Top Banner

of 10

FIAT PRODUCTION AUDIT - PDR

Feb 04, 2018

Download

Documents

olcayalljay1905
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
  • 7/21/2019 FIAT PRODUCTION AUDIT - PDR

    1/10

    General Navigation

    D .

    2

    3 C

    4 C

    5 C

    .

    ,

    .

    C

    . ,

    .

    C .

    ,

    Production Demonstration Run

    Annual: Daily:

    Annual: Daily:

    uction

    line

    ction

    line(s)

    Li h d i liShiftsPer Working Days

    Shifts Per

    Day

    [ ShifMinutes Per

    Gross Min

    A il bl P

    Scheduled

    Break/Lunch

    Changeover /

    Tool Changes

    Planned

    Maintenance

    Unscheduled

    DowntimeNet Min

    A il bl P

    0

    0

    0

    SYSTEM AVAILABILITY(TIME)

    Increased Contracted Capacity /

    Capacity Planning Volume

    Supplier Name

    Part(s) Description

    Part(s) Number

    Contracted Capacity

    PRODUCTION SYSTEM

  • 7/21/2019 FIAT PRODUCTION AUDIT - PDR

    2/10

    Getting Started

    1

    C

    D .

    2

    A A 2.

    3

    C C&

    B D

    ( ).

    D,

    D

    .

    Time allocated

    for other PN's

    (FIAT, Chrysler,

    or others)

    [minutes per

    day]

    Net minutes

    available / day

    for Study

    parts

    Cycle Time

    [seconds]% Scrap

    % True Scrap

    (Total Loss)

    Estimated

    Throughput

    For Study

    Parts Per Day

    Contracted Parts

    Per Day (Includes

    Spare Parts),

    Daily Tooling

    Capacity, or CPG

    % Utilization

    RESULT:

    Possible

    Constraint

    Operation

    (>90%) Are

    Marked [X]

    360 705 30 2.00% 7.50% 1304 1000 76.67%

    SYSTEM CAPACITY (UNITS)

    PDR

    Start

    Time

    PDR

    End

    Time

    PDR Actual

    Downtime

    [minutes]

    Length

    of

    PDR

    (minutes)

    PDR

    Total Parts

    Produced

    [pcs.]

    PDR

    OK Parts

    Produced

    [pcs.]

    Required

    PDR Line

    Speed

    (Parts/hour)

    Witnessed

    PDR

    OK Parts

    per hour

    [pcs.]

    CHRYSLERR

    un Rate:

    PDR >=

    Contracted

    Capacity

    (pcs / hour)

    ?

    FIAT

    Run Rate:

    PDR >=

    Contracted

    Capacity

    (pcs / hour)

    ?

    PDR

    FTC

    (%)

    PDR Actual

    Scrap [pcs.]

    12:00 14:00 0 120.0 400 392 85.1 196.0 YES YES 98.0% 8

    PDR STUDY RESULTS

    NOTES

  • 7/21/2019 FIAT PRODUCTION AUDIT - PDR

    3/10

    4

    A 2,

    C A

    A 3.

    A 3 C C

    , ().

    l i% Scrap

    % True Scrap

    (Total Loss)

    Estimated

    Throughput

    For Study

    Parts Per Day

    Contracted Parts

    Per Day (Includes

    Spare Parts),

    Daily Tooling

    Capacity, or CPG

    % Utilization

    RESULT:

    Possible

    Constraint

    Operation

    (>90%) Are

    Marked [X]

    2.00% 7.50% 1304 1000 76.67%

    5.10% 5.61% 1121 1000 89.18%

    0.54% 0.54% 955 1000 104.73% X

    SYSTEM CAPACITY (UNITS)

    No.

    ofoperation

    Nextoperation(s)

    List each separate SEQUENTIAL

    OPERATION in the Constraint Line

    Shifts Per

    Week

    Gross Min

    Available Per

    Day

    Scheduled

    Break/Lunch

    [minutes per

    day]

    Changeover /

    Tool Changes

    [minutes per

    day]

    Planned

    Maintenance

    [minutes per

    day]

    Unscheduled

    Downtime

    [minutes per

    day]

    MCBF

    [cycles]

    MTTR

    [minutes]

    Net Min

    Available Per

    Day

    Time

    allocated for

    other PN's

    (FIAT,

    Chrysler, or

    others)

    [minutes per

    day]

    Net minutes

    available / day

    for Study

    parts

    Cycle Time

    [seconds]

    Buffer Before

    Operation

    Buffer After

    Operation% Scrap

    % True Scrap

    (Total Loss)

    Estimated

    Throughput

    For Study

    Parts Per Day

    Contracted

    Parts Per Day

    (Includes Spare

    Parts), Daily

    Tooling

    Capacity, or

    CPG

    % Utilization

    RESULT:

    Possible

    Constraint

    Operation

    (>90%) Are

    Marked [X]

    0 0 0 0 0 0 0 0 0 0 #VALUE! 0 0.00%

    0 0 0 0 0 0 0 0 0 0 #VALUE! 0 0.00%

    0 0 0 0 0 0 0 0 0 0 #VALUE! 0 0.00%

    0 0 0 0 0 0 0 0 0 0 #VALUE! 0 0.00%

    0 0 0 0 0 0 0 0 0 0 #VALUE! 0 0.00%

    0 0 0 0 0 0 0 0 0 0 #VALUE! 0 0.00%0 0 0 0 0 0 0 0 0 0 #VALUE! 0 0.00%

    0 0 0 0 0 0 0 0 0 0 #VALUE! 0 0.00%

    0 0 0 0 0 0 0 0 0 0 #VALUE! 0 0.00%

    0 0 0 0 0 0 0 0 0 0 #VALUE! 0 0.00%

    0 0 0 0 0 0 0 0 0 0 #VALUE! 0 0.00%

    0 0 0 0 0 0 0 0 0 0 #VALUE! 0 0.00%

    0 0 0 0 0 0 0 0 0 0 #VALUE! 0 0.00%

    0 0 0 0 0 0 0 0 0 0 #VALUE! 0 0.00%

    0 0 0 0 0 0 0 0 0 0 #VALUE! 0 0.00%

    0.54%

    No.

    ofoperation

    Nextoperation(s)

    List each separate SEQUENTIAL

    OPERATIONin the Production Line

    PDR

    Start

    Time

    PDR

    End

    Time

    PDR Actual

    Downtime

    [minutes]

    Length

    of

    PDR

    (minutes)

    PDR

    Total Parts

    Produced

    [pcs.]

    PDR

    OK Parts

    Produced

    [pcs.]

    Required

    PDR Line

    Speed

    (Parts/hour)

    Witnessed

    PDR

    OK Parts

    per hour

    [pcs.]

    CHRYSLERR

    un Rate:

    PDR >=

    Contracted

    Capacity

    (pcs / hour)

    ?

    FIAT

    Run Rate:

    PDR >=

    Contracted

    Capacity

    (pcs / hour)

    ?

    PDR

    FTC

    (%)

    PDR Actual

    Scrap [pcs.]

    0 0 0 #VALUE!

    0 0 0 #VALUE!

    0 0 0 #VALUE!

    0 0 0 #VALUE!0 0 0 #VALUE!

    0 0 0 #VALUE!

    0 0 0 #VALUE!

    0 0 0 #VALUE!

    0 0 0 #VALUE!

    0 0 0 #VALUE!

    0 0 0 #VALUE!

    0 0 0 #VALUE!

    0 0 0 #VALUE!

    0 0 0 #VALUE!

    0 0 0 #VALUE!

    #NUM!

    PDR S TUDYRESULTS

    Process overall FTC

    NOTES

    True Scrap of Production Lines

    DOWNSTREAM to Constraint Production

    Line:

    OPERATIONS

    PRODUCTION SYSTEM

    OPERATION AVAILABILITY(TIME) OPERATION CAPACITY (UNITS)

  • 7/21/2019 FIAT PRODUCTION AUDIT - PDR

    4/10

    6

    C D

    . E 11

    (15 /). A

    4

    .

    E

    ,

    ,

    %

    C / A.

    D

    .

    11, .

    Modifying the Forms

    1. "" ( ; ).

    2. . A ; , .

    PDR Storage

    , D . E , .

    Scoring the PDR

    1

    2

    (C, B, .)

    C A ;

    C

    C

    (, ,

    , .)

    C A .

    /

    C /

    /

    (, , ,

    .)

    /

    /

    /

    (, , , .)

    C

  • 7/21/2019 FIAT PRODUCTION AUDIT - PDR

    5/10

    na nv 1 2 3 4 5

    8. Production of FINALoperation

    9. FINAL production est.

    (restricted observation)

    10. All performance /capability targets met?

    11. FTC and LineUtilization Acceptable?

    1. Score of last / currentProcess Audit?

    2. Have the Spare Partsbeen considered?

    3. System under normaloperative conditions?

    4. Clear responsibilityabout load / unload?

    5. Tier 2 capacity risk?6. Is contracted capacity

    enough to meet customer

    requirements?

    7. Production of

    CONSTRAINT operation

    Common Proc. Group

    < 90%

    0 > 90% < 90%

    > 90% < 90%

    0 > 90%

    0

    Required LineUtilization %

    Actual LineUtilization %

    All Requirements

    Met?

    0 > 90% < 90%

    Supplier Code:

    Customer monitoredMedium or High risk

    Supplier monitoredLow risk

    Part NumberRequired Line

    SpeedDemonstrated

    Line SpeedRequired FTC %

    DemonstratedFTC %

    10%

    Shifts/Working week avail.

    Weekly capacity 0

    OdM / Revision:

    Supplier Name:

    % Spare parts:

    Safety Coefficient:

    Project / Vehicle & MY:

    Part Number(s):

    Part(s) Description:Family of Products:

    Working Days / Week:

    Working hours / Shift:

    Supplier Plant Location:

    Description of common equipments / tools:

    Use of the part under investigation on other models:

    Requested and Contracted Capacity for each model:

    Total request:

    Description of specific equipments / tools:

    Qualified /Interim or IAA

    % GridAbsorption

    Part NumberIntermediate target

    reached? [Y/N]

    Requested

    Capacity / CPV

    Contracted Parts

    Per DayProduced parts

    constraint operation

    Produced parts final

    operation

    Completion DateResponsibleScore Problem / Root CauseContainment / Corrective Actions / Risk

    Mitigation Plan

    SCORE

    PRODUCTION DEMONSTRATION RUN (PDR)

    Shifts/Working week used:

    SQE:PDR Date:

    SUPPLIER QUALITY

  • 7/21/2019 FIAT PRODUCTION AUDIT - PDR

    6/10

  • 7/21/2019 FIAT PRODUCTION AUDIT - PDR

    7/10

  • 7/21/2019 FIAT PRODUCTION AUDIT - PDR

    8/10

  • 7/21/2019 FIAT PRODUCTION AUDIT - PDR

    9/10

  • 7/21/2019 FIAT PRODUCTION AUDIT - PDR

    10/10

    CAPABILITY DATA CHART

    PDR (Production Demonstration Run)Annex 5

    # / ? 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 9 6 97 98 99 1 00 &1 &2 &3 &4

    . .. 2

    .. .

    (/2)

    ?

    2 1,128

    A 3 1,693 4 2,059

    5 2,326

    6 2,534

    7 2,704

    8 2,847

    9 2,97

    10 3,078

    EA / 11 3,173

    EA E 12 3,258

    EA 13 3,336

    CCA D / 1D 14 3,407

    CCA 15 3,472

    CAAB 16 3,532

    / 17 3,588

    18 3,64

    19 3,689

    20 3,735

    21 3,778

    22 3,819

    23 3,858

    24 3,895

    25 3,931

    Annex 5