Issue Date: Planning | Design | Construction 901 South National Avenue Springfield, Missouri 65897 Phone: (417) 836-5101 Fax: (417) 836-6884 https://design.missouristate.edu Project Number: 210825- 015 02/15/2020 FIRST FLOOR RENOVATION FOR THE MULTICULTURAL RESOURCE CENTER (MRC) AND OFFICE OF STUDENT ENGAGEMENT (OSE), ROBERT W. PLASTER STDUENT UNION 01 Starbucks Office of Community Engagement SGA Bear Statue McDonald Hall & Arena Wells Hall Freudenberger House Siceluff Hall Baker Bookstore elevators THEATRE Multicultural Resource Center Phase 1 Game Center Multicultural Resource Center Phase 2 stairs O.S.E. & Student Organizations OVERALL PHASE PLAN
8

FIRST FLOOR RENOVATION FOR THE MULTICULTURAL ...

Feb 08, 2023

Download

Documents

Khang Minh
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: FIRST FLOOR RENOVATION FOR THE MULTICULTURAL ...

Issue Date:

Planning | Design | Construction

901 South National Avenue Springfield, Missouri 65897

Phone: (417) 836-5101 Fax: (417) 836-6884 https://design.missouristate.edu

Project Number: 210825-015

02/15/2020FIRST FLOOR RENOVATION FOR THE MULTICULTURAL RESOURCE CENTER (MRC)

AND OFFICE OF STUDENT ENGAGEMENT (OSE),ROBERT W. PLASTER STDUENT UNION 01

Starbucks

Office of Community

Engagement

SGABear Statue

McDonald Hall & Arena

Wells Hall

Freudenberger House

Siceluff Hall

BakerBookstore

elevators

THEATRE

Multicultural Resource Center

Phase 1

Game Center

Multicultural Resource Center

Phase 2

stairs

O.S.E. &Student Organizations

OVERALLPHASE PLAN

Page 2: FIRST FLOOR RENOVATION FOR THE MULTICULTURAL ...

Issue Date:

Planning | Design | Construction

901 South National Avenue Springfield, Missouri 65897

Phone: (417) 836-5101 Fax: (417) 836-6884 https://design.missouristate.edu

Project Number: 210825-015

02/15/2020FIRST FLOOR RENOVATION FOR THE MULTICULTURAL RESOURCE CENTER (MRC)

AND OFFICE OF STUDENT ENGAGEMENT (OSE),ROBERT W. PLASTER STDUENT UNION 02

10'-0" 6'-4" 15'-8" 8'-0"

16'-0" 11'-0" 5'-0" 8'-0" 15'-4" 5'-4" 12'-0" 10'-0" 18'-0" 20'-0" (+/-) 9'-4" 5'-4" 6'-8"

16'-11" 5'-10 1/2" 5'-0" 10'-0" 5'-0" 10'-0"

2'-4

"

6'-2"

1'-10 1/4"

6'-2"

1'-11 5/8"

6'-2"

1'-9 1/4"

5'-10 1/2"

12'-0

"

8'-8" 2'-0"

11'-0

"10

'-0"

10'-8

"

14'-0"

1'-2"

15'-0"

6'-8

"

2'-3" 6'-1" 12'-10" 10'-0" 6'-9"

9'-4

"10

'-4"

13'-4

"10

'-4"

10'-4

"10

'-4"

12'-4

"14

'-0"

5'-4

"

9'-8

"12

'-4"

20'-0

"

9'-1"

11'-0

"

1A2.1

2A2.1

3A2.1

6'-1

0"6'

-10"

13'-8

"

2'-0

"

14'-0

"5'

-0"

5'-0

"14

'-0"

10' -

4" (+

/_)

14'-0

"5'

-0"

13'-0

"10

'-0"

OVERALLFLOOR PLAN

Page 3: FIRST FLOOR RENOVATION FOR THE MULTICULTURAL ...

ADMIN. ASST. III NEW

STAFFNEW STAFF

COORD. S.E.

PROG.

ASST. DIR. S.E. PROG.

WORK

ASST. DIR. S.E. INVOLV.

DIR. S.E.

GRAD PAD

FSLTC SACSTUDENT

SPEC.

STUD. ORG. CALENDAR

COLLABORATION SPACE

SMALL COLLAB/MEETING

REC.

WAITING AREA

STORAGE

SUPPLIES

UPDATED FLOOR PLAN

STAIRS

GAME CENTER

GRAPHICS/COLOR

MEETING

STUDENT SPACES

STAFF SPACES

RAMP

RAMP

RAMP

60'- 6"

18'-00 18'- 00"

20'-00"36'-00"

18'- 00"

OFFICE OF STUDENT ENGAGEMENT (OSE)North

03

Page 4: FIRST FLOOR RENOVATION FOR THE MULTICULTURAL ...

SGA

UPDATED FLOOR PLANSTUDENT SPACES

STAFF SPACES

1 PERSON QUIET SPACE

COMPUTERS

CHAIR STORAGE

SEATING

LOUNGE

INFORMATION

MECHANICAL ROOM

DIV. TRANS. & SUPP. COORD.

DIR. A.P.

DIR. M.C.P.

ASST. DIR. M.C.P. &LGBTQ+

GA/ WORK

STUDY

QUIET SPACEROOM FOR REFL.

CONFERENCE ROOM

TRANSITION CLOSET

SORTING ROOM FOR TRANSITION

CLOSET.

STORAGE

STOR.

G.N.R.R

KITC

HEN

ETTE

QUIET SPACE

MULTICULTURAL RESOURCE CENTER (MRC)North 04

Page 5: FIRST FLOOR RENOVATION FOR THE MULTICULTURAL ...

SGA

UPDATED FLOOR PLAN

INFORMATION/ ENTRANCE/ FOYER

SOCIALIZING/ GATHERING

STUDENT SPACES

STAFF

STUDENT SPACES STUDENT SPACESSTUDENT SPACES

STAFF

MULTICULTURAL RESOURCE CENTER (MRC)North 05

Page 6: FIRST FLOOR RENOVATION FOR THE MULTICULTURAL ...

SGA

• UNLOCKED • LOCKED

UPDATED FLOORPLAN

AFTER 5PM

UPDATED FLOOR PLAN

1 PERSON QUIET SPACE

DIV. TRANS. & SUPP. COORD.

DIR. A.P.

DIR. M.C.P.

ASST. DIR. M.C.P. &LGBTQ+

GA/ WORK

STUDY

QUIET SPACEROOM FOR REFL.

CONFERENCE ROOM

TRANSITION CLOSET

SORTING ROOM FOR TRANSITION

CLOSET.

STORAGE

STOR.

G.N.R.R

KITC

HEN

ETTE

QUIET SPACE

MULTICULTURAL RESOURCE CENTER (MRC)North 06

Page 7: FIRST FLOOR RENOVATION FOR THE MULTICULTURAL ...

PROPOSED

MULTICULTURAL RESOURCE CENTER (MRC) 07

Page 8: FIRST FLOOR RENOVATION FOR THE MULTICULTURAL ...

Main entrance looking Southeast

Lounge

Banquettes

Computer desk, printer and quiet room

MULTICULTURAL RESOURCE CENTER (MRC) 08