Factory Building Symposium on Lean Production January 29, 2007 Austin, Texas
10

Factory Building Symposium on Lean Production

Feb 13, 2016

Download

Documents

Lavina mathur

Factory Building Symposium on Lean Production. January 29, 2007 Austin, Texas . Management Commitment. Southern Energy Homes Addison, AL Lamar Dickerson, Director of Lean Manufacturing. Southern Estates Plant. Interior Wall Build. Now. Then. Material Flow Work Space Conveyance - PowerPoint PPT Presentation
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Factory Building Symposium on Lean Production

Factory Building Symposium on Lean

Production

January 29, 2007Austin, Texas

Page 2: Factory Building Symposium on Lean Production

Management Commitment

Southern Energy HomesAddison, ALLamar Dickerson, Director of Lean Manufacturing

Page 3: Factory Building Symposium on Lean Production

Southern Estates Plant Started: 1982 Location: Addison, AL Home type(s): HUD Code Price point: Moderate Design: Some

customization Production: 5 to 6

floors/day Market area: Southeast US

Page 4: Factory Building Symposium on Lean Production

Material Flow Work Space Conveyance Quality Information flow

Organization and new hoist relieve strain and speed productionOrganization and new hoist relieve strain and speed productionMaterial not close to point of useMaterial not close to point of useProduct flow rationalizedProduct flow rationalizedNo error proofingNo error proofingJigs help maintain qualityJigs help maintain qualityConfusion leads to production of wrong partsConfusion leads to production of wrong partsRacks and labeling systemRacks and labeling system

Interior Wall Build

Congestion slowed workCongestion slowed workVisibility across workstation promotes visual managementVisibility across workstation promotes visual managementLots of totingLots of toting

Then Now

Page 5: Factory Building Symposium on Lean Production

Results Production on target Reduced from 9 to 6.5 people Re-assigned workers to other departments Space reduced by 12% Wallboard damage reduced 10% One-time cost of RPI: $25,786 Annual labor savings of $73,200 plus the

savings of not needing to hire and train 2.5 workers

Page 6: Factory Building Symposium on Lean Production

Highlights Wide range of RPI

participants All key people present Strong support of plant

management Morale in wall

department very high

Page 7: Factory Building Symposium on Lean Production

Management Commitment Dedicated director of

lean Permit teams to take

time Invest in the changes Take workers

seriously Senior manager

involvement

Page 8: Factory Building Symposium on Lean Production

Going forward Spread lean

company-wide Management

workshop Lean teams Plants required to

conduct lean activities

Page 9: Factory Building Symposium on Lean Production

Lean Symposium

Page 10: Factory Building Symposium on Lean Production

Manufactured Housing Research AllianceJordan Dentz

(212) 496-0900 [email protected]

www.mhrahome.org

Factory Building Symposium on Lean

Production