File E67601 Vol. 2 Index Page 1 Issued: 2017-03-24 INDEX Construction United States Types Canadian Types Sec. PVC Parallel Cord SPT-1, SPT-2, SPT-3, NISPT-1, NISPT-2 SPT-1, SPT-2, SPT-3, NISPT-1, NISPT-2 1 PVC Jacketed Cord SVT, SVTO, SJT, ST, SJTO, STO, SJTW, STW, SJTOW, STOW SVT, SVTO, SJT, ST, SJTO, STO, SJTW, STW, SJTOW, STOW 2 CABLE-UL-VOLEX-JEM 1/4
39
Embed
File E67601 Vol. 2 Index Page 1 Issued: 2017-03-24 … · current version of these documents from their local UL customer service representative or UL field representative. For assistance,
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
File E67601 Vol. 2 Index Page 1 Issued: 2017-03-24 INDEX
Construction United States Types Canadian Types Sec.
File E67601 Vol 2 Auth. Page 1 Issued: 2017-03-20 Revised: 2017-03-24 FOLLOW-UP SERVICE PROCEDURE (TYPE L) FLEXIBLE CORD (ZJCZ,ZJCZ7) Manufacturer: SEE ADDENDUM FOR MANUFACTURER LOCATIONS 197624 (Party Site) Applicant: Volex (Asia) Pte Ltd (337951-004) 35 TAMPINES ST 92 SINGAPORE 528880 SINGAPORE 197624 (Party Site) Listee/Classified Co.: SAME AS APPLICANT (337951-004) This Follow-Up Service Procedure authorizes the above Manufacturer(s) to use the marking specified by UL LLC, or any authorized licensee of UL LLC, including the UL Contracting Party, only on products when constructed, tested and found to be in compliance with the requirements of this Follow-Up Service Procedure and in accordance with the terms of the applicable service agreement with UL Contracting Party and any applicable Service Terms. The UL Contracting Party for Follow-Up Services is listed on addendum to this Follow-Up Service Procedure ("UL Contracting Party"). UL Contracting Party and UL LLC are referred to jointly herein as "UL." UL further defines responsibilities, duties and requirements for both Manufacturers and UL representatives in the document titled, "UL Mark Surveillance Requirements" that can be located at the following web-site: http://www.ul.com/fus and in the document titled "UL and Subscriber Responsibilities" that can be located at the following website: http://www.ul.com/responsibilities. Manufacturers without Internet access may obtain the current version of these documents from their local UL customer service representative or UL field representative. For assistance, or to obtain a paper copy of these documents or the applicable Service Terms, please contact UL's Customer Service at http://ul.com/aboutul/locations/, select a location and enter your request, or call the number listed for that location. The Applicant, the specified Manufacturer(s) and any Listee/Classified Co. in this Follow-Up Service Procedure must agree to receive Follow-Up Services from UL Contracting Party. If your applicable agreement is a Global Services Agreement ("GSA") with an effective date of January 1, 2012 or later and this Follow-Up Service Procedure is issued on or after that effective date, the Applicant, the specified Manufacturer(s) and any Listee/Classified Co. will be bound to a Service Agreement for Follow-Up Services upon the earliest by any Subscriber of use of the prescribed UL Mark, acceptance of the factory inspection, or payment of the Follow-Up Service fees which will incorporate such GSA, this Follow-Up Service Procedure and the Follow-Up Service Terms which can be accessed by clicking here: http://www.ul.com/contracts/Terms-After-12-31-2011. In all other events, Follow-Up Services will be governed by and incorporate the terms of your applicable service agreement and this Follow-Up Service Procedure.
CABLE-UL-VOLEX-JEM 2/4
File E67601 Vol 2 Auth. Page 2 Issued: 2017-03-20 Revised: 2017-03-24 It is the responsibility of the Listee/Classified Co. to make sure that only the products meeting the aforementioned requirements bear the authorized Marks of UL LLC, or any authorized licensee of UL LLC. This Follow-Up Service Procedure contains information for the use of the above Manufacturer(s) and representatives of UL and is not to be used for any other purpose. It is provided to the Manufacturer with the understanding that it will be returned upon request and is not to be copied in whole or in part. This Follow-Up Service Procedure, and any subsequent revisions, is the property of UL and is not transferable. This Follow-Up Service Procedure contains confidential information for use only by the above named Manufacturer(s) and representatives of UL and is not to be used for any other purpose. It is provided to the Subscribers with the understanding that it is not to be copied, either wholly or in part unless specifically allowed, and that it will be returned to UL, upon request. Capitalized terms used but not defined herein have the meanings set forth in the GSA and the applicable Service Terms or any other applicable UL service agreement. UL shall not incur any obligation or liability for any loss, expense or damages, including incidental, consequential or punitive damages arising out of or in connection with the use or reliance upon this Follow-Up Service Procedure to anyone other than the above Manufacturer(s) as provided in the agreement between UL LLC or an authorized licensee of UL LLC, including UL Contracting Party, and the Manufacturer(s). UL LLC has signed below solely in its capacity as the accredited entity to indicate that this Follow-Up Service Procedure is in compliance with the accreditation requirements. Bruce A. Mahrenholz Director North American Certification Program
CABLE-UL-VOLEX-JEM 3/4
File E67601 Vol 2 Addendum To Page 1 Issued: 2017-03-20 Authorization Page Revised: 2017-03-24 LOCATION 1640606 (Party Site) Volex-JEM Cable Precision (Dongguan) Co., Ltd No. 406, Qing Feng Road , Qingxi Town, Guangdong Province Dongguan City CHINA Factory ID: Volex-J or VLX-J UL Contracting Party for above site is: UL AG
CABLE-UL-VOLEX-JEM 4/4
DQD 507 Rev. 2016-02-18 Page 1
Certificate of Compliance Certificate: 70111963 Master Contract: 172976
Project: 70111963 Date Issued: 2017-04-07
Issued to: Volex (Asia) Pte Ltd.
35 Tampines St 92
Singapore, 528880
SINGAPORE
Attention: Joyce Teo
The products listed below are eligible to bear the CSA Mark shown
Issued by: Wilson Wang
Wilson Wang
PRODUCTS
CLASS - C583101 - WIRES-Flexible Cord
Types SPT-1, SPT-2, SPT-3, 300V, rated 60C, 75°C, 90°C and 105C, FT1, FT2 and VW-1.
Types NISPT-1, NISPT-2, 300V, rated 60C, 75°C, 90°C and 105C, FT1, FT2 and VW-1.
Types SVT, SVTO, 300V, rated 60C, 75°C, 90°C and 105C, FT1, FT2 and VW-1.
Types SJT,SJTO, SJTW, SJTOW, 300V, rated 60C, 75°C, 90°C and 105C, FT1, FT2 and VW-1.
Types ST, STO, STW, STOW, 600V, rated 60C, 75°C, 90°C and 105C, FT1, FT2 and VW-1.
APPLICABLE REQUIREMENTS
CSA Standard C22.2 No. 49 - Flexible Cords and Cables
CABLE-CSA-VOLEX-JEM 1/2
DQD 507 Rev. 2016-02-18 Page 1
Supplement to Certificate of Compliance
Certificate: 70111963 Master Contract: 172976
The products listed, including the latest revision described below,
are eligible to be marked in accordance with the referenced Certificate.
Product Certification History
Project Date Description
70111963 2017-04-07 Original Certification of Flexible cord, Types SPT-1, SPT-2, SPT-3, NISPT-
The appearance of a company's name or product in this database does not in itself assure that products soidentified have been manufactured under UL's Follow-Up Service. Only those products bearing the UL Mark shouldbe considered to be Certified and covered under UL's Follow-Up Service. Always look for the Mark on the product.
The appearance of a company's name or product in this database does not in itself assure that products soidentified have been manufactured under UL's Follow-Up Service. Only those products bearing the UL Mark shouldbe considered to be Certified and covered under UL's Follow-Up Service. Always look for the Mark on the product.
The appearance of a company's name or product in this database does not in itself assure that products soidentified have been manufactured under UL's Follow-Up Service. Only those products bearing the UL Mark shouldbe considered to be Certified and covered under UL's Follow-Up Service. Always look for the Mark on the product.
This is an electronically generated letter. Signatures are not required for this document to be valid. Page 1 of 2
05/10/2010 Shenzhen Bao Hing Electric Wire & Cable Mfr Co Ltd Mr. Jiadong Luo Buchong Tongfuyu Industry Area Shajing Rd Shajing St Baoan District Shenzhen Guangdong 518104, Cn
Our Reference: File E159216, Vol. 1 Project Number 10CA22625 Your Reference: MS. LUO ACCEPTED ON 30 APR 10 Project Scope: UL/CUL: TPE Flexible Cord, Types SVE, SVT, SJE, SJT, NISPE-1, NISPT-1 NISPE-2 and
NISPT-2, 18 AWG conductor, may employ rayon yarns with 200-500 denier within copper conductor strands
Dear Mr. Jiadong Luo:
UL's investigation of your product(s) has been completed under the above Reference Number and the product was determined to comply with the applicable requirements.
This letter temporarily supplements the UL Follow-Up Services Procedure and serves as authorization to apply the UL Mark only at authorized factories under UL's Follow-Up Service Program.
To provide the manufacturer with the intended authorization to use the UL Mark, the addressee must send a copy of this notice to each manufacturing location currently authorized in File E159216, Vol. 1.
This authorization is effective from the date of this Notice and only for products at the indicated manufacturing locations. Records in the Follow-Up Services Procedure covering the product are now being prepared and will be sent in the near future. This letter authorizes application of the UL Mark for 90 days from the date of this letter.
Products that bear the UL Mark shall be identical to those that were evaluated by UL and found to comply with UL’s requirements. If changes in construction are discovered, appropriate action will be taken for products not in conformance with UL’s requirements and continued use of the UL Mark may be withdrawn. UL may elect to withdraw use of the UL Mark if the Applicant or Manufacturer fails to comply with UL’s requirements including ongoing compliance of the product, under UL’s Follow-Up Service.
CABLE-UL-BH(SZ) 2/3
Notice of Authorization - 10CA22625
This is an electronically generated letter. Signatures are not required for this document to be valid. Page 2 of 2
Any information and documentation provided to you involving UL Mark services are provided on behalf of Underwriters Laboratories Inc. (UL) or any authorized licensee of UL.
The contents of this Letter are intended solely for the use of UL and the Applicant. The opinions and findings of UL represent its judgment given with due consideration to the necessary limitations of practical operation in accordance with UL’s objectives and purposes. UL shall not otherwise be responsible for the use of or reliance upon the contents of this letter by anyone. UL shall not incur any obligation or liability for any loss, expense or damages, including incidental, consequential or punitive damages, arising out of or in connection with the use or reliance upon the contents of this letter to anyone other than the Applicant as provided in the agreement between UL and Applicant. Any use or reference to UL’s name or certification mark(s) by anyone other than the Applicant in accordance with the agreement is prohibited without the express written approval of UL.