Feed Mill Management Charles Stark North Carolina State University
59

Feed Mill Management - WordPress.com · Manager Supervisor Rescue Contractor policy/procedures. ... Feed Mill Key Performance Indicators Productivity Tons/man hr Changeovers Tons

Mar 21, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Feed Mill Management - WordPress.com · Manager Supervisor Rescue Contractor policy/procedures. ... Feed Mill Key Performance Indicators Productivity Tons/man hr Changeovers Tons

Feed Mill Management

Charles StarkNorth Carolina State University

Page 2: Feed Mill Management - WordPress.com · Manager Supervisor Rescue Contractor policy/procedures. ... Feed Mill Key Performance Indicators Productivity Tons/man hr Changeovers Tons

Major Areas of Responsibilities

ProductionQualityCostsSafetyHousekeepingHuman ResourcesStrategic Planning/Cost Analysis

Page 3: Feed Mill Management - WordPress.com · Manager Supervisor Rescue Contractor policy/procedures. ... Feed Mill Key Performance Indicators Productivity Tons/man hr Changeovers Tons

Manager’s Responsibility

ProductionReview daily production recordsSchedule feed productionSchedule ingredient deliveriesSchedule employee shifts, vacation, etcEvaluate employee and equipment production

Page 4: Feed Mill Management - WordPress.com · Manager Supervisor Rescue Contractor policy/procedures. ... Feed Mill Key Performance Indicators Productivity Tons/man hr Changeovers Tons

Manager’s ResponsibilityQualityReview ingredient and feed sampling programReview quality assurance resultsAnswer phone calls on feed quality complaintsSubmit FDA medicated feed samplesEvaluate standard operating procedures Flushing Sequencing

Set the standard for Quality Assurance

Page 5: Feed Mill Management - WordPress.com · Manager Supervisor Rescue Contractor policy/procedures. ... Feed Mill Key Performance Indicators Productivity Tons/man hr Changeovers Tons

Manager’s Responsibility

CostPrepare annual budgetEvaluate time cards, labor and overtime.Review & report monthly costs Personnel, Property, Operating

Evaluate new technology to lower manufacturing cost

Prepare Capital request

Page 6: Feed Mill Management - WordPress.com · Manager Supervisor Rescue Contractor policy/procedures. ... Feed Mill Key Performance Indicators Productivity Tons/man hr Changeovers Tons

Manager’s Responsibility

SafetyNew Employee Safety TrainingSafety Meetings Monthly, Weekly

Annual Safety Training Fire Ext, Hot Works, Etc

Inspections Housekeeping, Safety

Permits Hot Works, Confined Space

Page 7: Feed Mill Management - WordPress.com · Manager Supervisor Rescue Contractor policy/procedures. ... Feed Mill Key Performance Indicators Productivity Tons/man hr Changeovers Tons

Housekeeping

InteriorProcess areas (grinding, pelleting, etc)Non-process areas (bin decks)

ExteriorLandscapingGrass

Control Rooms/OfficesMangers office is a reflection of expectations!!!

Page 8: Feed Mill Management - WordPress.com · Manager Supervisor Rescue Contractor policy/procedures. ... Feed Mill Key Performance Indicators Productivity Tons/man hr Changeovers Tons

Human ResourcesHiringTrainingEmployee DevelopmentContinuing EducationMentoring

DisciplineConflict Resolution InvestigationSafetyGrievance

Page 9: Feed Mill Management - WordPress.com · Manager Supervisor Rescue Contractor policy/procedures. ... Feed Mill Key Performance Indicators Productivity Tons/man hr Changeovers Tons

Feed Mill Key Performance IndicatorsProductivityCostPropertyPersonnelOperating

SafetyQuality IngredientsProcessFinished Feed

Page 10: Feed Mill Management - WordPress.com · Manager Supervisor Rescue Contractor policy/procedures. ... Feed Mill Key Performance Indicators Productivity Tons/man hr Changeovers Tons

New Employee Training

Charles Stark

Page 11: Feed Mill Management - WordPress.com · Manager Supervisor Rescue Contractor policy/procedures. ... Feed Mill Key Performance Indicators Productivity Tons/man hr Changeovers Tons

New Employee Training and DevelopmentFirst Day OverviewPosition ReviewComputer ReviewSafety Training TopicsQuality AssuranceRegulations – Air & WaterEmployee DevelopmentPreventive Maintenance & HousekeepingStandard Operating Procedures

Page 12: Feed Mill Management - WordPress.com · Manager Supervisor Rescue Contractor policy/procedures. ... Feed Mill Key Performance Indicators Productivity Tons/man hr Changeovers Tons

New Employee Roles

Keep your eyes open for hazardsFix or report problems to the manager or

maintenanceMake suggestions for improving safetyRead labels and ask questionsPay attention to warning signsBe aware of you surroundingsPractice good housekeeping

Page 13: Feed Mill Management - WordPress.com · Manager Supervisor Rescue Contractor policy/procedures. ... Feed Mill Key Performance Indicators Productivity Tons/man hr Changeovers Tons

Facility Tour - Checklist

Restrooms Fax Machines Copy Machines QA Lab Scale House Receiving Silos Liquid Storage

First Aid Kits Fire Alarms PPE Fall Protection Eyewashes Safety Showers Fire Extinguisher Fire Hoses Spill Kits Emergency Lights

Page 14: Feed Mill Management - WordPress.com · Manager Supervisor Rescue Contractor policy/procedures. ... Feed Mill Key Performance Indicators Productivity Tons/man hr Changeovers Tons

New Employee Information/Resources

Company HandbookSafety ManualSafety Training MaterialMSDS, LabelsBulletin BoardsSafety MeetingsManagers and SupervisorsSafety Director & Safety Committee

Page 15: Feed Mill Management - WordPress.com · Manager Supervisor Rescue Contractor policy/procedures. ... Feed Mill Key Performance Indicators Productivity Tons/man hr Changeovers Tons

New Employee Training – ChecklistSafety TrainingSmoking PolicyEmergency Procedures Meeting Location Safety Equipment, First Aid & Accidents Reporting Spills Fire, Weather, etc

Hazard Communication (MSDS/Labels)PPE requirementsLock-out/Tag-out

Page 16: Feed Mill Management - WordPress.com · Manager Supervisor Rescue Contractor policy/procedures. ... Feed Mill Key Performance Indicators Productivity Tons/man hr Changeovers Tons

Key Policies - Checklist

Company Mission Statement

Vacation and Sick Leave Leaves of Absence(FMLA) Holidays Time and Leave Reporting Overtime Performance Review Uniform Environmental Policy Right to Know

Personal Conduct Standards Progressive Disciplinary

Actions Security Confidentiality Safety Emergency Procedures Visitors E-mail and Internet Use Anti-Harassment

Page 17: Feed Mill Management - WordPress.com · Manager Supervisor Rescue Contractor policy/procedures. ... Feed Mill Key Performance Indicators Productivity Tons/man hr Changeovers Tons

New Employee Training – ChecklistSafety TrainingDesignated Confined SpacesAccident Reporting ProceduresMan liftsGrain Handling FacilitiesAccess to Employee Exposure and Medical

RecordsAccident Prevention, Signs, and Tags

Page 18: Feed Mill Management - WordPress.com · Manager Supervisor Rescue Contractor policy/procedures. ... Feed Mill Key Performance Indicators Productivity Tons/man hr Changeovers Tons

New Employee Training Follow-up

Document All TrainingsUtilize TestsEvaluate Performance After 30 DaysCreate Individual Development PlansPerformance Reviews6 months12 months

Annual Training TopicsMonthly Training

Page 19: Feed Mill Management - WordPress.com · Manager Supervisor Rescue Contractor policy/procedures. ... Feed Mill Key Performance Indicators Productivity Tons/man hr Changeovers Tons

EMPLOYEE TRAINING

Page 20: Feed Mill Management - WordPress.com · Manager Supervisor Rescue Contractor policy/procedures. ... Feed Mill Key Performance Indicators Productivity Tons/man hr Changeovers Tons

Quality Assurance TopicsMission StatementReceivingStandard Operating Procedures

BSE Training for Ingredient Truck DriversTraining and Documents

Ingredient Sampling Procedures In-Bound QC TestsGrades, Moisture, Mycotoxins

GrindingParticle Size Targets

Page 21: Feed Mill Management - WordPress.com · Manager Supervisor Rescue Contractor policy/procedures. ... Feed Mill Key Performance Indicators Productivity Tons/man hr Changeovers Tons

Quality Assurance Topics

Batching and Sequencing GuidelinesPremix Room and Micro-SystemReconciliation ProcessPelletingPackagingBulk Load-Out and DeliveryFinished Feed Sampling and ScheduleFinished Feed QC Tests

Page 22: Feed Mill Management - WordPress.com · Manager Supervisor Rescue Contractor policy/procedures. ... Feed Mill Key Performance Indicators Productivity Tons/man hr Changeovers Tons

Quality Assurance TopicsCurrent Good Manufacturing PracticesGeneral ProvisionConstruction and Maintenance of Facilities and

EquipmentProduct Quality ControlPackaging and LabelingRecords and ReportsFacilities and EquipmentProduct Quality Assurance Labeling

Bioterrorism Act

Page 23: Feed Mill Management - WordPress.com · Manager Supervisor Rescue Contractor policy/procedures. ... Feed Mill Key Performance Indicators Productivity Tons/man hr Changeovers Tons

Quality Assurance Topics

Employee Training – SOP’sReceivingGrindingManufacturing Medicated FeedsPackagingBulk Load-out

Page 24: Feed Mill Management - WordPress.com · Manager Supervisor Rescue Contractor policy/procedures. ... Feed Mill Key Performance Indicators Productivity Tons/man hr Changeovers Tons

Safety Manual

Emergency Action Plan - OSHA 1910.38

Emergency ContactsEngulfment InsertEAP Quick SheetEmployee LogEmployee AddressesFirst Aid Trained EmployeesVisitors Log Cover PageVisitors Log Sign In Page

Page 25: Feed Mill Management - WordPress.com · Manager Supervisor Rescue Contractor policy/procedures. ... Feed Mill Key Performance Indicators Productivity Tons/man hr Changeovers Tons

Safety Manual

Facility MapExits, fire fighting equipment, eyewash & showerFloor & room maps posted at exits

Hazard Communication Program OSHA 1910.1200

Employee Training & Information List of ChemicalsContainer LabelingMaterial Safety Data Sheets (MSDS)Outside ContractorsNon-Routine Hazardous

Page 26: Feed Mill Management - WordPress.com · Manager Supervisor Rescue Contractor policy/procedures. ... Feed Mill Key Performance Indicators Productivity Tons/man hr Changeovers Tons

Safety ManualHazard Assessment & PPE OSHA 1910.132-138

Eye and face protectionHead protectionFoot protectionHand protectionRespiratory protectionHearing protectionFall protection

Smoking PolicyApproved areas (break room, offices, vehicles)Distance from feed mill

Page 27: Feed Mill Management - WordPress.com · Manager Supervisor Rescue Contractor policy/procedures. ... Feed Mill Key Performance Indicators Productivity Tons/man hr Changeovers Tons

Safety ManualHousekeeping Program OSHA 1910.272

Priority Areas If dust accumulation in excess of 1/8 of an inch occurs within

35 feet of the following priority areas: Processing Areas - Grinding, Receiving, Bucket elevators, etc

Non Priority Warehouse Grounds Offices Silos

Page 28: Feed Mill Management - WordPress.com · Manager Supervisor Rescue Contractor policy/procedures. ... Feed Mill Key Performance Indicators Productivity Tons/man hr Changeovers Tons

Safety Manual

Lockout/Tagout Program OSHA 1910.147 LOTO Program Equipment (upstream, equipment, downstream) Stored energy (electrical, hydraulic, pneumatic, mechanical, and

chemical). Lock Devices Lock Tags Forms & checklists Shift Changes Outside Contractor Policy

Page 29: Feed Mill Management - WordPress.com · Manager Supervisor Rescue Contractor policy/procedures. ... Feed Mill Key Performance Indicators Productivity Tons/man hr Changeovers Tons

Safety ManualConfined Space Program OSHA 1910.146; 272

Permit requiredNon-permit confined spaceLocations (safety signs)Participants responsibility Attendant Entrant Manager Supervisor Rescue

Contractor policy/procedures

Page 30: Feed Mill Management - WordPress.com · Manager Supervisor Rescue Contractor policy/procedures. ... Feed Mill Key Performance Indicators Productivity Tons/man hr Changeovers Tons

Safety Manual

Hot Works Program OSHA 1910.252 Cutting, welding, grinding (sparks or open flame) Fire Prevention Cleaning Fire blankets Wetting area Fire Extinguishers

Personal Protective Equipment (PPE) Trained/Certified Welders Contractor Communication

Page 31: Feed Mill Management - WordPress.com · Manager Supervisor Rescue Contractor policy/procedures. ... Feed Mill Key Performance Indicators Productivity Tons/man hr Changeovers Tons

Safety Manual

Forklift Safety OSHA 1910.178

Equipment selectionTrained Classroom Driving test

Forklift checklist – dailyDriving rules

Page 32: Feed Mill Management - WordPress.com · Manager Supervisor Rescue Contractor policy/procedures. ... Feed Mill Key Performance Indicators Productivity Tons/man hr Changeovers Tons

Safety Manual

Ladder Safety OSHA 1910.25

Step Ladders Type 1 Industrial 3 to 20 ft Type 2 commercial 3 to 12 ft Type 3 household 3 to 6 ft

Rung Ladders Single section 30 ft max Two section 60 ft max

Care & maintenance Inspections

Page 33: Feed Mill Management - WordPress.com · Manager Supervisor Rescue Contractor policy/procedures. ... Feed Mill Key Performance Indicators Productivity Tons/man hr Changeovers Tons

Safety Manual

Hearing Conservation OSHA 1910.95

Noise monitoring ( Exceeds 85 db limit/8 hrs Exceeds 115 db limit/15 min

Hearing protection Earmuffs Earplugs

Employee training - annuallyEmployee hearing test - annuallySigns (hear protection areas)

Page 34: Feed Mill Management - WordPress.com · Manager Supervisor Rescue Contractor policy/procedures. ... Feed Mill Key Performance Indicators Productivity Tons/man hr Changeovers Tons

Safety ManualRespiratory Protection OSHA 1910.134

Dust MaskRespiratory Training Physical Selection Inspection, maintenance & care

Blood Borne Pathogens OSHA 1910.1030

Blood or body fluid exposure (HIV, Hepatitis)PPE – Gloves, eye protectionReport exposures

Page 35: Feed Mill Management - WordPress.com · Manager Supervisor Rescue Contractor policy/procedures. ... Feed Mill Key Performance Indicators Productivity Tons/man hr Changeovers Tons

SPCCSpill Prevention Control CountermeasuresEmergency Contacts Management EPA Report Hazardous Substance Releases or Oil Spills

to the National Response Center at 1-800-424-8802

Liquid Containment Area (55 drum, fat dikes)Spill kitsTraining Inspections

Page 36: Feed Mill Management - WordPress.com · Manager Supervisor Rescue Contractor policy/procedures. ... Feed Mill Key Performance Indicators Productivity Tons/man hr Changeovers Tons

Air & Water RegulationsAir Permit Emission Sources Boilers Bag Filters Cyclones

NESHAP NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS

Premixes that contain: Cr 0.1% and/or Mn 1% Greater that 50 tons/day pelleted feed

National Pollutant Discharge Elimination System Permit –NPDES

Storm Water Plan (Best Management Practices and Water Testing)

Page 37: Feed Mill Management - WordPress.com · Manager Supervisor Rescue Contractor policy/procedures. ... Feed Mill Key Performance Indicators Productivity Tons/man hr Changeovers Tons

SOP – Standard Operating Procedures

Sampling trucksEntering formulasGrading cereal grainsFeed additive reconciliationFeed deliveryMedicated feed sequencingLaboratory analysisMoisture, mycotoxin, NIR

Page 38: Feed Mill Management - WordPress.com · Manager Supervisor Rescue Contractor policy/procedures. ... Feed Mill Key Performance Indicators Productivity Tons/man hr Changeovers Tons

SOP – Example

Page 39: Feed Mill Management - WordPress.com · Manager Supervisor Rescue Contractor policy/procedures. ... Feed Mill Key Performance Indicators Productivity Tons/man hr Changeovers Tons

Preventive Maintenance & Housekeeping

Lock-out/Tag-out ProceduresEquipment NumbersMotor Control Center (MCC) Box Labels

Fall ProtectionElectrical SafetyPPEArc FlashClothing

Cleaning Magnets

Page 40: Feed Mill Management - WordPress.com · Manager Supervisor Rescue Contractor policy/procedures. ... Feed Mill Key Performance Indicators Productivity Tons/man hr Changeovers Tons

Preventive Maintenance & Housekeeping

Greasing Pellet Mill RollsGreasing BearingsWork OrdersTimeMoneyParts and VendorsHistory Tracking

Page 41: Feed Mill Management - WordPress.com · Manager Supervisor Rescue Contractor policy/procedures. ... Feed Mill Key Performance Indicators Productivity Tons/man hr Changeovers Tons

Preventive Maintenance & Housekeeping

Housekeeping AreasPriority AreasAssigned AreasCompressed Air Policy

Pest Control Program (Internal or External)

Page 42: Feed Mill Management - WordPress.com · Manager Supervisor Rescue Contractor policy/procedures. ... Feed Mill Key Performance Indicators Productivity Tons/man hr Changeovers Tons

Employee DevelopmentTime ManagementConflict ResolutionDisciplinePerformance ReviewsTeam BuildingPersonality Profiles Interviewing SkillPreventing Harassment in the Workplace

Page 43: Feed Mill Management - WordPress.com · Manager Supervisor Rescue Contractor policy/procedures. ... Feed Mill Key Performance Indicators Productivity Tons/man hr Changeovers Tons

Feed Mill Reports & Key Performance Indicators

Charles StarkNorth Carolina State University

Page 44: Feed Mill Management - WordPress.com · Manager Supervisor Rescue Contractor policy/procedures. ... Feed Mill Key Performance Indicators Productivity Tons/man hr Changeovers Tons

Feed Mill Key Performance IndicatorsProductivity Tons/man hr Changeovers Tons per run Energy per ton Electrical Fuel

Actual vs. scheduled hrs Bagged tons per day Downtime Unplanned vs. planned

Transportation efficiency Load-out waiting time

Page 45: Feed Mill Management - WordPress.com · Manager Supervisor Rescue Contractor policy/procedures. ... Feed Mill Key Performance Indicators Productivity Tons/man hr Changeovers Tons

Feed Mill Key Performance IndicatorsCostPersonnel Salary (exempt) Hourly (non-exempt) Overtime

Property cost Repair and maintenance Routine Extra-ordinary

Operating Supplies Utilities

Page 46: Feed Mill Management - WordPress.com · Manager Supervisor Rescue Contractor policy/procedures. ... Feed Mill Key Performance Indicators Productivity Tons/man hr Changeovers Tons

Feed Mill Key Performance Indicators

QualitySamples submitted vs. requiredParticle sizeFinished feed nutrient content % Theoretical Moisture Protein Fat

Shrink/Gain

Page 47: Feed Mill Management - WordPress.com · Manager Supervisor Rescue Contractor policy/procedures. ... Feed Mill Key Performance Indicators Productivity Tons/man hr Changeovers Tons

Feed Mill Key Performance Indicators

SafetyDays since LTADays since accidentNear missesSafety test results

Page 48: Feed Mill Management - WordPress.com · Manager Supervisor Rescue Contractor policy/procedures. ... Feed Mill Key Performance Indicators Productivity Tons/man hr Changeovers Tons

REPORTS

Page 49: Feed Mill Management - WordPress.com · Manager Supervisor Rescue Contractor policy/procedures. ... Feed Mill Key Performance Indicators Productivity Tons/man hr Changeovers Tons

Reporting Frequency

Shift Logs & ReportsDaily ReportsWeekly ReportsMonthly ReportsYTD Reports

Page 50: Feed Mill Management - WordPress.com · Manager Supervisor Rescue Contractor policy/procedures. ... Feed Mill Key Performance Indicators Productivity Tons/man hr Changeovers Tons

Feed Mill Daily Reports

Supervisor LogManufacturing ProblemsReceiving IssuesLack of ingredients

MaintenancePM items completedOpen PM work orders

Production Board/ReportDaily production by shift

Page 51: Feed Mill Management - WordPress.com · Manager Supervisor Rescue Contractor policy/procedures. ... Feed Mill Key Performance Indicators Productivity Tons/man hr Changeovers Tons

Batch Production Report

1

2

3

4

5

6

Page 52: Feed Mill Management - WordPress.com · Manager Supervisor Rescue Contractor policy/procedures. ... Feed Mill Key Performance Indicators Productivity Tons/man hr Changeovers Tons

Pellet Mill Motor Load

0

2

4

6

8

10

12

14

16

18

20

hp

Page 53: Feed Mill Management - WordPress.com · Manager Supervisor Rescue Contractor policy/procedures. ... Feed Mill Key Performance Indicators Productivity Tons/man hr Changeovers Tons

Daily Checklist

Bulk Ingredient Inventory Magnets

Bag Ingredient Inventory Lock‐out Fat Tank

Micro‐bin Inventory Scale checks

Drug Reconciliation

Feed production Report

Pellet Mill Reports

Maintenance

Boiler

Page 54: Feed Mill Management - WordPress.com · Manager Supervisor Rescue Contractor policy/procedures. ... Feed Mill Key Performance Indicators Productivity Tons/man hr Changeovers Tons

Hours ManufacturingSalary 120 Tons 9000Base 320 Schedule hrs 120OT 80 Actual hrs 125Employees Change overs 43Salary 2 Capacity 10000Hourly 8 R&M

KPI Downtime hrs 4

Total Hrs 520 TransportationHourly 400 Tons Shipped 8500

Emergency Outs 7Tons/Hr 72 Feed Returned 28Tons/Changeover 209Tons/Man Hr 17 InventoryEfficiency 90 Beginning 1800

Days Since LTA 372 Ending 2300Days Since Accident 45

Manager’s Weekly Report

Page 55: Feed Mill Management - WordPress.com · Manager Supervisor Rescue Contractor policy/procedures. ... Feed Mill Key Performance Indicators Productivity Tons/man hr Changeovers Tons

Sampling report

Item Target ActualFinished feed 10 8Particle size 2 2Mash/Cooler moisture 1 0Unit Train Sample 3 2Rail – liquid fat 5 3

Page 56: Feed Mill Management - WordPress.com · Manager Supervisor Rescue Contractor policy/procedures. ... Feed Mill Key Performance Indicators Productivity Tons/man hr Changeovers Tons

Inventory Trend Report – Major Scale

Page 57: Feed Mill Management - WordPress.com · Manager Supervisor Rescue Contractor policy/procedures. ... Feed Mill Key Performance Indicators Productivity Tons/man hr Changeovers Tons

Week Total Hrs Base OT Tons Tons/Run Tons/Man Hr

1 560 320 80 8,500 209 16

2 565 320 85 8,600 210 15

3 570 320 90 9,000 185 16

4 570 320 90 9,000 190 16

Average 566 320 86 8,775 199 16

Total 2,265 1,280 345 35,100

Days LTA Days Doctor

Safety Quiz Shrink

390 66 89 0.89

Feed Mill Monthly Report

Page 58: Feed Mill Management - WordPress.com · Manager Supervisor Rescue Contractor policy/procedures. ... Feed Mill Key Performance Indicators Productivity Tons/man hr Changeovers Tons

$/month Actual Budget DifferencePersonnelSalary 11,500  0.33 0.40 ‐0.07Hourly 23,400  0.67 0.65 0.02Benefits 10,121  0.29 0.25 0.04

PropertyRepair & Maintenance 31,550  0.90 0.75 0.15Die & Roll 3,510  0.10 0.10 0.00Depreciation 32,000  0.91 1.30 ‐0.39Rentals 2,500  0.07 0.11 ‐0.04Vehicle 350  0.01 0.01 0.00

OperatingElectricity 38,025  1.08 1.18 ‐0.10Fuel 63,000  1.79 2.00 ‐0.21Water 2,000  0.06 0.08 ‐0.02Manufacturing Supplies 2,555  0.07 0.10 ‐0.03Office Supplies 1,000  0.03 0.05 ‐0.02Waste 600  0.02 0.02 0.00

Other 80,000  2.28 2.00 0.28

Total $        302,111  8.61 9.00 ‐0.39Tons 35,100  34,000 

Manufacturing costs

Page 59: Feed Mill Management - WordPress.com · Manager Supervisor Rescue Contractor policy/procedures. ... Feed Mill Key Performance Indicators Productivity Tons/man hr Changeovers Tons

Words of Wisdom

Treat people as you want to be treated

Respect ALL employees

Do the Right Thing!!