Installation Guide for MBED-G Fascia 4 COMMERCE WAY, ARDEN, NC 28704 USA 800 . 892 . 9173 828 . 676 . 1700 OMGEDGESYSTEMS.COM For Built Up and Modified Roofs
3

For Built Up and Modified Roofs - Retrofit Roof Drains€¦ · Installation Guide for MBED-G Fascia 4 COMMERCE WAY, ARDEN, NC 28704 USA 800 .892 .9173 828.676 .1700 OMGEDGESYSTEMS.COM

May 17, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: For Built Up and Modified Roofs - Retrofit Roof Drains€¦ · Installation Guide for MBED-G Fascia 4 COMMERCE WAY, ARDEN, NC 28704 USA 800 .892 .9173 828.676 .1700 OMGEDGESYSTEMS.COM

Installation Guide for MBED-G Fascia

4 COMMERCE WAY, ARDEN, NC 28704 USA800.892.9173 828.676.1700

OMGEDGESYSTEMS.COM

For Built Up and Modified Roofs

Page 2: For Built Up and Modified Roofs - Retrofit Roof Drains€¦ · Installation Guide for MBED-G Fascia 4 COMMERCE WAY, ARDEN, NC 28704 USA 800 .892 .9173 828.676 .1700 OMGEDGESYSTEMS.COM

NOTES:#1 - Isolate all metal parts from ACQ treated wood or other galvanicallyincompatible material with appropriate membrane material.#2 - Appliance attachments, such as lightning rods, signs, or antennaethat penetrate the water seal, induce a galvanic reaction, or otherwisecompromise the effectiveness of the roof edge system, shall beeliminated or isolated to prevent problems per section 8.0 of ANSI/SPRI/FM4435/ES-1. Appliances shall be isolated from or not attached to the roof edge system. Consult the lightning protection system manufacturer for specific attachment instructions.

GALV. ANCHORCLEAT

FASCIA

1-in

.Min

.

STRIP-IN ORCAP SHEET

JOINTSPLICE

1½-in. SSRING SHANKNAILS

BASE PLY

Installation Guide forMBED - G Fascia(For Built Up or Modified Roofs)

®

C. Galvanized Steel Anchor Cleat10-ft. Lengths

B. Concealed Joint Splice4-in. Lengths

A. Formed Fascia Cover10-ft. Lengths

D. 1½-in. SS Ring Shank Nailat 12-in. o.c. (6-in. from ends)

(Included & Required)E. Base Ply

(By Installer)F. Strip-In or Cap Sheet

(By Installer)

A

1½-in. SSRING SHANKNAIL

B

E

F

DC

BUTT CLEAT ATEACH CORNER,TYP.

APPROVALS: Contact manufacturer for verification of test report data on your project.

ANSI/SPRI/FM4435/ES-1 TESTED

N0A#14-1202.08

Florida ProductApproval #FL7424

FMApproved

S

UL®

Page 3: For Built Up and Modified Roofs - Retrofit Roof Drains€¦ · Installation Guide for MBED-G Fascia 4 COMMERCE WAY, ARDEN, NC 28704 USA 800 .892 .9173 828.676 .1700 OMGEDGESYSTEMS.COM

4 COMMERCE WAY, ARDEN, NC 28704 USA800.892.9173 828.676.1700 OMGEDGESYSTEMS.COMCopyright © 2017 OMG, Inc. All rights reserved. EM

1054

Re

v. 0

3272

017

Superior productivity. Superior performance.

STEP 1: Installing Anchor CleatPlace the top lip of the continuous anchor cleat squarely on the topedge of the base ply and treated wood nailing plate. Press cleatssecurely in position and nail through the pre-punched holes with1½-in. ss ring shank nails provided. Install anchor cleats by buttingcleats at each corner. For miter application, fit into corner asrequired to maintain a continuous anchor cleat line. Then nail at amin. 6-in. on center in each direction from the corner.

STEP 3: Installing Fascia End Caps and End TermsInstall the fascia end caps and end terms by hooking the drip of thefascia onto the drip of the cleat and rotate back onto the roof.Fasten with 1½-in. ss ring shank nails provided in pre-punchedholes.

STEP 4: Installing Fascia Straight LengthsPlace a concealed joint splice in the opposite end of the installedmiter or end cap. Install the fascia by hooking the drip of the fasciaonto the drip of the cleat and rotate back onto the roof. Fasten with1½-in. ss ring shank nails provided in pre-punched holes. Allow a1/4-in.gap between fascia sections for thermal expansion.Consider lengths of all straight pieces prior to cutting to avoidcreating relatively short sections of fascia adjacent to full lengthsections.Note: There should be a joint splice at every joint.

STEP 2: Installing Fascia MitersLocate the miters and concealed joint splices for the appropriatecorners. Place a concealed joint splice under each end of the mitersections. Install the miter by hooking the drip of the fascia miteronto the drip of the cleat and rotate back onto the roof. Fasten with1½-in. ss ring shank nails provided in pre-punched holes.

STEP 5: Installing Strip-In or Cap SheetInstall strip-in ply or cap sheet per roofing manufacturer'sinstructions.

ANCHORCLEAT

BASEPLY

ENDCAP

WALLEND

JOINTSPLICE

ENDTERM

JOINTSPLICE

FASCIAMITER

FASCIASTRAIGHTLENGTH

STRIP-IN ORCAP SHEET

BASEPLY

OUTSIDE CORNER INSIDE CORNER

BASEPLY

ROOFSIDE

ROOFSIDE

JOINTSPLICE

1/4-in. GAP

1/4-in. GAP