Top Banner
BAJAJ STEEL INDUSTRIES LIMITED ISO 9001: 2008 CERTIFIED COMPANY SINCE 1961 MODERN DOUBLE ROLLER COTTON GIN AND AUTO FEEDER BAJAJ SPARE PARTS CATALOGUE AND OPERATING INSTRUCTIONS 2010 Superior Quality Higher Durability Ready Availability High quality spares parts mean less down-time and higher profits.
44

FINALLY FINAL catalogue 2009 (3) - bajajngp.com · BAJAJ SPARE PARTS CATALOGUE AND OPERATING INSTRUCTIONS ... a chart showing important setting parameters is given below: ... Y-1

Apr 18, 2018

Download

Documents

dinhbao
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: FINALLY FINAL catalogue 2009 (3) - bajajngp.com · BAJAJ SPARE PARTS CATALOGUE AND OPERATING INSTRUCTIONS ... a chart showing important setting parameters is given below: ... Y-1

BAJAJ STEEL INDUSTRIES LIMITEDISO 9001: 2008 CERTIFIED COMPANY

S I N C E 1 9 6 1

MODERN DOUBLE ROLLER COTTON GIN AND AUTO FEEDER

BAJAJ

SPARE PARTSCATALOGUE

AND OPERATING INSTRUCTIONS

2010

Superior Quality

Higher Durability

Ready Availability

High quality spares parts meanless down-time and higher profits.

Page 2: FINALLY FINAL catalogue 2009 (3) - bajajngp.com · BAJAJ SPARE PARTS CATALOGUE AND OPERATING INSTRUCTIONS ... a chart showing important setting parameters is given below: ... Y-1

Quality is never an accident. It is the result of an intelligent effort. There must be a will to produce a superior thing.

-JOHN RUSKIN

Chairman Shri Hargovind Bajaj receiving award from Shri Shankersinh Vaghela

Managing Director Shri Rohit Bajaj receiving Lalit Doshi Memorial award at SICOM

Page 3: FINALLY FINAL catalogue 2009 (3) - bajajngp.com · BAJAJ SPARE PARTS CATALOGUE AND OPERATING INSTRUCTIONS ... a chart showing important setting parameters is given below: ... Y-1

U K A S

ys e tn sem etgan m a cem y rt ti il fieau dq

Quality Policy

BAJAJ STEEL INDUSTRIES LIMITED

CORE PURPOSE

To pioneer innovations byidentifying customer needs & provide unique solutions.

Striving & sustaining profitable growth

Building reputation by constructively contributing to society

Dealing fairly with all who come in touch with us

CORE VALUESLeading edge innovations as way of life

Page 4: FINALLY FINAL catalogue 2009 (3) - bajajngp.com · BAJAJ SPARE PARTS CATALOGUE AND OPERATING INSTRUCTIONS ... a chart showing important setting parameters is given below: ... Y-1

NOTE:-1) All dimensions are in mm unless otherwise specified.2) This is only an indicative diagram, for conventional ginning factory, the layout may vary in case of side platform, central platform,

automatic set up folding angle structure or as per the customer’s requirement for which details may be obtained from the company on request.

FOUNDATION BOLT CENTRES FOR BAJAJ DR GIN

M/C BOLT POSITION

MACHINE NO.1

A A

AA

760(

30”)

430 152 298

MACHINE NO.2

CONVEYOR BRKT.BOLTPOSITION

SLID

E RA

IL N

o.1M

/C.

430

DESCRIPTION POSITION

JUMBO DR GIN M/C A

150

B B

B B

880

FOUNDATION BOLTS SIZE - 1177 (FOR SPL.)

1307 (FOR EL.)

1477 (FOR JUMBO)

A A

A AB

B

B

B

BOLT SIZE IN MM.

AFOR SPL & EL DR GIN M/C16 X 450 LONG(5/8” X 18”)

FOR SLIDE RAIL & CONV.BRACKET(SPL EL & JUMBO DR GIN M/C) B

16 X 450 LONG(5/8” X 18”)

19 X 450 LONG(3/4” X 18”)

150

FOUNDATION DETAILS OF BAJAJ DR GIN

BU

ILD

ING

WA

LL

8 200

8 150

8 150

BAR DETAILS

Ø8 TAR BAR

Ø8 TAR BAR

FOUNDATION DETAILS OF BAJAJ DR GIN

I.P.S.

(1:2:4) M15 [M/C

He

igh

t w

ith

Au

to F

ee

de

r]

[M/C

He

igh

t)

11

80

[3

'-1

0"]

1750 [

5'-

9"]

50

0 [

1'-

8"]

15

0 [

6"]

10

0 [

4"]

23

0

315 [12.5"]

BRICK WALL115Thk.

(4.5")

60% BOULDER+40% MURRUM

P.C.C

(1:3:6) M10

718 [2'-4.2"] 718 [2'-4.2"]

CA

BL

E T

RE

NC

H3

00

x1

50

R.C.C.

(1: 1 12 :3) M20

B

A

B

A

161

760 [2'-6"]

1436 [4'-8.5"]

2286 (Min)[7’6”]

23

0 [

9"]

50

[2

"]

T

T

T

Gin M/C center to wall inside

161

5425

42

952

597148 148

[9

"]

542

100

4061440

437

158

1BAJAJ STEEL INDUSTRIES LIMITEDIMAMBADA ROAD, NAGPUR- 440 018. INDIA. Tel: +91-712-272 0071 ~ 80 Fax: +91-712-272 8050 / 272 3068

BAJAJ DR GIN & AUTOFEEDER SPARE PARTS CATALOGUE 2010

FO

R C

ON

VE

YO

R

BR

AC

KE

T B

OLT

760(

30”)

Page 5: FINALLY FINAL catalogue 2009 (3) - bajajngp.com · BAJAJ SPARE PARTS CATALOGUE AND OPERATING INSTRUCTIONS ... a chart showing important setting parameters is given below: ... Y-1

BAJAJ DR GIN INSTALLATION GUIDELINES

Loosen cap nut before adjusting the beater height Tighten fully after giving a few turns to align the bearing Housing

Turn the rachet clockwise for reducing beater height.Turn the rachet anti-clockwise for increasing beater height.

Loosen or tighten these bolts for setting the knife rail. After setting, both the bolts should be fully tightened.

Loosen these nuts before adjusting the knife rail.Tighten fully after adjustment.

Projection of knife rail side adjustment.

The Bajaj DR Gin is supplied in assembled condition at the time of installation DR Gin, it must be ensured that the below Gin Seed conveyor might have been fitted in the cement trench. Following steps are required to be taken for installation of the machine :

1. Place the DR Gin on the foundation bolts and all the nuts should be tightened. The water level should be checked to ensure that the surface level is 0-0 at the bottom of the rail (plunt). If the level is not 0-0 an appropriate packing is to be provided below the DR Gin frame after loosening of nuts and then the nuts shall be tightened again.

2. The Machine Beater Assembly should be set as per the requirement of quality of cotton in the area. The clearance required between Fixed Knife and Moving Knife should be 1.5mm to 2 mm. It should be set with the help of Gauge supplied with the machine.

3. Check all the nut bolts to ensure that none has got loosen while in transit or mounting on foundation.

4. Motor rails are mounted on foundation bolts and nuts are tightened.

5. Electric Motor should be fitted on Motor Rails and Vee Belt Pulley line and level should be maintained straight. Motor Bo l ts shou ld be properly tightened and Vee Belt should be properly fitted on Motor Pulley and Machine Pulley.

6. Leather roll is then fitted on the DR Gin by moving out off side swing lever assembly. Slightly greesed roll shaft is then mounted on swing lever assembly gear side and then off side swing lever assembly is moved into it to position the roll. The roll is then rotated by hand to ensure that the taper pin does not touches the frame while in rotation.

7. Hopper tray is then mounted on DR Gin frame directly incase of manual ginning whereas in case of auto feeder the same is mounted only after the installation of auto feeder as per the guidelines mentioned in this book.

8. The weights are loaded on the weight lever rods as per the guidelines mentioned in this book and roll polishing is done.

SETTING OF BAJAJ DR GIN

2BAJAJ STEEL INDUSTRIES LIMITEDIMAMBADA ROAD, NAGPUR- 440 018. INDIA. Tel: +91-712-272 0071 ~ 80 Fax: +91-712-272 8050 / 272 3068

BAJAJ DR GIN & AUTOFEEDER SPARE PARTS CATALOGUE 2010

Page 6: FINALLY FINAL catalogue 2009 (3) - bajajngp.com · BAJAJ SPARE PARTS CATALOGUE AND OPERATING INSTRUCTIONS ... a chart showing important setting parameters is given below: ... Y-1

1. First carefully set the fixed knife using the gauge supplied with the gin. Normally the edges of the fixed knife are to be set at 85 mm from the seat on the knife rail throughout.

2. Then set the edges of moving knife on beater arm from the edges of the fixed knife i.e. set the moving knife parallel to the fixed knife throughout at a distance 1.5 mm to 2 mm. This is effected by :1) Adjusting the rail by means of loosening & tightening of the rail bolts in case the clearances at opposite diagonal ends are found unequal2) If gap is more, packing may be provided on beater arm to lift the moving knife.

3. Place the oscillating head on the beater shaft. Insert the head pin with needle bearing and connect it to connecting rod by wrist pin/gajjan pin.4. Set the moving knife in a way that strokes on both the sides are equal; however, if overlap on both sides is not equal then this can be

affected by:1) Adjusting the ratchet, in case the overlap on gear side of machine is not same as that on offside.2) Adjusting the setting from the head

5. The edges of the moving knife should clear the upper edge of fixed knife by about 1/3 of the staple length of the cotton being ginned. Normally 1/16” extra overlap should be there along the entire length of fixed knife if moisture contents are standard or on higher side; however, if cotton is having lower moisture, cut-off may be restricted to 1/3 of the staple length.

6. Slight reduction or increase in overlap can be adjusted by adjusting the head pin. By pulling out the head pin from the oscillating head ,the overlap is reduced. By pushing the head pin in the oscillating head, the overlap is increased. The longer the staple of cotton, the greater the overlap distance.

7. Grid bottom is then adjusted with the corresponding portion of the rails so that the gap between the two shall not exceed the seed size. The seed shall passed between the gap by slight pressure of finger. If this gap is more the cotton mill pass into the seed whereas if this gap is less cut seeds will be found in the lint. This gap can be adjusted by means of slots provided on the beater trough by loosening the bolts joining the grid and beater trough. For better understanding, a chart showing important setting parameters is given below:

oscillating

Gap not to exceed seed size i.e. Seed should pass by slight pressure of finger.

1.5 mm to 2 mm equal throughout length

85 mm (Max. upto 87mm for EL.Staple)

1” to 1-1/2” Depends upon length of fibre

2 mm

2 mm

I) Grid bottom and corresponding portion of Rail

ii) Gap between Moving Knife and Fixed Knife

iii) Height of Fixed Knife edge from Seat on Rail

Iv) Grooving on Roller

a) Distance between two groove

b) Width of groove

c) Depth of groove

PART SETTINGS REQUIRED

Note : the grooving on roller has been described in Bajaj DR Gin starting guidelines.

For overlap and suitability of grids, normally following settings are used:

While setting overlap, the fiber length, moisture and quality of cotton must be given due consideration. Looking to the above parameters machine to be set properly.

Sr. No. STAPLE LENGTH (MM) CUT-OFF / OVERLAP (MM) SEED SIZE / GRID SIZE (INCH)

1.

2.

3.

4.

5.

6.

7.

VARIETY OF COTTON

DESHI BENGAL WAGAD

B.T. COTTON

SHANKAR-4SHANKAR-6

SAVITA, MCU-5BANNI, BHRAMHA

DCH-32VAR-LAXMI, SWIN

17-18

28-30

30-31

31-32

33-34

5-6

9.5-10

10-10.5

10.5-11

13-14

1/4”

Y-1 G-12 KALYAN JAYDHAR 26-28 6-7 1/4”

J-34 (NARMA) 24-27 9-9.5 9/32”

9/32”

9/32”19/645/16”

9/32”19/64”5/16”

9/32”19/64”5/16”

8.TANZANIAN COTTONZIMBAMBWE COTTONUGANDA COTTON

9.GIZA (EZYPTSIAN COTTON)PIMA (PERU COTTON)SOUTH AMERICA

30-31.5

33-38

10-11

14-17

9/32”5/16”

19/64”

9/32”5/16”

11/32”

3BAJAJ STEEL INDUSTRIES LIMITEDIMAMBADA ROAD, NAGPUR- 440 018. INDIA. Tel: +91-712-272 0071 ~ 80 Fax: +91-712-272 8050 / 272 3068

BAJAJ DR GIN & AUTOFEEDER SPARE PARTS CATALOGUE 2010

SETTING OF BAJAJ DR GIN

Page 7: FINALLY FINAL catalogue 2009 (3) - bajajngp.com · BAJAJ SPARE PARTS CATALOGUE AND OPERATING INSTRUCTIONS ... a chart showing important setting parameters is given below: ... Y-1

K

HH

ON

GL

BC

N

ON

T

F A

AD

UE

LLR

I

A

I

SET

C S

WI

U

RI

ATIO

PI

SO

BJ

J O

BLR

OE

GN

NIN

GM

CH

NE

BEA

TER

BEA

RIN

G H

OU

SIN

G

(OFF

SID

E)G

REA

SE-

ON

CE

EVER

Y 4

WO

RK

ING

HR

S.

WIT

H ‘S

ERV

O’ M

ULT

IPU

RP

OS

E G

REA

SE

LEAT

HER

RO

LL B

ALL

JO

INTS

/ W

ITH

OU

T B

ALL

JOIN

TSEV

ERY

TIM

E W

HEN

RO

LL

IS F

ITTE

D, S

UFF

ICIE

NT

‘SER

VO

MU

LTIP

UR

PO

SE

GR

EAS

E

SH

OU

LD B

E A

PP

LIED

WEI

GH

T LE

VER

SG

REA

SE-

ON

CE

EVER

Y W

OR

KIN

G

WEE

K W

ITH

‘SER

VO

’ MU

LTIP

UR

PO

SE

GR

EAS

E

SW

ING

LEV

ERS

GG

REA

SE-

ON

CE

EVER

Y 4

WO

RK

IN H

RS

.

SW

ITH

‘SER

VO

’ MU

LTIP

UR

PO

E G

REA

SE

GEA

R P

INS

GR

EAS

E-O

NC

E EV

ERY

4

H

RS

. W

ITH

‘S

ERV

O’

MU

LTIP

UR

PO

SE

GR

EAS

E

TN

IMP

OR

AN

T O

TES

T

O

AR

D

H1.

P

LEA

SE

DO

NO

V

ERG

RE

SE

O U

NER

GR

EAS

ET

E M

AC

HIN

E;

AS

N

AE

E

U

ERI

OV

ER G

RE

IG

MAY

DM

AG

OIL

SA

LSW

HIL

E N

D G

REA

SN

G

DA

RM

AY

AM

GE

PATS

.G

G N

EE

N,

S

2.

AFT

ER F

ILLI

N

REA

SE

I T

H B

GI

NIN

GM

ILD

GR

EAIN

GA

S P

ERR

SO

BD

T

MU

EAO

IN

ST

UC

TIO

NS

H

ULD

E

ON

ES

O

HAT

C

H G

RS

E D

ESN

OT

E T

M

SP

WT

EC

OM

OU

FR

OG

REA

E O

INTS

; TO

AV

OID

A

SA

G O

FE

TN

T.

GR

EAS

AN

D C

ON

AM

IA

ION

TEN

IN

O

R&

I3.

S

PEC

IAL

AT

TO

S

HU

LD

BE

GIV

ENTO

P

RO

PE

TM

ELY

I

PR

BO

GG

REA

SN

G O

F W

RIS

T IN

& B

EATE

EA

RIN

G H

US

ING

EA

R S

IDE.

IA

NH

M

UD

BE

YF

I4.

IN

WN

TER

SE

SO

,TE

AC

HIN

ES

HO

L

E S

TAR

TD

B L

IT

NG

E

EH

ER

VC

OT-

DT

GTH

WIG

T IF

‘SO

A12

0’ IS

US

E O

N

EETH

OF

EAR

S.

N

HE

IN

IN‘S

EV

O-

20

’ K

S

SU

L

1. I

TB

EG

NG

R

OC

AT1

BL

AC

PAT

E

HO

DB

E

PIE

DO

L

O

EH

O

AR

Y

RS

R

BA

PL

N

YN

TE

T

FG

ES

B

BU

HO

Y

O

D

ET

TT

H

L

L

CN

TR

OL

LE

PO

UR

ING

T

O

NS

UR

E

HA

T

EE

OF

A

TH

EE

I

ER

O

AE

EE

OR

EE

IF

O

E

S.

GA

RS

N

GA

B

XR

C

OV

RD

, F

B

TT

RL

EF

GA

RE

E T

EO

SS

OC

EV

EY

EK

RP

ATH

PR

CE

N E

R W

E.

OE

NT

: PL

AE

ON

TL

N G

EI

EA

B Y

HD

AP

PIE

ES

D

O F

IL

AY

RA

SE

NG

RO

X IF

OU

A

LD

SR

V C

OA

-12

OE

E

. ‘

EO

T0’

N G

AR

TET

HF

ER

V

CO

T-P

AS

TI

O

TA

AI

AB

LT

EN

FIL

2.I

‘S

OA

12

0’

E

SN

V

LE

H

L

’U

PP

OE

RA

SE

O 5

6 K

S i.

eT

ALF

L

‘SER

VO

MLT

IU

RS

GE

AB

UT

-G

.. U

PO

H L

EVE

OF

INN

T

B

GN

NG

F

TE

Q

UA

NT

T

O

P

5

PIO

IN

HE

EI

NI

A

ND

UR

HR

IY

FU

TO00

M.

N E

RW

ET

MI

TL

VE

. G

SO

CE

VE

Y

EK

O

AN

TAIN

HE

EL

TB

GH

OS

ING

BEA

ER

EAR

IN

US

ID(G

EAR

E)

S-O

EE

R

WR

KIN

GH

GR

EAE

NC

V

EY

4O

R

S.

WS

ERO

MU

TIP

OE

GA

SE

ITH

‘V

’L

UR

PS

R

E

GJJ

/

IA

AN

PIN

W

RIS

TP

NG

AE

ON

CE

VR

Y 2

RE

S-

EE

WO

R

RS

. WT

KIN

GH

IH

‘R

VIP

UR

PS

SE

O’ M

ULT

OE

GA

ER

ES

S

HU

BG

2G

SR

EAS

E-l/

R

EAE

GE

ERY

UN

ON

CEV

6W

RK

I

O0

ON

GH

UR

SW

TH‘

ER’

I S

VO

MTI

PE

EU

LP

UR

OS

GR

EAS

GEA

RS

4

BAJ

AJ S

TEEL

IN

DU

STRIE

S LI

MIT

EDIM

AM

BA

DA

RO

AD

, N

AG

PU

R-

440

018.

IND

IA.

Tel:

+91-7

12-2

72

0071

~ 8

0

Fax:

+91-7

12-2

72

8050

/ 2

72

3068

BAJ

AJ D

R G

IN &

AU

TOFE

EDER

SPA

RE

PA

RTS

CAT

ALO

GU

E2

01

0

Page 8: FINALLY FINAL catalogue 2009 (3) - bajajngp.com · BAJAJ SPARE PARTS CATALOGUE AND OPERATING INSTRUCTIONS ... a chart showing important setting parameters is given below: ... Y-1

BAJAJ DR GIN STARTING GUIDELINES

I. Machine Beater Assembly should be set as per the requirement of quality of cotton in the area.2. All the points should be greased as per instructions provided about greasing. This is very important and proper care should be taken to

see that proper greasing is done, as shown on page no. 4.3. All the nut & bolts should be checked and tightened which might have got loosened during transit, loading, erection etc.4. After Beater setting, Machine should be run without putting Leather Washer Rolls on Machine i.e. without Rolls & without feeding any

cotton for about two hours5. After two hours of running, the Leather Rolls should be properly fitted to the Machine with Ball Joints properly greased or plain Roll

Shaft. All four Weights should be kept near the Rolls so that minimum load is there on the Machine. Then Machine should be started by lifting the Weights and slowly the Weights should be put back on Rolls.

6. The Machine should be run with Rolls fitted on it without feeding the cotton, and all the parts should be checked and if any bearing portion is observed hot the Machine should be stopped and greasing should be checked. After cooling of the part, grease the part and restart. Again check the part and if still observed hot, repeat the process few times to make the bearing free.

7. After running of about half an hour with Rolls, the Rolls will start getting polished / hot. Apply a wet clothth roughou t t he w id th o f t he Rollers of both sides, however, if Roll is not getting hot, then Weights should be pushed forward to increase the load so that Rolls can get polished fast. After about 8 hours of running, Machine should be stopped for about half an hour and all the parts should be once again checked. After further running of 4 hours without cotton, Machine shall be ready to use for cotton ginning.

8. After polishing of Rolls, the Rolls should be grooved properly on Roll Stand and reloaded on Machine. The groove specifications have been described on page no. 3 in settings required column.

9. After 8 hours running in above manner and cooling down period and loading of Polished Rolls with proper grooving, feeding of the raw cotton should be started. If proper flow of the lint is coming out from both the Rolls then Machine may be treated properly set, however, if any difference is found in the flow, necessary adjustment to Beater Head and Beater should be done to ensure proper flow of lint from each side.

10. In case extra thick blanket of cotton is observed, the Cut Off for higher length of staple can be increased by pushing the Head Pin inside to increase Cut Off. Similarly, if extra thin blanket is coming out of the Machine, there may be less staple length. This may be adjusted by pulling out the Head Pin outside slightly and head Bolt should be tightened to ensure equal flow of cotton lint from both the sides.

CHROME LEATHER ROLLER MAINTENANCE

1. Leather Rollers should be medium pressed as excess pressing may cause loss of shining and production of the cotton lint.2. Periodical grooving everyday should be done on Leather Rollers to maintain the depth of the groove to about 2 mm. The normal distance

between two grooves should be about 1” to 1-1/2”.However, this may be adjusted as per length of the staple.3. While cutting the groove, the saw should be kept straight so that the width of the groove is not increased and cut seed is avoided.4. The re-grooving of the Rollers should be done after about every 22 working hours.5. Only good quality Chrome Leather Washers should be used for better compatibility with knife, longer life of Roll & Knife and better lint

quality and output.Note : The roll washers shall be changed once the diameter reduces to 5 inches

Since it is very important that only high quality compatible spare parts should be used. Such as if the Knife is extra hard, it will eat out the Chrome Leather Roller very fast. Similarly if better quality Chrome Leather Washers are not used, it may affect the life of the Knife. Use genuine Bajaj Spare Parts for higher output and profitable maintenance of Bajaj DR.

The maintenance of proper moisture percentage in the raw cotton will always help better ginning. The proper moisture control methods should be used while automation of ginning factory and storage of raw cotton for better out turn.

IMPORTANT NOTES FOR BETTER WORKING AND LOWER MAINTENANCE

5BAJAJ STEEL INDUSTRIES LIMITEDIMAMBADA ROAD, NAGPUR- 440 018. INDIA. Tel: +91-712-272 0071 ~ 80 Fax: +91-712-272 8050 / 272 3068

BAJAJ DR GIN & AUTOFEEDER SPARE PARTS CATALOGUE 2010

Page 9: FINALLY FINAL catalogue 2009 (3) - bajajngp.com · BAJAJ SPARE PARTS CATALOGUE AND OPERATING INSTRUCTIONS ... a chart showing important setting parameters is given below: ... Y-1

DO’S AND DON’TS

CHECK LIST FOR VARIOUS STAGES OF BALAJ DR GIN FOR BETTER PERFORMANCE

1. Checklist for Installation of Bajaj DR Gin:

2. Checklist for Operation & Maintenance of Bajaj DR Gin:

a) Check 0-0 level of machine (at the bottom of Knife Rail).

b) Check that all the foundation bolts are properly tightened.

c) Check all nuts & bolts and tighten all nuts and bolts which might have got loosened during transit, loading, erection etc. Specially Cross

Bar, Gear Pins, Weight Lever, Rail, Connecting, Gear Box & Motor.

d) Check the alignment between Machine Pulley & Motor Pulley.

e) Check the Beater movement by rotating Machine Pulley by hand. It should swing equally in both directions.

f) Check that Weights are kept near Roller at beginning.

g) Check that all the points are properly greased as per instructions in Greasing Sketch.

h) Check that on starting of Electric Motor after proper greasing and observing above referred checks, the machine is running smoothly

and no abnormal heating is observed at any moving part of the machine and no abnormal sound is there.

a) Check that Leather Roller is properly grooved and reassembled only after applying minor grease to roll shaft ends.

b) Check that proper greasing to all the points is done as per the instructions shown in the lubrication sketch. Neither over greasing nor

under greasing should be done.

c) Check that the machine is run without load at the beginning as per guidelines.

d) Check that no excessive play is there between Gaggan pin and Bearing or Wrist Pin Bush and Wrist Pin.

e) Check that the Roll is properly polished and grooved as per instructions, before starting feeding of raw cotton.

f) Check that once you start feeding raw cotton the blanket of lint is coming out properly as desired.

g) Check periodically that all the nuts and bolts are properly tightened.

h) Check that whenever Gear Box is opened for replacing spare part etc. proper care is taken while reassembling the Gear Box i.e. the

clearance between the Pinion and 99 teeth gear, 89+46 Teeth Joint Gear, 95+49 Teeth of Joint Gear is adjusted by passing Sheet Metal

Strip of 24 Gauge thickness in between, while the Front Cover and hub bolts and Gear Pin Nuts are loose. All the bolts of Gear Box Front

Cover and hub are to be tightened evenly and simultaneously after matching the second hole on Gear Box. The Sheet Metal Strip can be

removed by rotating the Machine Pulley.

Do’s :

Don’ts :

1. Check all the routine parameters before switching on the machine everyday.

2. The Weight should be held up while switching on the machine at the start of each Day.

3. Run the machine for 2 to 5 minutes without feeding the raw cotton at the beginning of the day to warm up the Leather Rolls, to

avoid sticking of lint on roll due to moisture.

4. Before starting the machine at new season drain off the residual grease left in various parts with kerosene or Paraffin & apply

fresh grease.

5. Use genuine and standard quality spare parts for smooth and beneficial working.

1. Do not start the machine with raw cotton in Hopper Tray.

2. Do not run the machine without proper greasing.

3. Do not start the machine with Weights stretched to full on Weight Lever Rods.

4. Do not use non-compatible sub-standard parts and grease which may damage other parts also.

6BAJAJ STEEL INDUSTRIES LIMITEDIMAMBADA ROAD, NAGPUR- 440 018. INDIA. Tel: +91-712-272 0071 ~ 80 Fax: +91-712-272 8050 / 272 3068

BAJAJ DR GIN & AUTOFEEDER SPARE PARTS CATALOGUE 2010

Page 10: FINALLY FINAL catalogue 2009 (3) - bajajngp.com · BAJAJ SPARE PARTS CATALOGUE AND OPERATING INSTRUCTIONS ... a chart showing important setting parameters is given below: ... Y-1

1. Excess Lint on Seed Fibre Cut

2. Seed Chipping

3.Discontinuous blanket of Lint

4. Lint blanket hanging up

5. Seeds in Lint

1. Excessive clearance Between Seed Grid & Knife Rail2 Larger Size Grid

1. More clearance between Moving Knife & Fixed Knife.

2. Improper grooving on Leather Roll.3. Short size of Grid 4. Damage in edges of Back

Knife

1. Cut-off is excess.

2. Lower moisture

1. Cut-off is less2. Lower moisture

1. Improper positioning of Seed Guard2. Gap at sides

1. Reduce the gap between Grid Knife Rail as per seed size so that seed clears only on pressing by finger.

2. Change the size of Grid Slot according to seed size

1. Adjust the clearance betweenmoving knife and Fixed knife.

2. Control grooving to 2 mm size.

3. Use proper size Grid.4. Repair the edges of Back

Knife

1. Adjust the Cut-off/overlap asper staple length.

2. Use humidification methods.

1. Adjust the Cut-off.2. Stretch the wiper rope or Wooden

b l a n k t o w a r d s r o l l & U s ehumidification methods

1.Improve the positioning of Seed Guard.2.Remove the gap.

Trouble Symptoms Possible Causes Possible Solutions

Bajaj Auto Feeders are supplied in fully assembled condition. Proper installation of the same may be done as per following guidelines:

1. Fit the ‘U Clamp on DR Gin Machine frame properly and ensure that all the screws are tight.2. Loosen the nuts on each Mounting Angle fitted on Auto Feeder.3. Lift the Auto Feeder from four studs on take up unit and place it firmly on DR Gin Machine frame.4. Match the holes of ‘U’ Clamp with that of holes in Angle by adjusting the Auto Feeder Position.5. Insert the Hinge Pin in the hole of ‘U’ clamp and mounting angle & lock it by split pin on both sides.6. Tighten the nuts on each Folding Angle in this position.7. Adjust the Bearing Bracket to the lower most position.8. Tighten the V Belt / Link Belt between the Drive Pulley and Clutch Pulleys as per cross alignment.9. Check that all the Auto Feeder Rollers are straight and both the sides are aligned at 0-0.10. Check that Auto Feeder Cloth is neither very tight nor loose, this can be adjusted by bearing bracket.11. Check that all the Spike Strips are straight & no nails are broken or damaged.

Mounting

GUIDELINES FOR INSTALLATION OF BAJAJ AUTO FEEDER

GUIDELINES FOR TROUBLE SHOOTING IN BAJAJ DR GIN

7BAJAJ STEEL INDUSTRIES LIMITEDIMAMBADA ROAD, NAGPUR- 440 018. INDIA. Tel: +91-712-272 0071 ~ 80 Fax: +91-712-272 8050 / 272 3068

BAJAJ DR GIN & AUTOFEEDER SPARE PARTS CATALOGUE 2010

Page 11: FINALLY FINAL catalogue 2009 (3) - bajajngp.com · BAJAJ SPARE PARTS CATALOGUE AND OPERATING INSTRUCTIONS ... a chart showing important setting parameters is given below: ... Y-1

1. Start the Auto Feeder keeping the Upper Drive Roller in the minimum tension and check that the Conveyor Cloth is having sufficient tension to make it rotate along with Rollers, however, if it is loose adjust the Bearing Bracketequally on each side.

2. If any tilting or shifting is observed in the Conveyor Cloth, it should be adjusted so that it is straight. This can again be adjusted by tensioning & loosening of bearing bracket.

3. Avoid extra tightening of Conveyor Cloth ,however, it should have sufficient tension for proper drive by roll.4. At the time of starting ,the Auto Feeder should be empty and raw cotton should be filled only after starting.5. Ensure that the raw cotton is not filled excessively. In any case it should not be filled above the level of inspection window given

on side cover drive side/offside.6. Regularly clean the Auto Feeder by cleaning cloth at least once a month inside to remove the cotton and

materials which might have entered inside. Because this might cause tearing of cloth due to friction.7. Periodically check the tension in Cloth.8. Due to elongation, the Link Belt / Vee Belt may get loose in the beginning. Adjust the tension with the help of Tension

Pulley and by removing Links wherever necessary.9. Periodically open the glass door of the Hopper Sheet to remove impurities such as immature boils, stones,

leaves etc.

1. Cloth shifts to one side

2. Upper Roller Shifts to one side

3. Lower flow of the raw cotton

4. Seeds coming out of lower portion of Hopper

1. Unequal tension on Roller

1. Lock bush might be loose

2. UCT Bearing Allen Grub Screw might be loose

1. Centre Pipe may be on lower Position for higher moisture Cotton

1. Hopper Sheet bend

2. Hopper Sheet not properly set on Seed Guard

Probable Causes 1. Adjust the tension of the Roller either by increasing tension on the side which is down or slightly reduce the Tension on other side.

1. Tight the Lock Bush from belt sides.2. Tighten the Allen Grub Screw on Bearings on both Sides.

1. If cotton moisture is low lift the Centre Pipe to the upper Hole.

1. Straighten the Hopper Sheet or provide Stiffener if necessary.2. Properly push the Hopper Sheet to reduce the gap between Hopper Sheet

and Seed Guard.

Probable Solutions Problem Symptoms

TROUBLE SHOOTING CHART FOR BAJAJ AUTO FEEDER

GUIDELINES FOR OPERATION AND MAINTENANCE OF BAJAJ AUTO FEEDER

8BAJAJ STEEL INDUSTRIES LIMITEDIMAMBADA ROAD, NAGPUR- 440 018. INDIA. Tel: +91-712-272 0071 ~ 80 Fax: +91-712-272 8050 / 272 3068

BAJAJ DR GIN & AUTOFEEDER SPARE PARTS CATALOGUE 2010

Page 12: FINALLY FINAL catalogue 2009 (3) - bajajngp.com · BAJAJ SPARE PARTS CATALOGUE AND OPERATING INSTRUCTIONS ... a chart showing important setting parameters is given below: ... Y-1

Cktkt Mh vkj ftu cksYV lsaVjQkmUMs’ku

uksV a k1- tgkW vyx ls ugha n ;k gS os lHkh e i fe-eh- esa n×kkZ;s x;s gSaA

a2 z- mijksDr fp= lk/kkj.kr% cuusokyh ftuhax QWDVjh dk lkadsfrd ysvkmV gS] ftlesa dkWdhV ds lkbZM IysVQkeZ]lsaVªy IysVQkeZ]vkWVkseWfVd lsV vi]QksYMhax ,WaxYl~ ;k xzkgd dh vko×;drkuqlkj ifjorZu laHko gS] vf/kd tkudkjh ds fy, —i;k daiuh ls laidZ djsaA

×kkZ

ctkt Mh vkj ftu R.C.C. QkmUMs’ku

e”khu cksYV dh txg

1177 Lis”ky gsrw

1307 b-,y- gsrw

1477 tEcks gsrw

760

(30

”)

430 152 298

880 430dUos;j czWdsV cksYV dh txg

e”khu ua- 1 e’khu ua- 2

LykbM

jsy

ua- 1 e

”khu

vv

v vc

fooj.k txg cksYV lkbt fe-eh-

v

c

tEcks Mh vkj ftu ds fy,-

LykbM jsy ,oa dUos;j czdsV Lis”ky] ,DLVªk ykWax ,oa tEcks Mh vkj ftu ds fy,-

Lis”ky ,oa ,DLVªk yk¡x Mh vkj ftu

19 X 450 yackbZ(3/4” X 18”)

16 X 450 yackbZ(5/8” X 18”)

16 X 450 yackbZ

150

dUos;j

czWdsV

cksYV

dh tx

gc v

v

v

v

QkmUMs’ku cksYV ds lkbt

c

c

760

(30

”)

bekjr

dh fnokj

8 200

8 150

8 150

Ø8 TAR BAR

Ø8 TAR BAR

(1:2:4) M15

11

80

[3

'-1

0"]

1750 [

5'-

9"]

50

0 [

1'-

8"]

15

0 [

6"]

10

0 [

4"]

23

0

315 [12.5"]

718 [2'-4.2"] 718 [2'-4.2"]

B

A

B

A

161

760 [2'-6"]

1436 [4'-8.5"]

2286 (Min)[7’6”]

23

0 [

9"]

T

T

T

161

5425

42

952

597148 148

[9

"]

542

542

100

4061440

437

158

+

(1:3:6) M10

bZV dh fnokj115 pkSMkb4.5”¼ ½

bekjr dh fnokj lse'khu dk lsaVj

Vksj

9BAJAJ STEEL INDUSTRIES LIMITEDIMAMBADA ROAD, NAGPUR- 440 018. INDIA. Tel: +91-712-272 0071 ~ 80 Fax: +91-712-272 8050 / 272 3068

BAJAJ DR GIN & AUTOFEEDER SPARE PARTS CATALOGUE 2010

Page 13: FINALLY FINAL catalogue 2009 (3) - bajajngp.com · BAJAJ SPARE PARTS CATALOGUE AND OPERATING INSTRUCTIONS ... a chart showing important setting parameters is given below: ... Y-1

Cktkt Mh vkj ftu e’khu dh izfrLFkkiuk ds fy, fn’kk funsZ’kctkt Mcy jksyj ftu vlsEcYM :i esa Hksth tkrh gS bldh izfrLFkkiuk ds le; ;g lqfuf”pr djys dh ljdh dUkos;j dh fQfVax adkdz hV dh Mksaxh es gks pqdh gSA bldh izfrLFkkiuk ds fy, fuEu funsZ”kksa dk ikyu djsa%W

1. e”khu dks Hkyh izdkj QkmUMs”ku cksYVl ij j[k nsuk pkfg, rFkk lkjs uV VkbZV djus pkfg, A blds i”pkr jsy ds nksuksa vksj ds fupys fgLls ij ikuh dk ysoy 0-0 psd djysa] vxj ikuh dk ysoy 0-0 ugh gS rks QkmUMs”ku cksYV ds uV f<ys dj iWfdax Ik h e”khu ds ds fups Mkysa rFkk iqu% uV Hkyh izdkj dl nsus pkfg,A

2. s e”khu dh chVj vlsEcyh dks dikl dh DokfyVh ds vuqlkj lsV fd;k tkuk pkfg,A fQDl ukbZQ rFkk ewfox ukbZQ d chp esa tks varj j[kk tkuk gS og U;qure 1.5 fe-fe- rFkk vf/kdre 2 fe-fe- j[kuk pkfg;sA mls e”khu ds lkFkHksts x, ßxstÞ }kjk lsV fd;k tkuk pkfg,A

3. lHkh uV ,oa cksYV dh Bhd ls tkWap djsa rFkk e”khu ds ifjogu] yksfMax] vuyksfMax vkfn ds nkSjku f<ys gq;s uV ,oa cksYV dks dlsaA

4. eksVj jsy dks Hkyh izdkj ls QkmUMs”ku cksYVl ij j[kdj lHkh uV Hkyh izdkj ls dl nsus pkgh,sA5- fctyh dh eksVj dks eksVj jsy ij j[k dj ml ij yxh eksVj iqYyh dk ysoy e”khu ij yxh iqYyh ls fl/kkbZ esa feyk ysuk pkfg, rFkk

Ogh csYVl dks Hkyh izdkj fQV dj eksVj cksYVl dl nsuk pkfg,A6- se okW”kj jksy dks e”khu esa fQV djysaA bldh fQfVax ds fy, fLoax fyOgj vkWQ lkbM dks ckgj fudkys rFkk mfpr

fxzflax fd;k gqvk jksy “kkW A jksy dks gkFkksa ls A

7- gkWIkj V ksV A vkWVks QhMj izfrLFkkiuk dh i/nrh bl iqLrd esa vkxs nh x;h gSA

8- A

A

ê Ýse

Øks¶V dks fLoax fyOgj fx;j lkbM esa Mkydj fLoax fyOgj vkWQ lkbM esa fcBk;sa

?kqekdj ;g lqfuf”pr djysa dh Vsij fiu jksy ds ?kqers le; Ýse ij dgh uk jxMsaªªs dks e”khu Ýse ij fcBk;sa ;fn vkWVks QhMj cxSj thfuax djuh gS r vkWVks QhMj dks e”khu ij fcBkdj

gh gkWij ªs yxk;sae”khu ds lkFk Hksts x;s otuksa dks bl iqLrd esa nh;s x;s fn”kk funsZ”k ds vuqlkj osV fyOgj jkWM ij yxkuk pkgh, rFkk jksy ikWfy”khax djuh pkgh,

Cktkt Mh vkj ftu e’khu dh lsfVax

ukbZQ jsy dks vWMtLV djus ds fy, bu uV~l dks <hyk djsa rFkk ukbZQ jsy vWMtLV djus ds ckn okil dl nsaA

ukbZQ jsy dh ,d rjQ dh vWMtLVesaV dks n”kkZrk fp=A

chVj dh mWapkbZ vWMtLV djus ls igys fcVj dWi ds uV dks <hyk djsa o ?kqekdj cs;fjax gkWmflax dks Bhd txg Ykkus ds ckn okil iwjh rjg dl nsaA

achVj dh mWpkbZ de djus ds fy, jWpsV a aadks ckW;s ?kqek,W rFkk chVj dh mWpkbZ dks

ac<kus ds fy, jWpsV dks nk¡;s ?kqek,WA

ukbZQ jsy dks lsV djus ds fy, bu cksYVl dks <hyk djsa ;k dls rFkk ukbZQ jsy lsV djus ds ckn okil iwjh rjg dl nsaA

10BAJAJ STEEL INDUSTRIES LIMITEDIMAMBADA ROAD, NAGPUR- 440 018. INDIA. Tel: +91-712-272 0071 ~ 80 Fax: +91-712-272 8050 / 272 3068

BAJAJ DR GIN & AUTOFEEDER SPARE PARTS CATALOGUE 2010

Page 14: FINALLY FINAL catalogue 2009 (3) - bajajngp.com · BAJAJ SPARE PARTS CATALOGUE AND OPERATING INSTRUCTIONS ... a chart showing important setting parameters is given below: ... Y-1

Cktkt Mh vkj ftu e’khu dh lsfVax1- loZizFke fQDl ukbZQ dks xst dh lgk;rk ls iwjh rjg lh/kk lsV dj ysaA lk/kkj.kr % xst dk Åijh fljk iwjh yackbZ

esa leku :i ls lhV ls 85 feyh&ehVj gksuk pkfg,A2. chVj “kk¶V ij yxs ewfoax ukÃQ ds /kkjksa dks fQDLM ukÃQ ds /kkjksa ls lekukarj 1-1/2 feyh ehVj nwjh ij lsV dj

ysaA ;g fuEu izdkj ls fd;k tk ldrk gS %1. ;fn ewfoax ukÃQ rFkk fQDLM ukÃQ ds /kkjksa esa nks foijhr d.kksZ esa varj gks rks jsy cksYVl+ dks

f<yk djsa rFkk jsy lsV djus ds ckn okil iqjh rjg dl nsaA2. ;fn varj vf/kd gS rks chVj vkeZ vkSj ewfoax ukÃQ ds chp leku iWfdax nsaA

3- vkWflysfVax gsM dks chVj “kk¶V ds Åij yxk,Wa rFkk gsM fiu es fuMy csfjax Mkydj mls dusfDVxa jkWM es xtu fiu Mky dj tksM nsaA

4- ewfoax ukbZQ dks bl izdkj ls chVj ij lsV djsa fd nksuksa rjQ LVªksd cjkcj jgsA ;fn nksuksa rjQ vksojyWi@dV vkWQ cjkcj ugha gS rks fuEu izdkj ls bls lsV djsa %1. jWpsV dks mij fups djds ,Slk fd;k tk ldrk gS ;nh vksojyWi@dVvkWQ e”khu ds fx;j lkbM vkSj vkWQ lkbM

esa cjkcj uk gksA2. vkWflysfVax gsM dks vWMtLV djds bls Bhd dj nsaA

5- ewfoax ukÃQ ds fdukjs fQDl ukÃQ ds fdukjks ls ftu fd;s tk jgs dikl ds js”ks dh 1/3 yackbZ ;k mlls FkksMs vf/kd uhps dh vksj vanj tkuk pkfg,A lk/kkj.kr% lkekU; ;k vf/kd ueh okys dikl ds fy, yxHkx 1/16''vf/kd vksojyWi@dV vkWQ fQDl ukbZQ dh iwjh yackbZ ij leku :ils gksuk pkfg, ijarq ;fn dikl es ueh de gS rks dV vkWQ dks dikl dh 1/3 yackbZ rd lhfer j[kuk pkfg,A

6- vksojyWi @ dV vkWQ FkksMk de ;k T;knk djus ds fy, gsM fiu dks vWMtLV djsaA gsM fiu dks vkWflysfVax gsM ls ckgj [khapus ij vksojyWi @ dV vkWQ de gksxk rFkk vanj nckus ij vksojyWi @ dV vkWQ c<sxkA ftruh :bZ Qkbcj ¼js”kk½ dh yackbZ gksxh mlh vuqikr esa vksojyWi@dV vkWQ j[kk tkuk pkfg,A

7- tkyh ds fupys fgLls dks jsy ds lacaf/kr fgLls ds lkFk bl rjg vWMtsLV djsa dh nksuksa ds fcp dk varj cht ds vkdkj ls cMk uk gksA fct maxyh ds gYds ncko ls ckgj fudy tkuk pkfg,A

8- csgrj tkudkjh ds fy, Ñi;k fuEu pkVZ esa fn, x, egRoiw.kZ lsfVax lq>koksa dk ikyu djsa %

¼MkbZxksuy ikWbZaV½

+

Ek”khu ikVZ vko”;d lsfVax1- tkyh dk fupyk fgLlk vkSj jsy dk lacf/kr fgLlk

2- ewfoax ukÃQ rFkk fQDl ukÃQ ds chp dk varj

3- jsy dh lhV ls fQDl ukÃQ ds Åijh fljs dh mWapkbZ4- okW”kj jksyj ds Åij ukfy;kWa

v½ nks ukfy;ksa ds chp dk varjc½ ukyh dh pkSMkbZ d½ ukyh dh xgjkbZ

1- varj cht ds vkdkj ls cMk u gks rkfd maxyh ds gYds nckols cht fudy tk,A

2- 1-1/2 fe-eh- ls 2 fe-eh- iwjh yackbZ ij Lkeku :ils gksuk pkfg,A

3- 85 fe-eh- ¿vf/kd yach :bZ ds fy, vf/kdre 87 fe-eh-4- 25 fe-eh- ls 40 fe-eh- rd yach :bZ ftfuax djus gsrq

1'' ls 1-1/2'' rd gksuk pkfg,sA2 fe-eh-2 fe-eh-

uksV % okW”kj jksyj ds mij ukfy;ksa dks fudkyus dk rjhdk ctkt Mh vkj ftu e”khu pkyw djus ds fn”kk funsZ”k esa fn;k gS

11BAJAJ STEEL INDUSTRIES LIMITEDIMAMBADA ROAD, NAGPUR- 440 018. INDIA. Tel: +91-712-272 0071 ~ 80 Fax: +91-712-272 8050 / 272 3068

BAJAJ DR GIN & AUTOFEEDER SPARE PARTS CATALOGUE 2010

Page 15: FINALLY FINAL catalogue 2009 (3) - bajajngp.com · BAJAJ SPARE PARTS CATALOGUE AND OPERATING INSTRUCTIONS ... a chart showing important setting parameters is given below: ... Y-1

Cktkt Mh vkj ftu e’khu dh lsVhax

m qvksojyWi lsfVax djrs le; :bZ Qkbcj dh yackbZ]ueh ,oa dikl dh xq.koRrk dk /;ku j[kuk vfr vko”;d gSA ijksDr igyvksa dks /;ku esa j[krs gq, e”khu dks lgh <ax ls lsV djsaA

l-ua- dikl fd fdLe LVsiy ysUFk dV vkWQ@vksoj ySi cht dk vkdkj@tkyh dk vkdkj

1- ns’kh caxky] ckxM 17 - 18 5 6 fe-fe- 1/4''

2- ts 34] ¼ujek½ 26 - 28 fe-fe- 9 - 9-5 fe-fe- 9/32''

3- ok; - 1] th - 12 24 - 27 fe-fe- 6 - 7 fe-fe- 1/4''dY;k.k] t;/kj

4- ch- Vh- dkWVu 28 - 30 fe-fe- 9.5 - 10 fe-fe- 9/32''

5- ladj - 4 30 - 31 fe-fe- 10 - 10-5 fe-fe- 9/32''ladj - 6 19/64''

5/16''

6- lohrk] ,e-lh-;w--5 31 - 32 fe-fe- 10.5 - 11 fe-fe- 9/32''cUuh] czEgk 19/64''

5/16''

7- Mh-lh-,p--32 33 - 34 fe-fe- 13 - 14 fe-fe- 9/32''ojy{eh] fLou 19/64''

5/16''

8- ratkfu;u dkWVu 30 - 31.5 fe-fe- 10 - 11 fe-fe- 9/32''ftEckcoss dkWVu 5/16'';wxkUMk dkWVu 19/64''

9- xhtk ¼bthIrf’k;u dkWVu½ 33 - 38 fe-fe- 14 - 17 fe-fe- 9/32’’5/16''

fiek dkWVu ¼is# dkWVu½ 11/32''lkmFk vesfjdk

fe-fe- -

12BAJAJ STEEL INDUSTRIES LIMITEDIMAMBADA ROAD, NAGPUR- 440 018. INDIA. Tel: +91-712-272 0071 ~ 80 Fax: +91-712-272 8050 / 272 3068

BAJAJ DR GIN & AUTOFEEDER SPARE PARTS CATALOGUE 2010

Page 16: FINALLY FINAL catalogue 2009 (3) - bajajngp.com · BAJAJ SPARE PARTS CATALOGUE AND OPERATING INSTRUCTIONS ... a chart showing important setting parameters is given below: ... Y-1

Cktkt Mcy jksyj ftfuax e’khu d

s yqfczd

sfVax ikWbaV n’kkZrk fp=

13

BAJ

AJ S

TEEL

IN

DU

STRIE

S LI

MIT

EDIM

AM

BA

DA

RO

AD

, N

AG

PU

R-

440

018.

IND

IA.

Tel:

+91-7

12-2

72

0071

~ 8

0

Fax:

+91-7

12-2

72

8050

/ 2

72

3068

BAJ

AJ D

R G

IN &

AU

TOFE

EDER

SPA

RE

PA

RTS

CAT

ALO

GU

E2

01

0

chVj

cs;fjax

gkÅ

flax

¼vkWQ lkbM½

Áfr

pkj ¼4½ ?kaV

s pyu

s ij ,d

ckj lo

ksZ eYVhijit xzhl Hkj

saA

ckWy

tkWbUV

@ ;k c

xSj

ckWyt

kWbUV o

kys y

snj jksy

tc Hkh e”khu

ij yx

k,¡ r

c Hky

h izd

kj l

oksZ e

YVhijit

xzhl

yxk nsaA

osV fyo

j

pyus

ij ,

d c

kj l

oksZ

eYVhijit

xzhl HkjsaA

Áfr

g¶rs

¼7 fnu

½ e”khu

fLoax

fyoj

ckj lo

ksZ eYVhijit

xzhl HkjsaA

Áfr

pkj ¼4½ ?akV

s pyu

s ij ,d

fx;j

fiu

ckj lo

ksZ eYVhijit

xzhl HkjsaA

Áfr

pkj ¼4½ ?akV

s pyu

s ij ,d

chVj

cs;fjax

gkÅ

flax

¼fx;j

lkbM½

Áfr

pkj ¼4

½ ?kaV

s pyu

s ij ,d

ckj lo

ksZ eYVhijit

xzhl HkjsaA

xtufiu

@fjLV

fiu

ckj lo

ksZ eYVhijit

xzhl HkjsaA

Áfr

nks ¼

2½ ?akV

s pyu

s ij ,d

gc ,d c

kj v

k/kk xzhlx

u lo

ksZ eYVhijit

xzhl HkjsaA

Áfr

lkB

¼60½ ?akV

s pyu

s ij

dqN

Ë;ku n

sus ;ksX; c

krsa

1

auqd

lku

igWpk l

drk g

S tcfd d

e xzhl

iqtksZ dks uqd

lku

igqWpk l

drk g

SA2-vkjaHk

esa Hky

h izd

kj x

zhl Hkjus

ds c

kn l

e; i

j funsZ’kku

qlkj mi

;qDr

ek=k e

sa gh x

zhl Hkjuk p

kfg,

rkfd x

zhl i

kWbUV l

s xzhl c

kgj u

fudys

o xzhl

dh cc

kZnh

rFkk çn

w’k.k dks de

fd;k t

k ld

sA3-xt

ufiu

@fjLV

fiu

o fx;j

lkbM

ds c

hVj cs;

fjax

gkÅflax

esa le

; ij

fu;e

kuqlkj xzhl

Hkjus

ij fo”ks’k ?;ku

fn;k t

kuk pkfg,A

4-fx;j

nkWarksa ij ;

fn l

oksZ d

ksV&1

20 d

kyk isLV

yxk;k x;

k gks r

ks bl

n”kk e

sa ln

hZ@tkMs

ds e

kSle

esa e”khu

dks ot

u mB

kdj pkyw

dju

k pkfg,A

- e”khu

esa v

ko”;drk l

s vf/kd ;

k de

xzhl

u Mkysa&

vf/kd x

zhl v

kWby

lhy

dks

fx;j

1

lHkh fx;j

ds fl

QZ lHkh nk¡r d

oj gks t

k,a ft

lls fx

;j d

k dk;Zdky csgr

j gksA

;g izfØ;k izfr lkr fn

u esa ,d

ckj nksgjk,aA uksV % lo

ksZ dksV&1

20 isLV yxkus

ij fx

;j ckDl esa xzhl u Hkj

saA

2

¿yxHkx ik¡p l

s NS ¼

5&6

½ fdyksÀ lo

ksZ eYVhijij xzhl

vkjaHk

esa Hkj

sa rFkk ifzr

lIrkg ,d

ckj yxHkx ik¡p lkS ¼

500½ x

zke xzhl Mkysa rkfd

ysoy

cuk jgs A

- vkjaHk

esa lo

ksZ dksV&1

20 d

kyk i

sLV] c

z”k ;k /khe

h /kkj l

s bl

izdkj y

xk,sa fd

- ;fn lo

ksZ dksV&1

20 d

kyk i

sLV miy

C/k ugha gS rks fifu;

u ds v

k/ks y

soy rd

Page 17: FINALLY FINAL catalogue 2009 (3) - bajajngp.com · BAJAJ SPARE PARTS CATALOGUE AND OPERATING INSTRUCTIONS ... a chart showing important setting parameters is given below: ... Y-1

1.

lHkh xzhflax ikWabUV ij funsZ”kkuqlkj 2.

lHkh uV ,oa cksYV dh Bhd ls tkWp djsa rFkk e”khu ds ifjogu] yksfMax] vuyksfMax vFkok izfrLFkkiuk ds nkSjku <hys gq;s uV ,oa cksYV 3.

dks dlsaAchVj lsfVax ds ckn ftu e”khu dks cxSj ysnj jksy yxk, ,oa fcuk dikl Mkys nks ?kaVs rd [kkyh pyk,WaA4.

mfpr xzhflax fd, gq, cxSj ckWy tkWbUV ;k ckWy tkWbUV ds lkFk ysnj e”khu dks nks ?kaVs pykus ds ckn jksy dks e”khu es Bhd ls fQV djsaA 5.

lHkh pkj otuksa dks jksy ds utnhd j[kuk pkfg, ftlls e”khu ij de ls de Hkkj vk,A blds ckn otu dks mBkdj e”khu dks pkyw djsa ,oa /khjs&/khjs otu dks okfil jksy ij j[ksaA

a ,aoe”khu ij jksy fQV djds fcuk dikl Mkysa pyk,W lHkh ikVZ dh vPNh rjg tkWap dj ysa];fn cs;fjax okyk dksbZ fgLlk xeZ gksrk gS rks 6.

e”khu dks jksddj mldh xzhflax dh tkap djsaA e”khu ds mijksDr fgLls ds BaMk gksus ij mls xzhldjds e”khu iqu%”kq: djs aA ckn esa lanfHkZr fgLls dh iqu% tkap djsa rFkk fQj Hkh mls xeZ ik;s tkus ij mijksDr ifØ;k rc rd nksgjk,Wa tc rd fd cs;fjax Bhd rjg ls Qz h ugha gksrkAdjhc vk/kk ?kaVk jksy yxkdj e”khu pykus ds ckn jksy fpduk@xeZ gksus yxsxkA xhys diMs ls nksuksa jksy dks iwjh rjg iksaN ysa] ;fn jksy 7.

xeZ ugh gks jgk gks rks otu dks vkxs <dsyuk pkfg, rkfd Hkkj c<k dj jksy tYnh fpduk gksus yxsxkA djhc vkB ?kaVs pyus ds ckn e”khu dks djhc vk/kk ?kaVs ds fy, jksd ysuk pkfg, vkSj e”khu ds lHkh fgLlksa dh iqu% tkap djuk pkfg,A mlds mijkar pkj ?kaVs yxkrkj pykus ds ckn e”khu dikl ftuhax ds fy, rS;kj gksxhA

ajksy fpduk gksus ds ckn jksy dks uhps mrkj dj jksy LVWUM ij j[kdj mfpr /kkfj;kW cuk ysa ,oa mls e”khu esa iqu% fQV djsaA /kkfj;ksa dh 8.

pkSMkbZa] xgjkbZa ,oa varj ds fy, ist ua 11 ds Vscy dks ns[ksaAmijksDr i/nrh ls vkB ?kaVs ds xje ,oa BaMk gksus dh dkykof/k ds ckn o mfpr /kkfj;ksa okys fpdus jksy fQV djus ds ckn e”khu pkyw 9.

djds mlesa dikl Mkyuk pkfg,A ;fn nksuksa jksy ls :bZ cjkcj izokfgr gks jgh gks rks e”khu dh lsVhax lgh rjg ls gqbZ gSA ;fn iz okg esa vlekurk gks rks chVj gsM ,oa chVj dks vko”;drkuqlkj vWMtLV djsa ftlls fd nksuksa jksy ls :bZ dk izokg lgh <ax ls gksA;fn fdlh dkj.ko”k :bZ dh pknj vf/kd eksVh fn[kkbZ ns rks gsM fiu dks vUnj dh vksj <dyus ls vf/kd yacs LVsiy ds dV vkWQ dks 10.

c<k;k tk ldrk gSA mlh rjg vxj :bZ dh pknj vf/kd iryh fn[kkbZ ns rks gsM fiu dks FkksMk ckgj dh vksj [khapus ls de yackbZ ds LVsiy ds dV vkWQ dks vWMtLV fd;k tk ldrk gS ,oa gsM cksYV dks mfpr rjg ls dlsa ftlls nksuksa cktw ls :bZ dk leku iz okg fudysA

vkids {ks= esa dikl dh xq.koRrk dks /;ku esa j[krs gq, e”khu dh chVj vlsEcyh dks lsV djsaAxzhflax djuk pkfg,A ;g vfr vko”;d gSA mfpr xzhflax gqvk ;k ugha bldk Bhd ls /;ku nsaA

dkse ok’kj jksy dk j[kj[kkoz

1- Økse ok”kj jksy dh izsflax vf/kd gksus ls :bZ dh ped ,oa mRiknu esa deh gks ldrh gS blfy, mls e/;e izsl djsaA2- ukfy;ksa dh xgjkbZ LFkkbZ :i es djhc 2 fe-eh-j[kus ds fy, gj fnu fuf”pr dkyko/kh ds ckn jksy ij vkjh ls ;k e”khu }kjk /kkfj;kWa

cuk,Alk/kkj.kr% nks /kkfj;ksa ds chp l dk varj gksuk pkfg,] ;nkfi bls LVsiy dh yackbZ uqlkj vWMtLV dj ldrs gSaAa W 1'' s 1&1/2''

3- ukfy;kWa cukrs le; vkjh dks lh/kk j[ks rFkk e”khu dks Bhd ukyh dh fn”kk ij j[k dj gh jksy dks dkVs] ftlls ukyh dh pkSMkbZ T;knk u c<s ,oa cht dks VwVus ls jksdk tk ldsA

4- gj 22 ?kaVs dk;Zdky ds mijkar jksy dh ukfy;kWa iqu% lq/kkjuk pkfg,A5- jksy dh ukbQ ds lkFk csgrj vuq:irk ds fy, rFkk jksy ,oa ukbZQ vf/kd fnuksa rd pyus ds fy, ,oa :bZ dh csgrj xq.koRrk ,oa

mRiknu ds fy, mRre DokfyVh ds dkse ysnj ok”kj bLrseky djsaAz

uksV % O;kl ;nh 5 bap rd ?kV tk;s rks u;k z zdkse ok”kj dk dkse ok”kj yxk;sa A

14BAJAJ STEEL INDUSTRIES LIMITEDIMAMBADA ROAD, NAGPUR- 440 018. INDIA. Tel: +91-712-272 0071 ~ 80 Fax: +91-712-272 8050 / 272 3068

BAJAJ DR GIN & AUTOFEEDER SPARE PARTS CATALOGUE 2010

whCktkt Mh vkj ftu e’k u pky djus ds fn’kk funsZ’k

Page 18: FINALLY FINAL catalogue 2009 (3) - bajajngp.com · BAJAJ SPARE PARTS CATALOGUE AND OPERATING INSTRUCTIONS ... a chart showing important setting parameters is given below: ... Y-1

;fn vfr dfBu @ l[r ukbQ dk iz;ksx fd;k tk,xk rks og Økse ysnj ok”kj dks cgqr tYnh f?kl Mkysxk] blfy, ;g vR;ko”;d gS fd lqlaxr Lisvj ikVZ dk gh fu;fer mi;ksx gksuk pkfg, A ;fn mRre xq.koRrk ds dzkse ysnj ok”kj dk mi;ksx u gksrk gks rks mlls ukbQ dh mez ?kV ldrh gSA ctkt Mh vkj ftu e”khu ls vf/kd mRiknu ,oa U;wure j[kj[kko ds fy, ctkt ds vlyh Lisvj ikVZ dk gh mi;ksx djsaAdikl es mfpr ek=k esa ueh dk j[kuk csgrj ftfuax ds fy, lgk;d gksrk gSA ftfuax QWDVjh ds Lo;apyu ¼vkWVkses”ku½ ,oa csgrj mRiknu ds fy, rFkk dikl ds HkaMkj.k ¼LVksjst½ ds fy, mfpr ueh fu;a=d ;a= ¼º;qfeMhQk;j½ dk iz;ksx djuk pkfg,A

1- ctkt Mh vkj ftu dh izfrLFkkiuk ds fy, tkWap rkfydk%v½ e”khu dh 0-0 yos y dh tkpaW dja s ¼e”khu jys ds nkus ka s vkjs ds fupys fgLl½s A

a WCk½ lHkh QkmUM”s ku ckYs V Bhd ls dls g,q ga S bldh tk djAaspa Wd½ lHkh uV ,oa ckYs V dh Bhd ls tkp dja s rFkk e”khu ds ifjogu ykfs Mxa vuykfss Mxa LFkkkiuk vkfn ds nkjS ku <hys g,q uV ,oa ckYs V fo”k’s kr%

Økl¡ ckj] fx;j fiu] oVs fyoj] jys ] dufs DVxa ] fx;j ckDW l ,oa ekVs j dks dlAasMbQ

g

½ e”khu iYq yh ,oa ekVs j iYq yh dh fl/kkbZ dh tkpaW djAsa½ e”khu iYq yh dks gkFk ls ?keq kdj chVj dh xfr@ pky dh tkpW djAas og nkus ks vkjs cjkcj >yw uk pkfg,A

a½ “k:q vkr ea s otuka s dks oVs fyOgj jkMW ij jkys j ds ikl j[kk gS bldh tkpW djAasa pXk½ xhz flxa ds fp= ea s funfZs ”kr lHkh ikbW UV Bhd rjg ls xhz l fd, gks bldh tk djAasW

½ e”khu dh mi;Dq r tkpaW ,oa mfpr xhz flxa ds i”pkr byfs DVdª ekVs j “k:q djus ij e”khu lpq k: <xa ls py jgh gSaa pbldh tk djAas e”khu dk dkbs Z Hkh xfreku itq kZ vlk/kkj.k :i ls xeZ u gks ,oa mlea s vlk/kkj.k vkokt u gks bldh tk djAaspWW

aCktkt Mh vkj ftu e’khu ds cgs rj in’kuZ ds fy, fofHkUu voLFkkvka a s dh tkpW rkfydk z

- a2 Cktkt Mh vkj ftu dh fØ;k ,oa j[kj[kko ds fy, tkWp rkfydkav½ Bhd <xa ls ukfy;k W cus g,q yns j jkys dks cxjS ckyW tkbW UV ;k ckyW tkbW UV ea s xhz l yxkus ds ckn e”khu ij yxk, x, ga S bldh

Ck½ A =k ea s ugha gbq gks bldk /;ku j[kAasd½ fn”kk funfs ”kr “:q vkr ea s e”khu fcuk Hkkj ds pykbZ xbZ gS

tkpaW djAasfp= ea s funfZs ”kr xhz lhxa lHkh ikbW UV Bhd rjg ls xhz l fd, gks bldh tkpaW djas xhz flxa vf/kd ;k de ek

a a WZ k bldh tkp djAas bl ckr dh tkp dja s fd xtufiu ;k fjLV fiu ea s vf/kd <hykiu W;k Iys uk gkAs

ab½ dikl dks e”khu ea s Mkyus ds igys jkys mfpr idz kj ls ikfW y”k ¼fpduk½ gS rFkk ml ij ukfy;ka W fn;s g;q s fn”kk fun”Zs kka s ds vulq kj g]S bldh tkWp djAas

aQ½ dikl Mkyus ds ckn :bZ dh pknj vk”kku:q i vk jgh gS bldh tkpW djAasaXk½ le;&le; ij lHkh uV ,oa ckYs V Bhd ls dls gS bldh tkpW djAas

g½ tc dHkh fx;j ckDW l dks fdlh fgLl ;k itq Z s cnyus ds fy, [kkys k tkrk g]S rc mldh nkcs kjk vlEs cfyxa djrs le; mfpr lko/kkuh cjrh axbZ gS bldh tkpaW dja s tlS s QV doj o gc ds ckYs V ,oa fx;j fiu ds uV <hys j[kdj fifu;u ,oa 99 rFkk tkbW VZ fx;j dk 89+46 nkraW z a

h 24 a zfx;j dh njw xts ekVs kbZ ds i=s dh iVV~ h Mkydj vMW LV dh xbZ gAS lkFk gh lkFk fx;j ckDW l ds nlw js Nns dks feyus ds ckn QV d j t oo gc ds ckYs V ,o xvs j fiu ds lHkh uV ckYs V dls gS bldh tkp¡ djAs i=s dh iVV~ h dks e”khu dh iYq yh ?keq kdj fudkyk tkrk gAS

15BAJAJ STEEL INDUSTRIES LIMITEDIMAMBADA ROAD, NAGPUR- 440 018. INDIA. Tel: +91-712-272 0071 ~ 80 Fax: +91-712-272 8050 / 272 3068

BAJAJ DR GIN & AUTOFEEDER SPARE PARTS CATALOGUE 2010

mRre dk;’Z kyS h ,oa U;uw re j[kj[kko ds fy, vR;ko’;d l>q ko

Page 19: FINALLY FINAL catalogue 2009 (3) - bajajngp.com · BAJAJ SPARE PARTS CATALOGUE AND OPERATING INSTRUCTIONS ... a chart showing important setting parameters is given below: ... Y-1

djs a ,oa uk djs adjsa %

Ukk djsa %

1- gj jkst e”khu dks pkyw djus ls igys nSuafnu igywvksa dh tk¡p djsaA2- jkstkuk “kq:vkr es e”khu pkyq djrs le; otu dks mBk ysuk pkfg,A3- Økse ok”kj jksy dks xeZ djus ds fy, gj fnu “kw:vkr esa dikl Mkys fcuk e”khu dks 2 ls 5 feuV rd [kkyh pykuk pkfg,A rkdh #bZ jksy ij uk fpids

a4- gj u, ekSle esa e”khu dks pkyw djus ds igys mlesa yxs iqjkus xzhl dks dsjksflu ls /kks ysa ,oa u;k xzhl yxk,WA5- z e”khu dks lqpk: ,oa ykHkin fLFkrh esa pykus ds fy, vlyh ,oa loksZRre xq.koRrk ds iqtk dk bLrseky djuk pkfg,AZsa

1- gkWij Vªs esa dikl Hkj dj e”khu pkyw uk djsaA2- i;kZIr xzhflax ds fcuk e”khu pkyw uk djsaA3- otuksa dks osV fyoj jkWM ds Nksj ij j[k dj e”khu pkyw u djsaA

a4- vlaxr ,oa nq¸;e ntsZ ds iqtsZ rFkk xzhl dk bLrseky u djsa ftlls fd e'khu ds vU; iqtk dks {kfr igqWpsAZsa

1- cht ij :bZ dh vf/kdEkk=k@Qkbcj dh VwV

2- cht dk fNyuk

3- :bZ dh pknj dk VwVuk

4- :bZ dh pknj dk yVduk

5- :bZ esa cht

1

nwjh vf/kd gksuk

2- NksVs vkdkj dh tkyh

1- ewfoax ukbZQ ,oa fQDLk ukbZQ ds/kkjksa dh chp dh vf/kd nwjh

2- ysnj jksy ij vuqi;qDr ukfy;kWa

3- NksVh tkyh 4- cWd ukbZQ ds fdukjksa esa {kfr

1-dV vkWQ dk T;knk gksuk

2- ueh dh deh

1- dV vkWQ de gksuk

2- ueh dh deh

1- lhM xkMZ dk vuqfpr rjhds ls yxkuk

- ukbZQ jsy ,oa tkyh ds chp dh

Ikjs’kkfu;ksa ds y{k.k laHkkfor dkj.k laHkkfor mik;

1- Tkkyh vkSj ukbZQ jsy ds chp dh nwjh dks de djsa ftlls fd ek= maxyh d gyds ncko ls cht fudy tk,A

2- cht ds vuq:i tkyh dks cnysaA

1- ewfoax ukbZQ ,oa fQDl ukbZQ dss chp dh nwjh dks vWMtLV djsaA

2- ukfy;ksa dh pkSMkbZ ,oa xgjkbZ dks 2 fe-eh- rd fu;af=r djsaA

3- mi;qDr tkyh dk iz;ksx djsaA4- cWd ukbZQ ds fdukjksa dks lq/kkjsa ;k bls

cnysaA

1- dV vkWQ@vksojyWi dks LVsiy dh yackbZuqlkj vWMtLV djsaA

z2- ueh c<kus dh i/nfr;ksa dk i;ksx djsaA

1- dV vkWQ@vksojyWi dks LVsiy dh yackbZuqlkj vWMtLV djsaA

z2- ueh c<kus dh i/nfr;ksa dk i;ksx djsaA

1- lhM xkMZ dks mi;qDr rfjds ls yxk,WaA

Cktkt Mh vkj ftu vkusokyh ijs’kkfu;ksa ls NqVdkjs ds fn’kk funsZ’k

16BAJAJ STEEL INDUSTRIES LIMITEDIMAMBADA ROAD, NAGPUR- 440 018. INDIA. Tel: +91-712-272 0071 ~ 80 Fax: +91-712-272 8050 / 272 3068

BAJAJ DR GIN & AUTOFEEDER SPARE PARTS CATALOGUE 2010

Page 20: FINALLY FINAL catalogue 2009 (3) - bajajngp.com · BAJAJ SPARE PARTS CATALOGUE AND OPERATING INSTRUCTIONS ... a chart showing important setting parameters is given below: ... Y-1

Cktkt vkVW ks QhMj vlEs cy :i ea s Hkts h tkrh g]S bldh mRre ifz rLFkkiuk ds fy, fuEu dne mBkus dh vko ;drk gASa1. ^;w* DWyEi dks Mh vkj ftu e”khu dh Qz se ij yxk,W rFkk fuf'pr dj ysa fd lHkh LØw dls x, gSaA

2. vkWVks QhMj ds ekmfUVax ,Waxy ds izR;sd uV dks <hyk djsaA3. vkWVks QhMj dks pkjksa cs;fjax LVM ls Åij mBkdj Mh vkj ftu e”khu dh Qz se ij Bhd rjg ls fcBk nsaA4. vkWVks QhMj dks vWMtLV djds ̂;w* DWyEi ,oa ekmfUVax ,Waxy ds Nsn dks feyk nsaA5. ^;w* DWyEi ,oa ekmfUVax ,Waxy ds Nsn esa fgat fiu Mkysa ,oa fLIyV fiu ls ykWd djsaA

a6. bl fLFkfr esa izR;sd QksyfMax vWxy ds uV dl ysaA7. cs;fjax czWdsV dks T;knk ls T;knk uhps dh fLFkrh esa vWMtLV djsaA

a8. oh csYV @ fyad csYV dks Mªkbo iqYyh ,oa Dyp iqYyh ds chp x vkdkj esa f[akpkbZ esa ckW/k nsaAa9. vkWVks QhMj ds lHkh jksyj lh/ks gSa ,oa nksuksa cktw dh 0-0 ysoy feyh gS bldh tkWp djsaA

a 10. vkWVks QhMj ds diMs vR;f/kd <hys vFkok dls gq, uk gksa bldh tkWp djsaAa 11. lHkh dhy iV~fV;kW lh/kh gksa rFkk dksbZ Hkh dhy VqVh ;k eqMh uk gks bldh tkWap djsaA

czWdsV

1

lkFk ?kew lds bldh tkpaW dj]as ;nkfi mlds <hys gkus s ij c;s fjxa cdWz Vs dks nkus ka s rjQ leku :i ls vMW tLV dj yAas2- vxj dUos;j diMs esa frjNkiu gks ;k diMk ljd jgk gks rks mls vWMtLV dj lh/kk djus ds fy;s saA3- dUos;j diMs esa vf/kd ruko ugha gksuk pkfg,A ijarq mlesa bruk ruko gks fd og MªkbZo jksyj ds lkFk lgh <ax ls ?kwe ldsA4- vkWVks QhMj dks [kkyh fLFkfr esa pkyw djsA vkWVks QhMj “kq: gksus ds ckn gh mlesa dikl MkysaA

5- ;g fuf'pr dj ysa dh dikl vf/kd ek=k esa Hkjk ugha gks bldh [kk=h dj ysaA fdlh Hkh fLFkfr esa dikl lkbM dOgj MkbOg vFkok vkWQ lkbZM dh f[kMdh ls Åij uk Hkjus nsaA

6- eghus esa de ls de ,d ckj fu;fer :i ls vkWVks QhMj ds vanj dh lQkbZ diMs ls djsa ftlls ds ckgj ls vk, gq, vuko”;d pht dh lQkbZ gks ldsA vU;Fkk vUn#uh ?k’kZ.k ls diMksa ds QVus dk Mj gks ldrk gSA

7- le; le; ij diMs ds ruko dh tkWap djsaA8- f[kapko dh otg ls “kq:vkr esa fo csYV @ fyad csYV <hyk iM ldrk gS] mls Vsa”ku iqYyh dh lgk;rk ls ;k fyad gVk dj t:jrkuqlkj

vWMtLV djsaA9- le; le; ij gkWij “khV dh f[kMfd;ksa @ tkfy;ks dks [kksydj vkVks QhMj esa teh xanxh tSls vifjiDo xqBfy;kWa] doMh] iRFkj]

ifRr;kWa vkfn dks fudkydj Qsaduk pkfg,A

- vij MªkboZ jkys j dks U;uw re ruko ea s j[krs g,q vkVW ks QhMj dks pkyw dja s ,oa dUo;s j diMs ea s i;kIZ r ruko gks ftlls fd og jkys j ds

cs;fjax czWdsV dk bLrseky djsa

ª

17BAJAJ STEEL INDUSTRIES LIMITEDIMAMBADA ROAD, NAGPUR- 440 018. INDIA. Tel: +91-712-272 0071 ~ 80 Fax: +91-712-272 8050 / 272 3068

BAJAJ DR GIN & AUTOFEEDER SPARE PARTS CATALOGUE 2010

Cktkt vkWVks QhMj dh izfrLFkkiuk ds fy, fn’kk funsZ’k

Cktkt vkWVks QhMj dh fd;k ,oa j[kj[kko ds fy, fn’kk funsZ’kz

Page 21: FINALLY FINAL catalogue 2009 (3) - bajajngp.com · BAJAJ SPARE PARTS CATALOGUE AND OPERATING INSTRUCTIONS ... a chart showing important setting parameters is given below: ... Y-1

1. diMs dk ,d cktw ea s ljduk

2 vij jkys j ,d rjQ f[kldrk gks.

3. dikl dk ioz kg de gks

a4. gkiW j ds fupys fgLls ls xBq fy;k W vk jghgks

1. jkys j ij vleku ruko

1.

2.

ykdW c”q k <hyk iM x;k gks;lw hVh c;s fjxa dk vyW u xcz LØq <hyk gks

1. lVas jikbiZ vf/kd uhps dh fLFkfr ea s j[kk gks

vf/kdre ueh okys dikl ds fy,

1. gkiW j “khV eMq k gvq k gks

2. lhM xkMZ ij gkiW j “khV cjkcj lVsugha gks

1. jkys j ds ruko dks ?kVkus vFkok c<kus ds fy, mlds foijhr Hkkx dks vMW tLV djAas

1. cYs V lkbM dh vkjs ls ykdW c”q k dks dl yAas2. c;s fjxa ij vyW u xcz LØq nkus ka s vkjs ls dl yAas

1. vxj dikl ea s ueh de gks rks lVas j ikbiZ dks Åijh Nns dh vkjs mBk,A¡

1. l[rh dk vk/kkj nAasgkiW j “khV dks lh/kk dja s vFkok mls

2. de djus dsfy, gkiW j “khV dks nck,A¡gkiW j “khV ,oa lhM xkMZ ds chp vra j

Ikjs’kkfu;ksa ds y{k.k laHkkfor mik; laHkkfor dkj.k

18BAJAJ STEEL INDUSTRIES LIMITEDIMAMBADA ROAD, NAGPUR- 440 018. INDIA. Tel: +91-712-272 0071 ~ 80 Fax: +91-712-272 8050 / 272 3068

BAJAJ DR GIN & AUTOFEEDER SPARE PARTS CATALOGUE 2010

Cktkt vkWVks QhMj esa vkusokyh ijs’kkfu;ksa ls NqVdkjs ds fn’kk funsZ’k

Page 22: FINALLY FINAL catalogue 2009 (3) - bajajngp.com · BAJAJ SPARE PARTS CATALOGUE AND OPERATING INSTRUCTIONS ... a chart showing important setting parameters is given below: ... Y-1

GR

ID T

YP

E H

OP

PER

SH

EET

SEE

D G

UA

RD

RO

LLER

WEI

GH

T

UP

PER

PA

NEL

LOW

ER P

AN

EL

CR

OS

S B

AR

FRA

ME

OFF

-SID

E

GEA

R B

OX

SEE

D C

HA

NN

EL

MA

IN P

ULL

EY W

ITH

HU

B

FRA

ME-

GEA

R S

IDE

BAJAJ DR GIN INSTALLATION GUIDELINES

BAJA

J D

R G

IN W

ITH

AU

TO F

EED

ER

19

BAJ

AJ S

TEEL

IN

DU

STRIE

S LI

MIT

EDIM

AM

BA

DA

RO

AD

, N

AG

PU

R-

440

018.

IND

IA.

Tel:

+91-7

12-2

72

0071

~ 8

0

Fax:

+91-7

12-2

72

8050

/ 2

72

3068

BAJ

AJ D

R G

IN &

AU

TOFE

EDER

SPA

RE

PA

RTS

CAT

ALO

GU

E2

01

0

Page 23: FINALLY FINAL catalogue 2009 (3) - bajajngp.com · BAJAJ SPARE PARTS CATALOGUE AND OPERATING INSTRUCTIONS ... a chart showing important setting parameters is given below: ... Y-1

OFF

SID

E FR

AM

E &

SW

ING

LEV

ER A

SS

EMB

LIES

CR

OS

S B

AR

, RO

LLER

SH

AF

T &

SEE

D G

UA

RD

AS

SEM

BLI

ESR

AIL

AS

SEM

BLY

BEA

TER

SH

AF

T A

SS

EMB

LYG

EAR

BO

X A

SS

EMB

LY F

RO

NT

SID

EG

EAR

BO

X A

SS

EMB

LY B

AC

K S

IDE

HU

B A

SS

EMB

LYA

UTO

FEE

DER

AS

SEM

BLY

SC

REW

CO

NV

EYO

R F

OR

SEE

D &

SC

REW

CO

NV

EYO

R D

RIV

E A

SS

EMB

LIES

RO

LL P

RES

S S

TAN

D &

MO

TOR

RA

IL A

SS

EMB

LIES

AS

SEM

BLI

ES

20

BAJ

AJ S

TEEL

IN

DU

STRIE

S LI

MIT

EDIM

AM

BA

DA

RO

AD

, N

AG

PU

R-

440

018.

IND

IA.

Tel:

+91-7

12-2

72

0071

~ 8

0

Fax:

+91-7

12-2

72

8050

/ 2

72

3068

BAJ

AJ D

R G

IN &

AU

TOFE

EDER

SPA

RE

PA

RTS

CAT

ALO

GU

E2

01

0

Page 24: FINALLY FINAL catalogue 2009 (3) - bajajngp.com · BAJAJ SPARE PARTS CATALOGUE AND OPERATING INSTRUCTIONS ... a chart showing important setting parameters is given below: ... Y-1

OFF

SID

E S

WIN

G L

EVER

A

SS

EMB

LY

OFF

SID

E FR

AM

EA

SS

EMB

LY

33

A

21

BAJ

AJ S

TEEL

IN

DU

STRIE

S LI

MIT

EDIM

AM

BA

DA

RO

AD

, N

AG

PU

R-

440

018.

IND

IA.

Tel:

+91-7

12-2

72

0071

~ 8

0

Fax:

+91-7

12-2

72

8050

/ 2

72

3068

BAJ

AJ D

R G

IN &

AU

TOFE

EDER

SPA

RE

PA

RTS

CAT

ALO

GU

E2

01

0

30

31

28

32

33

34 A

35

73

32

3B 3

34B

53

63

83

933

A9

40

41

24

8

43

434343

Page 25: FINALLY FINAL catalogue 2009 (3) - bajajngp.com · BAJAJ SPARE PARTS CATALOGUE AND OPERATING INSTRUCTIONS ... a chart showing important setting parameters is given below: ... Y-1

11

E-1

J-1

212

512

512

5SW

ING

LEV

ER P

IN O

FF S

IDE

2

311

811

811

8TA

PER

PIN

FO

R S

WIN

G L

EVER

OFF

SID

E2

4S-

126

S-12

6S-

126

SWIN

G L

EVER

OFF

SID

E2

515

915

915

9PL

AIN

WA

SHER

1”

2

64

44

HEX

HEA

D N

UT

1”2

749

49J-

49W

EIG

HT

LEVE

R W

ITH

BO

LT &

NU

T O

FF S

IDE

2

844

-B44

-B44

-BG

REA

SE N

IPPL

E 1/

8”ST

RA

IGH

T6

913

013

013

0ST

UD

FO

R W

EIG

HT

LEVE

R O

FF S

IDE

2

1013

113

113

1H

EX H

EAD

NU

T 7/

8”2

1116

716

716

7PL

AIN

WA

SHER

7/8

”2

1251

51J-

51W

EIG

HT

LEVE

R R

OD

2

1353

E-53

J-53

WEI

GH

T O

FF S

IDE

2

1452

5252

H.H

.S.5

/8”x

2”

BO

LT2

1545

4545

H.H

.S.5

/8”x

4”

BO

LT2

1639

3939

HEX

HEA

D N

UT

5/8”

2

1717

117

117

1C

HEC

K P

IN4

1827

2727

SQU

AR

E H

EAD

BO

LT ½

”X4-

1/2”

4

1913

1313

SID

E SE

GM

ENT

PLAT

E LE

FT2

2014

1414

SID

E SE

GM

ENT

PLAT

E R

IGH

T2

219

99

H.H

.S. 5

/16”

X1-1

/2”B

OLT

8

SID

E FR

AM

E2

2221

2121

PLA

IN W

ASH

ER5/

16”

4

2313

413

413

4SE

ED G

UA

RD

PIN

4

OFF

SID

E FR

AM

E &

SW

ING

LEV

ER A

SS

EMB

LES

SR

NO

.SP

ECIA

LM

OD

ELJU

MBO

MO

DEL

2414

514

5J1

45R

ATC

HET

BO

LT3/

4”X1

”2

33-A

S-66

-FS-

66-F

1S-

66-F

1O

IL S

EAL

60X8

0X6

2

33-B

S-

66-F

2 O

IL S

EAL

55X8

0X6

2

S-66

-AS-

66-A

S-66

-ASW

ING

LEV

ER C

OVE

R (

61

MM

BO

RE

)2

S-66

-F2

SWIN

G L

EVER

CO

VER

( 5

6 M

M B

OR

E )

2

5/1

6”4

2514

614

6J-

146-

AR

ATC

HET

2

2614

6-A

E-14

6-A

J-14

6-A

CA

P2

2713

7E-

137

J-13

7C

AP

STR

IP2

2839

-A39

-A39

-AH

EX H

EAD

NU

T 3/

4”6

2914

314

3-A

143-

AB

EATE

R S

TUD

4

3042

-A42

-A42

-AG

REA

SE P

IPE

WIT

H C

OU

PLIN

G 4

-1/2

” LO

NG

2

3144

4444

GR

EASE

NIP

PLE

1/4”

STR

AIG

HT

2

32S-

66-E

S-66

-ES-

66-E

BA

LL B

EAR

ING

FO

R S

WIN

G L

EVER

(601

1)4

34-A

34-B

3543

4343

C.S

.K. 3

/16”

X1/2

”SC

REW

16

36S-

66-D

S-66

-DS-

66-D

SPA

CER

RIN

G 1

8.5M

M T

HIC

K F

OR

SW

ING

LEV

ER2

37S-

128

S-12

8S-

128

SWIN

G L

EVER

BU

SH O

FF S

IDE/

CLU

TCH

OFF

SID

E2

386

66

H.H

.S.1

/4”X

1/2”

BO

LT24

3911

1111

UPP

ER P

AN

EL C

OVE

R O

FF S

IDE

1

39-A

11-A

11-A

11-A

UPP

ER P

AN

EL C

OVE

R G

EAR

SID

E1

4010

1010

LOW

ER P

AN

EL C

OVE

R L

EFT

OR

RIG

HT

2

4112

E-12

J-12

HO

PPER

SH

EET

2

425

E-5

J-5

SEED

CH

AN

NEL

LEF

T O

R R

IGH

T2

4322

2222

HEX

HEA

D N

UT

DES

CR

IPTI

ON

PAR

T N

O.

PAR

T N

O.

EXTR

ALO

NG

MO

DEL

JUM

BOM

OD

EL

QTY

PER

M/C

.D

ESC

RIP

TIO

NSP

ECIA

LM

OD

EL

EXTR

ALO

NG

MO

DEL

QTY

PER

M/C

.

SR

NO

.

22

BAJ

AJ S

TEEL

IN

DU

STRIE

S LI

MIT

EDIM

AM

BA

DA

RO

AD

, N

AG

PU

R-

440

018.

IND

IA.

Tel:

+91-7

12-2

72

0071

~ 8

0

Fax:

+91-7

12-2

72

8050

/ 2

72

3068

BAJ

AJ D

R G

IN &

AU

TOFE

EDER

SPA

RE

PA

RTS

CAT

ALO

GU

E2

01

0

Page 26: FINALLY FINAL catalogue 2009 (3) - bajajngp.com · BAJAJ SPARE PARTS CATALOGUE AND OPERATING INSTRUCTIONS ... a chart showing important setting parameters is given below: ... Y-1

CO

SS

A

RS

EB

LY

RB

AS

M

LLR

H

LY

RO

E S

AFT

AS

SEM

B

EU

EB

SED

GA

RD

AS

SM

LY

3

54

1

4

31

2

4

3

2

43

2

23

42

3

1

1

5

23

BAJ

AJ S

TEEL

IN

DU

STRIE

S LI

MIT

EDIM

AM

BA

DA

RO

AD

, N

AG

PU

R-

440

018.

IND

IA.

Tel:

+91-7

12-2

72

0071

~ 8

0

Fax:

+91-7

12-2

72

8050

/ 2

72

3068

BAJ

AJ D

R G

IN &

AU

TOFE

EDER

SPA

RE

PA

RTS

CAT

ALO

GU

E2

01

0

Page 27: FINALLY FINAL catalogue 2009 (3) - bajajngp.com · BAJAJ SPARE PARTS CATALOGUE AND OPERATING INSTRUCTIONS ... a chart showing important setting parameters is given below: ... Y-1

SR

NO

.S

PEC

IAL

MO

DEL

EX

TR

ALO

NG

SP

EC

IAL

MO

DEL

JUM

BO

M

OD

ELQ

TY.

PER

M/C

PA

RT

NO

.

DES

CR

IPTI

ON

112

2E-

122

J-12

22

123

123

123

TAP

ER P

IN F

OR

RO

LLER

SH

AFT

& IT

S F

LAN

GES

4

412

412

412

4R

OLL

ER F

LAN

GE

4

RO

LLER

SH

AFT

2

319

3-A

193-

A19

3-A

CH

RO

ME

WA

SH

ER F

OR

RO

LL

78/9

0/11

0

SR

NO

.S

PEC

IAL

MO

DEL

EX

TR

ALO

NG

SP

EC

IAL

MO

DEL

JUM

BO

M

OD

ELQ

TY.

PER

M/C

PA

RT

NO

.

DES

CR

IPTI

ON

113

3E-

133

J-13

32

175

175

175

H.H

.S.5

/16”

X3/4

” B

OLT

43

2222

22H

EX H

EAD

NU

T 5/

16”

44

134

134

134

SEE

D G

UA

RD

PIN

4

HO

LDER

FO

R S

EED

GU

AR

D2

RO

LLER

SH

AF

T A

SS

EMB

LY

SEE

D G

UA

RD

AS

SEM

BLY

SR

NO

.S

PEC

IAL

MO

DEL

EX

TR

ALO

NG

SP

EC

IAL

MO

DEL

JUM

BO

M

OD

ELQ

TY.

PER

M/C

CR

OS

S B

AR

AS

SEM

BLY

PA

RT

NO

.

DES

CR

IPTI

ON

12

E-2

J-2

CR

OS

S B

AR

2

215

915

915

9P

LAIN

WA

SH

ER 1

”2

34

44

HEX

HEA

D N

UT

1”4

43

33

DIS

TAN

CE

BU

SH

CU

M B

ELT

SH

IFTE

R C

LAM

P4

5-

--

153

SP

LIT

WA

SH

ER 1

"2

24

BAJ

AJ S

TEEL

IN

DU

STRIE

S LI

MIT

EDIM

AM

BA

DA

RO

AD

, N

AG

PU

R-

440

018.

IND

IA.

Tel:

+91-7

12-2

72

0071

~ 8

0

Fax:

+91-7

12-2

72

8050

/ 2

72

3068

BAJ

AJ D

R G

IN &

AU

TOFE

EDER

SPA

RE

PA

RTS

CAT

ALO

GU

E2

01

0

Page 28: FINALLY FINAL catalogue 2009 (3) - bajajngp.com · BAJAJ SPARE PARTS CATALOGUE AND OPERATING INSTRUCTIONS ... a chart showing important setting parameters is given below: ... Y-1

RA

IL A

SS

EMB

LY

25

BAJ

AJ S

TEEL

IN

DU

STRIE

S LI

MIT

EDIM

AM

BA

DA

RO

AD

, N

AG

PU

R-

440

018.

IND

IA.

Tel:

+91-7

12-2

72

0071

~ 8

0

Fax:

+91-7

12-2

72

8050

/ 2

72

3068

BAJ

AJ D

R G

IN &

AU

TOFE

EDER

SPA

RE

PA

RTS

CAT

ALO

GU

E2

01

0

Page 29: FINALLY FINAL catalogue 2009 (3) - bajajngp.com · BAJAJ SPARE PARTS CATALOGUE AND OPERATING INSTRUCTIONS ... a chart showing important setting parameters is given below: ... Y-1

SR

NO

.

116

E-16

J-16

217

E-17

J-17

BA

CK

FLA

T (B

AC

K K

NIF

E)2

319

-AE-

19-A

J-19

-AFI

XED

FLA

T (F

IXED

KN

IFE)

2

420

E-20

J-20

FLAT

HO

LDER

2

515

-A15

-A15

-AC

.S.K

. 5/1

6”X1

-3/4

” S

CR

EW10

/14/

16

621

2121

PLA

IN W

AS

HER

5/1

6”10

/14/

16

722

2222

HEX

HEA

D N

UT

5/16

”10

/14/

16

818

1818

C.S

.K. 1

/4’x

1/2”

SC

REW

8/12

/16

925

2525

RO

UN

D H

EAD

BO

LT ½

”X4-

1/4”

4

1015

815

815

8P

LAIN

WA

SH

ER ½

”4

1126

2626

HEX

HEA

D N

UT

½”

4

1223

2323

H.H

.S. 3

/8”X

2” B

OLT

8/12

/16

1324

2424

HEX

HEA

D N

UT

3/8”

8/12

/16

1415

715

715

7P

LAIN

WA

SH

ER 3

/8”

8/12

/16

FLAT

RA

IL1

PAR

T N

O.

SP

ECIA

L M

OD

ELEX

TRA

LON

GS

PEC

IAL

M

OD

EL

JUM

BO

M

OD

EL

QTY

.P

ERM

/CD

ESC

RIP

TIO

N

RA

IL A

SS

EMB

LY

26

BAJ

AJ S

TEEL

IN

DU

STRIE

S LI

MIT

EDIM

AM

BA

DA

RO

AD

, N

AG

PU

R-

440

018.

IND

IA.

Tel:

+91-7

12-2

72

0071

~ 8

0

Fax:

+91-7

12-2

72

8050

/ 2

72

3068

BAJ

AJ D

R G

IN &

AU

TOFE

EDER

SPA

RE

PA

RTS

CAT

ALO

GU

E2

01

0

Page 30: FINALLY FINAL catalogue 2009 (3) - bajajngp.com · BAJAJ SPARE PARTS CATALOGUE AND OPERATING INSTRUCTIONS ... a chart showing important setting parameters is given below: ... Y-1

BEA

TER

SH

AF

T A

SS

EMB

LY

27

BAJ

AJ S

TEEL

IN

DU

STRIE

S LI

MIT

EDIM

AM

BA

DA

RO

AD

, N

AG

PU

R-

440

018.

IND

IA.

Tel:

+91-7

12-2

72

0071

~ 8

0

Fax:

+91-7

12-2

72

8050

/ 2

72

3068

BAJ

AJ D

R G

IN &

AU

TOFE

EDER

SPA

RE

PA

RTS

CAT

ALO

GU

E2

01

0

31A 31

30

32

33

34

35

Page 31: FINALLY FINAL catalogue 2009 (3) - bajajngp.com · BAJAJ SPARE PARTS CATALOGUE AND OPERATING INSTRUCTIONS ... a chart showing important setting parameters is given below: ... Y-1

131

E-31

J-31

232

32J-

32B

EATE

R A

RM

3

315

415

415

4SP

LIT

WA

SHER

5/8

”3

411

111

1J-

111

H.H

.S. 5

/8”

X 3”

2

515

115

1J-

151

HO

LLO

W W

ASH

ER F

OR

BEA

TER

SH

AFT

OFF

SID

E1

615

1-A

151-

AJ-

151-

AH

OLL

OW

WA

SHER

FO

R B

EATE

RSH

AFT

GEA

R S

IDE

1

7S-

41.H

S-41

.HJ.

41.H

CO

VER

FO

R B

EATE

R B

EAR

ING

HO

USI

NG

OFF

SID

E1

8S.

41-G

.1S.

41-G

.1O

IL S

EAL

55X6

5X6

2

8AS.

41-G

J.1

OIL

SEA

L 65

X75X

101

8BS.

41-G

J.2

OIL

SEA

L 58

X75X

101

941

-C41

-CB

ALL

BEA

RIN

G IN

BEA

TER

OFF

SID

E(60

08)

2

J-41

-CB

ALL

BEA

RIN

G IN

BEA

TER

OFF

SID

E(62

08)

2

10S-

41-E

S-41

-EJ-

41-E

BEA

TER

BEA

RIN

G H

OU

SIN

G O

FF S

IDE

1

1141

-D41

-D41

-DD

ISTA

NC

E B

USH

FO

R B

EATE

R S

HA

FT1

12S-

41-1

S-41

-1J-

41-1

CLO

SE C

OVE

R F

OR

O.S

. BEA

TER

BEA

RIN

G H

SG.

1

1323

123

1J-

231

H.H

.S. 5

/8”

X 2.

1/2

BO

LT -

(J)

H.H

.S. 5

/8”

X 3”

3

14S-

41-G

S-41

-GJ-

41-G

CO

VER

FO

R B

EATE

R B

EAR

ING

HSG

. GEA

R S

IDE

1

1541

41N

EED

LE R

OLL

ER B

EAR

ING

IN

BEA

TER

HSG

.(556

8)2

15A

J-41

NEE

DLE

RO

LLER

BEA

RIN

G IN

BEA

TER

HSG

.(N

A 4

911)

2

16S-

41-B

S-41

-BJ-

41-B

BEA

TER

BEA

RIN

G H

OU

SIN

G G

EAR

SID

E1

17S-

41-F

S-41

-FJ-

41-F

CO

VER

FO

R B

EATE

R B

EAR

ING

HSG

. GEA

R S

IDE

1

1843

4343

C.S

.K. 3

/16”

X3/4

”/ S

CR

EW16

1911

211

211

2H

.H.S

. ½ ”

X 2-

1/2”

BO

LT2

BEA

TER

SH

AFT

1

” 3/1

6”X1

2015

515

515

5SP

LIT

WA

SHER

½”

8

2133

3375

(E.L

) H

.H.S

. 3/8

”X1-

1/4”

BO

LT (

J) H

.H.S

. ½”X

1-1

/26

2215

615

615

6SP

LIT

WA

SHER

3/8

”18

236

H.H

.S. 5

/16”

X3/4

”BO

LT8

2435

E-35

J-35

MO

VIN

G F

LAT

2

2540

E-40

J-40

BEA

TER

TR

OU

GH

(DO

NG

I)1

2638

E-38

J-38

GR

ID 9

/32”

SLO

T (P

LEA

SE R

EFER

PG

. 3)

2

2740

-A40

-AJ-

40-A

STEE

L ST

RIP

(PAT

TI)

FOR

BEA

TER

TR

OU

GH

4

2828

2828

C.S

.K. 3

/8”X

1-1/

2” S

CR

EW12

2924

24

HEX

HEA

D N

UT

3/8”

18

3015

715

76

31S-

41-F

-1S-

41-F

-11

31-A

S-41

-FJ.

11

3211

011

0J-

110

1

3310

810

8J-

108

1

34J-

31-A

1

35SP

AC

ER R

ING

4 M

M T

HIC

K F

OR

BEA

TER

GEA

R S

IDE

175

175

29-A

J-2

4 H

EX H

EAD

NU

T 3/

8”12

PLA

IN W

ASH

ER 3

/8”

30-A

J-15

7PL

AIN

WA

SHER

½”

6

OIL

SEA

L 50

X65X

8

OIL

SEA

L 55

X75X

10

OSC

ILLA

TIN

G H

EAD

SETT

ING

PIN

/HEA

D P

IN

SLEE

VE (D

ISTA

NC

E B

USH

JU

MB

O)

55X6

5X25

SR

NO

.SP

ECIA

LM

OD

ELEX

TRA

LON

GM

OD

EL

JUM

BOM

OD

EL

DES

CR

IPTI

ON

PAR

T N

O.

PAR

T N

O.

JUM

BOM

OD

EL

QTY

PER

M/C

.D

ESC

RIP

TIO

NSP

ECIA

LM

OD

EL

QTY

PER

M/C

.

SR

NO

.EX

TRA

LON

GM

OD

EL

BEA

TER

SH

AF

T A

SS

EMB

LY

28

BAJ

AJ S

TEEL

IN

DU

STRIE

S LI

MIT

EDIM

AM

BA

DA

RO

AD

, N

AG

PU

R-

440

018.

IND

IA.

Tel:

+91-7

12-2

72

0071

~ 8

0

Fax:

+91-7

12-2

72

8050

/ 2

72

3068

BAJ

AJ D

R G

IN &

AU

TOFE

EDER

SPA

RE

PA

RTS

CAT

ALO

GU

E2

01

0

Page 32: FINALLY FINAL catalogue 2009 (3) - bajajngp.com · BAJAJ SPARE PARTS CATALOGUE AND OPERATING INSTRUCTIONS ... a chart showing important setting parameters is given below: ... Y-1

GEA

R B

OX

AS

SEM

BLY

FR

ON

T S

IDE

29

BAJ

AJ S

TEEL

IN

DU

STRIE

S LI

MIT

EDIM

AM

BA

DA

RO

AD

, N

AG

PU

R-

440

018.

IND

IA.

Tel:

+91-7

12-2

72

0071

~ 8

0

Fax:

+91-7

12-2

72

8050

/ 2

72

3068

BAJ

AJ D

R G

IN &

AU

TOFE

EDER

SPA

RE

PA

RTS

CAT

ALO

GU

E2

01

0

92

6

30

30

Page 33: FINALLY FINAL catalogue 2009 (3) - bajajngp.com · BAJAJ SPARE PARTS CATALOGUE AND OPERATING INSTRUCTIONS ... a chart showing important setting parameters is given below: ... Y-1

16S-

58.B

.1S-

58-B

.1S-

58-B

132

MM

DIS

TAN

CE

BU

SH F

OR

GEA

R P

IN L

AR

GE

1

17S-

59.A

S-59

.AG

EAR

WH

EEL

STEE

L 95

TEE

TH1

17-A

S-59

-A(H

)H

ELIC

AL

GEA

R 8

9 TE

ETH

1

1854

-A54

-A54

-AK

EY F

OR

PA

RT

NO

S.-5

8-B

& S

-59-

A1

1976

7676

FRO

NT

CO

VER

FO

R G

EAR

BO

X1

2011

311

311

3IN

SPEC

TIO

N H

OLE

CO

VER

1

2121

421

421

4M

.S. R

IVET

1/4

”x1-

1/2”

4

2279

-B79

-B79

-BH

UB

AS

SEM

BLY

CO

MPL

ETE

1

23S-

56-A

S-56

-AS-

56-A

WA

SHER

FO

R G

EAR

PIN

LA

RG

E1

23-A

S-55

-AS-

55-A

S-55

-AW

ASH

ER F

OR

GEA

R P

IN S

MA

LL1

2421

521

521

5C

.S.K

. 3/8

”XFO

R G

EAR

PIN

WA

SHER

SM

ALL

1

24-A

216

216

216

C.S

.K. 3

/8”X

1” F

OR

GEA

R P

IN W

ASH

ER L

AR

GE

1

2543

-A43

-A43

-AC

.S.K

. 3/1

6”X1

/2”

FOR

GEA

R P

IN W

ASH

ER4

2617

417

417

4H

.H.S

. 3/8

”X3/

4” B

OLT

2

2715

915

915

9PL

AIN

WA

SHER

1”

2

284

44

HEX

HEA

D N

UT

1”2

2917

517

517

5

3/4”

H.H

.S. 5

/16”

X3/4

” B

OLT

1

3072

7272

SPLI

T PI

N 1

/8”X

1-1/

2”2

146

-A46

-A46

-A

211

411

411

4TO

P C

OVE

R F

OR

GEA

R B

OX

1

375

7575

H.H

.S. ½

”X1-

1/2”

BO

LT20

468

-A68

-AG

EAR

WH

EEL

STEE

L 10

6 TE

ETH

2

4A68

-A(H

)H

ELIC

AL

GEA

R 9

9 TE

ETH

2

569

6969

5 M

M T

HIC

K W

ASH

ER F

OR

EC

CEN

TRIC

3SH

AFT

/106

TEE

TH /9

9 TE

ETH

HEL

ICA

L G

EAR

671

7171

CR

OW

N N

UT

3/4”

2

7S-

55S-

55S-

55G

EAR

PIN

SM

ALL

1

8S-

57-B

S-57

-BG

EAR

WH

EEL

STEE

L 49

TEE

TH S

MA

LL B

OS

S1

8AS-

57-B

(H)

HEL

ICA

L G

EAR

46

TEET

H S

MA

LL B

OS

S1

9S-

58-B

.2S-

57.B

.2S-

58.B

2B

ALL

BEA

RIN

G F

OR

GEA

R(6

007)

4

10S-

57.B

.1S-

57.B

.1S-

57.B

.1SP

AC

ER R

ING

2 M

M T

HIC

K F

OR

GEA

R P

IN S

MA

LL1

11S-

56S-

56S-

56G

EAR

PIN

LA

RG

E1

1242

-B42

-B42

-BG

REA

SE P

IPE

WIT

H C

OU

PLIN

G 8

-1/2

” LO

NG

2

1344

4444

GR

EASE

NIP

PLE

1/4”

STR

AIG

HT

2

1417

617

617

6A

LLEN

BO

LT 3

/8”X

1-1/

2”3

15S-

58 B

S.58

G

EAR

WH

EEL

STEE

L 49

TEE

TH L

ON

G B

OS

S1

GEA

R B

OX

ON

LY1

B

15-A

S-58

-B.(H

)H

ELIC

AL

GEA

R 4

6 TE

ETH

LO

NG

BO

SS

1

SR

NO

.SP

ECIA

LM

OD

ELEX

TRA

LON

GM

OD

EL

JUM

BOM

OD

EL

DES

CR

IPTI

ON

PAR

T N

O.

PAR

T N

O.

EXTR

ALO

NG

MO

DEL

JUM

BOM

OD

EL

QTY

PER

M/C

.D

ESC

RIP

TIO

NSP

ECIA

LM

OD

EL

QTY ER M/C

.

SR

NO

.

NO

TE :

HEL

ICA

L G

EAR

S A

SS

EMB

LY C

AN

BE

US

ED I

NS

TEA

D O

F S

PU

R G

EAR

W

HER

EVER

DES

IRED

AS

SEM

BLY

GEA

R B

OX

AS

SEM

BLY

FR

ON

T S

IDE

30

BAJ

AJ S

TEEL

IN

DU

STRIE

S LI

MIT

EDIM

AM

BA

DA

RO

AD

, N

AG

PU

R-

440

018.

IND

IA.

Tel:

+91-7

12-2

72

0071

~ 8

0

Fax:

+91-7

12-2

72

8050

/ 2

72

3068

BAJ

AJ D

R G

IN &

AU

TOFE

EDER

SPA

RE

PA

RTS

CAT

ALO

GU

E2

01

0

Page 34: FINALLY FINAL catalogue 2009 (3) - bajajngp.com · BAJAJ SPARE PARTS CATALOGUE AND OPERATING INSTRUCTIONS ... a chart showing important setting parameters is given below: ... Y-1

GEA

R B

OX

AS

SEM

BLY

BA

CK

SID

E

21

31

BAJ

AJ S

TEEL

IN

DU

STRIE

S LI

MIT

EDIM

AM

BA

DA

RO

AD

, N

AG

PU

R-

440

018.

IND

IA.

Tel:

+91-7

12-2

72

0071

~ 8

0

Fax:

+91-7

12-2

72

8050

/ 2

72

3068

BAJ

AJ D

R G

IN &

AU

TOFE

EDER

SPA

RE

PA

RTS

CAT

ALO

GU

E2

01

0

Page 35: FINALLY FINAL catalogue 2009 (3) - bajajngp.com · BAJAJ SPARE PARTS CATALOGUE AND OPERATING INSTRUCTIONS ... a chart showing important setting parameters is given below: ... Y-1

PAR

T N

O.

SP

ECIA

L M

OD

EL

EXTR

ALO

NG

SP

EC

IAL

MO

DEL

JUM

BO

M

OD

EL

QTY

.P

ERM

/CD

ESC

RIP

TIO

N

SR

NO

.

146

-A46

-A46

-A

2S

-49

S-4

9S

-49-

JW

EIG

HT

LEV

ER W

ITH

BO

LT &

NU

T G

EAR

SID

E2

344

-B44

-B44

-BG

REA

SE

NIP

PLE

1/8

” S

TRA

IGH

T2

445

4545

H.H

.S. 5

/8”X

4” B

OLT

2

539

3939

HEX

HEA

D N

UT

5/8”

2

6S

-48

S-4

8S

-48

BU

SH

FO

R W

EIG

HT

LEV

ER G

EAR

SID

E H

AR

DEN

ED2

747

4747

WEI

GH

T LE

VER

STU

D G

EAR

SID

E2

851

51J-

51W

EIG

HT

LEV

ER R

OD

2

954

54J-

54W

EIG

HT

GEA

R S

IDE

2

1052

5252

H.H

.S. 5

/8”X

2” B

OLT

2

1170

7070

SH

EET

MET

AL

CO

VER

FO

R S

WIN

G L

EVER

2

12S

.66

S.6

6S

.66

SW

ING

LEV

ER G

EAR

SID

E2

13S

.66.

DS

.66.

DS

.66.

DS

PAC

ER R

ING

18.

5MM

TH

ICK

FO

R S

WIN

G L

EVER

2

14S

.66.

AS

.66.

AS

.66.

AB

ALL

BEA

RIN

G F

OR

SW

ING

LEV

ER (

6011

)4

15S

.66.

FS

.66.

FO

IL S

EAL

55X8

0X6

2

15A

S.6

6.F1

OIL

SEA

L 60

X80X

62

16S

.66.

AS

.66.

AS

.66.

AS

WIN

G L

EVER

CO

VER

(56

MM

BO

RE

2 N

O’S

& 6

1 M

M B

OR

E 2

NO

’S)

4

1743

A43

A43

AC

.S.K

. 3/1

6”X1

/2”

SC

REW

16

18S

.67

S.6

7S

.67

SW

ING

LEV

ER B

US

H G

EAR

SID

E/C

LUTC

H G

EAR

SID

E2

1965

6565

KEY

FO

R G

EAR

WH

EEL

106

TEET

H /

99

TEET

H H

ELIC

AL

2

2050

5050

TAP

ER P

IN F

OR

WEI

GH

T LE

VER

2 2

GEA

R B

OX

ON

LY1

21

S.6

2

S

.62

S.6

2

S

TEEL

BU

SH

SW

ING

LEV

ER G

EAR

SID

E H

AR

DEN

ED

GEA

R B

OX

AS

SEM

BLY

BA

CK

SID

E

32

BAJ

AJ S

TEEL

IN

DU

STRIE

S LI

MIT

EDIM

AM

BA

DA

RO

AD

, N

AG

PU

R-

440

018.

IND

IA.

Tel:

+91-7

12-2

72

0071

~ 8

0

Fax:

+91-7

12-2

72

8050

/ 2

72

3068

BAJ

AJ D

R G

IN &

AU

TOFE

EDER

SPA

RE

PA

RTS

CAT

ALO

GU

E2

01

0

Page 36: FINALLY FINAL catalogue 2009 (3) - bajajngp.com · BAJAJ SPARE PARTS CATALOGUE AND OPERATING INSTRUCTIONS ... a chart showing important setting parameters is given below: ... Y-1

HU

B A

SS

EMB

LY

4

5

2A5

34A

34

33

33

BAJ

AJ S

TEEL

IN

DU

STRIE

S LI

MIT

EDIM

AM

BA

DA

RO

AD

, N

AG

PU

R-

440

018.

IND

IA.

Tel:

+91-7

12-2

72

0071

~ 8

0

Fax:

+91-7

12-2

72

8050

/ 2

72

3068

BAJ

AJ D

R G

IN &

AU

TOFE

EDER

SPA

RE

PA

RTS

CAT

ALO

GU

E2

01

0

Page 37: FINALLY FINAL catalogue 2009 (3) - bajajngp.com · BAJAJ SPARE PARTS CATALOGUE AND OPERATING INSTRUCTIONS ... a chart showing important setting parameters is given below: ... Y-1

HU

B A

SS

EMB

LY

SPEC

IAL

MOD

EL

EXTR

ALO

NG

MO

DEL

JUM

BOM

OD

EL

DES

CR

IPTI

ON

PAR

T N

O.

DES

CR

IPTI

ON

QTY

PER

M/C

.

SR

NO

.Q

TYPE

RM

/C.

PAR

T N

O.

EXTR

ALO

NG

MO

DEL

JUM

BOM

OD

ELSP

ECIA

LM

OD

EL

SR

NO

.

1997

9797

BA

LL B

ERIN

G H

OU

SIN

G IN

CO

N-R

OD

WIT

H C

OVE

R1

2010

110

110

1B

ALL

BEA

RIN

G H

OU

SIN

G C

OVE

R1

2196

96J-

96C

ON

NEC

TIN

G R

OD

1

2209

109

109

H.H

.S.3

/8”X

2”

BO

LT1

2315

615

615

6SP

LIT

WA

SHER

3/8

”1

2410

310

310

3EC

CEN

TRIC

WA

SHER

1

2510

4-A

104-

AST

EEL

PIN

ION

20

TEET

H (H

AR

DEN

ED)

1

25A

104-

A(H

)H

ELIC

AL

PIN

ION

19

TEET

H (H

AR

DEN

ED)

1

2669

6969

5MM

TH

ICK

WA

SHER

FO

R E

CC

SH

AFT

1

2771

7171

CR

OW

N N

UT

3/4”

1

2872

7272

SPLI

T PI

N 1

/8”X

1-1/

2”1

2910

210

210

2K

EY F

OR

PA

RT

NO

.104

,104

A &

83A

1

3090

9090

KEY

FO

R P

AR

T N

O.8

9,89

-A &

83-

A1

31&

31A

42-A

42-A

42-A

GR

EASE

PIP

E W

ITH

CO

UPL

ING

4-1

/2”

LON

G1

3244

-A44

-A44

-AG

REA

SE N

IPPL

E 1/

4” A

NG

ULA

R1

3310

710

7W

RIS

T PI

N (H

AR

DEN

ED)

1

106

106

WR

IST

PIN

BU

SH (H

AR

DEN

ED)

2

34A

E-25

0-B

J-25

0-B

BEA

RIN

G R

NA

690

2(ef

fect

from

200

9 )

1

3544

-B44

-B44

-BG

REA

SE N

IPPL

E 1/

8” S

TRA

IGH

T1

3616

816

816

8PL

AIN

WA

SHER

3/4

’1

33A

E-25

0-A

J-25

0-A

GA

JJA

N P

IN (e

ffect

from

200

9 EL

Mod

el m

/c)

1

34

GA

JJA

N P

INEL

m/c

179

7979

HU

B

1

286

8686

SHEE

T M

ETA

L D

ISH

(KAT

OR

I)1

384

8484

RO

LLER

BEA

RIN

G F

OR

HU

B (N

u 30

9)1

485

-A85

-A-

INSI

DE

BU

SH F

OR

EC

CEN

TRIC

SH

AFT

(LA

RG

E)1

4A85

BSP

AC

ER R

ING

4.5

mm

FO

R J

UM

BO

1

4B85

CST

EEL

BU

SH F

OR

EC

CEN

TRIC

SH

AFT

5m

m J

UM

BO

1

5A85

DST

EEL

BU

SH F

OR

EC

CEN

TRIC

SH

AFT

29m

m J

UM

BO

1

684

-A84

-AB

ALL

BEA

RIN

G F

OR

HU

B (6

309)

1

6A84

-A84

-AB

ALL

BEA

RIN

G F

OR

HU

B (6

309)

(effe

ct fr

om 2

009

ex M

/C)

2

7S-

66-F

S-66

-FS-

66-F

OIL

SEA

L 55

X80X

61

8S-

79-A

S-79

-AS-

79-A

CO

VER

FO

R H

UB

1

988

8888

STEE

L O

UTE

R R

ING

FO

R E

CC

ENTR

IC S

HA

FT1

1034

3434

H.H

.S. 5

/16”

X1”

BO

LT3

1189

-A89

-A89

-AFA

ST P

ULL

EY V

EE B

ELT

DR

IVE

1

1289

8989

FAST

PU

LLEY

FLA

T B

ELT

DR

IVE

1

1393

-A93

-A93

-AEN

D W

ASH

ER F

OR

VEE

BEL

T PU

LLEY

1

1493

9393

END

WA

SHER

FO

R F

LAT

BEL

T PU

LLEY

1

1552

5252

H.H

.S. 5

/8’X

2” B

OLT

1

1683

-A83

-A83

-AEC

CEN

TRIC

SH

AFT

VEE

BEL

T D

RIV

E1

1783

8383

ECC

ENTR

IC S

HA

FT F

LAT

BEL

T D

RIV

E1

18S-

100

S-10

0S-

100

BA

LL B

EAR

ING

FO

R C

ON

NEC

TIN

G H

SG.(2

2211

)1

585

85IN

SID

E B

USH

FO

R E

CC

ENTR

IC S

HA

FT (S

MA

LL)

1

34

BAJ

AJ S

TEEL

IN

DU

STRIE

S LI

MIT

EDIM

AM

BA

DA

RO

AD

, N

AG

PU

R-

440

018.

IND

IA.

Tel:

+91-7

12-2

72

0071

~ 8

0

Fax:

+91-7

12-2

72

8050

/ 2

72

3068

BAJ

AJ D

R G

IN &

AU

TOFE

EDER

SPA

RE

PA

RTS

CAT

ALO

GU

E2

01

0

Page 38: FINALLY FINAL catalogue 2009 (3) - bajajngp.com · BAJAJ SPARE PARTS CATALOGUE AND OPERATING INSTRUCTIONS ... a chart showing important setting parameters is given below: ... Y-1

AU

TO F

EED

ER A

SS

EMB

LY

69

35

BAJ

AJ S

TEEL

IN

DU

STRIE

S LI

MIT

EDIM

AM

BA

DA

RO

AD

, N

AG

PU

R-

440

018.

IND

IA.

Tel:

+91-7

12-2

72

0071

~ 8

0

Fax:

+91-7

12-2

72

8050

/ 2

72

3068

BAJ

AJ D

R G

IN &

AU

TOFE

EDER

SPA

RE

PA

RTS

CAT

ALO

GU

E2

01

0

Page 39: FINALLY FINAL catalogue 2009 (3) - bajajngp.com · BAJAJ SPARE PARTS CATALOGUE AND OPERATING INSTRUCTIONS ... a chart showing important setting parameters is given below: ... Y-1

AU

TO F

EED

ER A

SS

EMB

LY

36

BAJ

AJ S

TEEL

IN

DU

STRIE

S LI

MIT

EDIM

AM

BA

DA

RO

AD

, N

AG

PU

R-

440

018.

IND

IA.

Tel:

+91-7

12-2

72

0071

~ 8

0

Fax:

+91-7

12-2

72

8050

/ 2

72

3068

BAJ

AJ D

R G

IN &

AU

TOFE

EDER

SPA

RE

PA

RTS

CAT

ALO

GU

E2

01

0

Page 40: FINALLY FINAL catalogue 2009 (3) - bajajngp.com · BAJAJ SPARE PARTS CATALOGUE AND OPERATING INSTRUCTIONS ... a chart showing important setting parameters is given below: ... Y-1

BEL

OW

GIN

SEE

D S

CR

EW C

ON

VEY

OR

AS

SEM

BLY

40

DR

IVE

AS

SEM

BLY

FO

R S

CR

EW C

ON

VEY

OR

6

8 7

8

6 8 7

6 8

7

76

8

7

4

3

3

3

4 2

8

6 8 72

4

7

8

71

2

4

3

5

7

8

19

21

20

21

22

37

6224

37

23

25

26

72

27

28

2929

2830

29

36

13

32

33

32

33

6

1A6

16A

37

BAJ

AJ S

TEEL

IN

DU

STRIE

S LI

MIT

EDIM

AM

BA

DA

RO

AD

, N

AG

PU

R-

440

018.

IND

IA.

Tel:

+91-7

12-2

72

0071

~ 8

0

Fax:

+91-7

12-2

72

8050

/ 2

72

3068

BAJ

AJ D

R G

IN &

AU

TOFE

EDER

SPA

RE

PA

RTS

CAT

ALO

GU

E2

01

0

34

34

Page 41: FINALLY FINAL catalogue 2009 (3) - bajajngp.com · BAJAJ SPARE PARTS CATALOGUE AND OPERATING INSTRUCTIONS ... a chart showing important setting parameters is given below: ... Y-1

BEL

OW

GIN

SEE

D S

CR

EW C

ON

VEY

OR

AS

SEM

BLY

38

BAJ

AJ S

TEEL

IN

DU

STRIE

S LI

MIT

EDIM

AM

BA

DA

RO

AD

, N

AG

PU

R-

440

018.

IND

IA.

Tel:

+91-7

12-2

72

0071

~ 8

0

Fax:

+91-7

12-2

72

8050

/ 2

72

3068

BAJ

AJ D

R G

IN &

AU

TOFE

EDER

SPA

RE

PA

RTS

CAT

ALO

GU

E2

01

0

LIN

E O

F 12

200

34

2

4

24

2

4

HEX

. NU

T 3/

8”

35 36

(112

FR

AM

E)1 2212 12 2

100

Page 42: FINALLY FINAL catalogue 2009 (3) - bajajngp.com · BAJAJ SPARE PARTS CATALOGUE AND OPERATING INSTRUCTIONS ... a chart showing important setting parameters is given below: ... Y-1

BAJAJ DOUBLE ROLLER COTTON GIN

SRNO.

PART NO.DESCRIPTION

JUMBO SL

QTY.PERM/C

ROLL PRESS STAND ASSEMBLY

EL

1 190 1902 J-190 ROLL PRESS ROD( JUMBO) 23 189 189 189 ROLL PRESS PLATE 24 195 195 195 ROLL PRESS NUT 25 191 191 191 ROLL PRESS SPANNER 1

ROLL PRESS ROD 2

SRNO.

PART NO.DESCRIPTION

JUMBO SL

QTY.PERM/CEL

6 192 192 1927 185 FOUNDATION BOLT 5/8”X18” 48 39 HEX HEAD NUT 5/8 49 160 160 160 PLAIN WASHER 5/8” 410 23 23 23 HEX NUT 3/8” 411 157 157 157 PLAIN WASHER 3/8 812 24 24 24 HEX BOLT 3/8” 413 217 TO 220 ELECTRIC MOTOR 5 HP 1

MOTOR RAIL 2

X2”

MOTOR RAIL ASSEMBLY

MOTOR RAIL ASSEMBLY(SLIDE RAIL FOR ELECTRIC MOTOR)ROLL PRESS STAND ASSEMBLY

39BAJAJ STEEL INDUSTRIES LIMITEDIMAMBADA ROAD, NAGPUR- 440 018. INDIA. Tel: +91-712-272 0071 ~ 80 Fax: +91-712-272 8050 / 272 3068

BAJAJ DR GIN & AUTOFEEDER SPARE PARTS CATALOGUE 2010

Page 43: FINALLY FINAL catalogue 2009 (3) - bajajngp.com · BAJAJ SPARE PARTS CATALOGUE AND OPERATING INSTRUCTIONS ... a chart showing important setting parameters is given below: ... Y-1

Designed with the user in mind; over 48 years’ experience at hand!

BAJAJ STEEL INDUSTRIES LIMITED & CIRCOT

BAJAJ STEEL INDUSTRIES LIMITEDIMAMBADA ROAD, NAGPUR- 440 018. INDIA. Tel: +91-712-272 0071 ~ 80 Fax: +91-712-272 8050 / 272 3068

BAJAJ DR GIN & AUTOFEEDER SPARE PARTS CATALOGUE 2010

with inbuilt Screw Conveyor & Lint Side Plate

Page 44: FINALLY FINAL catalogue 2009 (3) - bajajngp.com · BAJAJ SPARE PARTS CATALOGUE AND OPERATING INSTRUCTIONS ... a chart showing important setting parameters is given below: ... Y-1

Bajaj Steel - HINGNA PLANT

IMAMBADA ROAD, NAGPUR- 440 018. INDIA Tel: +91-712-272 0071 ~ 80 Fax: +91-712-272 8050 / 272 3068 email : [email protected] website : www.bajajngp.com

BAJAJ STEEL INDUSTRIES LIMITEDMOODYINTERNATIONALISO 9001 QMS

U K A S

s e tn ym se tga en ma cm e ryt ti il fieau dq

Bajaj Steel - IMAMBADA PLANT

desi

gn@

blu

efla

mes.

inBAJAJ-CEC DELINTING EQUIPMENTS AND SYSTEMS “WORLD’S BEST NOW IN INDIA”Cotton Seed Screw Conveyors ~ Vertical Rotary Lifts ~ Seed Cleaner ~ Delinter ~ Pneumatic Conveying and

Distribution System of Linter and Motes ~ Linter Cleaner ~ Mechanical Distribution of Black Seed ~ Decorticator ~ Hull Beater ~ Saw Sharping Machines ~ Electricals & Linter Baling Press ~All other Storage

and Conveying Equipment and Devices for Delinting, Decorticating & Pressing Requirements

BAJAJ GINNING AND PRESSING MACHINERY & EQUIPMENTS

Double Roller Cotton Gins ~ Auto Feeder ~ Baling Presses ~Pre-Cleaner ~Lint Cleaner~Seed Cotton Opener & Cleaner~Pneumatic Conveying and Distribution System of Unginned Cotton for Automatic Plants~Belt conveyors

~ Pneumatic Conveying System for Cotton lint~Cotton Seed Conveyors, Elevators~Electricals & Spares etc.