Page 1: Gateway Plaza Wilmington, DE Elizabeth Hostutler Structural Option.

Gateway PlazaWilmington, DE

Elizabeth HostutlerStructural Option

Page 2: Gateway Plaza Wilmington, DE Elizabeth Hostutler Structural Option.

Presentation Outline• Project Overview• Depth Study• Breadth Studies

– Mechanical: duct design

– Construction Management: scheduling and cost estimates.

• Cost Analysis• Conclusions

GATEWAY PLAZAWilmington, DE

Elizabeth Hostutler – Structural Option – Spring 2006

Page 3: Gateway Plaza Wilmington, DE Elizabeth Hostutler Structural Option.

PROJECT INFORMATION

GATEWAY PLAZAWilmington, DE

Elizabeth Hostutler – Structural Option – Spring 2006

Page 4: Gateway Plaza Wilmington, DE Elizabeth Hostutler Structural Option.

Project Information-Key Players• Buccini/Pollin Group• Gilbane• Gensler• Engineers

– Landmark Engineering– Duffield Assoc., Inc.– BALA Consulting Engineers, Inc.– O’Donnell Naccarato & MacIntosh

GATEWAY PLAZAWilmington, DE

Elizabeth Hostutler – Structural Option – Spring 2006

Page 5: Gateway Plaza Wilmington, DE Elizabeth Hostutler Structural Option.

Project Information-Overview• Location: 500 Delaware Ave.• 15 stories + mechanical penthouse

(210’-6”)– 1st level: retail space & lobby.– 14 floors office space for tenant fit-out.

• July 2005-December 2006• $52 million (17% structural system)• 387,000 ft2

• 5-story parking garage in rear• Tinted glass curtain wall façade

GATEWAY PLAZAWilmington, DE

Elizabeth Hostutler – Structural Option – Spring 2006

Page 6: Gateway Plaza Wilmington, DE Elizabeth Hostutler Structural Option.

Project Information: Existing Conditions

• Composite steel framing• Concrete filled steel pile

foundations with pile cap• 6-¼” slab on deck• 30-1/4” floor depth.• Concentrically braced frames.

N

GATEWAY PLAZAWilmington, DE

Elizabeth Hostutler – Structural Option – Spring 2006

Service Core

STAIRS STAIRSREST-

ROOMSMECH.ROOM

ELEVATORLOBBY

Page 7: Gateway Plaza Wilmington, DE Elizabeth Hostutler Structural Option.

Project Information: Existing Conditions

N

GATEWAY PLAZAWilmington, DE

Elizabeth Hostutler – Structural Option – Spring 2006

52’-6”x30’-0” and 36’-0”x30’-0” typical bays.

52’-6” x 30’-0” bay

36’-0” x 30’-0” bay

Page 8: Gateway Plaza Wilmington, DE Elizabeth Hostutler Structural Option.

DEPTH STUDY

GATEWAY PLAZAWilmington, DE

Elizabeth Hostutler – Structural Option – Spring 2006

Page 9: Gateway Plaza Wilmington, DE Elizabeth Hostutler Structural Option.

Depth Study-Post-tensioned Concrete Floor

• Design Objectives:– Preserve long span bays.– Limit floor depth to 24”.

• Feasibility Factors:– Cost– Schedule– Impact on foundations

GATEWAY PLAZAWilmington, DE

Elizabeth Hostutler – Structural Option – Spring 2006

Page 10: Gateway Plaza Wilmington, DE Elizabeth Hostutler Structural Option.

Depth Study-Post-tensioned Concrete Floor

• Design: One-way post-tensioned concrete slab with post-tensioned beams framing along column lines.

• Criteria:– 6000 psi concrete

– 8” thick slab

– 52.5’ long beams: 24”x 36” beams

GATEWAY PLAZAWilmington, DE

Elizabeth Hostutler – Structural Option – Spring 2006

Page 11: Gateway Plaza Wilmington, DE Elizabeth Hostutler Structural Option.

Depth Study-Post-tensioned Concrete Floor

Tendon Layout

GATEWAY PLAZAWilmington, DE

Elizabeth Hostutler – Structural Option – Spring 2006

Page 12: Gateway Plaza Wilmington, DE Elizabeth Hostutler Structural Option.

Depth Study-Post-tensioned Concrete Floor

• Final Design:– Initial jacking force: 1303 k in slab and

1040 k in beams.– (6)-½” dia banded tendons in slab.– Tendons spaced 6’ apart.– 39 tendons in longitude beams.– 20 tendons in latitude beams.

GATEWAY PLAZAWilmington, DE

Elizabeth Hostutler – Structural Option – Spring 2006

Page 13: Gateway Plaza Wilmington, DE Elizabeth Hostutler Structural Option.

Depth Study-Post-tensioned Concrete Floor

• Initial Service Loading

GATEWAY PLAZAWilmington, DE

Elizabeth Hostutler – Structural Option – Spring 2006

Page 14: Gateway Plaza Wilmington, DE Elizabeth Hostutler Structural Option.

Depth Study-Post-tensioned Concrete Floor

• Sustained Service Loading

GATEWAY PLAZAWilmington, DE

Elizabeth Hostutler – Structural Option – Spring 2006

Page 15: Gateway Plaza Wilmington, DE Elizabeth Hostutler Structural Option.

Depth Study-Lateral System

GATEWAY PLAZAWilmington, DE

Elizabeth Hostutler – Structural Option – Spring 2006

• Problems:

– Increased weight impacted seismic.

– Eccentricity created torsion.

– Limiting drift to H/600 = 4.21”

• Solutions:

– Added 1 shearwall between mechanical room and elevator lobby.

– Considered concrete frames to resist lateral load.

– Maximum drift was 3” (H/840).

Page 16: Gateway Plaza Wilmington, DE Elizabeth Hostutler Structural Option.

Depth Study-Lateral System• Shearwalls: 12” thick 4000 psi with #6 @ 14” o.c.

N

GATEWAY PLAZAWilmington, DE

Elizabeth Hostutler – Structural Option – Spring 2006

Additional shearwall

Page 17: Gateway Plaza Wilmington, DE Elizabeth Hostutler Structural Option.

Depth Study-Lateral System

GATEWAY PLAZAWilmington, DE

Elizabeth Hostutler – Structural Option – Spring 2006

Seismic Loads in east-west direction: 0.9D + 1.0 E

Wind Loads in north-south direction: 1.2D + 1.6W + L + 0.5

Lr

Page 18: Gateway Plaza Wilmington, DE Elizabeth Hostutler Structural Option.

Depth Study-Impact on Foundation• Increase foundation loads by an

average 38%.• Change foundations to end-

bearing caissons.– Minimum size: 3.5’ diameter– Maximum Size: 6.5’ diameter

Concrete Steel

B 2 1107 k 307 k1 1151 k 754 k

C 3.7 98 k 98 k3 957 k 829 k2 2434 k 1796 k1 1597 k 1325 k

K 3.7 98 k 81 k3 992 k 831 k2 2069 k 1490 k1.4 1203 k 943 k

Location

GATEWAY PLAZAWilmington, DE

Elizabeth Hostutler – Structural Option – Spring 2006

Page 19: Gateway Plaza Wilmington, DE Elizabeth Hostutler Structural Option.

BREADTH STUDIES

GATEWAY PLAZAWilmington, DE

Elizabeth Hostutler – Structural Option – Spring 2006

Page 20: Gateway Plaza Wilmington, DE Elizabeth Hostutler Structural Option.

MECHANICAL STUDY

GATEWAY PLAZAWilmington, DE

Elizabeth Hostutler – Structural Option – Spring 2006

Page 21: Gateway Plaza Wilmington, DE Elizabeth Hostutler Structural Option.

Mechanical Study

• Check for proper indoor air quality.• Design ductwork.

GATEWAY PLAZAWilmington, DE

Elizabeth Hostutler – Structural Option – Spring 2006

Page 22: Gateway Plaza Wilmington, DE Elizabeth Hostutler Structural Option.

Mechanical Study• Existing system:

– Rooftop cooling tower.

– Heat pump and air conditioning unit in each mechanical room.

– 26”x96” main supply duct on each floor.

• 24”x24” supply and return diffusers.

• Ceiling plenum return.

GATEWAY PLAZAWilmington, DE

Elizabeth Hostutler – Structural Option – Spring 2006

Page 23: Gateway Plaza Wilmington, DE Elizabeth Hostutler Structural Option.

Mechanical Study

GATEWAY PLAZAWilmington, DE

Elizabeth Hostutler – Structural Option – Spring 2006

Typical open office floor plan for 6 tenants.

Page 24: Gateway Plaza Wilmington, DE Elizabeth Hostutler Structural Option.

Mechanical Study

GATEWAY PLAZAWilmington, DE

Elizabeth Hostutler – Structural Option – Spring 2006

• Supply diffuser layout with 16’ air throws.

• 650 cfm per diffuser.

Page 25: Gateway Plaza Wilmington, DE Elizabeth Hostutler Structural Option.

Mechanical Study• Supply ducts with return stub ducts.

– Largest: 68”x20”

– Smallest: 10”x10”

Exhaust LouverReturn grill

GATEWAY PLAZAWilmington, DE

Elizabeth Hostutler – Structural Option – Spring 2006

Page 26: Gateway Plaza Wilmington, DE Elizabeth Hostutler Structural Option.

CONSTRUCTION MANAGEMENT

STUDY

GATEWAY PLAZAWilmington, DE

Elizabeth Hostutler – Structural Option – Spring 2006

Page 27: Gateway Plaza Wilmington, DE Elizabeth Hostutler Structural Option.

Construction Management Study• Schedule Comparison• Cost Comparison• Rough estimate of foundation costs and

comparison.

GATEWAY PLAZAWilmington, DE

Elizabeth Hostutler – Structural Option – Spring 2006

Page 28: Gateway Plaza Wilmington, DE Elizabeth Hostutler Structural Option.

Construction Management Study-Scheduling• Duration: 156 days

– Columns (F/R/P): 2 days• Forming• Tying Reinforcement• Pouring and curing

– Construct/Erect shoring and formwork: 3 days

– Tie reinforcement for slab and beams: 1 day

– Rough-in for MEP: 1 day– Concrete (for each section):

• Pour and finish: 1 day• Cure: 2 days

– Strip formwork & reshore: 2 days– Jack the post-tensioning tendons: 1

day

0

20

40

60

80

100

120

140

160

Duration

Concrete

Steel

GATEWAY PLAZAWilmington, DE

Elizabeth Hostutler – Structural Option – Spring 2006

Page 29: Gateway Plaza Wilmington, DE Elizabeth Hostutler Structural Option.

Construction Management Study-Estimates

Amount Material Labor Equipment Cost

03110-405 Beam formwork 7044 SFCA 0.91 4.05 $63,46603110-420 slab edge forms 479 SFCA 0.48 4.6 $2,432

slab formwork 21910 sf 1.3 2.86 $216,47103210-600 Slab Reinforcing 46.18 tons 800 380 $72,041032230-600 Ungrouted Post-tensioned strand 26350 lb 0.47 0.87 0.02 $58,76103300-220 6000 psi Concrete 687 CY 109 $74,88303310-700 Placing 687 CY 11.5 4.7 $11,129

Total $499,183

03310-240 24"x24" average reinforcing including 4 use forms, concrete, placement, reinforcing

72 CY 370 400 41 $58,392

Total $58,392

B2010-101 12" thick, plain finish, 4000 psi wall including 4 use forms, reinforcing, concrete, placement

3402 sf 6.6 15.35 21.95 $97,127

Total $97,127

Total $654,702Cost/sf $28

Estimate of Post-tensioned Concrete Design for One Typical FloorSlabs System

Columns

Shearwalls

GATEWAY PLAZAWilmington, DE

Elizabeth Hostutler – Structural Option – Spring 2006

Page 30: Gateway Plaza Wilmington, DE Elizabeth Hostutler Structural Option.

Construction Management Study-Estimates

Amount Material Labor Equipment Total Cost05310-300 20 ga. 3-1/4" Metal Deck 23403 SF 1.88 0.34 0.02 $60,38003210-200 6x6 W1.4xW1.4 234 CSF 19.35 17.35 $12,64903300-220 6000 psi concrete 253 CY 81 $20,47803310-700 Placing concrete 253 CY 13.1 5.35 $4,66405120-260 Curb Edging 718 LF 14 4.95 0.33 $17,397

Total $98,171

05120-680 Offices over 15-stories 107 TON 1900 345 109 $251,87805090-840 3/4" dia Shear Studs 27352 0.49 0.67 0.28 $57,713

Total $309,591

05120-680Columns, Beams, and Braces 50 TON 1900 345 109 $117,700

07800-600 Decking 22000 SF 0.62 0.54 0.09 $51,260Beams 17295 SF 0.41 0.45 0.07 $31,650Columns 3506 SF 0.47 0.62 0.1 $8,521Total $91,430

TOTAL $616,892Cost/sf $26

Frames

Fireproofing

Estimate of Composite Steel Design for One Typical Floor

Slabs System

Structural Steel

GATEWAY PLAZAWilmington, DE

Elizabeth Hostutler – Structural Option – Spring 2006

Page 31: Gateway Plaza Wilmington, DE Elizabeth Hostutler Structural Option.

Construction Management Study-Estimates

Amount Material Labor Equipment Cost

A1020-310 4'-0" dia. x 100' 20 Ea 4358 70459 $1,496,3295'-0" dia. x 100' 6 Ea 8064 144990 $918,3246'-0" dia. x 100' 10 Ea 11730 172277 $1,840,069

TOTAL $4,254,722

A1020-130 End Bearing Steel Piles Amount Material Labor Equipment Cost2380 4 pile cluster 5 5625 3325 $44,7502460 6 pile cluster 8 8425 5025 $107,6002480 7 pile cluster 7 9825 5850 $109,7252500 8 pile cluster 5 12600 7525 $100,6252560 12 pile cluster 9 15400 9200 $221,400

03310-240 Pile caps, incl. forms and reinf. 612 108 49 0.31 $96,309TOTAL $680,409

Caissons

Concrete Filled, Drilled Piers

GATEWAY PLAZAWilmington, DE

Elizabeth Hostutler – Structural Option – Spring 2006

Page 32: Gateway Plaza Wilmington, DE Elizabeth Hostutler Structural Option.

Construction Management Study

Total Cost Cost/Floor Cost/sf Duration Foundations

Concrete $ 10,475,227 $ 654,702 $27.98 156 $4,254,722Steel $ 9,870,274 $ 616,892 $ 26.36 140 $680,409

System Comparison

GATEWAY PLAZAWilmington, DE

Elizabeth Hostutler – Structural Option – Spring 2006

Page 33: Gateway Plaza Wilmington, DE Elizabeth Hostutler Structural Option.

CONCLUSIONS

GATEWAY PLAZAWilmington, DE

Elizabeth Hostutler – Structural Option – Spring 2006

Page 34: Gateway Plaza Wilmington, DE Elizabeth Hostutler Structural Option.

Conclusions• Post-tensioned system is viable based on cost and

schedule, not on foundations.• Achieved savings of 6.25”/floor=100” total.

GATEWAY PLAZAWilmington, DE

Elizabeth Hostutler – Structural Option – Spring 2006

Page 35: Gateway Plaza Wilmington, DE Elizabeth Hostutler Structural Option.

AcknowledgementsO’Donnell Naccarato & MacIntosh

Peter Paton, Structural Engineer

GilbaneCraig Hedlund, Construction Manager

Dr. Linda Hanagan

RAM Concept Technical Support

Chad Illig Anthony Lucositic

David J. MelfiJustin MulhollanSteven Puchek

GATEWAY PLAZAWilmington, DE

Elizabeth Hostutler – Structural Option – Spring 2006

Page 36: Gateway Plaza Wilmington, DE Elizabeth Hostutler Structural Option.

QUESTIONS?

GATEWAY PLAZAWilmington, DE

Elizabeth Hostutler – Structural Option – Spring 2006