8/13/2019 Feasibility Study Techy Aspect
1/18
Feasibility
StudyTechnical Aspect
(Chapter 4)
8/13/2019 Feasibility Study Techy Aspect
2/18
1. Introduction 2 to 3 paragraphs
o! did you co"e up !ith a topic or a product#
8/13/2019 Feasibility Study Techy Aspect
3/18
2. $etailed In%or"ation o% the
&roduct Speci%icationParagraph form pero pwede rin yung
graphical form in case youll be
presenting using pictures
Length, width, size, color, height,
benefits, functionality, etc. (be
specific)Use your creativity
8/13/2019 Feasibility Study Techy Aspect
4/18
3. $irect 'a! aterials and Indirect
irect materials! visible to the finished
product
"ndirect materials! cant be seen (e#. $lue
tapos tatanggalin pala%, plastic containerpero wala sa finished product pero part
lang ng production process)
8/13/2019 Feasibility Study Techy Aspect
5/18
4. Total Cost o% the &roduct
8/13/2019 Feasibility Study Techy Aspect
6/18
. anu%acturing &rocessParagraph form pero numerical list
&numerated (insert 'onting english
before the list)
a#imum of pages&very move of the laborer or every
change of the product (determination
for manufacturing process)
8/13/2019 Feasibility Study Techy Aspect
7/18
*. Flo! Chartanufacturing process turned into graphical * chart form
+blong na na'ahiga (start* ending)
ectangle (process)
iamond (decision)
-aiting time din/awal lumi'o, from top to bottom ! 0U-1$ 1$2"P" 31
P1P&L
4+ &5PL1412"+4 6m*
4o color, plain blac' and borders, white yung inside part.
Pwedeng igilid yung shape pag may sabay na process
8/13/2019 Feasibility Study Techy Aspect
8/18
+. aterials and ,nergy -alance7ay mga nawawala, nag8eevaporate,
may natatapon9
etermine the weight, length, size,
volume from the start pa lang dapat
"t loo's li'e a process flow (puro bo#8
shaped) horizontal flow, bsta pwede
lumi'o3entences are optional :)
8/13/2019 Feasibility Study Techy Aspect
9/18
. &lant Si/eescriptive ; area (s< meters)
=8 paragraphs
bear in mind the size of your machines for proper spacing
within the plant, par'ing lot din and delivery
/ldg perspective (> drawings 2.2) ? @+42 A"&- (name, doors )
? floor plan (B, offices, warehouse, e#it (fire), stairs,
machines ; significant parts) 2+P A"&-
? floor plan (electrical, mga outlet, switches, lightsetc)
2+P A"&-
? floor plan (outside view ; par'ing) 2+P A"&-
? furniture inside offices
8/13/2019 Feasibility Study Techy Aspect
10/18
0. &lant ocation
"nclude 3pecific address2a'e a picture of the vacant lot
(includes road, electrical posts ; PL2
lines for communication, drainage)
8/13/2019 Feasibility Study Techy Aspect
11/18
1. &roduction Schedule
2abular form (crossword8li'e)
Bontents!
? time to start the operation (be
specific with the processes)
? must have +U2PU2 @+ 20& 1C
6m*
8/13/2019 Feasibility Study Techy Aspect
12/18
11. achinery and ,uip"ent
machine, description (function),pieces, price (tabular form)
ore or less D pages
2his part is for the production
process +4LC
8/13/2019 Feasibility Study Techy Aspect
13/18
12. Auiliary ,uip"ent
&
8/13/2019 Feasibility Study Techy Aspect
14/18
13. $epreciation Scheduleachineries and e
8/13/2019 Feasibility Study Techy Aspect
15/18
14. Indirect 'a! aterials
(&ac5aging)
8/13/2019 Feasibility Study Techy Aspect
16/18
1. Indirect abor
irect! wor' labored inside theplant*factory that has connection
with the process
"ndirect! wor' labored but not a part
of the production but in the
manufacturing place (Eanitor,
supervisor, security guard)
8/13/2019 Feasibility Study Techy Aspect
17/18
1*. 6aste anage"ent
0ow do you manage your wasteI
(paragraph form)
8/13/2019 Feasibility Study Techy Aspect
18/18
1+. 7tilities
21/UL1 @+ 6m*
? "dentify the sources and annual
estimated use*consumption
electricity
-ater
2elecommunication
internet