Top Banner
Construct ion Pitfalls of Construction.…
50

Fmc agserv pestech

Jun 14, 2015

Download

Environment

Eris Hess

What do we need know about managing termites
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Fmc agserv pestech

Construction

Pitfalls of Construction.…

Page 2: Fmc agserv pestech

So what do WE need to know?

Australian Standards

Legislation

Measurements

Method of Construction

Service Penetrations

Understanding of Ventilation

What builders leave for US

2

Page 3: Fmc agserv pestech

Currently under review

Page 4: Fmc agserv pestech

4

Currently under review

Page 5: Fmc agserv pestech

Slab on Ground Constructions

The Australian Standard AS 3660.1-2000 Termite management Part 1: New building work specifies that a slab on ground should be designed and constructed either in accordance with AS 2870 or AS 3660.

Section 2: Performance Criteria

2.3.1 Concrete slabs as termite barriers

• A concrete slab or footing used as a termite barrier shall

(a) be designed and constructed so that any cracks passing through the slab or footing do not exceed 1 mm in width through the depth of the slab;

(b) have all interfaces between the penetrations and slab or footing provided with a termite barrier system integrated with the slab; and

(c) have all joints, except for tied footing slab construction joints, provided with a termite barrier system integrated with the slab.

Page 6: Fmc agserv pestech

Legislation

• Queensland amendment to the BCA.

• BCA amendments only apply to building classes 1 & 10

• AS2870 -2011 Residential Slabs and Footings

• Soil Classification – A, S, M, H, E, P

− Slightly reactive to Extremely reactive.

6

Page 7: Fmc agserv pestech

‘The Measurements’

Standard Height Brick – 230mm x 110mm x 75mm

Besser Block – 390mm x 190mm x 190mm

Mortar Joint – 10mm-12mm

Render – 8mm-10mm

Bagging – Up to 3mm

7

Page 8: Fmc agserv pestech

Timber Detail

8

Page 9: Fmc agserv pestech

Figures from HIA

Page 10: Fmc agserv pestech

The Beginning……..

10

Page 11: Fmc agserv pestech

‘The Exposed Edge Slab’

11

Page 12: Fmc agserv pestech

‘The Exposed Edge Slab’…..gone!

12

Page 13: Fmc agserv pestech

‘The Exposed Edge Slab’

13

Page 14: Fmc agserv pestech

‘The Monolithic Slab’

14

Page 15: Fmc agserv pestech

Monolithic Slab Construction

Page 16: Fmc agserv pestech

‘The Infill Slab’

16

Page 17: Fmc agserv pestech

‘The Infill Slab’

17

Page 18: Fmc agserv pestech

‘The Waffle Pod’

18

Page 19: Fmc agserv pestech

‘The Waffle Pod’

19

Page 20: Fmc agserv pestech

‘The Inslab Water Tank’

• Inslab water tanks have been developed to cater for new houses constructed on a concrete slab.

• They provide architects, designers and builders with a unique water storage solution, especially where space is limited.

• Inslab water tanks conform to BCA AS2870-1996

20

Page 21: Fmc agserv pestech

‘The Inslab Water Tank’

21

Page 22: Fmc agserv pestech

22

Page 23: Fmc agserv pestech

‘The ServicePenetration’

23

Page 24: Fmc agserv pestech

‘The Service Penetration’

24

Page 25: Fmc agserv pestech

25

‘The Service Penetration’

Page 26: Fmc agserv pestech

26

‘The Open End’

Page 27: Fmc agserv pestech

‘The Service Penetration’

27

Page 28: Fmc agserv pestech

‘The Open End’

28

Page 29: Fmc agserv pestech

‘The Open End’

29

Page 30: Fmc agserv pestech

‘The Service Penetration’

30

Page 31: Fmc agserv pestech

‘The Shower Recess‘

31

Page 32: Fmc agserv pestech

‘The Shower Mess’

32

Page 33: Fmc agserv pestech

‘The Pier’

33

Page 34: Fmc agserv pestech

Piers

34

Page 35: Fmc agserv pestech

‘The Pier’

35

Page 36: Fmc agserv pestech

Ventilation

Sub-floor ventilation is often a forgotten part of termite management.

The BCA (Vol. 2) requires the sub-floor between a suspended floor and the ground to be ventilated.

AS3600 specifies ventilation to be minimum of 8,400 mm squared nett ventilation/Lm

This minimises sub-floor moisture which helps to prevent timber decay, and creates an environment that discourages termite attack.

To be effective, acceptable sub-floor construction must:

• Be free of building debris and vegetation

• Provide cross ventilation,

• Contain no dead air spaces

• Be graded to prevent ponding and be above the external ground level

• Have evenly spaced openings

36

Page 37: Fmc agserv pestech

Minimum Ground Clearance

Page 38: Fmc agserv pestech

Ventilation(cont)

38

• 230mm x 150mm• Terracotta 6,200 – Veta 11,200 – Galvanised

Metal11,700

Page 39: Fmc agserv pestech

Ventilation(cont) House only 6 months old poor ventilation and

termite damage

39

Page 40: Fmc agserv pestech

‘The Good’

40

Page 41: Fmc agserv pestech

‘The Good’

41

Page 42: Fmc agserv pestech

‘The Bad’Retaining wall tinsel

42

Page 43: Fmc agserv pestech

‘The Bad’

43

Page 44: Fmc agserv pestech

‘The Bad’

44

Page 45: Fmc agserv pestech

‘The Bad’

45

Page 46: Fmc agserv pestech

‘The Ugly’

46

Page 47: Fmc agserv pestech

‘The Ugly’

47

Page 48: Fmc agserv pestech

‘The Ugly’

48

Page 49: Fmc agserv pestech

Summary

• Understand construction methods

• Always ask for a plan

• Ask customer questions

• Each house is Different

• Never ASSUME

• If in doubt, phone a friend…….

49

Page 50: Fmc agserv pestech

Pestech Promotion 2014

50

=