Learned Presented By: John M. Gardner, P.E. 2009 ASCE Annual Meeting Greensboro, North Carolina.

Field Change:Field Change:

Regulatory Agency required soil cap Regulatory Agency required soil cap to be:to be:

k ≤ 1 x 10k ≤ 1 x 10-7-7 cm/s cm/s

Page 21: GEOTECHNICS OF WASTE WALLBOARD MONOFILL CLOSURE Lessons Learned Presented By: John M. Gardner, P.E. 2009 ASCE Annual Meeting Greensboro, North Carolina.

Closure Construction began June Closure Construction began June 1998 and completed in October 19981998 and completed in October 1998

Page 22: GEOTECHNICS OF WASTE WALLBOARD MONOFILL CLOSURE Lessons Learned Presented By: John M. Gardner, P.E. 2009 ASCE Annual Meeting Greensboro, North Carolina.

September 1998 - During basin September 1998 - During basin backfilling with stone – Tension Crack backfilling with stone – Tension Crack (about 250-foot long scarp) develop (about 250-foot long scarp) develop between the lower and middle between the lower and middle benches of the East Pilebenches of the East Pile

Crack/movement directly upslope of Crack/movement directly upslope of 30-foot depth, 1:1 basin excavation30-foot depth, 1:1 basin excavation

Clay layer and seepage noted at base Clay layer and seepage noted at base of movementof movement

Page 23: GEOTECHNICS OF WASTE WALLBOARD MONOFILL CLOSURE Lessons Learned Presented By: John M. Gardner, P.E. 2009 ASCE Annual Meeting Greensboro, North Carolina.
Page 24: GEOTECHNICS OF WASTE WALLBOARD MONOFILL CLOSURE Lessons Learned Presented By: John M. Gardner, P.E. 2009 ASCE Annual Meeting Greensboro, North Carolina.

Sliding wedge (Janbu) analysis was used to Sliding wedge (Janbu) analysis was used to back-calculate waste shear strengthback-calculate waste shear strength

C= 0 psf; phi = 18 degreesC= 0 psf; phi = 18 degrees

Modified Basin design to arrest movement Modified Basin design to arrest movement (accelerated basin backfilling; flattened (accelerated basin backfilling; flattened slope (4H:1V); raised stone in basin floor 3 slope (4H:1V); raised stone in basin floor 3 feet)feet)

Resulting Factor of Safety = 1.6Resulting Factor of Safety = 1.6

Set survey stakes along slope to observe Set survey stakes along slope to observe any further movementsany further movements

No further movements have been observed No further movements have been observed since that timesince that time

Page 25: GEOTECHNICS OF WASTE WALLBOARD MONOFILL CLOSURE Lessons Learned Presented By: John M. Gardner, P.E. 2009 ASCE Annual Meeting Greensboro, North Carolina.
Page 26: GEOTECHNICS OF WASTE WALLBOARD MONOFILL CLOSURE Lessons Learned Presented By: John M. Gardner, P.E. 2009 ASCE Annual Meeting Greensboro, North Carolina.
Page 27: GEOTECHNICS OF WASTE WALLBOARD MONOFILL CLOSURE Lessons Learned Presented By: John M. Gardner, P.E. 2009 ASCE Annual Meeting Greensboro, North Carolina.
Page 28: GEOTECHNICS OF WASTE WALLBOARD MONOFILL CLOSURE Lessons Learned Presented By: John M. Gardner, P.E. 2009 ASCE Annual Meeting Greensboro, North Carolina.
Page 29: GEOTECHNICS OF WASTE WALLBOARD MONOFILL CLOSURE Lessons Learned Presented By: John M. Gardner, P.E. 2009 ASCE Annual Meeting Greensboro, North Carolina.
Page 30: GEOTECHNICS OF WASTE WALLBOARD MONOFILL CLOSURE Lessons Learned Presented By: John M. Gardner, P.E. 2009 ASCE Annual Meeting Greensboro, North Carolina.
Page 31: GEOTECHNICS OF WASTE WALLBOARD MONOFILL CLOSURE Lessons Learned Presented By: John M. Gardner, P.E. 2009 ASCE Annual Meeting Greensboro, North Carolina.
Page 32: GEOTECHNICS OF WASTE WALLBOARD MONOFILL CLOSURE Lessons Learned Presented By: John M. Gardner, P.E. 2009 ASCE Annual Meeting Greensboro, North Carolina.
Page 33: GEOTECHNICS OF WASTE WALLBOARD MONOFILL CLOSURE Lessons Learned Presented By: John M. Gardner, P.E. 2009 ASCE Annual Meeting Greensboro, North Carolina.
Page 34: GEOTECHNICS OF WASTE WALLBOARD MONOFILL CLOSURE Lessons Learned Presented By: John M. Gardner, P.E. 2009 ASCE Annual Meeting Greensboro, North Carolina.
Page 35: GEOTECHNICS OF WASTE WALLBOARD MONOFILL CLOSURE Lessons Learned Presented By: John M. Gardner, P.E. 2009 ASCE Annual Meeting Greensboro, North Carolina.
Page 36: GEOTECHNICS OF WASTE WALLBOARD MONOFILL CLOSURE Lessons Learned Presented By: John M. Gardner, P.E. 2009 ASCE Annual Meeting Greensboro, North Carolina.

Construction completed - October Construction completed - October 19981998

Inclement weather resulted in re-Inclement weather resulted in re-seeding required - April 1999seeding required - April 1999

Final inspection - June 1999Final inspection - June 1999

Certification document submitted to Certification document submitted to Regulatory Agency - June 1999Regulatory Agency - June 1999

Regulatory Approval - July 1999Regulatory Approval - July 1999

Page 37: GEOTECHNICS OF WASTE WALLBOARD MONOFILL CLOSURE Lessons Learned Presented By: John M. Gardner, P.E. 2009 ASCE Annual Meeting Greensboro, North Carolina.
Page 38: GEOTECHNICS OF WASTE WALLBOARD MONOFILL CLOSURE Lessons Learned Presented By: John M. Gardner, P.E. 2009 ASCE Annual Meeting Greensboro, North Carolina.
Page 39: GEOTECHNICS OF WASTE WALLBOARD MONOFILL CLOSURE Lessons Learned Presented By: John M. Gardner, P.E. 2009 ASCE Annual Meeting Greensboro, North Carolina.

Semi-Annual Post Closure Inspections Semi-Annual Post Closure Inspections Began November 1999Began November 1999

Page 40: GEOTECHNICS OF WASTE WALLBOARD MONOFILL CLOSURE Lessons Learned Presented By: John M. Gardner, P.E. 2009 ASCE Annual Meeting Greensboro, North Carolina.

18 inspections to date between 18 inspections to date between 11/99 and 06/0911/99 and 06/09

Unique opportunity to review Final Unique opportunity to review Final Cover/Cap performance over timeCover/Cap performance over time

Page 41: GEOTECHNICS OF WASTE WALLBOARD MONOFILL CLOSURE Lessons Learned Presented By: John M. Gardner, P.E. 2009 ASCE Annual Meeting Greensboro, North Carolina.

Major Issues related to long-term Major Issues related to long-term maintenance:maintenance:

1.1. Settlement/Sinkhole Settlement/Sinkhole DevelopmentDevelopment

2.2. Erosion/Erodibility Erosion/Erodibility

3.3. Revegetation RequirementsRevegetation Requirements

Page 42: GEOTECHNICS OF WASTE WALLBOARD MONOFILL CLOSURE Lessons Learned Presented By: John M. Gardner, P.E. 2009 ASCE Annual Meeting Greensboro, North Carolina.

November 1999 Inspection :November 1999 Inspection :

Site adjacent to farms and pasturesSite adjacent to farms and pastures

Cow Manure was observed on final cover – Cow Manure was observed on final cover – both landfillsboth landfills

Initial trails were forming - caused by the Initial trails were forming - caused by the animals were observedanimals were observed

Facility was cited by the regulatory agency Facility was cited by the regulatory agency

Page 43: GEOTECHNICS OF WASTE WALLBOARD MONOFILL CLOSURE Lessons Learned Presented By: John M. Gardner, P.E. 2009 ASCE Annual Meeting Greensboro, North Carolina.

SolutionSolution: :

Installed gates and fences around Installed gates and fences around perimeter access pointsperimeter access points

Page 44: GEOTECHNICS OF WASTE WALLBOARD MONOFILL CLOSURE Lessons Learned Presented By: John M. Gardner, P.E. 2009 ASCE Annual Meeting Greensboro, North Carolina.
Page 45: GEOTECHNICS OF WASTE WALLBOARD MONOFILL CLOSURE Lessons Learned Presented By: John M. Gardner, P.E. 2009 ASCE Annual Meeting Greensboro, North Carolina.
Page 46: GEOTECHNICS OF WASTE WALLBOARD MONOFILL CLOSURE Lessons Learned Presented By: John M. Gardner, P.E. 2009 ASCE Annual Meeting Greensboro, North Carolina.
Page 47: GEOTECHNICS OF WASTE WALLBOARD MONOFILL CLOSURE Lessons Learned Presented By: John M. Gardner, P.E. 2009 ASCE Annual Meeting Greensboro, North Carolina.
Page 48: GEOTECHNICS OF WASTE WALLBOARD MONOFILL CLOSURE Lessons Learned Presented By: John M. Gardner, P.E. 2009 ASCE Annual Meeting Greensboro, North Carolina.

Slopes appear rutted with minor Slopes appear rutted with minor slope movement throughoutslope movement throughout

Page 49: GEOTECHNICS OF WASTE WALLBOARD MONOFILL CLOSURE Lessons Learned Presented By: John M. Gardner, P.E. 2009 ASCE Annual Meeting Greensboro, North Carolina.

SolutionSolution: :

Revised mowing schedule and Revised mowing schedule and equipmentequipment

Page 50: GEOTECHNICS OF WASTE WALLBOARD MONOFILL CLOSURE Lessons Learned Presented By: John M. Gardner, P.E. 2009 ASCE Annual Meeting Greensboro, North Carolina.
Page 51: GEOTECHNICS OF WASTE WALLBOARD MONOFILL CLOSURE Lessons Learned Presented By: John M. Gardner, P.E. 2009 ASCE Annual Meeting Greensboro, North Carolina.
Page 52: GEOTECHNICS OF WASTE WALLBOARD MONOFILL CLOSURE Lessons Learned Presented By: John M. Gardner, P.E. 2009 ASCE Annual Meeting Greensboro, North Carolina.
Page 53: GEOTECHNICS OF WASTE WALLBOARD MONOFILL CLOSURE Lessons Learned Presented By: John M. Gardner, P.E. 2009 ASCE Annual Meeting Greensboro, North Carolina.
Page 54: GEOTECHNICS OF WASTE WALLBOARD MONOFILL CLOSURE Lessons Learned Presented By: John M. Gardner, P.E. 2009 ASCE Annual Meeting Greensboro, North Carolina.

Original design was reviewed with Original design was reviewed with multiple benchesmultiple benches

Between 1999 and 2006 excessive Between 1999 and 2006 excessive erosion on West pileerosion on West pile

Exposed Waste WallboardExposed Waste Wallboard

Slope Length was determined as a Slope Length was determined as a major factor (about 150 feet max.)major factor (about 150 feet max.)

Page 55: GEOTECHNICS OF WASTE WALLBOARD MONOFILL CLOSURE Lessons Learned Presented By: John M. Gardner, P.E. 2009 ASCE Annual Meeting Greensboro, North Carolina.

SolutionSolution: :

Installed gas and leachate control Installed gas and leachate control system in new final cover and divided system in new final cover and divided slope with a diversion slope with a diversion

Page 56: GEOTECHNICS OF WASTE WALLBOARD MONOFILL CLOSURE Lessons Learned Presented By: John M. Gardner, P.E. 2009 ASCE Annual Meeting Greensboro, North Carolina.
Page 57: GEOTECHNICS OF WASTE WALLBOARD MONOFILL CLOSURE Lessons Learned Presented By: John M. Gardner, P.E. 2009 ASCE Annual Meeting Greensboro, North Carolina.
Page 58: GEOTECHNICS OF WASTE WALLBOARD MONOFILL CLOSURE Lessons Learned Presented By: John M. Gardner, P.E. 2009 ASCE Annual Meeting Greensboro, North Carolina.
Page 59: GEOTECHNICS OF WASTE WALLBOARD MONOFILL CLOSURE Lessons Learned Presented By: John M. Gardner, P.E. 2009 ASCE Annual Meeting Greensboro, North Carolina.
Page 60: GEOTECHNICS OF WASTE WALLBOARD MONOFILL CLOSURE Lessons Learned Presented By: John M. Gardner, P.E. 2009 ASCE Annual Meeting Greensboro, North Carolina.
Page 61: GEOTECHNICS OF WASTE WALLBOARD MONOFILL CLOSURE Lessons Learned Presented By: John M. Gardner, P.E. 2009 ASCE Annual Meeting Greensboro, North Carolina.
Page 62: GEOTECHNICS OF WASTE WALLBOARD MONOFILL CLOSURE Lessons Learned Presented By: John M. Gardner, P.E. 2009 ASCE Annual Meeting Greensboro, North Carolina.
Page 63: GEOTECHNICS OF WASTE WALLBOARD MONOFILL CLOSURE Lessons Learned Presented By: John M. Gardner, P.E. 2009 ASCE Annual Meeting Greensboro, North Carolina.
Page 64: GEOTECHNICS OF WASTE WALLBOARD MONOFILL CLOSURE Lessons Learned Presented By: John M. Gardner, P.E. 2009 ASCE Annual Meeting Greensboro, North Carolina.
Page 65: GEOTECHNICS OF WASTE WALLBOARD MONOFILL CLOSURE Lessons Learned Presented By: John M. Gardner, P.E. 2009 ASCE Annual Meeting Greensboro, North Carolina.
Page 66: GEOTECHNICS OF WASTE WALLBOARD MONOFILL CLOSURE Lessons Learned Presented By: John M. Gardner, P.E. 2009 ASCE Annual Meeting Greensboro, North Carolina.
Page 67: GEOTECHNICS OF WASTE WALLBOARD MONOFILL CLOSURE Lessons Learned Presented By: John M. Gardner, P.E. 2009 ASCE Annual Meeting Greensboro, North Carolina.

Simple perimeter maintenance Simple perimeter maintenance

Downed tree presented a breach in Downed tree presented a breach in the compacted clay capthe compacted clay cap

Possible leachate break-out pointPossible leachate break-out point

Page 68: GEOTECHNICS OF WASTE WALLBOARD MONOFILL CLOSURE Lessons Learned Presented By: John M. Gardner, P.E. 2009 ASCE Annual Meeting Greensboro, North Carolina.

SolutionSolution: :

Cut and remove fallen timber. Cut and remove fallen timber. Remove woody growth from the Remove woody growth from the landfill and perimeter channels landfill and perimeter channels

Page 69: GEOTECHNICS OF WASTE WALLBOARD MONOFILL CLOSURE Lessons Learned Presented By: John M. Gardner, P.E. 2009 ASCE Annual Meeting Greensboro, North Carolina.
Page 70: GEOTECHNICS OF WASTE WALLBOARD MONOFILL CLOSURE Lessons Learned Presented By: John M. Gardner, P.E. 2009 ASCE Annual Meeting Greensboro, North Carolina.
Page 71: GEOTECHNICS OF WASTE WALLBOARD MONOFILL CLOSURE Lessons Learned Presented By: John M. Gardner, P.E. 2009 ASCE Annual Meeting Greensboro, North Carolina.

November 2003 Inspection – revealed November 2003 Inspection – revealed a sinkhole on East Pile bencha sinkhole on East Pile bench

Surface water directly entering fillSurface water directly entering fill

Page 72: GEOTECHNICS OF WASTE WALLBOARD MONOFILL CLOSURE Lessons Learned Presented By: John M. Gardner, P.E. 2009 ASCE Annual Meeting Greensboro, North Carolina.

SolutionSolution: :

1.1. Immediately installed a diversion Immediately installed a diversion around around the sinkhole the sinkhole

2. Backfilled the sinkhole with a 2. Backfilled the sinkhole with a sand/bentonite sand/bentonite mixture (1 part mixture (1 part granulated Bentonite to 4 granulated Bentonite to 4 parts parts sand)sand)

3. Mound & Monitor; top-off as needed3. Mound & Monitor; top-off as needed

Page 73: GEOTECHNICS OF WASTE WALLBOARD MONOFILL CLOSURE Lessons Learned Presented By: John M. Gardner, P.E. 2009 ASCE Annual Meeting Greensboro, North Carolina.
Page 74: GEOTECHNICS OF WASTE WALLBOARD MONOFILL CLOSURE Lessons Learned Presented By: John M. Gardner, P.E. 2009 ASCE Annual Meeting Greensboro, North Carolina.
Page 75: GEOTECHNICS OF WASTE WALLBOARD MONOFILL CLOSURE Lessons Learned Presented By: John M. Gardner, P.E. 2009 ASCE Annual Meeting Greensboro, North Carolina.

Sinkhole started as a rodent burrow?Sinkhole started as a rodent burrow?

Page 76: GEOTECHNICS OF WASTE WALLBOARD MONOFILL CLOSURE Lessons Learned Presented By: John M. Gardner, P.E. 2009 ASCE Annual Meeting Greensboro, North Carolina.

Undercutting along bench discharge Undercutting along bench discharge pointspoints

Repaired with geomembrane Repaired with geomembrane underlayment beneath rip rapunderlayment beneath rip rap

Page 77: GEOTECHNICS OF WASTE WALLBOARD MONOFILL CLOSURE Lessons Learned Presented By: John M. Gardner, P.E. 2009 ASCE Annual Meeting Greensboro, North Carolina.
Page 78: GEOTECHNICS OF WASTE WALLBOARD MONOFILL CLOSURE Lessons Learned Presented By: John M. Gardner, P.E. 2009 ASCE Annual Meeting Greensboro, North Carolina.
Page 79: GEOTECHNICS OF WASTE WALLBOARD MONOFILL CLOSURE Lessons Learned Presented By: John M. Gardner, P.E. 2009 ASCE Annual Meeting Greensboro, North Carolina.
Page 80: GEOTECHNICS OF WASTE WALLBOARD MONOFILL CLOSURE Lessons Learned Presented By: John M. Gardner, P.E. 2009 ASCE Annual Meeting Greensboro, North Carolina.

Increased ponding on benchesIncreased ponding on benches

Observed settlements Observed settlements

Page 81: GEOTECHNICS OF WASTE WALLBOARD MONOFILL CLOSURE Lessons Learned Presented By: John M. Gardner, P.E. 2009 ASCE Annual Meeting Greensboro, North Carolina.

SolutionSolution: :

Regrade benches to improve Regrade benches to improve drainagedrainage

Page 82: GEOTECHNICS OF WASTE WALLBOARD MONOFILL CLOSURE Lessons Learned Presented By: John M. Gardner, P.E. 2009 ASCE Annual Meeting Greensboro, North Carolina.
Page 83: GEOTECHNICS OF WASTE WALLBOARD MONOFILL CLOSURE Lessons Learned Presented By: John M. Gardner, P.E. 2009 ASCE Annual Meeting Greensboro, North Carolina.
Page 84: GEOTECHNICS OF WASTE WALLBOARD MONOFILL CLOSURE Lessons Learned Presented By: John M. Gardner, P.E. 2009 ASCE Annual Meeting Greensboro, North Carolina.

SETTLEMENSETTLEMENTT

Page 85: GEOTECHNICS OF WASTE WALLBOARD MONOFILL CLOSURE Lessons Learned Presented By: John M. Gardner, P.E. 2009 ASCE Annual Meeting Greensboro, North Carolina.

Used historic topographic maps to Used historic topographic maps to estimate primary coefficient of estimate primary coefficient of consolidation for the waste wallboardconsolidation for the waste wallboard

Known timeframeKnown timeframe

Known original waste thicknessKnown original waste thickness

Known change in stressKnown change in stress

Cc (waste) ≈ 0.5Cc (waste) ≈ 0.5

Page 86: GEOTECHNICS OF WASTE WALLBOARD MONOFILL CLOSURE Lessons Learned Presented By: John M. Gardner, P.E. 2009 ASCE Annual Meeting Greensboro, North Carolina.
Page 87: GEOTECHNICS OF WASTE WALLBOARD MONOFILL CLOSURE Lessons Learned Presented By: John M. Gardner, P.E. 2009 ASCE Annual Meeting Greensboro, North Carolina.
Page 88: GEOTECHNICS OF WASTE WALLBOARD MONOFILL CLOSURE Lessons Learned Presented By: John M. Gardner, P.E. 2009 ASCE Annual Meeting Greensboro, North Carolina.
Page 89: GEOTECHNICS OF WASTE WALLBOARD MONOFILL CLOSURE Lessons Learned Presented By: John M. Gardner, P.E. 2009 ASCE Annual Meeting Greensboro, North Carolina.
Page 90: GEOTECHNICS OF WASTE WALLBOARD MONOFILL CLOSURE Lessons Learned Presented By: John M. Gardner, P.E. 2009 ASCE Annual Meeting Greensboro, North Carolina.

COST OF POST-CLOSURE COST OF POST-CLOSURE MAINTENANCE/REPAIRSMAINTENANCE/REPAIRS : :

Major site repairs monitored and conducted in Year 2, Year 7 Major site repairs monitored and conducted in Year 2, Year 7 and Year 8and Year 8

Year 2: $12,000 Contracted re-seeding, erosion repairsYear 2: $12,000 Contracted re-seeding, erosion repairs

Year 7: $149,000 Contracted leachate/gas, Venting/final Year 7: $149,000 Contracted leachate/gas, Venting/final cover replacementcover replacement

Year 8: $20,000 Contracted reseeding, erosion repairsYear 8: $20,000 Contracted reseeding, erosion repairs Mowing, tree/shrub removal not included – by plant staffMowing, tree/shrub removal not included – by plant staff

Closure construction cost totaled $1.3 MillionClosure construction cost totaled $1.3 Million

Suggests about 15% P-C over 10 years on a staggered Suggests about 15% P-C over 10 years on a staggered scheduleschedule

Page 91: GEOTECHNICS OF WASTE WALLBOARD MONOFILL CLOSURE Lessons Learned Presented By: John M. Gardner, P.E. 2009 ASCE Annual Meeting Greensboro, North Carolina.

Mulch netting introduced an Mulch netting introduced an unexpected results on the local snake unexpected results on the local snake populationpopulation

Page 92: GEOTECHNICS OF WASTE WALLBOARD MONOFILL CLOSURE Lessons Learned Presented By: John M. Gardner, P.E. 2009 ASCE Annual Meeting Greensboro, North Carolina.
Page 93: GEOTECHNICS OF WASTE WALLBOARD MONOFILL CLOSURE Lessons Learned Presented By: John M. Gardner, P.E. 2009 ASCE Annual Meeting Greensboro, North Carolina.

Lessons LearnedLessons Learned::

1.1. Conduct an early site visit to capture the actual Conduct an early site visit to capture the actual conditions for bidding/constructionconditions for bidding/construction

2.2. Stuff happens – landslide remediationStuff happens – landslide remediation

3.3. Livestock and rodents – don’t underestimate the Livestock and rodents – don’t underestimate the impact of these seemingly minor nuisancesimpact of these seemingly minor nuisances

4.4. Treat the soil loss equation with respect.Treat the soil loss equation with respect.

5.5. Test your site-specific soils for nutrient Test your site-specific soils for nutrient deficienciesdeficiencies

Page 94: GEOTECHNICS OF WASTE WALLBOARD MONOFILL CLOSURE Lessons Learned Presented By: John M. Gardner, P.E. 2009 ASCE Annual Meeting Greensboro, North Carolina.

Lessons Learned (cont.)Lessons Learned (cont.)::

6.6. It is possible to provide too much maintenance.It is possible to provide too much maintenance.

7.7. Remove dead/dying trees from the perimeter of Remove dead/dying trees from the perimeter of the site – can cause cap damagethe site – can cause cap damage

8.8. Conduct site visits with sufficient frequency to Conduct site visits with sufficient frequency to protect the large investments in closure costsprotect the large investments in closure costs

9.9. Consider joint visits with the regulatory agencies Consider joint visits with the regulatory agencies to earn trust and confidence.to earn trust and confidence.

10.10. With frequent visits, the cost of repairs can be With frequent visits, the cost of repairs can be controlled to coincide with budgets and prevent controlled to coincide with budgets and prevent more significant damage and failures from more significant damage and failures from occurring. It is not necessarily a uniform annual occurring. It is not necessarily a uniform annual fee.fee.

Page 95: GEOTECHNICS OF WASTE WALLBOARD MONOFILL CLOSURE Lessons Learned Presented By: John M. Gardner, P.E. 2009 ASCE Annual Meeting Greensboro, North Carolina.

Unanswered QuestionsUnanswered Questions::

How/why does the waste material seem to move How/why does the waste material seem to move up through the final cover soil?up through the final cover soil?

What is the long-term impact of the H2S on the What is the long-term impact of the H2S on the vegetation?vegetation?

Although somewhat limiting due to H2S, did Although somewhat limiting due to H2S, did borrows contribute to sinkhole development?borrows contribute to sinkhole development?

Does consolidation theory hold true for gypsum?Does consolidation theory hold true for gypsum?