ADIOS - A Deimos Impact & Observation Spacecraft Team 3 Jeff Anderson, Thomas Blachman, Andrew Fallon, John Franklin, Samuel Gaultney, David Habashy, Brian Hardie, Brandon Hing, Zujia Huang, Sung Kim, Jonathan Saenger
52

Final Presentation for Project A.D.I.O.S.

Mar 20, 2017

Download

Engineering

Stephen Kim
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Final Presentation for Project A.D.I.O.S.

ADIOS -

A Deimos Impact & Observation Spacecraft

Team 3

Jeff Anderson, Thomas Blachman, Andrew Fallon, John Franklin, Samuel Gaultney,

David Habashy, Brian Hardie, Brandon Hing, Zujia Huang, Sung Kim, Jonathan Saenger

Page 2: Final Presentation for Project A.D.I.O.S.

Mission Goal

Primary: Direct an impactor into Deimos at high velocities to launch a plume of surface and subsurface debris into space. The released plume will be analyzed by a passive infrared spectrometer to determine the composition of Deimos. This will determine whether Deimos is a C or D type asteroid, or Mars ejecta.

Secondary: Prebiotic volatile concentrations will be analyzed to determine the potential asteroid contributions to early life.

Alternative: Close Proximity Imaging of one face of Deimos with passive spectrometry of surface composition or total satellite impact with spectrometry conducted by Mars satellites.

2

Page 3: Final Presentation for Project A.D.I.O.S.

Objectives

- The impactor shall collide with Deimos’ surface and generate a plume sufficient enough in size for the CubeSat Spectrometer to detect.

- The impactor shall release from the observer and penetrate Deimos’ surface deep enough to expose subsurface volatile compounds including oxygen, carbon dioxide, carbon monoxide, water, and ammonia.

- The CubeSat shall analyze the plume with a spectrometer and determine the 1.3 µm absorption levels, as well as the absorption levels of volatiles and successfully relay this data back to Earth.

3

Page 4: Final Presentation for Project A.D.I.O.S.

Key Mission Requirements- Shall be ready for launch by July 14th, 2020- Shall not exceed $5.6 M in total cost - Shall not exceed 14 kg for all components- Be able to deliver the impactor to the surface of Deimos 50 minutes before the observer- Be able to deliver the impactor to Deimos at a speed no less than 3.5 km/s and a mass

of 4 kg to produce a sufficient plume size of 0.25 km x 0.25 km- Be able to determine the 1.3 µm absorption levels of the plume as well as the

absorption levels of volatiles- Be able to point the spectrometer at the plume for a minimum of 30 seconds at a range

of no more than 600km- Be able to relay all spectrometer data back to Earth via the DSN

4

Page 5: Final Presentation for Project A.D.I.O.S.

Mission Science Value Key science questions are

OriginCompositionRelationship to other solar system materials.

Are the moons possibly re-accreted Mars ejecta [or] primitive, D-type bodies? Spectrometry can answer this question.

“Resolving the debate concerning the compositions (and likely origins) of... Deimos may be relevant to understanding the early history of Mars...if they turn out to be related to volatile-rich asteroids...they may be the surviving representatives of a family of bodies that originated in the outer asteroid belt or further, and reached the inner solar system to deliver volatiles and organics to the accreting terrestrial planets.”

-Decadal Survey

5

Page 6: Final Presentation for Project A.D.I.O.S.

Science Traceability Matrix

6

Science ObjectivesMeasurement objectives

Measurement Requirements

Instrument Requirements Instruments Data Products

Deimos

Internal composition Measure ratio of iron in internal composition

Spectronomy measurements for 160 seconds

Be able to measure the 1.3 µm absorption levels of the plume

ARGUS Spectrometer Graphs of Spectronomy Readings

Internal volatiles Determined the amount and type of subsurface volatiles

Spectronomy measurements for 160 seconds

Be able to measure the 1.0 µm - 1.63 µm. absorption levels of the plume

ARGUS Spectrometer Graphs of Spectronomy Readings

Decadal Survey: “Are the moons possibly re-accreted Mars ejecta? Or are they possibly related to primitive, D-type bodies? These questions can be investigated….mission that includes measurements of bulk properties and internal structure.”

MEPAG goals Investigation A3.1: “Characterize organic chemistry, including (where possible) stable isotopic composition and stereochemical configuration. Characterize co-occurring concentrations of possible bioessential elements.”

Mission Objective: Measure the internal subsurface composition of Deimos to determine its origins and organic volatile levels.

Page 7: Final Presentation for Project A.D.I.O.S.

Requirement Flowdown- Project ADIOS will determine the surface and subsurface composition of Deimos through

spectrometry using a CubeSat and detachable impactor

- The impactor shall strike Deimos with a mass and velocity sufficient to generate an analyzable plume

- The impactor must detach safely from the CubeSat

- Separation mechanism requirements

- The impactor must navigate to Deimos

- GNC, ADCS, propulsion requirements

- The impactor must arrive with a mass of 4 kg and a speed of 3.5 km/s

- The CubeSat shall perform spectrometry on the generated plume and transmit the data back to Earth for analysis

- The CubeSat must pass within 600 km of the plume ~1 hr after impact

- GNC, ADCS, propulsion requirements

- The CubeSat must analyze the 1.3 μm absorption and absorption levels of volatiles

- ADCS, spectrometer, C&DH requirements

- The CubeSat must transmit the data to the DSN

- Comms requirements

7

Page 8: Final Presentation for Project A.D.I.O.S.

OV-1

8

Page 9: Final Presentation for Project A.D.I.O.S.

Trajectory:Overview and Maneuvers - Separation from Mars 2020

- Initial burn ΔVi ~ 41.46 m/s

- Occurs after 4 days

- Achieve Martian altitude of 30,000 km

- Achieve inclination of 0° relative to Deimos’ orbit

- Impact burn ΔVc ~ 19 m/s

- at Mars’ SOI

- Achieve impact with Deimos

- Separation of Observer and Impactor

- Observer burn ΔVo ~ 75.17 m/s

- Causes observer to arrive an hour after impact

- Flyby of observer

- Data collection

- Post mission objectives

9

VIDEO HERE

Page 10: Final Presentation for Project A.D.I.O.S.

Good window

Optimal case

Required ΔVc over one Deimos orbital period

Trajectory: Lining up with Deimos

10

- Retrograde Hyperbolic Trajectory for maximum impact velocity

- Over 12 hours window available each 30 hours (Deimos’ orbital period) to keep ΔVc low

- Adjustment to delay/advance arrival time can be done at initial separation

Worst case

Optimal case

Satisfactory

Deimos

Page 11: Final Presentation for Project A.D.I.O.S.

Spacecraft Architecture Overview

11

- 4U Observer Module

- Self-contained, self-controlled

- ADCS: star trackers, sun sensors, reaction wheels

- GNC: DDOR

- Comms: transceiver

- C&DH: Cube Computer

- EPS: solar panels, batteries

- Propulsion: chemical

- Payload: spectrometer

- 2U Impactor Module

- Self-contained, self-controlled

- ADCS: star trackers, sun sensors, reaction wheels

- GNC: camera

- C&DH: NanoMind A 3200

- EPS: batteries

- Propulsion: cold gas

- Payload:4 kg empty mass

6U CubeSat

Page 12: Final Presentation for Project A.D.I.O.S.

ArchitectureOverview

12

Overall Dimensions Impactor Dimensions Observer Dimensions

205.1x357.3x103.7 mm 205.1x153.7x103.7 mm 203.7x203.7x103.7 mm

Page 13: Final Presentation for Project A.D.I.O.S.

Payload: Spectrometer

Selected Instrument: ARGUS

- Passive infrared spectrometer- Operates in 1 μm to 1.7 μm range- Extended range version goes to 2400

nm - Range: 600 km- FOV: 0.15°- Power: 1.4 W- Volume: 0.18U- Integration Time Ranges: 500 μs to ~4

seconds- Data transmitted in 100 ms - Can adjust number of scans for co-

adding spectra

Requirements Necessary:

- Must have a spectronomy range of 1.0 µm to 1.63 µm.

- Physical range of greater than 400 km

- Size must be less than 2U

- Must make measurements in under 80 seconds

13

Page 14: Final Presentation for Project A.D.I.O.S.

Impact Design

14- Average Density of plume at arrival 0.02 kg/m3

Page 15: Final Presentation for Project A.D.I.O.S.

Flight Systems

15

Page 16: Final Presentation for Project A.D.I.O.S.

Structure- Custom-built aluminum frames

- Insulating layers for thermal containment

- Observer has 0.5U modules attached to the central propulsion frame

- Impactor has a single frame

- Components slot in individually

- Protection from 35 rads is accommodated by 0.8 mm aluminum on necessary parts

16

Page 17: Final Presentation for Project A.D.I.O.S.

Power

Observer

- Clyde Space Deployable, Double-Sided Solar Cells

- 5 mm Profile fits to 4U structure

- 40 W Peak Power at Mars, 20.8 W Average Orbit Power

- Clyde Space FlexU CubeSat EPS

- Up to 12 Solar Panels

- 98% Efficient at 5 V and 3.3 V Regulators

- Clyde Space 60 Wh Battery

- 10.4 Ah at 8.0 V to 6.4 V

- Custom battery protection circuitry

Impactor

- Clyde Space FlexU CubeSat EPS

- Up to 12 Solar Panels

- 98% Efficient at 5 V and 3.3 V Regulators

- 3x Clyde Space 40 Wh Battery

- 10.4 Ah at 8.0 V to 6.4 V

- Custom battery protection circuitry

17Observer Solar Panel Configuration

Page 18: Final Presentation for Project A.D.I.O.S.

PropulsionObserver

- Aerojet Rocketdyne 2U MPS-130

- Chemical Monopropellant: AF-M315E

- Expected Isp of 240 seconds

- Green Propellant

- Available V = 229 m/s𝚫- Assuming Total Spacecraft Mass: 14 kg

- Cost Savings

- Simplified range operations

- Reduction of thermal management

Impactor

- VACCO End-Mounted 0.5U MiPS

- Cold-Gas Propellant: R134a

- Isp of 40 seconds- Non-Toxic

- Available V = 39 m/s for corrections𝚫- Assuming Total Impactor Mass: 4.5 kg

18

Page 19: Final Presentation for Project A.D.I.O.S.

ADCS- BCT XACT

- 0.5 U

- 3-axis control- Contains Star Trackers, Reaction

Wheels- 1-sigma cross-axis pointing error

better than 8 arcseconds

- Pointing Accuracy: 0.003° (2 axis), 0.007° (3rd axis)

- Slew Rate: 10 deg/s

GNC

Observer- Delta-DOR

- Utilize DSN and IRIS Comm. System on CubeSat

- Used by ESA for interplanetary missions such as Mars Express

Impactor- MSSS ECAM-M50 (Camera)

19

Page 20: Final Presentation for Project A.D.I.O.S.

Telecommunications

20

Iris V2

- Antenna

- 8x8 Tx Patch

- 1000-62 bps

- Capable of transmitting 5.16 MB in less than 10 minutes

- Covers 2x2 U surface

- Rx patch integrated into TX board

- 1.2 kg, 0.5U

- 26 W at full transpond

- X-band transpond

Pictured Above: Iris Transponder

Pictured Above: 4x4 Graphical representation of Tx patch.

Page 21: Final Presentation for Project A.D.I.O.S.

Command and Data Handling

- Cube Computer

- Off-the-shelf

- Operating Voltage: 3.3V

- PC/104 Form Factor compatible with CubeSat

- Internal and external watchdog

- 400 MHz processor

- Two 1 MB SRAM for data storage

- 2 GB MicroSD socket

- Redundant clocks

- Heritage from ADCS OBC on QB50 precursor satellites and DeorbitSail

21

Observer Impactor

- NanoMind A 3200

- Off-the-shelf

- Real Time Clock

- Operating Voltage: 3.3V

- 3-Axis gyroscope

- On-board temperature sensors

- 32 MB SDRAM

- 512 KB built-in flash

- Two 64 MB NOR flash

- IPC-A-610 Class C assembly certification

Page 22: Final Presentation for Project A.D.I.O.S.

Payload Separation:NiChrome Wire Cutter

22

- NiChrome Wire Cutter Release Mechanism

- Created by Adam Thurn

- The two saddles (see green in model) are only non-commercial parts

- Dimensions: 32 x 16.5 x 11.5 mm

- Average Vacuum Cut Time of Vectran

- 200 Denier: 2.6 Seconds

- 400 Denier: 6.2 Seconds

- Used on Tether Electrodynamics Propulsion Cubesat Experiment (TEPCE)

- Total Cost per Unit: $166.21

Page 23: Final Presentation for Project A.D.I.O.S.

System Engineering

23

Page 24: Final Presentation for Project A.D.I.O.S.

Observer Mass Budget & TRLs

Subsystem Component (Quantity) Current Best Estimate (kg) TRL Contingency

(%)Maximum Expected

Value (kg)

ADCS BCT XACT 0.91 9 5 0.956

Communication Iris V2 1.2 5 25 1.5

C&DH Cube Computer 0.07 9 5 0.074

EPS

Clyde Space FlexU EPS 0.148 8 10 0.163

Clyde Space 60 Wh Battery 0.475 8 10 0.523

Clyde Space 2U Deployable Array (4) 0.8 8 10 0.88

Payload Argus 1000 IR Spectrometer 0.23 9 5 0.242

Propulsion (Wet) Rocketdyne MPS-130 3.5 6 25 4.375

StructureAluminum Frame (2) 0.201 9 5 0.211

Fasteners (50) 0.25 9 5 0.263

Radiation Shielding .25 9 0 .25

Misc. Cables, Wires (20) 0.1 9 5 0.105

Subtotal (Dry) 6.834 8.239

24

Page 25: Final Presentation for Project A.D.I.O.S.

Impactor Mass Budget & TRLs

Subsystem Component (Quantity) Current Best Estimate (kg) TRL Contingency (%) Maximum Expected

Value (kg)

ADCS BCT XACT 0.91 9 5 0.956

C&DH NanoMind A3200 0.014 6 25 0.018

EPSClyde Space FlexU EPS 0.148 8 10 0.163

Clyde Space 40Wh Battery (3) 0.954 8 10 1.05

GNC MSSS ECAM-M50 0.256 7 20 0.307

Propulsion (Wet) VACCO End-Mounted MiPS 0.924 6 30 1.201

Structure

Aluminum Frame 0.617 9 5 0.648

Fasteners (25) 0.125 9 5 0.131

Radiation Shielding 0.15 0.15

Misc. Cables, Wires (10) 0.05 9 5 0.053

Subtotal (Dry) 3.725 4.252

Subtotal (Wet) 4.148 4.675

Maximum Expected Total Dry Mass (kg) 12.491

25

Page 26: Final Presentation for Project A.D.I.O.S.

26

Observer Power Budget- Solar panels will provide

enough power for majority of modes

- Battery will be fully charged from Earth and will be used during Downlink Mode

27 26.06

60

21.51 25.69

52.51

Page 27: Final Presentation for Project A.D.I.O.S.

Impactor Power Budget

27

Impactor Power BudgetAverage Component Estimated Draw

SubsystemCBE Power (W)

Contingency (%)

MEV Power (W)

Structure and Mechanisms 0.00 0.20 0.00Thermal Control 0.00 0.20 0.00Power (inc. harness) 0.00 0.10 0.00On-Board Processing 0.55 0.05 0.585Attitude Determination and Control 2.00 0.15 2.30Propulsion 10.00 0.05 10.5Guidance and Navigation Control 2.00 0.15 2.3

Total Power 14.55 15.68

- Only one Mode

- 120 Wh battery will allow for multiple maneuvers since propulsion will only use power for minutes at a time

- Battery will be fully charged from Earth

Page 28: Final Presentation for Project A.D.I.O.S.

Telecom Link Budget, Data Volume and Return Strategy

28

- Utilize 8x8 Tx Patch

- Opposition: 1000 bps

- Conjunction: 62 bps

- Total Data Accumulated:

- 5.16 MB

- Entire end of life utilized to transmit data

- At peak rate, ~10 minutes.

Page 29: Final Presentation for Project A.D.I.O.S.

Thermal Energy Balance and Management

Observer + Impactor Observer Impactor

α = absorbed 0.92 0.92 0.92

ε = emitted 0.85 0.85 0.79So = Earth Solar Flux 1370 1370 1370So = Mars Solar Flux 608.9 608.9 608.9A=Area absorbed 0.06 0.04 0.04

Ar=Area emitted 0.22 0.2 0.1

σ = constant 5.67E-8 5.67E-8 5.67E-8Watts (min) 25.69 25.69 .55Watts (max) 26 52 14.55Watts (heater) 0 10 0

Earth cruise 37.65199138

Mars cruise 0.4701006878 11.49890 -8.67

Mars full power 0.8267963944 23.38434 16.45723844

Q e = ε σ Ar Tr^4⋅ ⋅ ⋅Qa = So α A cos(θ)+Watts+heater⋅ ⋅ ⋅

ConfigMax Tolerable Temperature (°C) Part

Min Tolerable Temperature (°C) Part

Observer + Impactor 40

Argus Spectrometer 5

Rocketdyne MPS-130

Observer 40Argus Spectrometer 5

Rocketdyne MPS-130

Impactor 40Clyde Space Battery -10

VACCO End-Mounted MiPS

29

Page 30: Final Presentation for Project A.D.I.O.S.

Radiation Shielding

- ADIOS will experience approximately 35 rads during its mission

- Calculated from Curiosity measurements

- An adequate amount of aluminum shielding will be applied to protect vital components

- 0.8 mm thick

- 400 g

- Reduces radiation by 90% 3.15 rads

30

Page 31: Final Presentation for Project A.D.I.O.S.

Risk Identification & Mitigation1. Damage to key systems from Radiation

a. All components have radiation hardening for mission time or are otherwise insulated.

2. Trajectory Mishap

a. 33% extra fuel for course corrections

b. Communication directly back to earth possible

3. Impactor Fails Separation

a. Surface Spectrometry

b. Redundant release system

4. Plume Size Failure

a. Plume is adjusted to be larger than needed by having a heavy 4 kg impactor.

5. Power failure

a. Contingency 12% for peak power requirements

6. Temperature failure

a. Spacecraft passively maintains correct temperature ranges

31

Page 32: Final Presentation for Project A.D.I.O.S.

Management, Schedule, Cost

32

Page 33: Final Presentation for Project A.D.I.O.S.

33

Page 34: Final Presentation for Project A.D.I.O.S.

Program Schedule

34

Page 35: Final Presentation for Project A.D.I.O.S.

Cos

t Est

imat

e

35

Total Project Cost

$3,783,955

With Contingency

$3,947,944

Page 36: Final Presentation for Project A.D.I.O.S.

Cost: Personnel

36

$601,955

$173,363

$669,794

Page 37: Final Presentation for Project A.D.I.O.S.

Cost: Equipment

37

17 18 19 20 21

Year of Purchase

Page 38: Final Presentation for Project A.D.I.O.S.

Cost: Other Direct

38

$100,000

$5,000

$401,877

$31,480

$12,949

Page 39: Final Presentation for Project A.D.I.O.S.

Descope Options

- Use MRO or future spacecraft to do spectronomy- Saves $49,000 for Argus and no longer need separate impactor

- Have impactor be unguided- Saves $200,000 in component costs and reduces complexity- Increases risk of missing.

- Reduce the amount of employees- Cutting 2 graduate students saves $484,452.77 over 5 years

- Only do spectronomy of Deimos Surface - Backup in case of impactor failure

39

Page 40: Final Presentation for Project A.D.I.O.S.

Questions?

40

Page 41: Final Presentation for Project A.D.I.O.S.

References1Amicucci, Zac., Hartley, Jacob., Martin, Patrick., Ofer, Hans., Sprague, Christopher., Sparer, Daniel., Ware, Adam., “Mitigation of Environmental Risks due to Debris Impacts on Unfortunate

Spacecraft (MERiDIUS),” Aerospace Solutions. 11 December 2015.

2Asmar, S., and Matousek, S., “Mars Cube One (MarCO),” (November 2014).

https://marscubesatworkshop.jpl.nasa.gov/static/files/presentation/Asmar-Matousek/07-MarsCubeWorkshop-MarCO-update.pdf. [Retrieved 15 October 2016].

3Border, J.S., “Delta Differential One-way Ranging,” Deep Space Network, Jet Propulsion Laboratory, http://deepspace.jpl.nasa.gov/dsndocs/810-005/210/210A.pdf [Retrieved 25 October 2016].

4Cloutis, E. A., & Gaffey, M. J. (1993). The Constituent Minerals in Calcium-Aluminum Inclusions: Spectral Reflectance Properties and Implications for CO Carbonaceous Chondrites and Asteroids. Icarus, 105(2), 568-579. doi:10.1006/icar.1993.1150

5D.J. Scheeres, “Orbital Motion in Strongly Perturbed Environments: Applications to Asteroid, Comet, and Planetary Satellite Orbiters,” Springer-Praxis Books in Astronautical Engineering. 2012

6Daga, Andrew, Carlton Allen, Melissa Battler, James Burke, Ian Crawford, Richard Léveillé, Steven Simon, and Lin Tze Tan. “Lunar and Martian Lava Tube Exploration as Part of an Overall Scientific Survey,” A White Paper Submitted to the Planetary Sciences Decadal Survey 2013-2022. Lunar and Planetary Institute, n.d. [Retrieved 3 September

2016].

7Drysdale, Timothy D., Vourch, Clement J. “Low-Profile Antenna Package for Efficient Inter-CubeSat Communication in S- and V-band,” Electronics & Nanoscale Engineering Division, University of Glasgow, UK. (2015). https://icubesat.files.wordpress.com/2015/05/icubesat-2015_org_b-2-3_svband_paper_vourch.pdf. [Retrieved 15 October

2016].

8Duncan, C. B., Aguirre, F. H., Smith, A. E., “Iris Transponder -- Communications and Navigation for Deep Space,” California Institute of Technology. Pasadena, California. 2014. http://digitalcommons.usu.edu/cgi/viewcontent.cgi?article=3083&context= smallsat. [Retrieved 1 November 2016].

9Gibbon, D., Dr. Underwood, C., Prof. Sweeting, M., “Cost Effective Propulsion Systems for Small Satellites using Butane Propellant,” Acta Astronautica Vol. 51, No. 1- 9, pp. 145-152, 2002.

10Guillois, G., Dahaene, T., and Sarrazin, T., “X-Band Downlink for Cubesat: From Concept to Prototype,” http://digitalcommons.usu.edu/cgi/viewcontent.cgi?rticle=2915&context=smallsat. [Retrieved 12 October 2016].

11K.M. Brumbaugh, The Metrics of Spacecraft Design Reusability and Cost Analysis as Applied to Cubesats, University of Texas 2012. https://repositories.lib.utexas.edu/handle/2152/ETD-UT-2012-05-5065.[Retrieved 10 September 2016].

41

Page 42: Final Presentation for Project A.D.I.O.S.

References12Kessler, D. J., and B. G. Cour-Palais. “Collision frequency of artificial satellites: The creation of a debris belt,” J. Geophys. Res., 83(A6), 2637–2646, MEPAG (2015), Mars Scientific Goals,

Objectives, Investigations, and Priorities: 2015. V. Hamilton, ed., 74 p. <http://mepag.nasa.gov/reports.cfm>. [Retrieved 5 September 2016].

13Kubitschek, Daniel G., “Impactor Spacecraft Encounter Sequence Design for the Deep Impact Mission,” NASA- Jet Propulsions Laboratory. Paper No. GT-SSEC.C.3

14Leveille, Richard and Saugata Datta. "Lava tubes and basaltic caves as astrobiological targets on Earth and Mars: A Review," Elsevier (2009): 592-598. <http://ac.els-cdn.com/S0032063309001603/1-s2.0-S0032063309001603-main.pdf?_tid=3693bac6-739f-11e6-

9e3200000aacb361&acdnat=1473104013_0684dc2eaf7c006ece67d6daf61 3e962>. [Retrieved 18 September 2016].

15McNutt, L., Johnson, L., Clardy, D., Castillo-Rogez, J., Frick, A., and Jones, L., “Near-Earth Asteroid Scout,” AIAA Paper, https://ntrs.nasa.gov/archive/nasa/casi.ntrs.nasa.gov/20140012882.pdf [Retrieved 24 October 2016].

16Morris, Dennis., “Small Satellite Conference: Sat Advanced Technology Propulsion System Concepts using Additive Manufacturing. Small Sat Conf. Presentation- 5. 6 August 2014.

17Murchie, Scott., “Science options and priorities for the exploration of Phobos and Deimos,” Johns Hopkins University/Applied Physics Laboratory. (2014).

18Pardo de Santayan, R., and Lauer, M., “Optical Measurements for Rosetta Navigation Near the Comet,” ESA, http://issfd.org/2015/files/downloads/papers/062_Pardo.pdf [retrieved 29 October 2016].

19Richardson, J. E., Dr. (March 2013). “An examination of the Deep Impact collision site on Comet Tempel 1 via Stardust-NExT: Placing further constraints on cometary surface properties, <https://www.researchgate.net/publication/256461959_An_examination_of_the_Deep_Impact_collision_site_on_Comet_Tempel_1_via_Stardust-

NExT_Placing_further_constraints_on_cometary_surface_properties>. [Retrieved 10 October 2016].

20Richardson, J. E., Melosh, H. J., Artemeiva, N. A., & Pierazzo, E. (n.d.). “Impact Cratering Theory and Modeling for the Deep Impact Mission: From Mission Planning to Data Analysis,” Deep Impact Mission: Looking Beneath the Surface of a Cometary Nucleus, 241-267. doi:10.1007/1-4020-4163-2_10

21Rodriguez M., N. Paschalidis, S. Jones, E. Sittler, D. Chornay, P. Uribe, T. Cameron. Miniaturized Ion and Neutral Mass Spectrometer for CubeSat Atmospheric Measurements.digitalcommons.usu.edu/cgi/viewcontent.cgi?article=3524&context=smallsat. [Retrieved 1 November 2016].

22Selva, Daniel., Krejci, David., “A survey and assessment of the capabilities of Cubesats for Earth Observation,” Acta Astronautica 74 (2012) 50-68. 42

Page 43: Final Presentation for Project A.D.I.O.S.

References23Smith, Matthew W. et al. “ExoplanetSat: detecting transiting exoplanets using a low- cost CubeSat platform,” Space Telescopes and Instrumentation (2010): Optical, Infrared, and Millimeter Wave.

Ed. Jacobus M. Oschmann et al. San Diego, California, USA: SPIE, 2010. 773127-14. © 2010 SPIE.

24Spacecraft Buses, Systems & Solutions. (n.d.). http://bluecanyontech.com/wp-content/uploads/2016/07/RW.pdf. [Retrieved 15 October 2016].

25Spinhirne, James D., “Micro Pulse Lidar,” IEEE Transactions on Geoscience and Remote Sensing. Vol. 31, No. 1, January 1993.

26Spores, Ronald, Robert Masse, Scott Kimbrel, and Mclean Chris. "GPIM AF-M315E Propulsion System." (15 July 2013). <

https://www.rocket.com/files/aerojet/documents/CubeSat/GPIM%20AF-M315E%20Propulsion%20System.pdf>. [Retrieved 14 October 2016].

27Stafford, G. “XB1: Enabling a New Realm of CubeSat Science,” Blue Canyon Technologies [online], http://mstl.atl.calpoly.edu/~bklofas/Presentations/SummerWorkshop2012 /Stafford_XB1.pdf [Retrieved 12 October 2016].

28Whittaker, William., “Technologies Enabling Exploration of Skylights, Lava Tubes and Caves,” NASA Innovative Advanced Concepts (NIAC) Phase I. (2012).

29Wilson, Michael., “Mars 2020 Mission Concept,” Jet Propulsions Laboratory. 10 October 2013. PowerPoint Presentation.

30Zurek, R. W. (2011). “Methane on Mars: Current observations, interpretation, and future plans,” Planetary and Space Science, 59(2-3), 133-136. doi:10.1016/j.pss.2010.10.008.

31“About Delta DOR,” European Space Agency. October 1, 2013. http://www.esa.int/Our_Activities/Operations/About_delta_DOR. [Retrieved 1 November 2016]

32“ARGUS 1000 IR Spectrometer Owner’s Manual,” Thoth Technology Inc. Document Number OG728001. Version 1.03. 2010.

http://thothx.com/manuals/Argus%20Owner%27s%20Manual,%20Thoth %20Technology,%20Oct%2010,%20rel%201_03.pdf. [Retrieved 1 November 2016]

33“ARGUS IR Spectrometer Kit, Space Grade,” Thot Technology Inc. http://thothx.com/product/argus-1000sk-infrared-spectrometer-kit/. [Retrieved 1 November 2016].

34“ARGUS 1000 Infrared Spectrometer,” CubeSatShop. https://www.cubesatshop.com/product/argus-1000-infrared-spectrometer/. [Retrieved 1 November 2016].

35“Attitude Determination Control Systems,” Blue Canyon Technologies [online], http://bluecanyontech.com/wp-content/uploads/2016/08/ADCS_F.pdf. [Retrieved 12 October 2016].

43

Page 44: Final Presentation for Project A.D.I.O.S.

References36“Chapter 2. NASA Life Cycles for Space Flight Programs and Projects,” (2012, August 14). Retrieved from NASA Procedural Requirements:

http://nodis3.gsfc.nasa.gov/displayDir.cfm?Internal_ID=N_PR_7120_005E_&page_name=Chapter2. [Retrieved 18 October 2016].

37“Command & Data Handling Systems,” http://www.cubesatshop.com/product-category/command-and-data-handling (n.d.). [Retrieved 20 September 2016].

38“CPOD MiPS Overview,” Micro Propulsion Systems URL: http://mstl.atl.calpoly.edu/~bklofas/presentations/developersworkshop2015/day_micro_propulsion.pdf. [Retrieved 1 October 2016.]

39“Cube Computer - CubeSatShop.com,” CubeSatShop.com Available: https://www.cubesatshop.com/product/cube-computer/ [Retrieved 28 October 2016].

40“Delta Differential One-Way Ranging,” Jet Propulsions Laboratory. Pasadena, California. 2015. http://deepspace.jpl.nasa.gov/dsndocs/810-005/210/210A.pdf. [Retrieved 1 November 2016].

41“ECAM Imaging System,” Malin Space Science Systems [online], http://www.msss.com/brochures/ecam.pdf. [Retrieved 28 October 2016].

42"Green High Delta V Propulsion for Cubesats," <http://www.rocket.com/files/aerojet/documents/CubeSat/crop-MPS-130%20data%20sheet-single%20sheet.pdf>. [Retrieved 27 September 2016].

43"Green Propellant Infusion Mission Project," National Aeronautics and Space Administration,<http://www.nasa.gov/sites/default/files/files/GreenPropel lantInfusionMissionProject_v2.pdf>. [Retrieved 15 September 2016].

44“Iris V2 CubeSat Deep Space Transponder,” National Aeronautics and Space Administration. (2015). https://deepspace.jpl.nasa.gov/files/dsn/Brochure_IrisV2_201507.pdf. [Retrieved 25 September 2016].

45“MAI-400 1/2U CubeSat ADACS,” Maryland Aerospace. http://maiaero.com/datasheets/MAI400_Specifications.pdf. [Retrieved 20 October 2016].

46“MAI-SS Space Sextant Low Cost Miniature Star Tracker,” Maryland Aerospace. http://maiaero.com/datasheets/MAI-SS%20Space%20Sextant%20Datasheet.pdf. [Retrieved 12 October 2016].

47Mars Exploration Program Analysis Group (MEPAG), “Mars Science Goals, Objectives, Investigations, and Priorities: 2015 Version,” 19 June 2015. http://mepag.nasa.gov/reports.cfm. [Retrieved 18 October 2016].

48“Nano Star Trackers,” http://www.cubesatshop.com/product- category/command- and-data-handling (n.d.). [Retrieved 12 October 2016]. 44

Page 45: Final Presentation for Project A.D.I.O.S.

References49“NASA's Mission Operations and Communications Services, NASA Deep Space,” (2014). https://deepspace.jpl.nasa.gov/files/dsn/6_nasa_mocs_2014_10_01_14.pdf [Retrieved 5 November 2016].

50“NASA Space Flight Program and Project Management Handbook,” NASA, Hampton. (2014). https://ntrs.nasa.gov/archive/nasa/casi.ntrs.nasa.gov/20150000400.pdf. [Retrieved 5 November 2016].

51“On Board Computer,” https://www.cubesatshop.com/product/on-board-computer/. [Retrieved 28 October 2016].

52"Products- CS High Power Bundle" Clyde Space. N.p., n.d. https://www.clyde.space/products/47-cs-high-power-bundle-c-eps-80whrbattery. [Retrieved 14 October 2016].

53"Products- Double Deployed Solar Array" Clyde Space. N.p., n.d. https://www.clyde.space/products/27-2u-doubledeployed-solar-array. [Retrieved 14 October 2016].

54“Reaction Control Propulsion Module,” CubeSat Propulsion Systems, URL: http://www.cubesat-propulsion.com/wp-content/uploads/2015/10/reaction-control-propulsion-module.pdf. [Retrieved 1 November 2016].

55“Thoth Technology, Inc. ‘Argus 1000 IR Spectrometer Owner’s Manual,’” http://thothx.com/manuals/Argus%20Owner's%20Manual,%20Thoth%20Technology,%20Oct%2010,%20rel%201_03.pdf . [Retrieved 25 September 2016].

56“Vision and Voyages for Planetary Science in the Decade 2013-2022,” Washington, D.C.: National Academies Press, ©2011. <http://solarsystem.nasa.gov/docs/Vision_and_Voyages-FINAL.pdf>. [Retrieved 15 October 2016].

45

Page 46: Final Presentation for Project A.D.I.O.S.

46

Page 47: Final Presentation for Project A.D.I.O.S.

WBS Breakdown

47

Page 48: Final Presentation for Project A.D.I.O.S.

48

Page 49: Final Presentation for Project A.D.I.O.S.

49

Cost Estimation

Page 50: Final Presentation for Project A.D.I.O.S.

Observer Detail Power Budget

50

Average Component Estimated Draw Maneuver Cruise Mode Science ModeDownlink Mode

Subsystem CBE Power (W) Cont. %MEV Power (W) Duty Cycle Duty Cycle Duty Cycle Duty Cycle

Spectrometer 1.24 15.00 1.43 0 0 1 0Structure and Mechanisms 5.83 20.00 7.00 0 1 0 0On-Board Processing 0.13 5.00 0.14 1 1 1 1Attitude Determination and Control 0.50 15.00 0.58 1 1 1 1Propulsion 11.00 5.00 11.55 1 0 1 1Communications (Uplink) 12.00 15.00 13.80 1 1 1 0Communications (Downlink) 35.00 15.00 40.25 0 0 0 1

Total Power 52.46 59.51 26.06 21.51 25.69 52.51

Page 51: Final Presentation for Project A.D.I.O.S.

Link Analysis Detail

51

Page 52: Final Presentation for Project A.D.I.O.S.

Critical PathConcept Studies: Jan. 2017 - Feb. 2017

Concept/Technology Development: Mar. 2017-July 2017

Prelim. Design: Aug. 2017 - Mar. 2018

Final Design/Fabrication: Apr. 2018 - July 2019

Sys. AI&T: July 2019-July 2020

Launch & Ops: July 2021 - Mar. 2021

Decommissioning: Apr. 2021 - June 2021

52