Holbrook Campground Road at Midway Road Intersection Improvement Project FINAL PRESENTATION JULY 27, 2016
17

Final Presentation (Intersection Improvement Project)

Apr 15, 2017

Download

Documents

Josia Tannos
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Final Presentation (Intersection Improvement Project)

Holbrook Campground Road at Midway RoadIntersection Improvement Project

FINAL PRESENTATION

JULY 27, 2016

Page 2: Final Presentation (Intersection Improvement Project)

PROJECT LOCATION

Source: GIS Cherokee County

Page 3: Final Presentation (Intersection Improvement Project)

EXISTING CONDITIONS

Page 4: Final Presentation (Intersection Improvement Project)

BACKGROUND

• Sight distance

• Midway Road stopped traffic looking left

• Safety• Accident reports

• Congestion

Page 5: Final Presentation (Intersection Improvement Project)

STOP SIGN ALTERNATIVE (1)

Page 6: Final Presentation (Intersection Improvement Project)

STOP SIGN ALTERNATIVE (2)

• Advantages• Solves sight distance issue• Safer approach

• Disadvantages• Little to no benefit for traffic

Page 7: Final Presentation (Intersection Improvement Project)

ROUNDABOUT ALTERNATIVE (1)

• Geometric Design• Inscribed circle

• Lane widths

• Entry, exit, circulatory

Page 8: Final Presentation (Intersection Improvement Project)

ROUNDABOUT ALTERNATIVE (2)

• Geometric Design• Horizontal curves

• 346’

• 362’

Page 9: Final Presentation (Intersection Improvement Project)

ROUNDABOUT ALTERNATIVE (3)

• Advantages• Solves sight distance issue• Safer approach speed• Improved intersection traffic flow and capacity• Cheaper alternative

• Disadvantages• Mainline traffic

Page 10: Final Presentation (Intersection Improvement Project)

TRAFFIC

Northbound Southbound Westbound

2016 AM A B A

2016 PM A A A

2036 AM C A A

2036 PM A A B

Page 11: Final Presentation (Intersection Improvement Project)

DRAINAGE

Page 12: Final Presentation (Intersection Improvement Project)

TYPICAL SECTION

Page 13: Final Presentation (Intersection Improvement Project)

UTILITIES

Page 14: Final Presentation (Intersection Improvement Project)

COST ESTIMATES

• Total Project Costs

• T Intersection: $ 543,748.00

• Roundabout: $ 513,585.00

Page 15: Final Presentation (Intersection Improvement Project)

FUTURE RECOMMENDATIONS

• Fastest Path Analysis

• Speed Control

• Traffic Predictions and Trend

Page 16: Final Presentation (Intersection Improvement Project)

CONCLUSION

• Safety• Sight Distance

• Speed

• Congestion• Traffic Flow

• Traffic Capacity

• Cost Effective

Page 17: Final Presentation (Intersection Improvement Project)

Thank You