    SM CITY SUCAT

    SMSC Weekly Report | Week 2

    Jan.09Jan.15,2014

    Prepared by:

    Jerome U. Villasanta

    RE

    Reviewed by:

    Julius O. Salacup

    RE

    Noted by:

    Bernabe T. Salazar Jr.

    ROM

  • 8/13/2019 Facilities Weekly Report

    2/33

    EngineeringDesign &Development

    Table of Contents1. General Information

    1.1. Photos

    1.2. Basic Information

    1.3. Tenants Information

    2. Technical Reports and Updates

    2.1. Utilities Interruption

    2.2. Utilities Consumptions

    2.2.1. Daily Non-Potable Water ConsumptionMonitoring

    2.3. Equipment Updates

    2.3.1. Genset

    2.3.2. Air Handling Units

    2.3.3. Cooling Towers

    2.3.4. Chillers2.3.5. Elevators/Escalators Repair

    2.3.6. (Any Other Equipment Utilities that undergo

    Major Maintenance/Repair)

    SMSC Weekly Report | Week 2

  • 8/13/2019 Facilities Weekly Report

    3/33

    EngineeringDesign &Development

    Table of Contents

    2.4 Lightings

    2.4.1 Mall Lightings2.4.2 Logos

    2.4.2.1 SM Logos

    2.4.2.2 Tenants Logos

    2.5 Rest Rooms

    2.6 Water Leaks

    2.6.1 Photo of the Roof2.6.2 Weather

    3. Materials Withdrawals Monitoring

    3.1. Materials requested within the week

    3.2. Materials withdrawn within the week

    4. RFW

    5. SMR

    6. Issues and Needs List

    SMSC Weekly Report | Week 2

  • 8/13/2019 Facilities Weekly Report

    4/33

    EngineeringDesign &Development

    1. General Information

    SMSC Weekly Report | Week 2

  • 8/13/2019 Facilities Weekly Report

    5/33

    EngineeringDesign &Development

    1.1. Photo and Basic Information

    SMSC GENERAL INFORMATION SHEET

    86 GP DR. A SANTOS AVENUE, SAN DIONISIO, PARAAQUE CITY

    DATE OF OPENING:Bldg. A July 2001,Bldg. B November 11, 2005

    LAND AREA: 100,812.31 sq.m.

    CFA: 126,987.92 sq.m. TOTAL LEASABLE AREA: 77,137.17sq.m.

    FOOD TENANTS: 43 NON-FOOD TENANTS: 161

    OPEN PARKING: 1,346 slots MOTORCYCLE PARKING: 126 slots

    PARKING FOR PWD: 18 Slots

    CINEMA SEATING CAPACITY

    CINEMA 1: 361 CINEMA 2: 582 CINEMA 3: 584 CINEMA 4: 428

    Bldg. A Bldg. B

    SMSC Weekly Report | Week 2

  • 8/13/2019 Facilities Weekly Report

    6/33

    EngineeringDesign &Development

    1.2. Basic Information

    Leasable Area : 77,137.17 sq. m

    Common Area : 126,987.92 sq. m

    Percentage of Leasable from Common Area: 60.74 %

    SMSC Weekly Report | Week 2

  • 8/13/2019 Facilities Weekly Report

    7/33

    EngineeringDesign &Development

    1.3. Tenants information

    Total Vacant Constructing CFA

    20419 Long Term4 Short Term

    1 54,892.51 sq. m

    SMSC Weekly Report | Week 2

  • 8/13/2019 Facilities Weekly Report

    8/33

    EngineeringDesign &Development

    2. Technical Report and

    Updates

    SMSC Weekly Report | Week 2

  • 8/13/2019 Facilities Weekly Report

    9/33

    EngineeringDesign &Development

    2.1. Utilities Interruptions

    Utilities Status (Jan02-Jan.08) Week 54 Status (Jan.09-Jan.15) Week 55

    Power No Interruption Fluctuation 1106 am at Bldg. B

    Water No Interruption No Interruption

    Gas No Interruption No Interruption

    EquipmentBreakdowns

    Chiller 3B For OverhaulingCooling Tower 1B Misaligned FanPulley

    Chiller 3B For OverhaulingCooling Tower 1B MisalignedFan Pulley

    Numbers ofAAR

    0 0

    SMSC Weekly Report | Week 2

  • 8/13/2019 Facilities Weekly Report

    10/33

    EngineeringDesign &Development

    2.2. Utilities Consumptions

    Utilities Consumption(Jan.02-Jan.08) Week 54

    Consumption(Jan.09-Jan.15) Week 55

    Power 89,850 KWH 82,500 KWH

    Potable Water

    General use : 2,916 m3

    Cooling Tower A & B : 558 m3General use : 2,733 m3

    Cooling Tower A & B : 550 m3

    Gas 7,318 Liters 7,363 Liters

    Diesel

    23Li (W/-Load test) 3 Genset

    Bldg. A15 Li (W/-Load test) 2 GensetBldg. B

    23Li (W/O-Load test) 3 Genset

    Bldg. A15 Li (W/O-Load test) 2 GensetBldg. B

    SMSC Weekly Report | Week 2

  • 8/13/2019 Facilities Weekly Report

    11/33

    EngineeringDesign &Development

    Jan.09 Jan.10 Jan.11 Jan.12 Jan.13 Jan.14 Jan.15

    CoolingTower n/a n/a n/a n/a n/a n/a n/a

    TTP(Production)

    n/a n/a n/a n/a n/a n/a n/a

    TTP Make-up water(Potablewater)

    n/a n/a n/a n/a n/a n/a n/a

    Mall (mainMeter)

    n/a n/a n/a n/a n/a n/a n/a

    STPDischarge n/a n/a n/a n/a n/a n/a n/a

    2.2.1. Daily Non-Potable Water Consumption

    Monitoring

    Note: No non-potable water supply in SMSC.

    SMSC Weekly Report | Week 2

  • 8/13/2019 Facilities Weekly Report

    12/33

    EngineeringDesign &Development

    2.3. Equipment Updates

    2.3.1. Genset (update/major works)

    GeneratorRunning

    Hours

    Specific Gravity

    VoltsBattery 1 Battery 2 Battery 3 Battery 4

    G1 A 562 1.28GREEN

    1.28GREEN

    1.28GREEN

    1.28GREEN

    24

    G2 A 341 1.27GREEN

    1.27GREEN

    1.27GREEN

    1.27GREEN

    25

    G3 A 271 1.27GREEN

    1.27GREEN

    1.27GREEN

    1.27GREEN

    25

    Building A

    SMSC Weekly Report | Week 2

  • 8/13/2019 Facilities Weekly Report

    13/33

    EngineeringDesign &Development

    2.3. Equipment Updates

    2.3.1. Genset (Update/major works)

    Generator Running Hours

    Specific Gravity

    VoltsBattery 1 Battery 2

    G1B 284 1.27GREEN

    1.27GREEN

    25

    G2B 214 1.27GREEN

    1.27GREEN

    25

    Building B

    SMSC Weekly Report | Week 2

  • 8/13/2019 Facilities Weekly Report

    14/33

    EngineeringDesign &Development

    2.3.2. AHUs (Major Works/Activities)

    DATE ACTIVITY

    Jan.09 Cleaning of AHU A18SF & A12GF

    Jan.10 Cleaning of AHU A25TF,B3GF,B11SF B1GF & B9SF

    Jan.11 Cleaning of AHU A28TF,B2GF,B10SF,B4GF &B12SF

    Jan.12 Cleaning of AHU A27TF,B17TF,B18TF & B19TF

    Jan.13 Cleaning of AHU A37FF,A38FF,B29TF &

    B20ATF

    Jan.14 Cleaning of AHU A34C & A33C

    Jan.15 Cleaning of AHU A35CL,A36CL & A22GF

    SMSC Weekly Report | Week 2

  • 8/13/2019 Facilities Weekly Report

    15/33

    EngineeringDesign &Development

    Cleaning of Cooling Tower

    2.3.3. Cooling Tower

    DATE ACTIVITY

    Jan.09 Cleaning of CT # 5 Bldg. ACleaning of CT # 1 Bldg. B

    Jan.10 Cleaning of CT # 6 Bldg. ACleaning of CT # 2 Bldg. B

    Jan.11 Cleaning of CT # 1 Bldg. ACleaning of CT # 3 Bldg. B

    Jan.12 Cleaning of CT # 2 Bldg. ACleaning of CT # 1 Bldg. B

    Jan.13 Cleaning of CT # 3 Bldg. ACleaning of CT # 2 Bldg. B

    Jan.14 Cleaning of CT # 4 Bldg. ACleaning of CT # 3 Bldg. B

    Jan.15 Cleaning of CT # 5 Bldg. ACleaning of CT # 1 Bldg. B

    SMSC Weekly Report | Week 2

  • 8/13/2019 Facilities Weekly Report

    16/33

    EngineeringDesign &Development

    2.3.4. Chillers

    PREVENTIVE MAINTENANCE OF CHILLERS

    Date Chiller No. Remarks

    SMSC Weekly Report | Week 2

  • 8/13/2019 Facilities Weekly Report

    17/33

    EngineeringDesign &Development

    2.3.5. Elevator/Escalator

    Equipment TotalNon -

    OperationalOn-GoingRepairs

    Target Date ofCompletion

    Cause Remarks

    Elevator 5 0 0 N/A N/A

    Escalator 16 0 0 N/A N/A

    Dumbwaiter 0 0 0 N/A N/A

    PWD Lift 0 0 0 N/A N/A

    Car Lift 0 0 0 N/A N/A

    Moving Walk 2 0 0 N/A N/A

    SMSC Weekly Report | Week 2

  • 8/13/2019 Facilities Weekly Report

    18/33

    Engineering

    Design &Development

    2.3.6 Major work done with in the week

    Preventive maintenance of EERm Panel Breakers

    SMSC Weekly Report | Week 2

  • 8/13/2019 Facilities Weekly Report

    19/33

    Engineering

    Design &Development

    2.3.7 Major work done with in the week

    Preventive maintenance of Main Breaker, Basbar & Transformers

    SMSC Weekly Report | Week 2

  • 8/13/2019 Facilities Weekly Report

    20/33

    Engineering

    Design &Development

    2.3.8 Major work done with in the week

    Fabrication of drain pan for leak at Austin land area

    SMSC Weekly Report | Week 2

  • 8/13/2019 Facilities Weekly Report

    21/33

    Engineering

    Design &Development

    2.4. Lightings

    2.4.1. Mall Lightings

    Brand # of Busted as

    of January 15

    Average

    Life

    Total # of installed

    lamp (with the

    same brand)

    Connection

    (Vertical/Horizontal)

    Sylvania 0 Vertical

    Karo 0 Vertical

    Osram 1 Vertical

    GE 0 Vertical

    Philips 30 Vertical

    SMSC Weekly Report | Week 2

  • 8/13/2019 Facilities Weekly Report

    22/33

    Engineering

    Design &Development

    2.4.2. Logos

    Total Number of Logos Total number repaired/replacedlights

    4 0

    Details Location Type# busted lamp

    replaced

    Remarks

    Logo 1 Entrance 1 Bldg A LED 0

    Busted LED alreadyreported to DO

    Logo 2 Entrance 6 Bldg B LED 0Busted LED alreadyreported to DO

    Logo 3 West Parking Bldg B LED 0 Busted LED alreadyreported to DO

    Logo 4 South Parking Bldg B LED 0Busted LED alreadyreported to DO

    2.4.2.1 SM Logos

    SMSC Weekly Report | Week 2

  • 8/13/2019 Facilities Weekly Report

    23/33

    Engineering

    Design &Development

    2.4.2.2 Tenants Logos

    Total Number of Logos

    Total number

    repaired/replaced lights

    120 (tenants logo) 0

    Details Location Type

    # busted lamp

    replaced Remarks

    Total Tenant'sLogo

    Bldg. A & Bldg. B LED 0 All Tenant Logo areOperational

    SMSC Weekly Report | Week 2

  • 8/13/2019 Facilities Weekly Report

    24/33

    Engineering

    Design &Development

    2.5. Restrooms

    FixturesTotal #

    of

    Fixture

    Total

    Numberrepaired for

    the week

    Total number

    of fixture thatis not

    repaired yet

    Remarks

    Water Closet 61 1 0Declogged water closet bowl at2nd.flr female & male CR Bldg. B

    Urinal 49 0 0Replacement urinal cartridge 2nd.flr

    Bldg. A

    Sink 40 0 0Declogging of toilet bowl at 2nd.flr

    female CR Bldg. B

    Floor Drain 96 2 0Declogging of floor drain at 3rd.flr CR

    Bldg. B

    Faucet 40 0 0 Declogging toilet bowl 3rd.flr maleCR Bldg. A

    Wash Tub 12 2 0Declogging of wash tub at 3rd.flr CR

    Bldg. B

    Total number of fixture repaired during the week

    SMSC Weekly Report | Week 2

  • 8/13/2019 Facilities Weekly Report

    25/33

    Engineering

    Design &Development

    2.6. Water Leaks

    Location Total number ofwater leaks as

    of January 15

    Total numberrectified

    Total numberschedule to be

    rectified

    (Target date)

    Remarks

    Tenant 1 1 1/14/14 Done

    Affiliates

    Common Area

    Utility Room

    SMSC Weekly Report | Week 2

  • 8/13/2019 Facilities Weekly Report

    26/33

    Engineering

    Design &Development

    2.6.1 Roof Photo

    Bldg. A

    Bldg. B

    SMSC Weekly Report | Week 2

  • 8/13/2019 Facilities Weekly Report

    27/33

    Engineering

    Design &Development

    2.6.2 Weather

    Note: The weather condition on the table is based on Accuweather.com

    ***All temperature are in degrees Fahrenheit.

    Jan.9

    Actual

    Temp

    87 Lo

    74

    Hist.Avg.

    86 Lo

    69

    Jan.10

    Actual

    Temp

    83 Lo 75

    Hist. Avg.

    86 Lo 69

    Jan.11

    Actual

    Temp

    86 Lo

    72

    Hist.Avg.

    86 Lo

    69

    Jan.12

    Actual

    Temp

    85 Lo 72

    Hist. Avg.

    86 Lo 69

    Jan.13

    Actual

    Temp

    86 Lo 73

    Hist. Avg.

    86 Lo 69

    Jan.14

    Actual

    Temp

    86 Lo 72

    Hist. Avg.

    86 Lo 69

    Jan.15

    Actual

    Temp

    86 Lo 73

    Hist. Avg.

    86 Lo 69

    SMSC Weekly Report | Week 2

  • 8/13/2019 Facilities Weekly Report

    28/33

    Engineering

    Design &Development

    3. Materials Monitoring

    3.1 Materials requested within the week.

    MSRS #Material

    RequestedQTY Amount Purpose Remarks

    SMSC Weekly Report | Week 2

  • 8/13/2019 Facilities Weekly Report

    29/33

    Engineering

    Design &Development

    3.2. Materials withdrawn within the week.

    MSRS # Material Requested QTY Amount Purpose Remarks

    814292 Electrical tape 3For replacement due to re-

    arrange of kiosk

    Double deadlock 1

    For replacement due to

    defective double deadlock at2nd.flr.Bldg B

    SMSC Weekly Report | Week 2

  • 8/13/2019 Facilities Weekly Report

    30/33

    Engineering

    Design &Development

    4. RFW (under TFPI)

    TOTAL

    RFW

    New

    RFW

    Mall

    Related

    Tenant

    Related

    For

    QuotationFor SMR For PO

    Work In-

    ProgressDONE

    DISAPPROVED

    OTHERS

    Remarks

    Previous 21 2 12 9 1 0 1 3 1 9 10

    Current 21 2 12 9 1 0 1 3 1 9 10

    SMSC Weekly Report | Week 2

  • 8/13/2019 Facilities Weekly Report

    31/33

    Engineering

    Design &Development

    5. SMR

    Total Completed Cancelled Outstanding Remarks/Status

    PreviousWeek

    56 40 0 16

    Currentweek

    56 40 0 16

    SMSC Weekly Report | Week 2

  • 8/13/2019 Facilities Weekly Report

    32/33

    Engineering

    Design &Development

    6. Issues and Needs List (not SMR)

    Description Status Target Date