Top Banner
PO Box 4405 East Gosford, NSW 2250 M 0466 385 221 [email protected] www.benvirongroup.com.au ABN 52 119 978 063 Geotechnical Investigation Report Proposed Development at 29‐35 Burlington Road and 30‐32 The Crescent Homebush NSW prepared for Lion Civil Group Pty Ltd Report No. G17 January 2016
37

Geotechnical Investigation Report - Strathfield Council · PDF fileGeotechnical Investigation Report ... recommended that further drilling during excavation be ... into the excavation

Feb 13, 2018

Download

Documents

phungnhi
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Geotechnical Investigation Report - Strathfield Council · PDF fileGeotechnical Investigation Report ... recommended that further drilling during excavation be ... into the excavation

PO Box 4405 East Gosford, NSW 2250

M 0466 385 221 [email protected] www.benvirongroup.com.au

ABN 52 119 978 063  

Geotechnical Investigation Report     

Proposed Development at  29‐35 Burlington Road and 30‐32 The Crescent 

Homebush NSW     

prepared for  

Lion Civil Group Pty Ltd 

 

 

   

Report No. G17  

 January 2016 

Page 2: Geotechnical Investigation Report - Strathfield Council · PDF fileGeotechnical Investigation Report ... recommended that further drilling during excavation be ... into the excavation

January 2016 Geotechnical Investigation Report, Ref: P2014‐003‐G11 Site: 29‐35 Burlington Road, 30‐32 The Crescent, Homebush  Page 2 of 18 

DOCUMENT CONTROL REGISTER  

Document Information 

Job Number  G17 

Document Number  1

Report Title  Geotechnical Assessment 

Site Address  29‐35 Burlington Road & 30‐32 The Crescent, Homebush NSW 

Prepared for  Lion Civil Group Pty Ltd 

 

Document Review 

Revision Number  Date Issued  Description  Issued By 

0  10/03/14 Initial Issue Ben Buckley

1  11/12/15  Revision 1  Ben Buckley 

2  14/01/15  Revision 2  Ben Buckley 

 

Distribution Register 

Distribution Method  Custodian  Issued to 

Electronic  B. Buckley  Benviron Group Office 

Electronic  Youssef Rahman/Lion Civil 

Group 

PO Box 5123, Chullora NSW 

 

Authorisation and Release 

  Signature  Name  Date 

Author  

 Benjamin Buckley  14/01/15 

 

 

Page 3: Geotechnical Investigation Report - Strathfield Council · PDF fileGeotechnical Investigation Report ... recommended that further drilling during excavation be ... into the excavation

January 2016 Geotechnical Investigation Report, Ref: P2014‐003‐G11 Site: 29‐35 Burlington Road, 30‐32 The Crescent, Homebush  Page 3 of 18 

 

Executive Summary 

Benviron Group carried out a geotechnical  investigation at 29‐35 Burlington Road, and 30‐

32 The Crescent at Homebush in February 2014 to investigate and assess the site’s surface 

and subsurface conditions in order to provide geotechnical recommendations and advice for 

the design and construction of the proposed residential development.  

 

It  is  understood  the  proposed  development  involves  the  demolition  of  all  existing  site 

features on 29‐35 Burlington Road, and 30‐32 The Crescent and with the construction of a 

9‐storeys mixed commercial and residential building development with a 4 level basement 

car parking facility.   

 

As  of  November  2015  and  additional  basement  has  been  added  to  the  building.  It  is 

recommended  that  further  drilling  during  excavation  be  undertaken  to  confirm  the 

underlying geology which was undertaken on the 23rd December 2015. 

 

Two  investigation holes was drilled to depths of approximately 9.1m and 14.1m with rock 

coring  to  enable  the  stratigraphy  of  the  subsoil  profile  and  engineering  properties  be 

mapped  in  anticipation  for  the  basement  excavation  works  and  proposed  foundations 

works. 

 

This report presents and  interprets  the findings of  the geotechnical  investigation that was 

carried within accessible areas of the site.  Based on the findings, geotechnical assessments 

and recommendations are presented.  

 

The  proposed  development  is  considered  feasible  subjected  to  the  recommendations 

provided in this report are carried out. 

Page 4: Geotechnical Investigation Report - Strathfield Council · PDF fileGeotechnical Investigation Report ... recommended that further drilling during excavation be ... into the excavation

January 2016 Geotechnical Investigation Report, Ref: P2014‐003‐G11 Site: 29‐35 Burlington Road, 30‐32 The Crescent, Homebush  Page 4 of 18 

 

Table of Contents 

EXECUTIVE SUMMARY ........................................................................................................................... 3 

1.0  INTRODUCTION .............................................................................................................................. 5 

2.0  AVAILABLE INFORMATION ........................................................................................................ 6 

3.0  PROPOSED DEVELOPMENT ........................................................................................................ 6 

3.1  SITE LOCATION AND DESCRIPTION ......................................................................................... 6 

3.2  REGIONAL GEOLOGY .................................................................................................................. 6 

4.0  FIELDWORK ..................................................................................................................................... 6 

5.0  FILED WORK RESULTS ................................................................................................................. 7 

5.1  SUBSOIL CONDITIONS ................................................................................................................. 7 

5.2  GROUND WATER .......................................................................................................................... 7 

6.0  LABORATORY TEST RESULTS ................................................................................................... 9 

7.0  DISCUSSIONS AND RECOMMENDATIONS............................................................................... 9 

7.1  GENERAL ........................................................................................................................................ 9 

7.2  EXCAVATION CONDITIONS AND VIBRATION CONTROL ................................................. 10 

7.3  GROUND WATER MANAGEMENT ........................................................................................... 11 

7.4  TEMPORARY BATTER SLOPES ................................................................................................ 11 

7.5  RETAINING STRUCTURES ......................................................................................................... 12 

7.6  FOUNDATION SYSTEMS ............................................................................................................ 15 

8.0  CONCLUSIONS ............................................................................................................................... 15 

REFERENCES ............................................................................................................................................ 17 

LIMITATIONS............................................................................................................................................ 18 

 Appendix A: Figures 

Appendix B: Engineering Logs   

Appendix C: Laboratory Test Results 

 

 

 

Page 5: Geotechnical Investigation Report - Strathfield Council · PDF fileGeotechnical Investigation Report ... recommended that further drilling during excavation be ... into the excavation

January 2016 Geotechnical Investigation Report, Ref: P2014‐003‐G11 Site: 29‐35 Burlington Road, 30‐32 The Crescent, Homebush  Page 5 of 18 

1.0 INTRODUCTION 

Benviron Group was engaged to undertake a geotechnical  investigation at the subject site 

located at 29‐35 Burlington Road, and 30‐32 The Crescent at Homebush. The purpose of this 

investigation is to assess the site’s surface and subsurface conditions within accessible areas 

in  order  to  provide  geotechnical  recommendations  and  advice  for  the  design  and 

construction  of  the  proposed  mixed‐use  commercial  and  residential  apartment 

development in preparation for a development application submission.  

 

The  proposed  development  involves  the  demolition  of  all  existing  site  features  and  the 

construction  of  a  7‐storeys  mixed  commercial  and  residential  building  and  a  3‐level 

basement car parking facility. As of November these plans have been amended and is now 9 

storeys and 4 basement levels. 

 

This report presents and interprets the findings of the geotechnical investigation carried out 

on  the  26th  February  2014  and  the  23rd  December  2015  on  the  subject  site,  known  as 

number  29‐35  Burlington  Road,  and  30‐32  The  Crescent  at  Homebush.  With  the  site 

constraints, the fieldwork was carried out by using a truck mounted drilling rig with coring 

facilities to accessible parts of the site at 29‐35 Burlington Road Homebush. Two boreholes 

were drilled and cored to provide the following information: 

 

Method of investigation, 

Site description, including surface and sub‐surface conditions,  

Site plan indicating borehole locations and footprint of the proposed roads and buildings 

within the development,  

Groundwater conditions and management,  

Result of laboratory rock testing, 

Recommendations on the excavation conditions and temporary slope batters, 

Recommendations on vibration control and management, 

Provision of earth pressure parameters for design of retaining structures,  

Recommendations on footings and serviceability bearing pressures, 

Page 6: Geotechnical Investigation Report - Strathfield Council · PDF fileGeotechnical Investigation Report ... recommended that further drilling during excavation be ... into the excavation

January 2016 Geotechnical Investigation Report, Ref: P2014‐003‐G11 Site: 29‐35 Burlington Road, 30‐32 The Crescent, Homebush  Page 6 of 18 

2.0 AVAILABLE INFORMATION 

At the time of writing this report, there were no architectural drawings provided from the 

client. There is a drawing prepared by Strat Surv on the Nos. 37‐39 Burlington Road & 33‐34 

The Crescent Homebush. Verbal information was provided to indicate that there is a 3 level 

basement  carpark  and  the  proposed  development  is  7  storeys  high  with  a  ground  floor 

commercial  units. As of November  these plans have been amended and  is now 9  storeys 

and 4 basement levels. 

 

3.0 PROPOSED DEVELOPMENT  

3.1 Site Location and Description 

The site is located near the Homebush at approximately 11 Km west of the Sydney CBD as 

shown in the Locality Plan (Figure 1).  The site comprises two major lots, and is bounded by 

Burlington Road  in  the  south and The Crescent  in  the north.   The  lot adjoining Burlington 

Road currently  is  a mainly a  carpark,  and  the  lot adjoining The Crescent  is a  single  storey 

house   as shown  in the Site Plan (Figure 2).   The proposed development comprises mixed 

development with a 4 level basement carpark. 

 

3.2 Regional Geology 

 Reference to  the Sydney 1: 1:100,000 Geological  Series Sheet 9029‐9130 Edition 1, 1983, 

indicates the site to be underlain by Ashfield Shale of Middle Triassic Age.  Ashfield Shale is 

typically consisted of dark grey to black shale and laminate. 

4.0 FIELDWORK 

Fieldwork  for  the geotechnical  investigation was carried on  the 26 February 2014 and the 

23rd December 2015 and comprised the following works:  

A detailed walk‐over  inspection of  the site and surrounding environment to capture any 

significant geological features.  

Drilling of one (1) borehole BH1 using a 10 tonne drilling rig mounted with V‐bit , and then 

T    bit  attached  to  a  solid  flight  auger    and  then  using  NMLC  diamond  rock  coring 

Page 7: Geotechnical Investigation Report - Strathfield Council · PDF fileGeotechnical Investigation Report ... recommended that further drilling during excavation be ... into the excavation

January 2016 Geotechnical Investigation Report, Ref: P2014‐003‐G11 Site: 29‐35 Burlington Road, 30‐32 The Crescent, Homebush  Page 7 of 18 

techniques to drill down to a total depth of  9.1m below existing ground level . TA follow 

up second borehole was drilled to approximately 14.1m BGL. 

Standard Penetration Tests (SPT) was undertaken at regular intervals within the borehole 

to assess the in‐situ strength of subsoil properties. 

 

The  approximate  location  of  the  investigation  borehole  is  shown  in  Figure  2  and  the 

Engineering Logs are presented in Appendix B. 

5.0 FILED WORK RESULTS 

5.1 Subsoil Conditions  

Based on  information gathered and observations made from the site  inspection,  it can be 

inferred that  it  is  likely the subsoil profile comprises road base which overlies the residual 

material  of  differing  degree  of  weathering  ranging  from  a  sandy  CLAY  to  a  more 

predominant CLAY matrix that sits on top of the Shale Bedrock . 

 

The subsurface soil profile within BH1 indicated a 200mm thick gravel underlain by a loose 

to medium dense  silty  Sand  to  a depth of  approximately  1.0m below  the existing  ground 

level. This  is  then underlain by a moist  stiff  to very stiff high plasticity Clay which extends 

down to approximately 2.0m below existing ground level. This moist Clay material becomes 

hard  in strength from 2.0m to approximately 5.5m below ground level. The shale bedrock 

commenced at approximately 5.5m and varying between low to high strength from 5.5m to 

9.1m  below  existing  ground  level.  This  borehole  was  terminates  at  9.1m  below  existing 

ground level. 

5.2 Ground Water 

Groundwater  or  seepage was  not  observed  in  the  borehole  during  the  investigation 

works on  the 26 February 2014. Groundwater  seepage was also not observed during 

auger drilling of the boreholes on the 23rd December 2015.  

However  Groundwater  level  was  measured  at  a  depth  of  about  6.5  mBGL,  on  4th 

January 2016, which is expected to be above the final bulk excavation level. 

Page 8: Geotechnical Investigation Report - Strathfield Council · PDF fileGeotechnical Investigation Report ... recommended that further drilling during excavation be ... into the excavation

January 2016 Geotechnical Investigation Report, Ref: P2014‐003‐G11 Site: 29‐35 Burlington Road, 30‐32 The Crescent, Homebush  Page 8 of 18 

 

However, due to the expected low permeability of the residual clay and shale bedrock, 

we  do  not  expect  the  groundwater  to  have  a  major  impact  on  the  proposed 

development or adjoining structures. However, we expect minor groundwater  inflows 

into the excavation at the soil/rock interface and through any defects within the shale 

bedrock (such as jointing, and bending planes, etc.) following periods of heavy rain. 

 

We  expect  that  any  seepage  that  does  occur  will  be  able  to  be  controlled  using  a 

conventional  sump‐and‐pump  system.  In  the  long  term, drainage  should be provided 

behind all basement retaining walls, around the perimeter of the basement and below 

the basement slab. The hydraulic engineer should inspect the completed excavation to 

confirm that adequate drainage has been allowed for. Drainage should be connected to 

the sump‐and‐pump system and discharging into the stormwater system.  

 

Notwithstanding, we recommend further detailed groundwater monitoring with pump 

out tests be carried out within the already installed monitoring well for monitoring of 

groundwater  levels,  estimation  of  seepage  volumes  and  to  determine  the  extent  of 

seasonal variation on the groundwater table 

 

However,  it  should  be  noted  groundwater  levels  may  be  subject  to  seasonal 

fluctuations,  rainfall,  prevailing  weather  conditions  and  also  future  developments  of 

the areas and land forms. 

 

 

 

 

 

Page 9: Geotechnical Investigation Report - Strathfield Council · PDF fileGeotechnical Investigation Report ... recommended that further drilling during excavation be ... into the excavation

January 2016 Geotechnical Investigation Report, Ref: P2014‐003‐G11 Site: 29‐35 Burlington Road, 30‐32 The Crescent, Homebush  Page 9 of 18 

 

6.0 LABORATORY TEST RESULTS 

Rock  cores  drilled  are  kept  at  core‐boxes  as  shown  in  Appendix  D.  Samples  have  been 

collected from these core‐boxes to assess the rock strength at the various level within the 

Shale  bedrock.  The  testing  carried  out  on  the  rock  samples was  the  Point  Load  Strength 

Index  Test,  and  the Point  Load  Strength  Indices  for  the  rock  cores  and  the  assessed  rock 

strengths  in  accordance with  the  Australian  Standards  (Reference  1).  The  test  results  are 

enclosed in Appendix C and are summarised in the following Table 1. 

 Table 1: Point Load Test Results 

 

Sample ID  Location  Depth 

(m) 

Diametrical 

Is(50) (MPa) 

Axial    

Is(50) (MPa)

Assessed Strength  

1  BH1  6.3  0.55  0.50  Medium/High 

2  BH1  7.7  0.39  0.36  Medium 

3  BH1  9.0  NA  0.60  High 

 

Based on the rock core strengths (Table 1) and the rock discontinuities (shown in the core 

logs and core photographs), the bedrock for the proposed development site for preliminary 

foundation  design  purposes  in  accordance  with  Pells  et  al  (Reference  4)  is  classified  in 

general as a Class III Shale. 

7.0 DISCUSSIONS AND RECOMMENDATIONS 

7.1 General 

From the result of the investigation obtained on this site, it can be inferred that the subsoil 

conditions comprise generally a sandy fill layer which is underlain by predominantly a high 

plasticity clay. Depth to the shale bedrock within the proposed development is likely to be 

approximately 5.5m below the existing ground surface level.  The strength and quality of the 

Shale bedrock in general increase with depth. 

  

Page 10: Geotechnical Investigation Report - Strathfield Council · PDF fileGeotechnical Investigation Report ... recommended that further drilling during excavation be ... into the excavation

January 2016 Geotechnical Investigation Report, Ref: P2014‐003‐G11 Site: 29‐35 Burlington Road, 30‐32 The Crescent, Homebush  Page 10 of 18 

The  proposed  development  involves  the  demolition  of  all  existing  site  features  and  the 

construction  of  a  9‐storeys  mixed  commercial  and  residential  building  and  a  4‐level 

basement car parking facility. Formation of the basement is expected to entail excavations 

of up to 12m deep and stratigraphy of the ground material for the proposed basement and 

foundation has been assessed.  

 

For the lot adjoining The Crescent, where the future access ramp to the basement carpark is 

likely, additional site investigation works will be required to confirm the stratigraphy of the 

area as assumed with the current information provided once the access is made available for 

further drilling works in that area. 

 

7.2 Excavation Conditions and Vibration Control 

Based on provided information, the establishment of basement B4 car park level will involve 

excavation of materials to depths of approximately 12m below the existing pavement level 

of Burlington Road.  The likely soil profile materials to be encountered within the depths of 

basement excavation are likely to comprise sandy fill overlying stiff to very stiff sandy clays 

and Shale of differing degree of weathering. 

 

It  is expected  that excavation of  soils and  low strength shale bedrock can be achieved by 

conventional excavation methods. However, for the excavation of medium to high strength 

shale  bedrock,  these  may  be  achieved  by  using  saw  cutting  method  followed  by  rock 

breaking hammers to ensure the integrity of the nearby structures are safeguarded. 

 

With  the  close  proximity  of  buildings  and  civil  structures  along  the  perimeter  of  the  site 

boundaries,  and  the  use  of  vibratory  rock  breaking  hammer  equipment  that  may  be 

required  for  the  proposed  excavation  works  in  the  expected  harder  shale  bedrock,  it  is 

essential  to  carry  out  saw  cutting  along  the  perimeter  of  the  site  in  order  to  limit  the 

vibration  levels that may  induce on nearby structures to within acceptable  levels.  Induced 

vibrations  in  structures  adjacent  to  the  excavation  should  not  exceed  a  peak  particle 

velocity  (PPV)  of  10mm/sec  for  structures  in  good  condition  or  2mm/sec  for  heritage  or 

Page 11: Geotechnical Investigation Report - Strathfield Council · PDF fileGeotechnical Investigation Report ... recommended that further drilling during excavation be ... into the excavation

January 2016 Geotechnical Investigation Report, Ref: P2014‐003‐G11 Site: 29‐35 Burlington Road, 30‐32 The Crescent, Homebush  Page 11 of 18 

poor‐conditioned structures. Vibration monitoring  system should be established at  critical 

locations such as along southern and northern boundaries adjoining major roads, as well as 

along eastern and western site boundaries with neighbouring buildings in order to monitor 

the vibration levels throughout the period of rock excavation. 

 

We  recommend  that  where  percussive  excavation  techniques  are  to  be  adopted, 

dilapidation reports are to be carried out on all adjoining buildings, roads and civil structures 

so that an accurate record of the existing conditions of these elements are mapped prior to 

the commencement of excavation. These records shall be agreed by the respective owner in 

order to reduce the risk of future owner’s dispute on subsequent potential damage claims.  

 

7.3 Ground Water Management 

With the excavation anticipated to be at least 12.1m below existing ground level, based on 

the  data  observed  from  the  investigation,  it  is  possible  that  excavation  works  could 

encounter  ground water  inflow  at  6.5m BGL.  As water  seepage  could  be  detected,  these 

flows should be managed accordingly with measures to facilitate the inflow and to keep the 

excavation dry for working as per sections above.  

 

7.4 Temporary Batter Slopes 

With the proposed development, there is very limited room for the use of temporary batter 

slopes  during  construction  as most  of  the  building  perimeter  walls  are  very  close  to  the 

boundaries.  However wherever required (such as an access ramp for construction propose) 

the  safe  temporary batters  are  recommended  as  presented  in  Table  2,  provided  that  the 

basement excavation is set back sufficiently from the common site boundaries to facilitate 

for the formation of the batters.. 

 

 

 

 

Page 12: Geotechnical Investigation Report - Strathfield Council · PDF fileGeotechnical Investigation Report ... recommended that further drilling during excavation be ... into the excavation

January 2016 Geotechnical Investigation Report, Ref: P2014‐003‐G11 Site: 29‐35 Burlington Road, 30‐32 The Crescent, Homebush  Page 12 of 18 

 Table 2: Minimum temporary batter slopes 

 

Materials 

Temporary 

(Horizontal: Vertical) 

 

  Exposed  Protected 

Silty and clayey soils, sand‐clay 

mixtures 2.0:1.0  1.5:1.0 

Weathered Shale bedrock  1.0:1.0  ‐ 

 

Temporary  surface  protection  against  erosion  may  be  provided  by  covering  the  batter 

with  plastic  sheeting,  and  these  should  be  applied  for  a  limited  time  and  inspected  by 

Geotechnical  Engineers  after  significant  events.    It  should  be  noted  however  that  the 

plastic sheeting should extend at least 1.5m behind the crest of the cut face or at least up 

to the common site boundaries. 

 

7.5 Retaining Structures 

With the proposed development footprint close to the site boundary and adjoining a major 

roadway,  the  forming  of  basement  will  need  to  adopt  a  construction  methodology  that 

ensure  the  cut  faces  are  supported  at  all  times.    In  particularly,  to  manage  ground 

movement  by  limiting  wall  deflections  to  acceptable  limits  during  all  stages  of  the 

excavation  works.  The  retaining  structures  should  be  designed  to  withstand  the  applied 

lateral pressures of  the soil  layers,  the water pressure, and all existing surcharges  in  their 

zone of influence that includes existing nearby structures and traffic loadings.  

 

With  the  proposed  basement  level  of  the  development,  it  is  likely  the  excavation will  be 

beneath  the  foundation  of  the  adjacent  buildings  northwest  of  the  site.  It  is  therefore 

necessary to ensure that the construction system ensure that the integrity of these adjacent 

buildings’ foundations are safeguarded at all times, and this is dependent on the conditions 

of the foundations of the adjacent buildings when exposed. 

 

Page 13: Geotechnical Investigation Report - Strathfield Council · PDF fileGeotechnical Investigation Report ... recommended that further drilling during excavation be ... into the excavation

January 2016 Geotechnical Investigation Report, Ref: P2014‐003‐G11 Site: 29‐35 Burlington Road, 30‐32 The Crescent, Homebush  Page 13 of 18 

In general,  it  is considered a continuous pile wall system may be necessary to ensure that 

the excavation faces are protected at all times. However, other methods of protecting the 

exposed faces can be considered depending the soil properties  in the area,  the rock head 

levels  encountered,  the  conditions  of  the  existing  footings,  and  the  integrity  of  the 

pavement sub‐grade when exposed.  

 

The  pressure  distribution  on  cantilever  retaining  structures  may  be  assumed  to  be 

triangular and estimated as follows:     

ph = kH + qk 

Where,                                 

ph = Horizontal pressure (kN/m2) 

= Wet density (kN/m3) 

k = Coefficient of earth pressure (ka or ko) 

H = Retained height (m) 

q = Surcharge pressure behind retaining wall (kN/m2) 

 

For  the  design  of  flexible  retaining  structures,  where  some  lateral  movement  is 

acceptable, an active earth pressure coefficient  is recommended.  Should it be critical to 

limit  the  horizontal  deformation  of  a  retaining  structure,  use  of  an  earth  pressure 

coefficient  at  rest  should  be  considered.    Recommended  parameters  for  the  design  of 

retaining structures are presented in the following Table 3. 

 

 

 

 

 

 

 

Page 14: Geotechnical Investigation Report - Strathfield Council · PDF fileGeotechnical Investigation Report ... recommended that further drilling during excavation be ... into the excavation

January 2016 Geotechnical Investigation Report, Ref: P2014‐003‐G11 Site: 29‐35 Burlington Road, 30‐32 The Crescent, Homebush  Page 14 of 18 

Table 3: Geotechnical Design Parameters 

Materials 

Unit 

Weight 

(kN/m3) 

Active Earth 

Pressure 

coefficient 

(Ka) 

At Rest Earth 

Pressure 

Coefficient 

(Ko) 

Passive Earth 

Pressure Coefficient (Kp) or Pressure 

Fill  17  0.5  0.63  ignore 

Residual Soil  18  0.40  0.50  ignore 

Extremely 

Weathered Shale 

(Class V or IV) 

20  0.25  0.40  250kPa  

Distinctly to Slightly 

Weathered Shale 

( Class IV or III) 

21  0.20  0.3  375kPa 

Slightly Weathered 

to fresh Shale  

(Class III or II) 

22  0.15  0.2  500kPa 

 

The  above  coefficients  assume  that  ground  level  behind  the  retaining  structures  is 

horizontal  and  the  retained  material  is  effectively  drained.  It  should  be  noted  that 

hydrostatic pressures due to ground water table (if present) and surcharge due to nearby 

structures (within the influence zone) should also be taken into the account in the design 

of  the  retaining  structures.  This  is  particularly  the  case  for  the  retaining  walls  located 

immediately adjacent to the neighboring buildings. 

 

Should  the  retaining  structures  be  anchored  or  strutted,  the  pressure  distribution  is 

assessed to be rectangular, with magnitude estimated as follows: 

  ph   =   0.65kH  

The design of any retaining structure should be checked for bearing capacity, overturning, 

and overall stability of the slope. 

 

Page 15: Geotechnical Investigation Report - Strathfield Council · PDF fileGeotechnical Investigation Report ... recommended that further drilling during excavation be ... into the excavation

January 2016 Geotechnical Investigation Report, Ref: P2014‐003‐G11 Site: 29‐35 Burlington Road, 30‐32 The Crescent, Homebush  Page 15 of 18 

7.6 Foundation Systems 

The  loading  conditions  for  the  proposed  development  are  not  known  at  the  time  of 

preparation  of  this  report.    However,  considering  the  scale  of  the  development,  it  is 

envisaged  that  foundation  materials  required  to  support  the  proposed  structure  would 

comprise  Class  III  or  better  shale  bedrock.    Based  on  the  borehole  information  and  rock 

strength testing, it is envisaged that the shale bedrock likely to be exposed at basement bulk 

excavation levels would constitute either Class  III or Class  III/II and is  feasible to meet this 

requirement. 

 

Spread footings comprising strip or pad footings founded in Class III or better shale bedrock 

below the basement bulk excavation level may be designed for a serviceability end bearing 

capacity  of  3000kPa.  It  is  recommended  that  a  further  drilling  for  assessment  of  the 

foundation material  of  the  proposed  footings  be  carried  out  once  excavation  to  the  final 

basement  level  has  been  reached  in  order  to  confirm outcomes  of  this  assessment.    The 

footing  inspection and assessment  requirement can be  referred  to  the guidelines given  in 

accordance with Pells, Douglas et al . (Reference 5).  

  

Footing inspections by a Geotechnical Engineer will be required during footing excavation to 

confirm  appropriate  founding  materials,  that  the  recommended  serviceability  bearing 

pressures could be met and to ensure  that all  soft and wet materials have been removed 

from the foundation footprint prior to concrete placement. 

8.0 CONCLUSIONS 

 

This  report  presents  the  findings  and  recommendations  for  the  proposed  mixed 

development at 29‐35 Burlington Road, and 30‐32 The Crescent, Homebush NSW. It is based 

on the geotechnical  investigation results available to date.    It considers that the proposed 

development is feasible subjected to the recommendations presented in this report. 

 

 

Page 16: Geotechnical Investigation Report - Strathfield Council · PDF fileGeotechnical Investigation Report ... recommended that further drilling during excavation be ... into the excavation

January 2016 Geotechnical Investigation Report, Ref: P2014‐003‐G11 Site: 29‐35 Burlington Road, 30‐32 The Crescent, Homebush  Page 16 of 18 

For and on behalf of 

Benviron Group 

       

 

 

Noriman Mak 

Geotechnical Engineer 

MIEAust., RPE (Civ, Geo), NPER (Civ, Geo) 

Page 17: Geotechnical Investigation Report - Strathfield Council · PDF fileGeotechnical Investigation Report ... recommended that further drilling during excavation be ... into the excavation

January 2016 Geotechnical Investigation Report, Ref: P2014‐003‐G11 Site: 29‐35 Burlington Road, 30‐32 The Crescent, Homebush  Page 17 of 18 

REFERENCES 

 

1. Australian Standard AS1726‐1993 ‘Geotechnical Site Investigation’; and 

2. Australian Standard AS2870‐2011 ‘Residential Slabs and Footings’; 

3. Australian Standards – Guidelines on Earthworks for Commercial and Residential 

Developments, AS3798‐2007. 

4. Pells, P.J.N, Mostyn, E  and Walker , B F – Foundations on Sandstone and Shale in the 

Sydney Region, Australian Geomechanics Journal, Dec 1998 

5. Pells, P.J.N, Douglas D.J, Rodway, B, Thorne C, McManon B.K  – Design Loadings for 

Foundations on Shale and Sandstone in the Sydney Region.oundations on Sandstone and 

Shale in the Sydney Region, Australian Geomechanics Journal, 1978 

6. N.S.W. Transport : Roads & Maritime Services – Technical Direction Geotechnology  

GTD2012/001 27 April 2012 

Page 18: Geotechnical Investigation Report - Strathfield Council · PDF fileGeotechnical Investigation Report ... recommended that further drilling during excavation be ... into the excavation

January 2016 Geotechnical Investigation Report, Ref: P2014‐003‐G11 Site: 29‐35 Burlington Road, 30‐32 The Crescent, Homebush  Page 18 of 18 

LIMITATIONS 

The  assessment  of  the  sub‐surface  profile  within  the  proposed  development  area  and  the 

recommendations presented in this report are based on limited information available to date. 

The recommendations and advice presented in this report on soil and rock condition is considered 

to be indicative only as only very limited areas were assessed on site to date. Site inspection by a 

consulting  Geotechnical  Engineer  or  Engineering  Geologist  are  to  be  undertake  when  further 

investigation works are to be carried out to confirm the condition of founding materials in which 

this geotechnical assessment recommends. 

Anecdotal evidence and Information provided by client is assumed to be relevant and to the best 

of knowledge be appropriate for its interpretation. 

There is a possibility that the actual geotechnical and groundwater conditions across the site could 

differ from the inferred geotechnical assumptions and derivations on which our recommendations 

are presented in this report.   

 

 

Page 19: Geotechnical Investigation Report - Strathfield Council · PDF fileGeotechnical Investigation Report ... recommended that further drilling during excavation be ... into the excavation

___________________________________________________________________________________________

Locality Plan G17-P2014-010 Figure 1

The Site

Page 20: Geotechnical Investigation Report - Strathfield Council · PDF fileGeotechnical Investigation Report ... recommended that further drilling during excavation be ... into the excavation

___________________________________________________________________________________________

Site Plan & Investigation Locations G17-P2014-010 Figure 2

The Crescent

The Site

BH1

Rochester Street

Burlington Road

Ben Buckley
Text Box
BH2
Ben Buckley
Oval
Page 21: Geotechnical Investigation Report - Strathfield Council · PDF fileGeotechnical Investigation Report ... recommended that further drilling during excavation be ... into the excavation

Job No: G17-P2014-010Hole No: BH1Sheet 1 of 2

ENGINEERING LOG OF DRILLED BOREHOLEClient: Lion Civil Pty LtdProject: Proposed Development Test Method: Project Location: 29-35 Burlington Road, Homebush Date:

Gro

undw

ater

Sam

ples

/Fi

eld

Test

s

Dep

th (m

)

Gra

phic

Log

Uni

fied

Cla

ssifi

catio

n

Description Moi

stur

e C

ondi

tion

Con

sist

ency

/R

el. D

ensi

ty

Additional Comments Dep

th (m

)

0.1 GRAVEL, coarse grained, dark grey M 0.1

0.2 0.2

0.3 Silty SAND, fine to medium grained, dark grey M 0.3

0.4 0.4

0.5 0.5

0.6 0.6

0.7 0.7

0.8 0.8

0.9 0.9

1.0 CLAY, high plasticity, light brown M 1.0

1.1 1.1

1.2 CLAY, high plasticity, red brown and grey M 1.2

1.3 1.3

1.4 1.4

1.5 1.5

1.6 1.6

1.7 1.7

1.8 1.8

1.9 1.9

2.0 2.0

2.1 M 2.1

2.2 2.2

2.3 2.3

2.4 2.4

2.5 2.5

2.6 2.6

2.7 2.7

2.8 2.8

2.9 2.9

3.0 3.0

3.1 3.1

3.2 3.2

3.3 3.3

3.4 3.4

3.5 3.5

Explanatory Notes:Consistency Density Index Samples MoistureVS Very Soft VL Very Loose B Bulk Sample D DryS Soft L Loose D Disturbed Sample M MoistF Firm MD Medium Dense U50 Undisturbed Sample W WetSt Stiff D Dense (50mm diam.) Wp Plastic LimitVSt Very Stiff VD Very Dense N S.P.T. Value Wl Liquid LimitH Hard

Logged by: MM

SPT

14,16,12

N=28

CH

VSt

VSt

Test Location: Refer to Figure 2

SM

VL

Surface Level: Approx. +8.8mAHD26/02/14Drill Rig

VSt-H

S

GM

CH

SPT

4,6,7

N=13

CLAY, medium to high plasticity, orange brown and grey with traces of iron stained gravel

CH

Page 22: Geotechnical Investigation Report - Strathfield Council · PDF fileGeotechnical Investigation Report ... recommended that further drilling during excavation be ... into the excavation

Job No: G17-P2014-010Hole No: BH1Sheet 2 of 2

ENGINEERING LOG OF DRILLED BOREHOLEClient: Lion Civil Pty LtdProject: Proposed Development Test Method: Project Location: 29-35 Burlington Road, Homebush Date:

Gro

undw

ater

Sam

ples

/Fi

eld

Test

s

Dep

th (m

)

Gra

phic

Log

Uni

fied

Cla

ssifi

catio

n

Description Moi

stur

e C

ondi

tion

Con

sist

ency

/R

el. D

ensi

ty

Additional Comments Dep

th (m

)

3.6 CLAY, low plasticity, light brown with traces of gravel M 3.6

3.7 3.7

3.8 3.8

3.9 3.9

4.0 4.0

4.1 4.1

4.2 CLAY, low to medium plasticity, grey M 4.2

4.3 4.3

4.4 4.4

4.5 4.5

4.6 4.6

4.7 4.7

4.8 4.8

4.9 CLAY, low to medium plasticity, dark grey M 4.9

5.0 5.0

5.1 5.1

5.2 5.2

5.3 5.3

5.4 No groundwater encountered 5.4

5.5 5.5

5.6 See Core Log BH1 5.6

5.7 5.7

5.8 5.8

5.9 5.9

6.0 6.0

6.1 6.1

6.2 6.2

6.3 6.3

6.4 6.4

6.5 6.5

6.6 6.6

6.7 6.7

6.8 6.8

6.9 6.9

7.0 7.0

Explanatory Notes:Consistency Density Index Samples MoistureVS Very Soft VL Very Loose B Bulk Sample D DryS Soft L Loose D Disturbed Sample M MoistF Firm MD Medium Dense U50 Undisturbed Sample W WetSt Stiff D Dense (50mm diam.) Wp Plastic LimitVSt Very Stiff VD Very Dense N S.P.T. Value Wl Liquid LimitH Hard

CL H

CL H

Test Location: Refer to Figure 2Drill Rig

26/02/14 Logged by: MMSurface Level: Approx. +8.8mAHD

CL H

N>30

8, 30 at 100mm

V-Bit refusal at 5.5m

SPT

5,15,20

N=35

SPT

Page 23: Geotechnical Investigation Report - Strathfield Council · PDF fileGeotechnical Investigation Report ... recommended that further drilling during excavation be ... into the excavation

Job No: G17-P2014-010Hole No: BH1Sheet 1 of 2

CORELOG OF TEST HOLEClient: Lion Civil Pty LtdProject: Proposed DevelopmentProject Location: 29-35 Burlington Road, Homebush

Drill Model: Slope: 90o R.L. Surface: Existing

Barrel Type / Length: 1.5m Bearing: - Datum: -Drilling Information Rock Substance Rock Mass Defects

Met

hod

Cas

e - L

ift

Gro

undw

ater

Sam

ples

/

Fiel

d Te

sts

Dep

th (m

)

Gra

phic

Log

Substance Description Wea

ther

ing

EL VL

L

E

stim

ated

M H

S

treng

thV

HEH

Is(50) Mpa

A:Axial D:Diam-

etral 30 100

Def

ect

300

1000

S

paci

ng30

00 Defect Description Dep

th (m

)

3.6 3.6

3.7 3.7

3.8 3.8

3.9 3.9

4.0 4.0

4.1 4.1

4.2 4.2

4.3 4.3

4.4 4.4

4.5 4.5

4.6 4.6

4.7 4.7

4.8 4.8

4.9 4.9

5.0 5.0

5.1 5.1

5.2 5.2

5.3 5.3

5.4 5.4

5.5 See Borehole Log BH1 5.5

5.6 EW 5.6

5.7 5.77m, B=00, flat, smooth, clean 5.7

5.8 5.86m, B=00, flat, smooth, clean 5.8

5.9 5.89m, B=00, flat, smooth, clean 5.9

6.0 MW 6.0

6.1 6.1

6.2 6.16m to 6.23m, crushed zone 6.2

6.3 Is(A) 0.54 6.3

6.4 Is(D) 0.75 6.4

6.5 MW 6.5

6.6 to 6.6

6.7 SW 6.54m to 6.58m, crushed zone 6.7

6.8 6.8

6.9 6.9

7.0 7.0

7.1 7.1Key - Method Case - lift Weathering Strength Is (50) MPa

AS Auger Screwing Casing used Fr Fresh EL Extremely Low < 0.03AD Auger Drilling Barrel withdrawn water level SW Slightly weathered VL Very Low 0.03 - 0.1R Roller / Tricone date shown MW Moderately weathered L Low 0.1 - 0.3W Washbore Water inflow HW Highly weathered M Medium 0.3 - 1.0NMLC NMLC Core Drill Partial drilling water loss EW Extremely weathered H High 1.0 - 3.0NQ,HQ Wireline Core Drill Complete drilling water loss VH Very High 3.0 - 10.0

EH Extremely High >10.0

6.65m to 7.10m, 4 x B=00, flat, smooth, clean

SHALE, extremely low strength, grey, extremely weathered, very thinly laminated, highly fractured

SHALE, medium to high strength grey, moderately weathered, very thinly laminated, highly fractured to fractured

SHALE, mediume to high strength, grey, moderately to slightly weathered, very thinly laminated, highly fractured to fractured

NM

LC 1

00%

Rec

over

y

Hole Commenced: 26/02/2014Hole Completed: 26/02/2014Supervised by: MMChecked by: NM

6.00m to 6.07m, 3 x B=00, flat, smooth, clean

NM

LC 1

00%

Rec

over

yN

MLC

100

% R

ecov

ery

6.30m to 6.45m, 3 x B=00 to 200, flat, smooth, clean

6.51m, B=100, flat, smooth, clay infill 2mm

Page 24: Geotechnical Investigation Report - Strathfield Council · PDF fileGeotechnical Investigation Report ... recommended that further drilling during excavation be ... into the excavation

Job No: G17-P2014-010Hole No: BH1Sheet 2 of 2

CORELOG OF TEST HOLEClient: Lion Civil Pty LtdProject: Proposed DevelopmentProject Location: 29-35 Burlington Road, Homebush

Drill Model: Slope: 90o R.L. Surface: Existing

Barrel Type / Length: 1.5m Bearing: - Datum: -Drilling Information Rock Substance Rock Mass Defects

Met

hod

Cas

e - L

ift

Gro

undw

ater

Sam

ples

/

Fiel

d Te

sts

Dep

th (m

)

Gra

phic

Log

Substance Description Wea

ther

ing

EL VL

L

E

stim

ated

M H

S

treng

thV

HEH

Is(50) Mpa

A:Axial D:Diam-

etral 30 100

Def

ect

300

1000

S

paci

ng30

00 Defect Description Dep

th (m

)

7.2 SW 7.2

7.3 7.40m, B=00, flat, smooth, clean 7.3

7.4 7.4

7.5 7.53m, B=00, flat, smooth, clean 7.5

7.6 7.6

7.7 Is(A) 0.38 7.7

7.8 Is(D) 0.50 7.60m to 7.64m, clay seam 4mm 7.8

7.9 7.9

8.0 8.0

8.1 8.1

8.2 8.2

8.3 8.3

8.4 8.4

8.5 8.5

8.6 8.6

8.7 8.7

8.8 8.78m, B=00, flat, smooth, clean 8.8

8.9 8.9

9.0 8.95m, B=150, flat, smooth, clean 9.0

9.1 Is(A) 0.67 9.1

9.2 BH1 Terminated at 9.1m 9.2

9.3 9.3

9.4 9.4

9.5 9.5

9.6 9.6

9.7 9.7

9.8 9.8

9.9 9.9

10.0 10.0

10.1 10.1

10.2 10.2

10.3 10.3

10.4 10.4

10.5 10.5

10.6 10.6

10.7 10.7Key - Method Case - lift Weathering Strength Is (50) MPa

AS Auger Screwing Casing used Fr Fresh EL Extremely Low < 0.03AD Auger Drilling Barrel withdrawn water level SW Slightly weathered VL Very Low 0.03 - 0.1R Roller / Tricone date shown MW Moderately weathered L Low 0.1 - 0.3W Washbore Water inflow HW Highly weathered M Medium 0.3 - 1.0NMLC NMLC Core Drill Partial drilling water loss EW Extremely weathered H High 1.0 - 3.0NQ,HQ Wireline Core Drill Complete drilling water loss VH Very High 3.0 - 10.0

EH Extremely High >10.0

7.82m to 7.93m, 3 x B=00, flat, smooth, clean

NM

LC 1

00%

Rec

over

y

8.05m to 8.15m, 2 x B=00, flat, smooth, clean

8.37m to 8.54m, 4 x B=00, flat, smooth, clean

SHALE, medium to high strength, grey, slightly weathered, very thinly laminated, fractured to slightly fractured

Hole Commenced: 26/02/2014Hole Completed: 26/02/2014Supervised by: MMChecked by: NM

7.53m to 7.60m, J=800, flat, smooth, clean

Page 25: Geotechnical Investigation Report - Strathfield Council · PDF fileGeotechnical Investigation Report ... recommended that further drilling during excavation be ... into the excavation

Job No: G17

Hole No: BH2Sheet 1 of 2

ENGINEERING LOG OF DRILLED BOREHOLEClient: Lion CivilProject: Proposed Development Test Method: Project Location: 29-35 Burlington Road, Homebush Date:

Gro

undw

ater

Sam

ples

/

Fie

ld T

ests

Dep

th (

m)

Gra

phic

Log

Uni

fied

Cla

ssif

icat

ion

Description Moi

stur

e C

ondi

tion

Con

sist

ency

/R

el. D

ensi

ty

Additional Comments Dep

th (

m)

0.1 Concrete 0.1

0.2 0.2

0.3 Silty SAND, fine to medium grained, dark grey M 0.3

0.4 0.4

0.5 0.5

0.6 0.6

0.7 0.7

0.8 0.8

0.9 0.9

1.0 CLAY, high plasticity, light brown M 1.0

1.1 1.1

1.2 CLAY, high plasticity, red brown and grey M 1.2

1.3 1.3

1.4 1.4

1.5 1.5

1.6 1.6

1.7 1.7

1.8 1.8

1.9 1.9

2.0 2.0

2.1 M 2.1

2.2 2.2

2.3 2.3

2.4 2.4

2.5 2.5

2.6 2.6

2.7 2.7

2.8 2.8

2.9 2.9

3.0 3.0

3.1 3.1

3.2 3.2

3.3 3.3

3.4 3.4

3.5 3.5

Explanatory Notes:Consistency Density Index Samples MoistureVS Very Soft VL Very Loose B Bulk Sample D DryS Soft L Loose D Disturbed Sample M MoistF Firm MD Medium Dense U50 Undisturbed Sample W WetSt Stiff D Dense (50mm diam.) Wp Plastic LimitVSt Very Stiff VD Very Dense N S.P.T. Value Wl Liquid LimitH Hard

14,16,12

N=28

SPT

CH CLAY, medium to high plasticity, red brown and grey with traces of iron stained gravel

VSt-H

4,6,7 N=13

SPT CH VSt

CH VSt

SM S

Test Location: Refer to Figure 2Drill Rig

23/12/2015 Logged by: BBSurface Level:

Page 26: Geotechnical Investigation Report - Strathfield Council · PDF fileGeotechnical Investigation Report ... recommended that further drilling during excavation be ... into the excavation

Job No: G17

Hole No: BH2Sheet 2 of 2

ENGINEERING LOG OF DRILLED BOREHOLEClient: Lion CivilProject: Proposed Development Test Method: Project Location: 29-35 Burlington Road, Homebush Date:

Gro

undw

ater

Sam

ples

/

Fie

ld T

ests

Dep

th (

m)

Gra

phic

Log

Uni

fied

Cla

ssif

icat

ion

Description Moi

stur

e C

ondi

tion

Con

sist

ency

/R

el. D

ensi

ty

Additional Comments Dep

th (

m)

3.6 CLAY, low plasticity, light brown with traces of gravel M 3.6

3.7 3.7

3.8 3.8

3.9 3.9

4.0 4.0

4.1 4.1

4.2 CLAY, low to medium plasticity, grey M 4.2

4.3 4.3

4.4 4.4

4.5 4.5

4.6 4.6

4.7 4.7

4.8 4.8

4.9 CLAY, low to medium plasticity, dark grey M 4.9

5.0 5.0

5.1 5.1

5.2 5.2

5.3 5.3

5.4 No groundwater encountered 5.4

5.5 See Core Log BH2 5.5

5.6 5.6

5.7 5.7

5.8 5.8

5.9 5.9

6.0 6.0

6.1 6.1

6.2 6.2

6.3 6.3

6.4 6.4

6.5 6.5

6.6 6.6

6.7 6.7

6.8 6.8

6.9 6.9

7.0 7.0

Explanatory Notes:Consistency Density Index Samples MoistureVS Very Soft VL Very Loose B Bulk Sample D DryS Soft L Loose D Disturbed Sample M MoistF Firm MD Medium Dense U50 Undisturbed Sample W WetSt Stiff D Dense (50mm diam.) Wp Plastic LimitVSt Very Stiff VD Very Dense N S.P.T. Value Wl Liquid LimitH Hard

V-Bit refusal at 5.4m

8, 30 at 100mm N>30

SPT

CL H

N=36

SPT CL H5,15,21

Test Location: Refer to Figure 2Drill Rig

23/12/2015 Logged by: BBSurface Level: -

CL H

Page 27: Geotechnical Investigation Report - Strathfield Council · PDF fileGeotechnical Investigation Report ... recommended that further drilling during excavation be ... into the excavation

Job No: G29

Hole No: BH2

Sheet 1 of 3

CORELOG OF TEST HOLEClient: Lion CivilProject: Proposed DevelopmentProject Location: 29-35 Burlington Road, Homebush

Drill Model: Slope: 90o R.L. Surface: Existing

Barrel Type / Length: 1.5m Bearing: - Datum: -Drilling Information Rock Substance Rock Mass Defects

Met

hod

Cas

e -

Lif

t

Gro

undw

ater

Sam

ples

/

Fie

ld T

ests

Dep

th (

m)

Gra

phic

Log

Substance Description Wea

ther

ing

EL

VL

L

E

stim

ated

M H

S

tren

gth

VH

EH

Is(50)

Mpa A:Axial D:Diam-

etral 30 100

Def

ect

300

1000

S

paci

ng30

00

Defect Description Dep

th (

m)

3.6 3.6

3.7 3.7

3.8 3.8

3.9 3.9

4.0 4.0

4.1 4.1

4.2 4.2

4.3 4.3

4.4 4.4

4.5 4.5

4.6 4.6

4.7 4.7

4.8 4.8

4.9 4.9

5.0 5.0

5.1 5.1

5.2 5.2

5.3 5.3

5.4 5.4

5.5 See Borehole Log BH2 5.5

5.6 EW 5.6

5.7 5.79m, B=00, flat, smooth, clean 5.7

5.8 5.86m, B=00, flat, smooth, clean 5.8

5.9 5.89m, B=00, flat, smooth, clean 5.9

6.0 6.0

6.1 6.1

6.2 MW 6.2

6.3 6.3

6.4 6.4

6.5 MW 6.5

6.6 to 6.6

6.7 SW 6.7

6.8 6.8

6.9 6.9

7.0 7.0

7.1 7.1Key - Method Case - lift Weathering Strength Is (50) MPa

AS Auger Screwing Casing used Fr Fresh EL Extremely Low < 0.03AD Auger Drilling Barrel withdrawn water level SW Slightly weathered VL Very Low 0.03 - 0.1R Roller / Tricone date shown MW Moderately weathered L Low 0.1 - 0.3W Washbore Water inflow HW Highly weathered M Medium 0.3 - 1.0NMLC NMLC Core Drill Partial drilling water loss EW Extremely weathered H High 1.0 - 3.0NQ,HQ Wireline Core Drill Complete drilling water loss VH Very High 3.0 - 10.0

EH Extremely High >10.0

NM

LC

100

% R

ecov

ery 6.00m to 6.07m, B=00, flat, smooth,

clean

6.30m to 6.45m, 3 x B=00 to 200, flat, smooth, clean

NM

LC

100

% R

ecov

ery

SHALE, low to medium strength, grey, moderately to slightly weathered, very thinly laminated, highly fractured to fractured

6.51m, B=100, flat, smooth, clay infill 2mm

6.65m to 7.10m, 4 x B=00, flat, smooth, clean

SHALE, very low to low strength, grey, moderately weathered, very thinly laminated, highly fractured to fractured

Hole Commenced: 23/12/2015Hole Completed: 23/12/2015Supervised by: MMChecked by: NM

NM

LC

100

% R

ecov

ery SHALE, extremely low strength, grey, extremely

weathered, very thinly laminated, highly fractured

Page 28: Geotechnical Investigation Report - Strathfield Council · PDF fileGeotechnical Investigation Report ... recommended that further drilling during excavation be ... into the excavation

Job No: G17

Hole No: BH2

Sheet 2 of 3

CORELOG OF TEST HOLEClient: Lion CivilProject: Proposed DevelopmentProject Location: 29-35 Burlington Road, Homebush

Drill Model: Slope: 90o R.L. Surface: Existing

Barrel Type / Length: 1.5m Bearing: - Datum: -Drilling Information Rock Substance Rock Mass Defects

Met

hod

Cas

e -

Lif

t

Gro

undw

ater

Sam

ples

/

Fie

ld T

ests

Dep

th (

m)

Gra

phic

Log

Substance Description Wea

ther

ing

EL

VL

L

E

stim

ated

M H

S

tren

gth

VH

EH

Is(50)

Mpa A:Axial D:Diam-

etral 30 100

Def

ect

300

1000

S

paci

ng30

00

Defect Description Dep

th (

m)

7.2 7.2

7.3 SW 7.40m, B=00, flat, smooth, clean 7.3

7.4 7.4

7.5 7.53m, B=00, flat, smooth, clean 7.5

7.6 7.6

7.7 7.40m to 7.54m, clay seam 4mm 7.7

7.8 7.8

7.9 7.9

8.0 8.0

8.1 8.1

8.2 8.2

8.3 8.3

8.4 8.4

8.5 8.5

8.6 8.6

8.7 8.7

8.8 8.8

8.9 8.9

9.0 8.95m, B=00, flat, smooth, clean 9.0

9.1 9.1

9.2 9.2

9.3 9.3

9.4 9.4

9.5 9.5

9.6 9.6

9.7 9.7

9.8 9.8

9.9 9.9

10.0 10.0

10.1 10.1

10.2 10.2

10.3 10.3

10.4 10.4

10.5 10.5

10.6 10.6

10.7 10.7Key - Method Case - lift Weathering Strength Is (50) MPa

AS Auger Screwing Casing used Fr Fresh EL Extremely Low < 0.03AD Auger Drilling Barrel withdrawn water level SW Slightly weathered VL Very Low 0.03 - 0.1R Roller / Tricone date shown MW Moderately weathered L Low 0.1 - 0.3W Washbore Water inflow HW Highly weathered M Medium 0.3 - 1.0NMLC NMLC Core Drill Partial drilling water loss EW Extremely weathered H High 1.0 - 3.0NQ,HQ Wireline Core Drill Complete drilling water loss VH Very High 3.0 - 10.0

EH Extremely High >10.0

NM

LC

100

% R

ecov

ery

7.82m to 7.93m, 3 x B=00, flat, smooth, clean

8.05m to 8.54m, 2 x B=00, flat, smooth, clean

SHALE, medium to high strength, grey, slightly weathered, very thinly laminated, fractured to slightly

Hole Commenced: 23/12/2015Hole Completed: 23/12/2015Supervised by: MMChecked by: NM

Page 29: Geotechnical Investigation Report - Strathfield Council · PDF fileGeotechnical Investigation Report ... recommended that further drilling during excavation be ... into the excavation

Job No: G17

Hole No: BH2

Sheet 3 of 3

CORELOG OF TEST HOLEClient: Lion CivilProject: Proposed DevelopmentProject Location: 29-35 Burlington Road, Homebush

Drill Model: Slope: 90o R.L. Surface: Existing

Barrel Type / Length: 1.5m Bearing: - Datum: -Drilling Information Rock Substance Rock Mass Defects

Met

hod

Cas

e -

Lif

t

Gro

undw

ater

Sam

ples

/

Fie

ld T

ests

Dep

th (

m)

Gra

phic

Log

Substance Description Wea

ther

ing

EL

VL

L

E

stim

ated

M H

S

tren

gth

VH

EH

Is(50)

Mpa A:Axial D:Diam-

etral 30 100

Def

ect

300

1000

S

paci

ng30

00

Defect Description Dep

th (

m)

10.8 10.8

10.9 SW 10.9

11.0 11.0

11.1 11.1

11.2 11.2

11.3 11.3

11.4 11.4

11.5 11.5

11.6 11.6

11.7 11.71m, B=00, flat, smooth, clean 11.7

11.8 11.8

11.9 11.9

12.0 12.0

12.1 12.1

12.2 12.2

12.3 12.3

12.4 12.4

12.5 12.5

12.6 12.62m, B=00, flat, smooth, clean 12.6

12.7 12.7

12.8 12.8

12.9 12.9

13.0 13.0

13.0 13.0

13.2 13.2

13.3 13.3

13.4 13.4

13.5 13.5

13.6 13.6

13.7 13.7

13.8 13.8

13.9 13.9

14.0 14.0

14.1 BH2 Terminated at 14.0m 14.1

14.2 14.2

14.3 14.3Key - Method Case - lift Weathering Strength Is (50) MPa

AS Auger Screwing Casing used Fr Fresh EL Extremely Low < 0.03AD Auger Drilling Barrel withdrawn water level SW Slightly weathered VL Very Low 0.03 - 0.1R Roller / Tricone date shown MW Moderately weathered L Low 0.1 - 0.3W Washbore Water inflow HW Highly weathered M Medium 0.3 - 1.0NMLC NMLC Core Drill Partial drilling water loss EW Extremely weathered H High 1.0 - 3.0NQ,HQ Wireline Core Drill Complete drilling water loss VH Very High 3.0 - 10.0

EH Extremely High >10.0

NM

LC

100

% R

ecov

ery

Hole Commenced: 23/12/2015Hole Completed: 23/12/2015Supervised by: MMChecked by: NM

SHALE, medium to high strength, grey, slightly weathered, very thinly laminated, fractured to slightly

Page 30: Geotechnical Investigation Report - Strathfield Council · PDF fileGeotechnical Investigation Report ... recommended that further drilling during excavation be ... into the excavation

Soil Sand

Bituminous ConcreteClayey Sand

ConcreteSilty Sand

Topsoil

GravelFill

Sandy GravelPeat

ClaySedimentary Rock

Silty Clay Sandstone Coarse Grained

Silt Sandstone Fine Grained

Sandy Clay Siltstone

Gravelly Clay Laminite

Shaly Clay Shale

Clayey Silt Coal

Sandy Silt Limestone

GRAPHIC SYMBOLS FOR SOIL AND ROCK

Page 31: Geotechnical Investigation Report - Strathfield Council · PDF fileGeotechnical Investigation Report ... recommended that further drilling during excavation be ... into the excavation

ACN 069 211 561

Unit 12/9-15 Gundah Road

Mount Kuring-gai NSW 2080

Phone: (02) 8438 0300

Fax: (02) 8438 0310

Email: [email protected]

Web: www.netgeo.com.au

Point Load Strength Index Test ReportG09/1306_PL

Client: Benviron Group Accredited for compliance with ISO/IEC 17025

Project: G11 Approved Signatory: Chris Stabb

Consultant

Job No: G09/1306 10/03/2014

Test Request No: NA

THIS DOCUMENT SHALL NOT BE REPRODUCED EXCEPT IN FULL

Sample Details

Sampled By: Client Air dried conditon from field

Date Sampled: 6/03/2014 As received

Test Results

Date of Test: 10/03/2014 AS 4133 4.1

Diam Width

Comments

Failure Mode

1= Fracture through fabric oblique to bedding 4= Fracture through rock mass:

2= Fracture along bedding (J) Joint plane, (M) Microfracture, (F) Follation, (V) Vein

3= Fracture through rock mass 5= Partial fracture or chip (invalid result)

Point Load

Strength

Index

Is(50) (Mpa)

Load at

Failure

(kN)

Test

Orientation

Failure

Mode

Test Method:

Sampling Method:

Lithology

Sample History:

Report Number:

Point Load

Strength

Is (Mpa)

0.552

0.54

Sample SourceSample

No.

Issue Number: 1

Mount Kuring-gai

Laboratory 1318

Date of Issue:

Size of Specimen

(mm)

0.38

0.50

1.06

0.74

Diametral 0.49 0.75

51.77

Diametral

Axial 0.98

0.42

0.67

25.62

24.07

29.44

51.71

27.51

51.48

51.75

51.87

G35781

G35781

G35782

ShaleG35780

G35780 Shale

BH1 - 6.3

BH1 - 6.3

0.39

BH1 - 9.0

BH1 - 7.7

BH1 - 7.7 Shale 28.92

Axial

Axial 2

2

Shale

Shale

0.60

0.36

2

2 0.50

Document No: RP315 Version No: 3 16/01/14 Page 1 of 1

Page 32: Geotechnical Investigation Report - Strathfield Council · PDF fileGeotechnical Investigation Report ... recommended that further drilling during excavation be ... into the excavation

Job No: G17

Core Box Photographs

Lion Civil Pty Ltd

Proposed Development

29-35 Burlington Road, Homebush

February 2014

BH1: 5.50m to 9.10m

Page 33: Geotechnical Investigation Report - Strathfield Council · PDF fileGeotechnical Investigation Report ... recommended that further drilling during excavation be ... into the excavation

GSPublisherVersion 0.0.100.96

A1150DRAWING NUMBER

DA AISSUE

1:200

DRAWING NAME

STREETSCAPE ANALYSIS

HOMEBUSH PROJECT DEVELOPMENTS

27/11/2015

PRO

JECT

NU

MBE

R

08.1

4

DRAWN BY: CHECKED 1: CHECKED 2: APPROVED:

SCALE: DATE: CAD FILE NUMBER:

CLIENT:

PROJECT:ARCHITECT:

PLANNING:BCA:HYDRAULIC:ACOUSTIC:TRAFFIC:ACCESS:

29-35 BURLINGTON RD, HOMEBUSH

QUANTITY SURVEY: WASTE MANAGEMENT:HERITAGE:LANDSCAPING :GEOTECHNICAL:BASIX:

JU GAMO

0 1 2 5 10M

N© COPYRIGHT

DO NOT SCALE DWGS. USE DIMENSIONSONLY. REFER ANY DISCREPANCIES TOARCHITECT PRIOR TO CONSTRUCTION.

THESE DRAWINGS ARE SUBJECT TOCOPYRIGHT.

FOR DA PURPOSES ONLYNOT FOR CONSTRUCTION

Dra

win

g O

rigin

al S

ize

A1

Issu

eD

ate

Des

crip

tion

D A T. +612 9744 7035 | E . office@ ghazia.c o mA C N : 67 167 131 838

DA

27/1

1/20

15A

SCALE 1:200

UNIT 2 , 14 RAILWAY PARADE ,B U R W O O D N S W 2134

TRAFFIXA:SUITE 3.08 46a Macleay Street Potts PointNSW 2011 | PO Box Potts Point NSW 1035t: +61 2 8324 8700

WILLANA ASSOCIATESRandwick NSW 2037 | PO BOX NSW 170t: +61 2 9399 6500

VIPAC ENGINEERS AND SCIENTISTS2 Sirius Road, Lane Cove, NSW 2066t: +61 2 9422 4230

SGC CONSULTANTS PTY LIMITEDa: suite 113, Bldg A, Level 1, 20 LexingtonDrive, Bella Vista, NSW 2153 |t: +612 88834239 f: +612 96726977 w:www.sgce.com.au

Elephants Foot Recycling SolutionsSuite 29, Level 8 | 320 Adelaide Street |Brisbane QLD 4000

m: 04 3799 5916 f: 61+ 02 9707 2588 w:www.elephantsfoot.com.au

MMDCSuite 5/101 George St Parramatta NSW2150t: +61 2 9633 9233

CONZEPT LANDSCAPE ARCHITECTSSuite 101, 506 Miller Street, CammerayNSW 2062t: +61 2 9922 5312w: www.conzept.net.au

EXISTING GROUND LEVEL

ROCHESTERSTREET

37-39 BURLINGTON RD 29-35 BURLINGTON RD41 BURLINGTON RD 25-27 BURLINGTON RD 39 ROCHESTER ST

11m HEIGHT LIMIT

16m HEIGHT LIMIT

BO

UN

DA

RY

BO

UN

DA

RY

EAST ELEVATION @ 1:200

APPROVED DA 195/2

011

(SUBJECT TO S96)

PROPOSED DADA 195/2011

DA

Page 34: Geotechnical Investigation Report - Strathfield Council · PDF fileGeotechnical Investigation Report ... recommended that further drilling during excavation be ... into the excavation

GSPublisherVersion 0.0.100.96

A1250DRAWING NUMBER

DA AISSUE

1:200

DRAWING NAME

BASEMENT 4

HOMEBUSH PROJECT DEVELOPMENTS

27/11/2015

PRO

JECT

NU

MBE

R

08.1

4

DRAWN BY: CHECKED 1: CHECKED 2: APPROVED:

SCALE: DATE: CAD FILE NUMBER:

CLIENT:

PROJECT:ARCHITECT:

PLANNING:BCA:HYDRAULIC:ACOUSTIC:TRAFFIC:ACCESS:

29-35 BURLINGTON RD, HOMEBUSH

QUANTITY SURVEY: WASTE MANAGEMENT:HERITAGE:LANDSCAPING :GEOTECHNICAL:BASIX:

JU GAMO

0 1 2 5 10M

N© COPYRIGHT

DO NOT SCALE DWGS. USE DIMENSIONSONLY. REFER ANY DISCREPANCIES TOARCHITECT PRIOR TO CONSTRUCTION.

THESE DRAWINGS ARE SUBJECT TOCOPYRIGHT.

FOR DA PURPOSES ONLYNOT FOR CONSTRUCTION

Dra

win

g O

rigin

al S

ize

A1

Issu

eD

ate

Des

crip

tion

D A T. +612 9744 7035 | E . office@ ghazia.c o mA C N : 67 167 131 838

DA

27/1

1/20

15A

SCALE 1:200

UNIT 2 , 14 RAILWAY PARADE ,B U R W O O D N S W 2134

TRAFFIXA:SUITE 3.08 46a Macleay Street Potts PointNSW 2011 | PO Box Potts Point NSW 1035t: +61 2 8324 8700

WILLANA ASSOCIATESRandwick NSW 2037 | PO BOX NSW 170t: +61 2 9399 6500

VIPAC ENGINEERS AND SCIENTISTS2 Sirius Road, Lane Cove, NSW 2066t: +61 2 9422 4230

SGC CONSULTANTS PTY LIMITEDa: suite 113, Bldg A, Level 1, 20 LexingtonDrive, Bella Vista, NSW 2153 |t: +612 88834239 f: +612 96726977 w:www.sgce.com.au

Elephants Foot Recycling SolutionsSuite 29, Level 8 | 320 Adelaide Street |Brisbane QLD 4000

m: 04 3799 5916 f: 61+ 02 9707 2588 w:www.elephantsfoot.com.au

MMDCSuite 5/101 George St Parramatta NSW2150t: +61 2 9633 9233

CONZEPT LANDSCAPE ARCHITECTSSuite 101, 506 Miller Street, CammerayNSW 2062t: +61 2 9922 5312w: www.conzept.net.au

920

920

920

920

216 217 218 219 220 221

222223

224225

226

227

175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198

228 229 230

16

x 18

8 =

3,00

0

1 2 3 4 5 6 7

8

9101112131415

16 x 188 = 3,000

1234567

8

9101112131415

199200201202203204205206207208209210211212213214215 16 x 188 = 3,000

1 2 3 4 5 6 7

8

9101112131415

174

16 x 188 = 3,000

1 2 3 4 5 6 7

8

9101112131415

231

232

233

234

235

236

237

33 33 33 33 33 33 33 33

A

A B

B

E

E

F

F

11

22

5 5

D

DA

A B

B

E

E

F

F

11

22

5 5

D

DA

A B

B

E

E

F

F

11

22

5 5

D

DA

A B

B

E

E

F

F

11

22

5 5

D

DA

A B

B

E

E

F

F

11

22

5 5

D

DA

A B

B

E

E

F

F

11

22

5 5

D

DA

A B

B

E

E

F

F

11

22

5 5

D

D G

G

H

H

I

I

A

A B

B

E

E

F

F

11

22

5 5

D

D G

G

H

H

I

I

G

G

H

H

I

I

G

G

H

H

I

I

6,165 5,199 15,460 6,126 5,874 9,835 6,300 14,790 21,250 30,902

500 14,600 4,250 29,274 200500

200 3,950 200 2,200 200 8,876 2,800 14,000 40,170

3,00

018

,136

9,39

72,

926

9,21

13,

050

724

11,5

652,

600

4,87

16,

600

2,60

02,

259

2,70

09,

000

2,80

1

2,99

918

,136

9,39

72,

926

9,21

13,

050

724

23,6

986,

557

2,20

020

09,

540

2,80

0

6,165 5,199 15,460 6,126 5,874 9,835 6,300 14,790 21,250 30,920

500 7,620 5,204 2,800 10,688 48,887 6,050 40,170

-3.30

-3.30

-3.30

-3.30

STORMWATER CULVERT

STORM

WATER

EASEMEN

T

BURLIN

GTO

N RO

AD

FOR SHORING DETAILSREFER TO STRUCTURAL

ENGINEERS DWG'S

FOR SHORING DETAILSREFER TO STRUCTURAL

ENGINEERS DWG'S

MIRROR

FIREEXIT

FIREEXIT

FOR SHORING DETAILSREFER TO STRUCTURAL

ENGINEERS DWG'S

STORE

FIREEXIT

1500 LIFT

1500

1500

LIFT

LIFT

LIFT

FIREEXIT

GIVEW

AY

CONVEXMIRROR

CONVEXMIRROR

CONVEXMIRROR

CONVEXMIRROR

STORE

STORE

STORE

STO

RE

CAR WASH BAY /SERVICE BAY

STORE

BOUNDARY

BOU

ND

ARY

BOUNDARY

BOU

ND

ARY

BOU

ND

ARY

BOU

ND

ARY

BASEMENT 4

RAMP2m @ 1:8

16.25m @ 1:6,5

RAMP16.25m @ 1:6,5

RAMP2m @ 1:8

AA1

AA1

BB

1B

B1

AA

AA

BB

BB

LIFT

C

C

4 4

C

C

4 4

C

C

4 4

C

C

4 4

C

C

4 4

C

C

4 4

C

C

4 4

C

C

4 4

BASEMENT 04 @ 1:200

Page 35: Geotechnical Investigation Report - Strathfield Council · PDF fileGeotechnical Investigation Report ... recommended that further drilling during excavation be ... into the excavation

GSPublisherVersion 0.0.100.96

A 1211DRAWING NUMBER

DA AISSUE

1:200

DRAWING NAME

LEVEL 08 - SUBJECT TO DAAPPROVAL

HOMEBUSH PROJECT DEVELOPMENTS

27/11/2015

PRO

JECT

NU

MBE

R

08.1

4

DRAWN BY: CHECKED 1: CHECKED 2: APPROVED:

SCALE: DATE: CAD FILE NUMBER:

CLIENT:

PROJECT:ARCHITECT:

PLANNING:BCA:HYDRAULIC:ACOUSTIC:TRAFFIC:ACCESS:

29-35 BURLINGTON RD, HOMEBUSH

QUANTITY SURVEY: WASTE MANAGEMENT:HERITAGE:LANDSCAPING :GEOTECHNICAL:BASIX:

JU GAMO

0 1 2 5 10M

N© COPYRIGHT

DO NOT SCALE DWGS. USE DIMENSIONSONLY. REFER ANY DISCREPANCIES TOARCHITECT PRIOR TO CONSTRUCTION.

THESE DRAWINGS ARE SUBJECT TOCOPYRIGHT.

FOR DA PURPOSES ONLYNOT FOR CONSTRUCTION

Dra

win

g O

rigin

al S

ize

A1

Issu

eD

ate

Des

crip

tion

D A T. +612 9744 7035 | E . office@ ghazia.c o mA C N : 67 167 131 838

DA

27/1

1/20

15A

SCALE 1:200

UNIT 2 , 14 RAILWAY PARADE ,B U R W O O D N S W 2134

TRAFFIXA:SUITE 3.08 46a Macleay Street Potts PointNSW 2011 | PO Box Potts Point NSW 1035t: +61 2 8324 8700

WILLANA ASSOCIATESRandwick NSW 2037 | PO BOX NSW 170t: +61 2 9399 6500

VIPAC ENGINEERS AND SCIENTISTS2 Sirius Road, Lane Cove, NSW 2066t: +61 2 9422 4230

SGC CONSULTANTS PTY LIMITEDa: suite 113, Bldg A, Level 1, 20 LexingtonDrive, Bella Vista, NSW 2153 |t: +612 88834239 f: +612 96726977 w:www.sgce.com.au

Elephants Foot Recycling SolutionsSuite 29, Level 8 | 320 Adelaide Street |Brisbane QLD 4000

m: 04 3799 5916 f: 61+ 02 9707 2588 w:www.elephantsfoot.com.au

MMDCSuite 5/101 George St Parramatta NSW2150t: +61 2 9633 9233

CONZEPT LANDSCAPE ARCHITECTSSuite 101, 506 Miller Street, CammerayNSW 2062t: +61 2 9922 5312w: www.conzept.net.au

2100

-268

521

00-2

350

2400-31182400-31182400-21712400-2171

2100-1800

2100

-359

9

850

2800

-534

4

2800-1800

2100-35992100-3599

2100-5344

2100

-300

021

00-3

000

920

850

2100-2171

2100-3599

850

920

850

850

9202100-4213820

850850

850

850

2100-3599

820

820

820

820

820

850 850

820

820 820 820820 820

820

820

820

820

820

820

850

850

850

850

820

820

820

820

820

820

820

820

33 33 33 33 33 33 33 33

A

A B

B

E

E

F

F

11

22

5 5

D

DA

A B

B

E

E

F

F

11

22

5 5

D

DA

A B

B

E

E

F

F

11

22

5 5

D

DA

A B

B

E

E

F

F

11

22

5 5

D

D

16 x 188 = 3,000

1234567

8

9 10 11 12 13 14 15

A

A B

B

E

E

F

F

11

22

5 5

D

D

16

x 18

8 =

3,00

0

1234567

8

9101112131415

16 x 188 = 3,000

1234567

8

9 10 11 12 13 14 15

A

A B

B

E

E

F

F

11

22

5 5

D

DA

A B

B

E

E

F

F

11

22

5 5

D

D G

G

H

H

I

I

A

A B

B

E

E

F

F

11

22

5 5

D

D G

G

H

H

I

I

G

G

H

H

I

I

G

G

H

H

I

I

AA1

AA1

BB

1B

B1

AA

AA

BB

BB

6,165 5,199 15,460 6,126 5,874 9,835 6,300 14,790 21,250 30,902

3,00

018

,136

9,39

72,

926

9,21

13,

050

32,324 200 13,700 200 2,235 200 7,015 200 4,738 200 3,980 200 13,831 200 8,750 200 1,950 31,796

2,99

920

01,

800

200

10,6

9020

05,

336

200

8,70

720

08,

309

2,93

43,

945

3,00

020

012

,690

200

5,04

62,

100

200

4,80

020

05,

023

200

8,81

120

03,

050

2,99

918

,136

9,39

72,

926

9,21

13,

050

6,165 5,199 15,460 6,126 5,874 9,835 6,300 14,790 21,250 30,920

9,164 2,200 15,460 5,500 200 6,300 200 6,300 200 7,236 200 2,000 250664

200 5,726 200 7,550 200 8,114 200 9,910 200 2,000 31,746

34.30

34.30

34.30

16.33 m2

11.00 m2

13.08 m2 13.81 m2

15.66 m2

12.80 m2

14.78 m2

8.81 m2 8.27 m2

37-39 HOMEBUSH RD 33 THE CRESCENT

31 THE CRESCENT

25 HOMEBUSH RD

FHR

1500

LIFT

FHR

FIREEXIT

LIFT

FHR BINS

1500LIFT

CHUTE04

BALCONY

L'DRY

12.00 m2

12.00 m2

12.00 m2

BALCONY

BALCONY

BALCONY

BALCONY

BALCONY

BALCONY

BALCONY BALCONY

BALCONY

SKYLIGHT

SKYLIGHT SKYLIGHT

BALCONY BALCONY

KITCHEN

LIVING/DINING

STORE

ROBE

ROBE

BED 1ENS.

DINING

KITCHEN

BED 2

BATH

L'DRY

LIVING

STORE

STO

RE

STOREROBE

BED

LIVING/DINING KITCHEN

BATHROOM

L'DRY

STO

RAG

E

STORE

ROBEROBE

L'DRY

BED 2

KITCHEN

BED 1

LIVING/DINING

BATH

ENS.

STORAGE

STORE

STORAGE

STO

RE

ROBE ROBE

LIVING

KITCHEN BED 2 BED 1

L'DRY BATH ENS.

STO

RE

DINING

STO

REST

ORE

BED 1

KITCHEN

LIVING/DINING

BATH

STO

RE

ROBE

ROBE

STO

RAG

E

STUDY

L'DRY

STORAGE

ROBE

LIVING

BEDL'DRY

BATH

KITCHEN

DINING

STORE

STORE

BOUNDARY

BOU

ND

ARY

BOUNDARY

BOU

ND

ARY

BOU

ND

ARY

BOU

ND

ARY

ROBE

BED 2 BED 1

KITCHEN

LIVING/DINING

L'DRY

ENSUITE

ROBE

STORE

ROBE

BED 2

KITCHEN

LIVING/DINING

BATH

ROBE

BED 1

ENS.

L'D

RY

STORE

STO

RE

STORE

OUTLINE OF THEBUILDING BELOW

OU

TLIN

E O

F TH

EBU

ILD

ING

BEL

OW

OU

TLIN

E O

F TH

EBU

ILD

ING

BEL

OW

BATH

ROBE

WIR

WIR

L'D

RYST

ORESKYLIGHT

SKYLIGHT

8073 BED

91.68 m2

8011 BED

61.35 m2

8022 BED

85.60 m2

8032 BED

83.61 m2

8042 BED

77.80 m2

8052 BED

89.71 m2

8092 BED

78.42 m2

8101 BED

65.85 m2

8061 BED

58.09 m2

C

C

4 4

C

C

4 4

C

C

4 4

C

C

4 4

C

C

4 4

C

C

4 4

C

C

4 4

C

C

4 4

CHUTE02

CHUTE03

BATHROOM

LEVEL 08 @ 1:200

Page 36: Geotechnical Investigation Report - Strathfield Council · PDF fileGeotechnical Investigation Report ... recommended that further drilling during excavation be ... into the excavation

GSPublisherVersion 0.0.100.96

A 1212DRAWING NUMBER

DA AISSUE

1:200

DRAWING NAME

ROOF PLAN - SUBJECT TO DAAPPROVAL

HOMEBUSH PROJECT DEVELOPMENTS

27/11/2015

PRO

JECT

NU

MBE

R

08.1

4

DRAWN BY: CHECKED 1: CHECKED 2: APPROVED:

SCALE: DATE: CAD FILE NUMBER:

CLIENT:

PROJECT:ARCHITECT:

PLANNING:BCA:HYDRAULIC:ACOUSTIC:TRAFFIC:ACCESS:

29-35 BURLINGTON RD, HOMEBUSH

QUANTITY SURVEY: WASTE MANAGEMENT:HERITAGE:LANDSCAPING :GEOTECHNICAL:BASIX:

JU GAMO

0 1 2 5 10M

N© COPYRIGHT

DO NOT SCALE DWGS. USE DIMENSIONSONLY. REFER ANY DISCREPANCIES TOARCHITECT PRIOR TO CONSTRUCTION.

THESE DRAWINGS ARE SUBJECT TOCOPYRIGHT.

FOR DA PURPOSES ONLYNOT FOR CONSTRUCTION

Dra

win

g O

rigin

al S

ize

A1

Issu

eD

ate

Des

crip

tion

D A T. +612 9744 7035 | E . office@ ghazia.c o mA C N : 67 167 131 838

DA

27/1

1/20

15A

SCALE 1:200

UNIT 2 , 14 RAILWAY PARADE ,B U R W O O D N S W 2134

TRAFFIXA:SUITE 3.08 46a Macleay Street Potts PointNSW 2011 | PO Box Potts Point NSW 1035t: +61 2 8324 8700

WILLANA ASSOCIATESRandwick NSW 2037 | PO BOX NSW 170t: +61 2 9399 6500

VIPAC ENGINEERS AND SCIENTISTS2 Sirius Road, Lane Cove, NSW 2066t: +61 2 9422 4230

SGC CONSULTANTS PTY LIMITEDa: suite 113, Bldg A, Level 1, 20 LexingtonDrive, Bella Vista, NSW 2153 |t: +612 88834239 f: +612 96726977 w:www.sgce.com.au

Elephants Foot Recycling SolutionsSuite 29, Level 8 | 320 Adelaide Street |Brisbane QLD 4000

m: 04 3799 5916 f: 61+ 02 9707 2588 w:www.elephantsfoot.com.au

MMDCSuite 5/101 George St Parramatta NSW2150t: +61 2 9633 9233

CONZEPT LANDSCAPE ARCHITECTSSuite 101, 506 Miller Street, CammerayNSW 2062t: +61 2 9922 5312w: www.conzept.net.au

33 33 33 33 33 33 33 33

A

A B

B

E

E

F

F

11

22

5 5

D

DA

A B

B

E

E

F

F

11

22

5 5

D

DA

A B

B

E

E

F

F

11

22

5 5

D

DA

A B

B

E

E

F

F

11

22

5 5

D

DA

A B

B

E

E

F

F

11

22

5 5

D

DA

A B

B

E

E

F

F

11

22

5 5

D

DA

A B

B

E

E

F

F

11

22

5 5

D

D G

G

H

H

I

I

A

A B

B

E

E

F

F

11

22

5 5

D

D G

G

H

H

I

I

G

G

H

H

I

I

G

G

H

H

I

I

AA1

AA1

BB

1B

B1

AA

AA

BB

BB

6,165 5,199 15,460 6,126 5,874 9,835 6,300 14,790 21,250 30,920

3,00

05,

925

7,16

55,

336

1,80

910

,223

9,21

13,

050

3,00

018

,136

9,39

72,

926

9,21

13,

050

2,99

927

,533

15,1

88

6,165 5,199 15,460 6,126 5,874 9,835 6,300 14,790 21,250 30,902

9,164 39,495 3,082 18,295 18,136 33,746

2,99

918

,136

9,39

72,

926

9,21

13,

050

7,620 2,744 1,000 15,460 12,000 6,500 9,936 5,700 8,790 6,942 8,025 3,457 33,746

37.30

38.10

38.10

38.10

37-39 HOMEBUSH RD 33 THE CRESCENT

31 THE CRESCENT

25 HOMEBUSH RD

SKYLIGHT

SKYLIGHT SKYLIGHT

BOUNDARY

BOU

ND

ARY

BOUNDARY

BOU

ND

ARY

BOU

ND

ARY

BOU

ND

ARY

OUTLINE OF THEBUILDING BELOW

OU

TLIN

E O

F TH

EBU

ILD

ING

BEL

OW

OU

TLIN

E O

F TH

EBU

ILD

ING

BEL

OW

SKYLIGHT

SKYLIGHT

C

C

4 4

C

C

4 4

C

C

4 4

C

C

4 4

C

C

4 4

C

C

4 4

C

C

4 4

C

C

4 4

ROOF PLAN @ 1:200

Page 37: Geotechnical Investigation Report - Strathfield Council · PDF fileGeotechnical Investigation Report ... recommended that further drilling during excavation be ... into the excavation

GSPublisherVersion 0.0.100.96

A1700DRAWING NUMBER

DA AISSUE

1:200

DRAWING NAME

SECTIONS

HOMEBUSH PROJECT DEVELOPMENTS

27/11/2015

PRO

JECT

NU

MBE

R

08.1

4

DRAWN BY: CHECKED 1: CHECKED 2: APPROVED:

SCALE: DATE: CAD FILE NUMBER:

CLIENT:

PROJECT:ARCHITECT:

PLANNING:BCA:HYDRAULIC:ACOUSTIC:TRAFFIC:ACCESS:

29-35 BURLINGTON RD, HOMEBUSH

QUANTITY SURVEY: WASTE MANAGEMENT:HERITAGE:LANDSCAPING :GEOTECHNICAL:BASIX:

JU GAMO

0 1 2 5 10M

N© COPYRIGHT

DO NOT SCALE DWGS. USE DIMENSIONSONLY. REFER ANY DISCREPANCIES TOARCHITECT PRIOR TO CONSTRUCTION.

THESE DRAWINGS ARE SUBJECT TOCOPYRIGHT.

FOR DA PURPOSES ONLYNOT FOR CONSTRUCTION

Dra

win

g O

rigin

al S

ize

A1

Issu

eD

ate

Des

crip

tion

D A T. +612 9744 7035 | E . office@ ghazia.c o mA C N : 67 167 131 838

DA

27/1

1/20

15A

SCALE 1:200

UNIT 2 , 14 RAILWAY PARADE ,B U R W O O D N S W 2134

TRAFFIXA:SUITE 3.08 46a Macleay Street Potts PointNSW 2011 | PO Box Potts Point NSW 1035t: +61 2 8324 8700

WILLANA ASSOCIATESRandwick NSW 2037 | PO BOX NSW 170t: +61 2 9399 6500

VIPAC ENGINEERS AND SCIENTISTS2 Sirius Road, Lane Cove, NSW 2066t: +61 2 9422 4230

SGC CONSULTANTS PTY LIMITEDa: suite 113, Bldg A, Level 1, 20 LexingtonDrive, Bella Vista, NSW 2153 |t: +612 88834239 f: +612 96726977 w:www.sgce.com.au

Elephants Foot Recycling SolutionsSuite 29, Level 8 | 320 Adelaide Street |Brisbane QLD 4000

m: 04 3799 5916 f: 61+ 02 9707 2588 w:www.elephantsfoot.com.au

MMDCSuite 5/101 George St Parramatta NSW2150t: +61 2 9633 9233

CONZEPT LANDSCAPE ARCHITECTSSuite 101, 506 Miller Street, CammerayNSW 2062t: +61 2 9922 5312w: www.conzept.net.au

A

A

B

B

C

C

E

E

F

F

G

G

H

H

I

I

D

D

F

F

E

E

D

D

C

C

B

B

A

A

I

I

I

I

I

I

H

H

H

H

H

H

G

G

G

G

G

G

F

F

F

F

F

F

F

F

F

F

F

F

E

E

E

E

E

E

E

E

E

E

E

E

D

D

D

D

D

D

D

D

D

D

D

D

C

C

C

C

C

C

C

C

C

C

C

C

B

B

B

B

B

B

B

B

B

B

B

B

A

A

A

A

A

A

A

A

A

A

A

A

21,250 14,790 6,300 9,835 5,874 6,126 15,460 5,199

3,00

03,

000

3,00

04,

600

3,00

03,

000

3,00

03,

000

3,00

03,

000

3,00

03,

000

3,00

0

3,00

03,

000

3,00

03,

000

1,60

0

-3.30

-0.30

+2.70

+5.70

+8.70

+10.30

+13.30

+16.30

+19.30

+22.30

+25.30

+28.30

+31.30

+34.30

+37.30+38.10+38.10

2,200

+10.30

+25.30

+31.30+32.10

+26.40

+13.30

+37.30

3,00

03,

000

3,00

03,

000

3,00

03,

000

3,00

03,

000

3,00

03,

000

+34.10

+32.30+31.30

NGL +9.20NGL +8.71

NGL +8.44

NGL +8.51

EXISTING GROUND LEVEL

BO

UN

DA

RY

BO

UN

DA

RY

3,00

03,

000

3,00

02,

800

200

1,60

0

G RL. 10.300

RL. 13.300

RL. 16.300

1

2

3RL. 19.300

RL. 22.3004

GROUND LEVEL

LEVEL 02

LEVEL 03

LEVEL 01

LEVEL 04

LEVEL 05RL. 25.300

5

LEVEL 06RL. 28.300

6

BASEMENT LEVEL 01 RL. 5.700B1

BASEMENT LEVEL 02 RL. 2.700B2

BASEMENT LEVEL 03 RL. -0.300B3

LEVEL 07RL. 31.300

7

ROOF LEVELRRL. 37.300

LEVEL 088RL. 34.300

BASEMENT LEVEL 04 RL. -3.300B4

5

5

4

4

3

3

2

2

1

1

5

5

4

4

3

3

2

2

1

1

5

5

5

5

5

5

5

5

5

5

5

5

4

4

4

4

4

4

4

4

4

4

4

4

3

3

3

3

3

3

3

3

3

3

3

3

2

2

2

2

2

2

2

2

2

2

2

2

1

1

1

1

1

1

1

1

1

1

1

1

18,136 9,397 2,926 9,211

3,00

03,

000

3,00

04,

600

3,00

03,

000

3,00

03,

000

3,00

03,

000

3,00

03,

000

3,00

0

+31.30

+28.30

+25.30

+22.30

+19.31

+16.30

+13.30

+10.30

+5.70

+2.70

-3.30

-0.30

3,00

03,

000

3,00

03,

000

1,40

03,

200

3,00

03,

000

3,00

03,

000

3,00

03,

000

3,00

03,

000

2,400

+37.30+38.10

+10.30 +10.20

+34.30

+37.30

+25.50

+26.40

+8.70

+26.30

NGL +8.36 NGL +8.52 NGL +8.71

EXISTING GROUND LEVEL

BO

UN

DA

RY

BO

UN

DA

RY

G RL. 10.300

RL. 13.300

RL. 16.300

1

2

3RL. 19.300

RL. 22.3004

GROUND LEVEL

LEVEL 02

LEVEL 03

LEVEL 01

LEVEL 04

LEVEL 05RL. 25.300

5

LEVEL 06RL. 28.300

6

BASEMENT LEVEL 01 RL. 5.700B1

BASEMENT LEVEL 02 RL. 2.700B2

BASEMENT LEVEL 03 RL. -0.300B3

LEVEL 077RL. 31.300

ROOF LEVELRRL. 37.300

LEVEL 088RL. 34.300

BASEMENT LEVEL 04 RL. -3.300B4

SEC TION AA @ 1:200

SEC TION BB @ 1:200 SUBJECT TO DA APPROVAL

APPROVED DA 2011/1

95

APPROVED DA 2011/1

95

PROPOSED DADA 2011/195

PROPOSED DADA 2011/195