8/13/2019 Facilities Weekly Report
1/33
EngineeringDesign &Development
SM CITY SUCAT
SMSC Weekly Report | Week 2
Jan.09Jan.15,2014
Prepared by:
Jerome U. Villasanta
RE
Reviewed by:
Julius O. Salacup
RE
Noted by:
Bernabe T. Salazar Jr.
ROM
8/13/2019 Facilities Weekly Report
2/33
EngineeringDesign &Development
Table of Contents1. General Information
1.1. Photos
1.2. Basic Information
1.3. Tenants Information
2. Technical Reports and Updates
2.1. Utilities Interruption
2.2. Utilities Consumptions
2.2.1. Daily Non-Potable Water ConsumptionMonitoring
2.3. Equipment Updates
2.3.1. Genset
2.3.2. Air Handling Units
2.3.3. Cooling Towers
2.3.4. Chillers2.3.5. Elevators/Escalators Repair
2.3.6. (Any Other Equipment Utilities that undergo
Major Maintenance/Repair)
SMSC Weekly Report | Week 2
8/13/2019 Facilities Weekly Report
3/33
EngineeringDesign &Development
Table of Contents
2.4 Lightings
2.4.1 Mall Lightings2.4.2 Logos
2.4.2.1 SM Logos
2.4.2.2 Tenants Logos
2.5 Rest Rooms
2.6 Water Leaks
2.6.1 Photo of the Roof2.6.2 Weather
3. Materials Withdrawals Monitoring
3.1. Materials requested within the week
3.2. Materials withdrawn within the week
4. RFW
5. SMR
6. Issues and Needs List
SMSC Weekly Report | Week 2
8/13/2019 Facilities Weekly Report
4/33
EngineeringDesign &Development
1. General Information
SMSC Weekly Report | Week 2
8/13/2019 Facilities Weekly Report
5/33
EngineeringDesign &Development
1.1. Photo and Basic Information
SMSC GENERAL INFORMATION SHEET
86 GP DR. A SANTOS AVENUE, SAN DIONISIO, PARAAQUE CITY
DATE OF OPENING:Bldg. A July 2001,Bldg. B November 11, 2005
LAND AREA: 100,812.31 sq.m.
CFA: 126,987.92 sq.m. TOTAL LEASABLE AREA: 77,137.17sq.m.
FOOD TENANTS: 43 NON-FOOD TENANTS: 161
OPEN PARKING: 1,346 slots MOTORCYCLE PARKING: 126 slots
PARKING FOR PWD: 18 Slots
CINEMA SEATING CAPACITY
CINEMA 1: 361 CINEMA 2: 582 CINEMA 3: 584 CINEMA 4: 428
Bldg. A Bldg. B
SMSC Weekly Report | Week 2
8/13/2019 Facilities Weekly Report
6/33
EngineeringDesign &Development
1.2. Basic Information
Leasable Area : 77,137.17 sq. m
Common Area : 126,987.92 sq. m
Percentage of Leasable from Common Area: 60.74 %
SMSC Weekly Report | Week 2
8/13/2019 Facilities Weekly Report
7/33
EngineeringDesign &Development
1.3. Tenants information
Total Vacant Constructing CFA
20419 Long Term4 Short Term
1 54,892.51 sq. m
SMSC Weekly Report | Week 2
8/13/2019 Facilities Weekly Report
8/33
EngineeringDesign &Development
2. Technical Report and
Updates
SMSC Weekly Report | Week 2
8/13/2019 Facilities Weekly Report
9/33
EngineeringDesign &Development
2.1. Utilities Interruptions
Utilities Status (Jan02-Jan.08) Week 54 Status (Jan.09-Jan.15) Week 55
Power No Interruption Fluctuation 1106 am at Bldg. B
Water No Interruption No Interruption
Gas No Interruption No Interruption
EquipmentBreakdowns
Chiller 3B For OverhaulingCooling Tower 1B Misaligned FanPulley
Chiller 3B For OverhaulingCooling Tower 1B MisalignedFan Pulley
Numbers ofAAR
0 0
SMSC Weekly Report | Week 2
8/13/2019 Facilities Weekly Report
10/33
EngineeringDesign &Development
2.2. Utilities Consumptions
Utilities Consumption(Jan.02-Jan.08) Week 54
Consumption(Jan.09-Jan.15) Week 55
Power 89,850 KWH 82,500 KWH
Potable Water
General use : 2,916 m3
Cooling Tower A & B : 558 m3General use : 2,733 m3
Cooling Tower A & B : 550 m3
Gas 7,318 Liters 7,363 Liters
Diesel
23Li (W/-Load test) 3 Genset
Bldg. A15 Li (W/-Load test) 2 GensetBldg. B
23Li (W/O-Load test) 3 Genset
Bldg. A15 Li (W/O-Load test) 2 GensetBldg. B
SMSC Weekly Report | Week 2
8/13/2019 Facilities Weekly Report
11/33
EngineeringDesign &Development
Jan.09 Jan.10 Jan.11 Jan.12 Jan.13 Jan.14 Jan.15
CoolingTower n/a n/a n/a n/a n/a n/a n/a
TTP(Production)
n/a n/a n/a n/a n/a n/a n/a
TTP Make-up water(Potablewater)
n/a n/a n/a n/a n/a n/a n/a
Mall (mainMeter)
n/a n/a n/a n/a n/a n/a n/a
STPDischarge n/a n/a n/a n/a n/a n/a n/a
2.2.1. Daily Non-Potable Water Consumption
Monitoring
Note: No non-potable water supply in SMSC.
SMSC Weekly Report | Week 2
8/13/2019 Facilities Weekly Report
12/33
EngineeringDesign &Development
2.3. Equipment Updates
2.3.1. Genset (update/major works)
GeneratorRunning
Hours
Specific Gravity
VoltsBattery 1 Battery 2 Battery 3 Battery 4
G1 A 562 1.28GREEN
1.28GREEN
1.28GREEN
1.28GREEN
24
G2 A 341 1.27GREEN
1.27GREEN
1.27GREEN
1.27GREEN
25
G3 A 271 1.27GREEN
1.27GREEN
1.27GREEN
1.27GREEN
25
Building A
SMSC Weekly Report | Week 2
8/13/2019 Facilities Weekly Report
13/33
EngineeringDesign &Development
2.3. Equipment Updates
2.3.1. Genset (Update/major works)
Generator Running Hours
Specific Gravity
VoltsBattery 1 Battery 2
G1B 284 1.27GREEN
1.27GREEN
25
G2B 214 1.27GREEN
1.27GREEN
25
Building B
SMSC Weekly Report | Week 2
8/13/2019 Facilities Weekly Report
14/33
EngineeringDesign &Development
2.3.2. AHUs (Major Works/Activities)
DATE ACTIVITY
Jan.09 Cleaning of AHU A18SF & A12GF
Jan.10 Cleaning of AHU A25TF,B3GF,B11SF B1GF & B9SF
Jan.11 Cleaning of AHU A28TF,B2GF,B10SF,B4GF &B12SF
Jan.12 Cleaning of AHU A27TF,B17TF,B18TF & B19TF
Jan.13 Cleaning of AHU A37FF,A38FF,B29TF &
B20ATF
Jan.14 Cleaning of AHU A34C & A33C
Jan.15 Cleaning of AHU A35CL,A36CL & A22GF
SMSC Weekly Report | Week 2
8/13/2019 Facilities Weekly Report
15/33
EngineeringDesign &Development
Cleaning of Cooling Tower
2.3.3. Cooling Tower
DATE ACTIVITY
Jan.09 Cleaning of CT # 5 Bldg. ACleaning of CT # 1 Bldg. B
Jan.10 Cleaning of CT # 6 Bldg. ACleaning of CT # 2 Bldg. B
Jan.11 Cleaning of CT # 1 Bldg. ACleaning of CT # 3 Bldg. B
Jan.12 Cleaning of CT # 2 Bldg. ACleaning of CT # 1 Bldg. B
Jan.13 Cleaning of CT # 3 Bldg. ACleaning of CT # 2 Bldg. B
Jan.14 Cleaning of CT # 4 Bldg. ACleaning of CT # 3 Bldg. B
Jan.15 Cleaning of CT # 5 Bldg. ACleaning of CT # 1 Bldg. B
SMSC Weekly Report | Week 2
8/13/2019 Facilities Weekly Report
16/33
EngineeringDesign &Development
2.3.4. Chillers
PREVENTIVE MAINTENANCE OF CHILLERS
Date Chiller No. Remarks
SMSC Weekly Report | Week 2
8/13/2019 Facilities Weekly Report
17/33
EngineeringDesign &Development
2.3.5. Elevator/Escalator
Equipment TotalNon -
OperationalOn-GoingRepairs
Target Date ofCompletion
Cause Remarks
Elevator 5 0 0 N/A N/A
Escalator 16 0 0 N/A N/A
Dumbwaiter 0 0 0 N/A N/A
PWD Lift 0 0 0 N/A N/A
Car Lift 0 0 0 N/A N/A
Moving Walk 2 0 0 N/A N/A
SMSC Weekly Report | Week 2
8/13/2019 Facilities Weekly Report
18/33
Engineering
Design &Development
2.3.6 Major work done with in the week
Preventive maintenance of EERm Panel Breakers
SMSC Weekly Report | Week 2
8/13/2019 Facilities Weekly Report
19/33
Engineering
Design &Development
2.3.7 Major work done with in the week
Preventive maintenance of Main Breaker, Basbar & Transformers
SMSC Weekly Report | Week 2
8/13/2019 Facilities Weekly Report
20/33
Engineering
Design &Development
2.3.8 Major work done with in the week
Fabrication of drain pan for leak at Austin land area
SMSC Weekly Report | Week 2
8/13/2019 Facilities Weekly Report
21/33
Engineering
Design &Development
2.4. Lightings
2.4.1. Mall Lightings
Brand # of Busted as
of January 15
Average
Life
Total # of installed
lamp (with the
same brand)
Connection
(Vertical/Horizontal)
Sylvania 0 Vertical
Karo 0 Vertical
Osram 1 Vertical
GE 0 Vertical
Philips 30 Vertical
SMSC Weekly Report | Week 2
8/13/2019 Facilities Weekly Report
22/33
Engineering
Design &Development
2.4.2. Logos
Total Number of Logos Total number repaired/replacedlights
4 0
Details Location Type# busted lamp
replaced
Remarks
Logo 1 Entrance 1 Bldg A LED 0
Busted LED alreadyreported to DO
Logo 2 Entrance 6 Bldg B LED 0Busted LED alreadyreported to DO
Logo 3 West Parking Bldg B LED 0 Busted LED alreadyreported to DO
Logo 4 South Parking Bldg B LED 0Busted LED alreadyreported to DO
2.4.2.1 SM Logos
SMSC Weekly Report | Week 2
8/13/2019 Facilities Weekly Report
23/33
Engineering
Design &Development
2.4.2.2 Tenants Logos
Total Number of Logos
Total number
repaired/replaced lights
120 (tenants logo) 0
Details Location Type
# busted lamp
replaced Remarks
Total Tenant'sLogo
Bldg. A & Bldg. B LED 0 All Tenant Logo areOperational
SMSC Weekly Report | Week 2
8/13/2019 Facilities Weekly Report
24/33
Engineering
Design &Development
2.5. Restrooms
FixturesTotal #
of
Fixture
Total
Numberrepaired for
the week
Total number
of fixture thatis not
repaired yet
Remarks
Water Closet 61 1 0Declogged water closet bowl at2nd.flr female & male CR Bldg. B
Urinal 49 0 0Replacement urinal cartridge 2nd.flr
Bldg. A
Sink 40 0 0Declogging of toilet bowl at 2nd.flr
female CR Bldg. B
Floor Drain 96 2 0Declogging of floor drain at 3rd.flr CR
Bldg. B
Faucet 40 0 0 Declogging toilet bowl 3rd.flr maleCR Bldg. A
Wash Tub 12 2 0Declogging of wash tub at 3rd.flr CR
Bldg. B
Total number of fixture repaired during the week
SMSC Weekly Report | Week 2
8/13/2019 Facilities Weekly Report
25/33
Engineering
Design &Development
2.6. Water Leaks
Location Total number ofwater leaks as
of January 15
Total numberrectified
Total numberschedule to be
rectified
(Target date)
Remarks
Tenant 1 1 1/14/14 Done
Affiliates
Common Area
Utility Room
SMSC Weekly Report | Week 2
8/13/2019 Facilities Weekly Report
26/33
Engineering
Design &Development
2.6.1 Roof Photo
Bldg. A
Bldg. B
SMSC Weekly Report | Week 2
8/13/2019 Facilities Weekly Report
27/33
Engineering
Design &Development
2.6.2 Weather
Note: The weather condition on the table is based on Accuweather.com
***All temperature are in degrees Fahrenheit.
Jan.9
Actual
Temp
87 Lo
74
Hist.Avg.
86 Lo
69
Jan.10
Actual
Temp
83 Lo 75
Hist. Avg.
86 Lo 69
Jan.11
Actual
Temp
86 Lo
72
Hist.Avg.
86 Lo
69
Jan.12
Actual
Temp
85 Lo 72
Hist. Avg.
86 Lo 69
Jan.13
Actual
Temp
86 Lo 73
Hist. Avg.
86 Lo 69
Jan.14
Actual
Temp
86 Lo 72
Hist. Avg.
86 Lo 69
Jan.15
Actual
Temp
86 Lo 73
Hist. Avg.
86 Lo 69
SMSC Weekly Report | Week 2
8/13/2019 Facilities Weekly Report
28/33
Engineering
Design &Development
3. Materials Monitoring
3.1 Materials requested within the week.
MSRS #Material
RequestedQTY Amount Purpose Remarks
SMSC Weekly Report | Week 2
8/13/2019 Facilities Weekly Report
29/33
Engineering
Design &Development
3.2. Materials withdrawn within the week.
MSRS # Material Requested QTY Amount Purpose Remarks
814292 Electrical tape 3For replacement due to re-
arrange of kiosk
Double deadlock 1
For replacement due to
defective double deadlock at2nd.flr.Bldg B
SMSC Weekly Report | Week 2
8/13/2019 Facilities Weekly Report
30/33
Engineering
Design &Development
4. RFW (under TFPI)
TOTAL
RFW
New
RFW
Mall
Related
Tenant
Related
For
QuotationFor SMR For PO
Work In-
ProgressDONE
DISAPPROVED
OTHERS
Remarks
Previous 21 2 12 9 1 0 1 3 1 9 10
Current 21 2 12 9 1 0 1 3 1 9 10
SMSC Weekly Report | Week 2
8/13/2019 Facilities Weekly Report
31/33
Engineering
Design &Development
5. SMR
Total Completed Cancelled Outstanding Remarks/Status
PreviousWeek
56 40 0 16
Currentweek
56 40 0 16
SMSC Weekly Report | Week 2
8/13/2019 Facilities Weekly Report
32/33
Engineering
Design &Development
6. Issues and Needs List (not SMR)
Description Status Target Date
SMSC Weekly Report | Week 2
8/13/2019 Facilities Weekly Report
33/33
Engineering
Design &
Thank You!
SMSC W kl R t | W k 2