8/11/2019 Generator Set-1.pdf http://slidepdf.com/reader/full/generator-set-1pdf 1/15 BILL NR 1: PRELIMINARIES AND GENERAL ITEMS
15

Generator Set-1.pdf

Jun 02, 2018

Download

Documents

KenazMZ
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Generator Set-1.pdf

8/11/2019 Generator Set-1.pdf

http://slidepdf.com/reader/full/generator-set-1pdf 1/15

BILL NR 1:

PRELIMINARIES AND GENERAL

ITEMS

Page 2: Generator Set-1.pdf

8/11/2019 Generator Set-1.pdf

http://slidepdf.com/reader/full/generator-set-1pdf 2/15

ITEM

D E S C R I P T I O N

Q T Y U NI T

R A T E

 

• M O U N T

A

B

C

D

E

F

B I L L N O . 1 - P R E L IM I N A R I E S A N D G E N E R A L I T E M S

I t e m

I t e m

I t e m

I t e m

I t e m

I t e m

 

i

Barr i cades and No t ices

Si te Invest igat ion

,Spec ia l too ls and equ ipmen t

i Si te Sup erv is ion

 

Sta tu to ry t es t s , exam ina t ions and cer t i fi ca t ion

1 2 m o n th s m a i n te n a n ce

P R E L I M IN A R I E S A N D G E N E R A L IT E M S  

T O T A L C A R R I E D

T O

G E N E R A L S U M M A R Y

1 / 1

 

Page 3: Generator Set-1.pdf

8/11/2019 Generator Set-1.pdf

http://slidepdf.com/reader/full/generator-set-1pdf 3/15

BILL NR 2

DESCRIPTION AND WORKMANSHIP

Page 4: Generator Set-1.pdf

8/11/2019 Generator Set-1.pdf

http://slidepdf.com/reader/full/generator-set-1pdf 4/15

DESCRIPTION OF M TERI LS ND WORKM NSHIP

SPECIFICATION AND BILLS OF QUANTITIES

For the proposed

PROPOSED REPLACEMENT OF 1NO STANDBY DIESEL ELECTRIC GENERATOR FOR

NATIONAL ASSEMBLY

At

NATIONAL ASSEMBLY

BILL NO 2

00 

tandard specification for Materials

and

Workmanship

1.01

 

he Specification for materials and workmanship is the Standard General

Specification of Materials and Workmanship for Building Works interim metric 1970

edition current at time of tendering with any amendments, addenda or supplements thereto,

together with any Particular Specifications, if any, all as detailed in the tender documents and

on the drawings. These shall be read as mutually explanatory one with the other. Where a

particular Specification is incorporated, it will take precedence and shall prevail over the

Standard General Specification should any conflict discrepancy arise between these

documents.

GENERALLY

00 

aterials

2.01

 

ll materials shall be of the specified quality if specified, shall be of the

best of the quality, no better quality being obtainable, trade usage's to the contrary

notwithstanding. Where no quality is specified and a Specification issued by the

British or Zambian Standards Institutions is current and is appropriate, all goods and

materials shall where practicable be in accordance with the Specification. All materials

shall be from approved manufacturers.

In the event of materials or articles specified being temporarily unobtained, the Contractor

shall submit alternatives for the Director of Buildings' consideration in order to prevent

delay.

Generally

Materials generally are referenced to the British or Zambian Standards. Where two or more

Standards of the same reference number are issued the latest issued shall be the one applicable.

All materials shall be properly protected from snow, frost and inclement weather and any

materials damaged shall be removed from the site immediately and replaced with sound

materials.

2/1

Page 5: Generator Set-1.pdf

8/11/2019 Generator Set-1.pdf

http://slidepdf.com/reader/full/generator-set-1pdf 5/15

GPOPILMENIMINs,mwitorallor,...•••••

BILL NR :

GNERATOR SET

Page 6: Generator Set-1.pdf

8/11/2019 Generator Set-1.pdf

http://slidepdf.com/reader/full/generator-set-1pdf 6/15

S T A N D B Y D I E S E L E L E C T R IC G E N E R A T O R

DESCRIPTION

I EMOLITIONS

arefully disconnect demount and remove the

following, including all necessary accessories and

and over to client as described

ables to and from the generator set 130m)

ables from the generator at the change over panel 10m)

1No. Generator Set

1No. Change over Pannel

DEMOLITIONS - TOTAL

CARRIED TO SUMMARY

ITEM

QTY

UNIT

Item

Item

Item

Item 

Page 7: Generator Set-1.pdf

8/11/2019 Generator Set-1.pdf

http://slidepdf.com/reader/full/generator-set-1pdf 7/15

E

130

a b l e s

PVC amoured and PVC sheated cables complete with multi core

copper conductors

120mm

 

x 4 core pvc/swa/pvc cable and provide lugs on both

nd s

To C o l le c t io n

ST NDBY DIESEL ELECTRIC GENER TOR

I T E M

A

B

D E S C R I P T I O N

IN S T A L L A T I O N O F 5 00 KV A S T A N D B Y D IE S E L E L E C T R I C

QTY UNIT

nr

E N E R A T O R S E T

jSupply and install electric generator set with weather protection

d sound attenuated modular type canopies with all necessary

cessories and with the following configurations:

apacity KVA ) - 500

requency HZ) - 50

oltage V) - 380/230

ontrol Panel - com plete with mains failure

esidual Silencer

A uto Load transfer

/C meter

mmergency stop button

attery condition meter

oltmeter with selector switch

arth faulty indicator and re-set button

ours and m inuts indicator

it Pressure Gauge

oolant tempreture gauge

our pole circuit breaker and all other necessary accessories

E X C A V A T I O N S

xcavating trenches to receive am oured cables, grading

ttom, earthwork support, backfiling with excavated material

eposing of surplus excavated materia by removing from site

xcavating starting from reduced level not exceeding I .50m deep

verage width 600mm

130

m

C

xtra Over from breaking up rock m et within excavations

 

in3

D

How for making good all disturbed arising from excavations

d trunking

Item

Page 8: Generator Set-1.pdf

8/11/2019 Generator Set-1.pdf

http://slidepdf.com/reader/full/generator-set-1pdf 8/15

STANDBY DIESEL ELECTRIC GENERATOR

ITEM

DESCRIPTION

INSTALLATION OF 500KVA STANDBY DIESEL ELECTRIC

QTY UNIT

ENERATOR SET CONT D

A

B

16mm2 x 4 core pvc/swa/pvc cable

eeder pillar base in grade 15 plain concrete including all

ecessary excavation ,compactions, formwork struck smooth

320

m

o engineer's detail

 

m3

Feeder Pillar

C

 

upply and fix install 1 No. single door feeder pillar and all

 

ccessories with 1 No. standard double door feeder pillar

ith the following contents:-

00 Amp MCCB breaker

15 No. 60 Amp T.P MCB

5 No. 600 Amp bus bars

No. lightening arrestor

1 No. Earth Inspection box

1 No. 2.4m earth rods

esting and Commissioning

Allow for testing and commisioning in accordance with subject

o installation test

To Collection

COLLECTION

Page No. 3/2

Page No. 3/3

GENERATOR SET-TOTAL

CARRIED TO SUMMARY

Item

Item

Page 9: Generator Set-1.pdf

8/11/2019 Generator Set-1.pdf

http://slidepdf.com/reader/full/generator-set-1pdf 9/15

STAN DB Y DI ESEL ELEC T R IC G EN ER A T OR

DES RIPTION

SUMM RY

DEMOLITIONS

I No. GENERATOR SET

TOTAL CARRIED TO SUMMARY

UNIT

P A G E

3/1

3/3

ITEM

QTY

Page 10: Generator Set-1.pdf

8/11/2019 Generator Set-1.pdf

http://slidepdf.com/reader/full/generator-set-1pdf 10/15

BILL NR 4:

PRIME COST AND PROVISIONAL

SUM

Page 11: Generator Set-1.pdf

8/11/2019 Generator Set-1.pdf

http://slidepdf.com/reader/full/generator-set-1pdf 11/15

D E S C R I P T I O N

P R O V I S IO N A L S U M S A N D P R I M E C O S T

Include the following NE T Provisional Sums

o be expended by the Director of B uildings

  r

omitted if not expended

Contingencies

A

 

r o v i si o n a l S u m f o r C o n t i n g e n c i e s t o b e

-x p e n d e d b y th e D i r e c t o r o f B u i ld i n g s o r

o m i tt e d if n o t e x p e n d e d f o r a n y u n f o r e s s e n

a r i a ti o n s n o t m e a s u r e d i n th e f o r e g o i n g

B i l ls o f Q u a n t it ie s - T h i r t y M i l li o n K w a c h a o n l y

(K30,000,000.00)

P R O V I S IO N A L S U M S A N D P R IM E C O S T

TOTAL C RRIED T O S U M M A R Y

,4/1

RATE I MOUNT

30,000,000 00

I T E M

Q T Y U N I T

 

Page 12: Generator Set-1.pdf

8/11/2019 Generator Set-1.pdf

http://slidepdf.com/reader/full/generator-set-1pdf 12/15

GENERAL SUMMARY

Page 13: Generator Set-1.pdf

8/11/2019 Generator Set-1.pdf

http://slidepdf.com/reader/full/generator-set-1pdf 13/15

I T EM

  E S R IP T I O N

U N I T

Q T Y

B I L L S O F Q U A N T I T IE S

Fo r t h e P r o p o se d

R E P L A C E M E N T O F 1N O . D IE S E L E L E C T R I C

G E N E R A T O R S E T

A T

N A T IO N A L A S S E M B L Y

G E N E R A L S U M M A R Y

M A Y , 2 0 1 2

BILL NR . 1

 

R E L I M I N A R I E S

BILL NR . 2

 

E S C R I P T IO N O F

M A T E R I A L S W O R K M A N S H I P

BILL NR . 3

 

E P L A C E M E N T O F 1 N O . S T A N D B Y

D I E S E L E LE C T R I C G E N E R A T O R S E T S

BI LL NR . 4

 

R IM E C O S T A N D

P R O V I S IO N A L S U M S

C A R R I E D F O R W A R D

  I)

Page 14: Generator Set-1.pdf

8/11/2019 Generator Set-1.pdf

http://slidepdf.com/reader/full/generator-set-1pdf 14/15

I T E M

D E S C R I P T I O N

U N I T

Q T Y

B I L L S O F Q U A N T I T IE S

F o r th e P r o p o s e d

R E P L A C E M E N T O F 1 N O . D I E S E L E L E C T R I C

G E N E R A T O R S E T

A T

N A T IO N A L A S S E M B L Y

G E N E R A L S U M M A R Y

M A Y , 2 0 1 2

BILL NR . 1

 

R E L I M I N A R I E S

BI LL NR . 2

 

E S C R I P T IO N O F

M A T E R I A L S W O R K M A N S H I P

BI LL NR . 3

 

U P P L Y A N D I N S T A L L A T I O N O F

G E N E R A T O R S E T S

BI LL NR . 4

 R IM E C O S T A N D

P R O V I S IO N A L S U M S

C A R R I E D FO R W A R D

  i)

Page 15: Generator Set-1.pdf

8/11/2019 Generator Set-1.pdf

http://slidepdf.com/reader/full/generator-set-1pdf 15/15

Bro ught Fo rw a rd

d d f o r t h e f o l l o w in g i n a c c o r d a n c e w i t h

p r o v i s i o n s o f t h e c o n t r a c t (i f n o t in c l u d e d w i th i n

h e b o d y o f t h e B i ll s )

I I i n s u r a n c e

I I S t a tu t o r y o r d e r s a n d R e g u l a t io n s

a t e r f o r th e W o r ks

n y o t h e r M a t te r s

S h o u ld t h e C o n t ra c t o r d e s ir e t o m a ke a n y g e n e r a l

i n c r e a s e o r d e c r e a s e o n t h e a b o v e t o t a l, it is t o b e

m a d e h e r e a n d t h e a m o u n t w il l be t r e a te d a s a

p e r c e n t a g e o f t h e t o t a l a s a b o v e , a f te r d e d u c t in g

h e n e t a m o u n t o f a l l p r o v i s io n a l a n d p r im e c o s t

s u m s u n c l u d in g p r o f it . T h e r a t e s i n s e r te d b y t h e

o n t r a c t o r a g a i n s t th e i t e m s t h r o u g h o u t th i s t e n d e r

i ll be d e e m e d t o b e a d j u s t e d a c c o r d i n g l y by t h i s

p e r c e n ta g e .

d d 1 6 V A T

OT L C RRIED TO FORM OF TENDER

Signature of Contractor-

N a m e o f F ir m •

 

d r e s s •

 

ate: . . .

UILDINGS DEP RTMENT

P . O . B O X 50 80 0

L U S A K A

 

i t em

i tem

i tem

item