SUMMER INTERSHIP REPORT -2015
`
1
SUMMER INTERNSHIP REPORT
ON
SITE PLANNING & EXECUTION
Under the supervision of:
Submitted by-
CHAUDHARY KAMLESH BHEMJIBHAI
(AP14024)
ADVANCED CONSTRUCTION MANAGEMENT (ACM 28th
)
NATIONAL INSTITUTE OF CONSTRUCTION MANAGEMENT AND
RESEARCH
NICMAR (PUNE)
SUMMER INTERSHIP REPORT -2015
`
2
ACKNOWLEDGEMENT
Any accomplishment requires the efforts of many people and this work is no exception. I
appreciate the support and contribution, which various individuals have provided me for the
successful completion of the dissertation ‘LOTUS DIWADKAR COMMERCIAL
COMPLEX ’.
I, sincerely, express my deep sense of gratitude to Mr. Deepak Bapodra, Mr. Yakin Desai,
Mr. Sanjay Bhatnagar & Mr. Nilesh Adurkar for accepting and providing me the opportunity
to work under their expert guidance and close supervision. I am highly indebted to them for their
useful discussions and continuous encouragement during the course of my project work. Their
clear vision of scientific content and astonishing language skills helped me in a tremendous
manner.
Furthermore, I would also like to thank National Institute Of Construction Management And
Research for allowing me to carry out this internship under RVSA Consultants Private
Limited lastly my faculties who have been a driving force behind the project also played as a
catalyst that helped me get the maximum out of the internship.
Kamlesh B Chaudhary (AP14024)
PGP ACM 28TH
BATCH (2014-2016)
NICMAR, PUNE.
SUMMER INTERSHIP REPORT -2015
`
3
NATIONAL INSTITUTE OF CONSTRUCTION MANAGEMENT AND
RESEARCH
NICMAR (PUNE)
DECLARATION I declare that the summer internship report entitled “SITE EXECUTION & PLANNING”
APPLICABLE FOR EXECUTION OF CIVIL AND STRUCTURAL WORK FOR LOTUS
DIWADKAR COMMERCIAL COMPLEX is the bona-fide work carried out by me, at
RVSA Consultants Private Limited under the guidance of Mr. Sushant (Senior Engineer)
& Mr. Nilesh Adurkar . Further I declare that this has not been previously formed the basis of
award of any degree, diploma, associate-ship or other similar degrees or diplomas, and has not
been submitted anywhere else.
Date: 15th
June 2015 Mr. Deepak Bapodra
(Director)
RVSA Consultants Private Limited
Place: Mumbai
Kamlesh Chaudhary (AP14024) PGP ACM 28
TH BATCH (2014-2016)
NICMAR, PUNE.
SUMMER INTERSHIP REPORT -2015
`
4
NATIONAL INSTITUTE OF CONSTRUCTION MANAGEMENT AND
RESEARCH
NICMAR (PUNE)
CERTIFICATE
This is to certify that the summer internship report “SITE EXECUTION & PLANNING”
APPLICABLE FOR EXECUTION OF CIVIL AND STRUCTURAL WORK FOR LOTUS
DIWADKAR COMMERCIAL COMPLEX is the bona-fide work of
Mr. Kamlesh Chaudhary, at RVSA Consultants Private Limited , from 15th
April 2015 to
15th
June 2015 in partial fulfillment of the academic requirements for the award of Post
Graduate Programme in Advanced Construction Management (PGP ACM). This work was
carried out by him, under my guidance and supervision.
Date: 15th
June 2015 Mr. Deepak Bapodra
(Director)
RVSA Consultants Private Limited
Place: Mumbai
SUMMER INTERSHIP REPORT -2015
`
5
Objectives of Summer Internship Program
1. To familiarize with construction industry planning, design,
and field operations.
2. To introduce with the interrelations among the various
tasks and participants in the construction process.
3. To get exposure with the management and communication
functions performed within a construction project.
4. To aid in acquiring specific skill sets which will enhance
their value to employers and the industry
The duration of the summer internship program is of 8 weeks which
started on 15th
April 2015 and concluded on 15th
June 2015.
SUMMER INTERSHIP REPORT -2015
`
6
INDEX
SR. NO
DESCRIPTION
PAGE NO.
1
AN OVERVIEW OF THE COMPANY
SELECTED FOR TRAINING
07-12
2
PROJECT HIGHLIGHTS
13
3
JOB SITE LAYOUT
14
4
KEY MEMBERS @........... SITE
15
5
GENERAL NOMENCLATURE
used ………..@@@@@.....SITE
16
6
Members …..@ …….Site
17
7
MY VISIT TO READY MIXED CONCRETE
(RMC) ULTRATECH PLANT
18-24
8
MY SITE EXECUTION, SUPERVISION &
MONITORING ON SOME OF THE WORKS
25-43
9
CURRENT PROGRESS OF THE SITE
47
10
LIST OF IS CODES FOR REFERENCE
48
11 RECCOMENDATIONS 49
12 CONCLUSION 50
SUMMER INTERSHIP REPORT -2015
`
7
An overview of the company selected for training:
RVSA Consultants Private Limited is a team of professionals providing services in the field of
Urban Design
Architecture
Interiors
Retail Project Management
We ensure that the wealth of our experience passes on as value to our clients. The commitment
we bring to work in being with the client as a team is the key differentiator in this field
proliferating with PMCs.
Key People:
Mr. Deepak Bapodra
Mr. Yakin Desai
Mr. Sanjay Bhatnagar
Services:
PROJECT ANALYSIS PHASE
Developing the required monitoring and reporting criteria
MASTER PLANNING PHASE
Assess the requirements of the Clients program, the preferred options,
the potential approvals process, its schedule and cost.
SUMMER INTERSHIP REPORT -2015
`
8
PRE-DESIGN PLANNING
To assist the Client
• In defining overall objectives and options
• Define the project team
• Assist in identifying suitable specialist consultants
• Assist in finalizing the consultant’s contract and scope on behalf of the Client
• Develop a master schedule for the entire project
• Develop a preliminary total project budget
DESIGN PHASES
• Oversee the design phase of the project to ensure that the Clients requirements are met for
- Budget
- Schedule
- Function
• Provide for the Client the pre-qualification of the Contractors
• Review bidding documents prior to issue
• Develop a tight and clearly understandable Construction Contract to minimize Change Orders
BID ANALYSIS STAGE
• Incorporate comments from all bidders regarding areas of concern, omission or ambiguity in
the
contract documents identified during bidding
• Evaluate the contractor’s detailed progress schedule
• Define the project administration procedures for the Contractor
• Define Change Order substantiation procedures as stipulated in the Contract
• Finalize the project budget and schedule
• Evaluate the project's cash flow projections for the Clients.
SUMMER INTERSHIP REPORT -2015
`
9
CONSTRUCTION PHASE SERVICES -ADMINISTRATION OF CONTRACT
• Oversee developments of the Contractor's detailed project schedule
• Monitor schedule progress and budget through the project
• Certify and recommend for payment Contractors’ bills
• Assist in quality control of the design and construction
• Chair and minute weekly site progress meetings
• Evaluate and resolve any Change Order applications
• Prepare punch lists of the work as it progresses
• Coordinate close-out documentation for the project
• Oversee the relocation of the staff and their Fixtures, Furniture and Equipment
• Debrief with the Client’s staff to ensure a smooth operations start-up
DIFFERENT PROJECTS OF RVSA Consultants Private Limited
INFRASTRUCTURE
Mumbai Metropolitan Region Development Authority
CIDCO - Railway Station Kharghar
Rabale
ARCHITECTURAL
CIDCO Exhibition Centre
Construction of CIDCO Exhibition Centre including Civil, Interior, Electrical, Air-
conditioning, Audio-Visual and Site Development works at Plot Nos.1A, 15, 29 and 30
in Sector 30A, Vashi, Navi Mumbai [4,19,640 sq.ft., will be completed in October 2011]
Reliance Industries Limited
SUMMER INTERSHIP REPORT -2015
`
10
Eastern India Garment Manufacturer Federation Apparel Park Limited
Construction of Factory Buildings including Sanitary and Plumbing works at Kolkata
[1,00,000 sq.ft., will be completed in April 2011]
Sir Shapurji Billimoria Foundation
Construction of Education Research and Training Centre at Plot No.76, Sector 21,
Kharghar, Navi Mumbai [60,000 sq.ft., will be completed in July 2011]
Gujarat Eco-Textile Park Limited
Construction of the proposed Centre of Excellence at Gujarat Eco-Textile Park Ltd.
[60,000 sq.ft., will be completed in 2011]
L&T Special Steels & Heavy Forgings Private Limited
Infrastructure works for the Hazira Manufacturing Company at Hazira, Surat [200
Acres, will be completed in May 2011]
Tata Communications Limited
Civil and Interior works at Bandra-Kurla Complex, Bandra, Mumbai [3,50,000 sq.ft.,
December 2009]
DOW Chemical International Pvt.Ltd.
Expansion to the existing factory building and office interiors at Kalwa, MIDC, Navi
Mumbai [60,000 sq.ft., October 2008]
Sar Infracon Private Limited
Construction of the proposed Surat International Exhibition and Convention Centre at
SAR Infracon Pvt.Ltd. [1,50,000 sq.ft., will be completed in 2011]
SUMMER INTERSHIP REPORT -2015
`
11
CORPORATE INTERIORS
Tata International Limited
Corporate Office Interiors at Worli, Mumbai [15,000 sq.ft. - April 2001]
Videsh Sanchar Nigam Limited
Utility Building and International InfoTech Park, Vashi, Navi Mumbai (through
CIDCO) [Internet Data Centre - 20,000 sq.ft., Utility Building - 5,000 sq.ft., January
2002]
3 Global Services Private Limited
International Call Centre having capacity of 1500 call taking seats with support
facilities at Paradigm, Mindspace Complex, Malad (W), Mumbai 400 064
[1,05,000 sq.ft., September 2004]
Hughes Tele.(Com) India Limited
Office Interiors for Switch Centre at Shivajinagar, Pune [25,000 sq.ft. - November
1999]
Office Interiors and Architectural renovation for Switch Centre at MIDC, Andheri,
Mumbai [13,000 sq.ft. - October 2000]
McKinsey & Company, Inc.
Corporate Office Interiors at Express Towers, 21st, 22nd and 24th Floors, Nariman
Point, Mumbai [33,000 sq.ft. - August 2001]
Reliance Infocom Limited
National Network Operation Centre, Navi Mumbai [1, 00,000 sq.ft. - December 2002]
SUMMER INTERSHIP REPORT -2015
`
12
Relocation of Corporate Office to Patel Engineering Company, S.V.Road, Jogeshwari