7/21/2019 FIAT PRODUCTION AUDIT - PDR
1/10
General Navigation
D .
2
3 C
4 C
5 C
.
,
.
C
. ,
.
C .
,
Production Demonstration Run
Annual: Daily:
Annual: Daily:
uction
line
ction
line(s)
Li h d i liShiftsPer Working Days
Shifts Per
Day
[ ShifMinutes Per
Gross Min
A il bl P
Scheduled
Break/Lunch
Changeover /
Tool Changes
Planned
Maintenance
Unscheduled
DowntimeNet Min
A il bl P
0
0
0
SYSTEM AVAILABILITY(TIME)
Increased Contracted Capacity /
Capacity Planning Volume
Supplier Name
Part(s) Description
Part(s) Number
Contracted Capacity
PRODUCTION SYSTEM
7/21/2019 FIAT PRODUCTION AUDIT - PDR
2/10
Getting Started
1
C
D .
2
A A 2.
3
C C&
B D
( ).
D,
D
.
Time allocated
for other PN's
(FIAT, Chrysler,
or others)
[minutes per
day]
Net minutes
available / day
for Study
parts
Cycle Time
[seconds]% Scrap
% True Scrap
(Total Loss)
Estimated
Throughput
For Study
Parts Per Day
Contracted Parts
Per Day (Includes
Spare Parts),
Daily Tooling
Capacity, or CPG
% Utilization
RESULT:
Possible
Constraint
Operation
(>90%) Are
Marked [X]
360 705 30 2.00% 7.50% 1304 1000 76.67%
SYSTEM CAPACITY (UNITS)
PDR
Start
Time
PDR
End
Time
PDR Actual
Downtime
[minutes]
Length
of
PDR
(minutes)
PDR
Total Parts
Produced
[pcs.]
PDR
OK Parts
Produced
[pcs.]
Required
PDR Line
Speed
(Parts/hour)
Witnessed
PDR
OK Parts
per hour
[pcs.]
CHRYSLERR
un Rate:
PDR >=
Contracted
Capacity
(pcs / hour)
?
FIAT
Run Rate:
PDR >=
Contracted
Capacity
(pcs / hour)
?
PDR
FTC
(%)
PDR Actual
Scrap [pcs.]
12:00 14:00 0 120.0 400 392 85.1 196.0 YES YES 98.0% 8
PDR STUDY RESULTS
NOTES
7/21/2019 FIAT PRODUCTION AUDIT - PDR
3/10
4
A 2,
C A
A 3.
A 3 C C
, ().
l i% Scrap
% True Scrap
(Total Loss)
Estimated
Throughput
For Study
Parts Per Day
Contracted Parts
Per Day (Includes
Spare Parts),
Daily Tooling
Capacity, or CPG
% Utilization
RESULT:
Possible
Constraint
Operation
(>90%) Are
Marked [X]
2.00% 7.50% 1304 1000 76.67%
5.10% 5.61% 1121 1000 89.18%
0.54% 0.54% 955 1000 104.73% X
SYSTEM CAPACITY (UNITS)
No.
ofoperation
Nextoperation(s)
List each separate SEQUENTIAL
OPERATION in the Constraint Line
Shifts Per
Week
Gross Min
Available Per
Day
Scheduled
Break/Lunch
[minutes per
day]
Changeover /
Tool Changes
[minutes per
day]
Planned
Maintenance
[minutes per
day]
Unscheduled
Downtime
[minutes per
day]
MCBF
[cycles]
MTTR
[minutes]
Net Min
Available Per
Day
Time
allocated for
other PN's
(FIAT,
Chrysler, or
others)
[minutes per
day]
Net minutes
available / day
for Study
parts
Cycle Time
[seconds]
Buffer Before
Operation
Buffer After
Operation% Scrap
% True Scrap
(Total Loss)
Estimated
Throughput
For Study
Parts Per Day
Contracted
Parts Per Day
(Includes Spare
Parts), Daily
Tooling
Capacity, or
CPG
% Utilization
RESULT:
Possible
Constraint
Operation
(>90%) Are
Marked [X]
0 0 0 0 0 0 0 0 0 0 #VALUE! 0 0.00%
0 0 0 0 0 0 0 0 0 0 #VALUE! 0 0.00%
0 0 0 0 0 0 0 0 0 0 #VALUE! 0 0.00%
0 0 0 0 0 0 0 0 0 0 #VALUE! 0 0.00%
0 0 0 0 0 0 0 0 0 0 #VALUE! 0 0.00%
0 0 0 0 0 0 0 0 0 0 #VALUE! 0 0.00%0 0 0 0 0 0 0 0 0 0 #VALUE! 0 0.00%
0 0 0 0 0 0 0 0 0 0 #VALUE! 0 0.00%
0 0 0 0 0 0 0 0 0 0 #VALUE! 0 0.00%
0 0 0 0 0 0 0 0 0 0 #VALUE! 0 0.00%
0 0 0 0 0 0 0 0 0 0 #VALUE! 0 0.00%
0 0 0 0 0 0 0 0 0 0 #VALUE! 0 0.00%
0 0 0 0 0 0 0 0 0 0 #VALUE! 0 0.00%
0 0 0 0 0 0 0 0 0 0 #VALUE! 0 0.00%
0 0 0 0 0 0 0 0 0 0 #VALUE! 0 0.00%
0.54%
No.
ofoperation
Nextoperation(s)
List each separate SEQUENTIAL
OPERATIONin the Production Line
PDR
Start
Time
PDR
End
Time
PDR Actual
Downtime
[minutes]
Length
of
PDR
(minutes)
PDR
Total Parts
Produced
[pcs.]
PDR
OK Parts
Produced
[pcs.]
Required
PDR Line
Speed
(Parts/hour)
Witnessed
PDR
OK Parts
per hour
[pcs.]
CHRYSLERR
un Rate:
PDR >=
Contracted
Capacity
(pcs / hour)
?
FIAT
Run Rate:
PDR >=
Contracted
Capacity
(pcs / hour)
?
PDR
FTC
(%)
PDR Actual
Scrap [pcs.]
0 0 0 #VALUE!
0 0 0 #VALUE!
0 0 0 #VALUE!
0 0 0 #VALUE!0 0 0 #VALUE!
0 0 0 #VALUE!
0 0 0 #VALUE!
0 0 0 #VALUE!
0 0 0 #VALUE!
0 0 0 #VALUE!
0 0 0 #VALUE!
0 0 0 #VALUE!
0 0 0 #VALUE!
0 0 0 #VALUE!
0 0 0 #VALUE!
#NUM!
PDR S TUDYRESULTS
Process overall FTC
NOTES
True Scrap of Production Lines
DOWNSTREAM to Constraint Production
Line:
OPERATIONS
PRODUCTION SYSTEM
OPERATION AVAILABILITY(TIME) OPERATION CAPACITY (UNITS)
7/21/2019 FIAT PRODUCTION AUDIT - PDR
4/10
6
C D
. E 11
(15 /). A
4
.
E
,
,
%
C / A.
D
.
11, .
Modifying the Forms
1. "" ( ; ).
2. . A ; , .
PDR Storage
, D . E , .
Scoring the PDR
1
2
(C, B, .)
C A ;
C
C
(, ,
, .)
C A .
/
C /
/
(, , ,
.)
/
/
/
(, , , .)
C
7/21/2019 FIAT PRODUCTION AUDIT - PDR
5/10
na nv 1 2 3 4 5
8. Production of FINALoperation
9. FINAL production est.
(restricted observation)
10. All performance /capability targets met?
11. FTC and LineUtilization Acceptable?
1. Score of last / currentProcess Audit?
2. Have the Spare Partsbeen considered?
3. System under normaloperative conditions?
4. Clear responsibilityabout load / unload?
5. Tier 2 capacity risk?6. Is contracted capacity
enough to meet customer
requirements?
7. Production of
CONSTRAINT operation
Common Proc. Group
< 90%
0 > 90% < 90%
> 90% < 90%
0 > 90%
0
Required LineUtilization %
Actual LineUtilization %
All Requirements
Met?
0 > 90% < 90%
Supplier Code:
Customer monitoredMedium or High risk
Supplier monitoredLow risk
Part NumberRequired Line
SpeedDemonstrated
Line SpeedRequired FTC %
DemonstratedFTC %
10%
Shifts/Working week avail.
Weekly capacity 0
OdM / Revision:
Supplier Name:
% Spare parts:
Safety Coefficient:
Project / Vehicle & MY:
Part Number(s):
Part(s) Description:Family of Products:
Working Days / Week:
Working hours / Shift:
Supplier Plant Location:
Description of common equipments / tools:
Use of the part under investigation on other models:
Requested and Contracted Capacity for each model:
Total request:
Description of specific equipments / tools:
Qualified /Interim or IAA
% GridAbsorption
Part NumberIntermediate target
reached? [Y/N]
Requested
Capacity / CPV
Contracted Parts
Per DayProduced parts
constraint operation
Produced parts final
operation
Completion DateResponsibleScore Problem / Root CauseContainment / Corrective Actions / Risk
Mitigation Plan
SCORE
PRODUCTION DEMONSTRATION RUN (PDR)
Shifts/Working week used:
SQE:PDR Date:
SUPPLIER QUALITY
7/21/2019 FIAT PRODUCTION AUDIT - PDR
6/10
7/21/2019 FIAT PRODUCTION AUDIT - PDR
7/10
7/21/2019 FIAT PRODUCTION AUDIT - PDR
8/10
7/21/2019 FIAT PRODUCTION AUDIT - PDR
9/10
7/21/2019 FIAT PRODUCTION AUDIT - PDR
10/10
CAPABILITY DATA CHART
PDR (Production Demonstration Run)Annex 5
# / ? 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 9 6 97 98 99 1 00 &1 &2 &3 &4
. .. 2
.. .
(/2)
?
2 1,128
A 3 1,693 4 2,059
5 2,326
6 2,534
7 2,704
8 2,847
9 2,97
10 3,078
EA / 11 3,173
EA E 12 3,258
EA 13 3,336
CCA D / 1D 14 3,407
CCA 15 3,472
CAAB 16 3,532
/ 17 3,588
18 3,64
19 3,689
20 3,735
21 3,778
22 3,819
23 3,858
24 3,895
25 3,931
Annex 5