Grace Bible Church Building Renovation Overview
Dec 31, 2015
Foyer improvements
Two dedicated counseling rooms Expanded library and book store New reception/secretary area New resource area (for copier, etc.)
Sanctuary improvements
New seating and carpet New platform configuration New rock work to replace wood in front New paint New ceiling and lighting Faux pilasters and beams New sound system
Additional improvements
New and expanded restrooms Expanded nursery and new parent room Covered walkway between sanctuary and
gym building
Financial Information
Construction contract: $202,600 Furn., Fixtures & Equip: $101,400 Total Remodel cost: $304,000
(includes $20,000 contingency)
Building fund balance: $154, 913 Need to complete project: $150,000
Volunteer projects
Pack up and move various items (nursery, resource room, floral room, library, tables, chairs, copier, sound system, etc.)
Sanctuary projects (remove pews, remove carpet, set up new platform and podium)
Various additional projects Please sign up on “Construction Volunteer” sign-
up sheet
Faith Promise CardFaith Promise Card
GBC Building Renovation Project 2009
By the grace of God, and trusting His provision for my family and me, I affirm that I will give the following gifts beyond all my other regular giving.
$ ______________ an initial gift that I am giving now (by March 8)
$ ______________ a promise of gifts given in faith and trust in God’s provision that I will give in the next 3 months (including the amount on the previous line).
$ ______________ a promise of gifts given in faith and trust in God’s provision that I will give in the next 12 months (including the amount on the previous two lines).
I understand that this promise is made in faith of God’s provision and is both secret (between me and the Lord alone) and non-binding