F.I.O State Enterprise
•Economic Plantation 144,000 ha (200 Project)
•Wood Residues 1,200,000 tons/yr
•Agriculture Residues from Neighboring F.I.O Plantation 3,000,000 tons/yr
• Fuel Cost for transportation in 20 km: 750 THB/trip
• Wood Weight per Trip: 17 ton
Cost of Wood Residues = 500 Bht./ton
Fuel price will depend on the financial analysis.
Level ofUnderstanding
Attitude onEnvironmental
Impacts
Acceptance
• High public acceptance due to increasing revenues from job creation and selling biomass
• Good relationship between FIO plantations and locals creates public acceptance e.g. Chiang Tong
• Awritten social contract with the local authority as assurance on environmental impacts effectively create confidence and acceptance of biomass power plants from communities.
Group 1 : No background on Biomass power plant, but concerns on environmental impactsGroup 2 : Strong concern on environmental impacts especially Those in Lampang Province due to their experiences fromEnvironmental impacts of Coal-fired power plant
• Developer shall provide info on environmental impacts and mitigation option.
• The project should at least conduct IEE to ensure that all environmental impacts are taken into considertion.
• Low level of understanding
• It is crucial to provide basic information on biomass power plant to the locals once start project implementation.
Attitude Survey
Benefit to community from Biomass plant
Wood residues as main feedstock
InstalledCapacity
Feedstock consumption
(ton/day)
Number of woodCollectors worker
Wage rate(baht/day)
Revenue to community(baht/year)
25
15
10
25
15
10
150
150
150
1,379,700
827,820
551,880Remarks : a worker collecting wood residues 1 ton/day
Wage rate for FIO’s temperaly worker 120-150 baht/day