FOR LEASE KIPLING SQUARE/ANNEX 601/611 10 TH AVENUE SW CALGARY, AB FOR INFORMATION CONTACT: STUART WATSON Senior Vice President 403 750 0540 [email protected]KATIE SAPIEHA Vice President 403 750 0529 [email protected]MACKENZIE ALLEN Sales Representative 403 303 3608 [email protected]
9
Embed
FOR LEASE IPLIN SARE/ANNE - LoopNet...FOR LEASE IPLIN SARE/ANNE 01/11 10 TH AENUE SW CALGARY A FOR INFORMATION CONTACT: STUART WATSON Senior Vice President 403 750 0540 [email protected]
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
FOR LEASEKIPLING SQUARE/ANNEX601/611 10TH AVENUE SW CALGARY, AB
FOR LEASEKIPLING SQUARE/ANNEX601/611 10TH AVENUE SW CALGARY, AB
MUNICIPAL HERITAGE DESIGNATION A:
Kipling Square was constructed in 1914 for the Simington Company and updated in 1945 to serve as a retail location for Western Grocers. The utilitarian design of the building was offset by the dramatic cut stone doorways and flat-arched window heads which brought a liveliness to the building.
Between 1979 and 1980, Kipling Square was renovated by Paul Tarjan & Associates, one of Calgary’s architectural firms that sparked the trend for refurbishing Calgary’s warehouse district. Tarjan & Associates added the Annex to the building which not only increased the usable space, but offered a unique glass-walled feature that added an unexpected and elevated design to Kipling Square.
Today, Kipling Square/Annex’s unparalleled design features offer suites with a strong sense of unique character.
Suite L001: 606 SF (Square)Suite L002/L005: 4,161 SF (Square)Suite L012: 2,839 SF (Square)Suite L015: 1,258 SF (Square)Suite 155: 1,161 SF* (SquareSuite 201: 3,032 SF (Square)Suite 210: 1,949 SF (Annex)
Suite L002/L005 can be demised to 3,104 SF and 1,057 SF
AVAILABILITY Available Immediately*Available June 1, 2019
BASIC RENT Market
OPERATING COSTS $16.10 per SF (2019)
PARKINGSuite 105 - 2 StallsSuite 201 - 2 Stalls
PARKING RATE $300/stall/month
FOR LEASEKIPLING SQUARE/ANNEX601/611 10TH AVENUE SW CALGARY, AB
SUITE L001: 606 SF (SQUARE)SUITE L002/L005: 4,161 SF (SQUARE)SUITE L012: 2,839 SF (SQUARE)SUITE L015: 1,258 SF (SQUARE)
601-611 10th Avenue SouthwestKipling SquareCalgary, Alberta
This work product has been prepared by ExtremeMeasures Inc. pursuant to a contract with the Clientfor the sole benefit of and use by the Client. No thirdparty may rely on this work product without the receiptof a reliance letter from Extreme Measures Inc.
Basement
14/03/2014FP2A
ELEV
UP
DN
UP
UP
DN
UP
UP
UP
UP
L001
SERVERROOM JANITOR
STORAGEJANITORROOM
L015
L004
L003
L005
BOILERROOM
GAS METERROOM
STORAGE 4
STORAGE 2
MAINTENANCEROOM
TENANTMECH.ROOM
L011
MECHANICALROOM
RECORDINGBOOTH
NO ACCESSPROVIDED
STORAGE 1
STORAGE 3
ELEC
.MWR
WWR
L012
ELECTRICALROOM
L002
Please Refer toCorresponding Area Chart
N
FOR LEASEKIPLING SQUARE/ANNEX601/611 10TH AVENUE SW CALGARY, AB
SUITE 155: 1,161 SF (SQUARE)
N
601-611 10th Avenue SouthwestKipling SquareCalgary, Alberta
This work product has been prepared by ExtremeMeasures Inc. pursuant to a contract with the Clientfor the sole benefit of and use by the Client. No thirdparty may rely on this work product without the receiptof a reliance letter from Extreme Measures Inc.
Floor 1
14/03/2014FP2A
LOADING DOCK
DNDN
UP DN
DN
UP
UP
DN
DN
DN
UP
UP
UP
UP
DNUP
ELEV
105
175
145
155MAIL
ELE
C
LOADINGROOM
SERVERROOM
ELE
C
SERVERROOM
EXTERIOR FOYER
STORAGE 1
180
OPEN TOBELOW
ELE
C.
SERVERROOM
WWR
MWR
Please Refer toCorresponding Area Chart
LEASED
LEASED
LEASED
LEASED
FOR LEASEKIPLING SQUARE/ANNEX601/611 10TH AVENUE SW CALGARY, ABSUITE 201: 3,032 SF (SQUARE)SUITE 210: 1,949 SF (ANNEX)
N
201
LEASED
210
LEASED
601-611 10th Avenue SouthwestKipling SquareCalgary, Alberta
This work product has been prepared by ExtremeMeasures Inc. pursuant to a contract with the Clientfor the sole benefit of and use by the Client. No thirdparty may rely on this work product without the receiptof a reliance letter from Extreme Measures Inc.
Floor 1
14/03/2014 FP2A
LOADING DOCK
DN DN
UPDN
DN
UP
UP
DN
DN
DN
UP
UP
UP
UP
DN UP
ELEV
105
175
145
155MAIL
ELE
C
LOADINGROOM
SERVERROOM
ELE
C
SERVERROOM
EXTERIOR FOYER
STORAGE 1
180
OPEN TOBELOW
ELE
C.
SERVERROOM
WWR
MWR
Please Refer toCorresponding Area Chart
601-611 10th Avenue SouthwestKipling SquareCalgary, Alberta
This work product has been prepared by ExtremeMeasures Inc. pursuant to a contract with the Clientfor the sole benefit of and use by the Client. No thirdparty may rely on this work product without the receiptof a reliance letter from Extreme Measures Inc.
Floor 1
14/03/2014FP2A
LOADING DOCK
DNDN
UP DN
DN
UP
UP
DN
DN
DN
UP
UP
UP
UP
DNUP
ELEV
105
175
145
155MAIL
ELE
C
LOADINGROOM
SERVERROOM
ELE
C
SERVERROOM
EXTERIOR FOYER
STORAGE 1
180
OPEN TOBELOW
ELE
C.
SERVERROOM
WWR
MWR
Please Refer toCorresponding Area Chart
601-611 10th
Aven
ue S
ou
thw
estK
iplin
g S
qu
areC
algary, Alberta
mail@
xmeasures.com
Tel:
416.323.2858
26/06/2017P
repared:
Measured:
Version:
416.323.0855F
ax:
ww
w.xm
easures.com
"Client"
feet
09
18
This w
ork product has been prepared by Extrem
eM
easures Inc. pursuant to a contract with the C
lientfor the sole benefit of and use by the C
lient. No third
party may rely on this w
ork product without the receipt
of a reliance letter from E
xtreme M
easures Inc.
Flo
or 1
14/03/2014F
P2A
LOA
DIN
G D
OC
K
DN
DN
UP
DN
DN UP
UP
DN
DN
DN
UP
UP
UP
UP
DN
UP
ELE
V
105
175
145
155M
AIL
ELEC
LOA
DIN
GR
OO
M
SE
RV
ER
RO
OM
ELEC
SE
RV
ER
RO
OM
EX
TE
RIO
R F
OY
ER
ST
OR
AG
E 1
180
OP
EN
TO
BE
LOW
ELEC.
SE
RV
ER
RO
OM
WW
R
MW
R
Please R
efer toC
orresponding Area C
hart
FOR LEASEKIPLING SQUARE/ANNEX601/611 10TH AVENUE SW CALGARY, ABSUITE 201 (SQUARE)
SUITE 210 (ANNEX)
FOR LEASEKIPLING SQUARE/ANNEX601/611 10TH AVENUE SW CALGARY, AB
BELTLINE | HEART OF THE BELTLINE
The Marriott – Parker SilverBirch announced its construction ground-break on April 5, 2016 and is expected to be completed in early 2019, looking to cater to business and family leisure travelers. Each of the 390 rooms will feature a full kitchen with separate living and sleeping areas offering convenience and comfort for the long-stay users.
To be built on the corner or 10th Avenue and 5th Street SW, the hotel will provide seamless connectivity to the home and office.
MARRIOTT - PARKER SILVERBIRCH
This disclaimer shall apply to CBRE Limited, Brokerage, and to all other divisions of the Corporation (“CBRE”). The information set out herein (the “Information”) has not been verified by CBRE, and CBRE does not represent, warrant or guarantee the accuracy, correctness and completeness of the Information. CBRE does not accept or assume any responsibility or liability, direct or consequential, for the Information or the recipient’s reliance upon the Information. The recipient of the Information should take such steps as the recipient may deem necessary to verify the Information prior to placing any reliance upon the Information. The Information may change and any property described in the Information may be withdrawn from the market at any time without notice or obligation to the recipient from CBRE.
Place 10 is the new office complex that offers tenants a premier work environment. The building is conveniently located steps from the C-Train and over 290 km of bike paths, and offers top of the line “A” class amenities for its tenants. The convenient Beltline location is just one block North of the recently redeveloped Central Memorial Park, Calgary’s oldest park.
Centron is developing Place 10 under LEED (Leadership in Energy and Environmental Design) Silver standards which results in less water, energy, and greenhouse gas emissions.
PLACE 10
The new 6th & 10th Condos are being developed by the prominent Toronto condo developer, Lamb Development Corp. Lamb has completed 12 projects and will introduce his signature stylish and lean condominiums to the Calgary urban landscape.
Lamb Development Corp. believes the 31 storey building in the Beltline area is the precise place to build a trendy, high design building that’s unlike anything Calgary has seen. The units will feature 9 foot ceilings that will include full floor to ceiling windows. This residential tower is slated to be completed in March 2017.