Colin Morgan Colin Morgan Garrad Hassan & Partners Ltd www.garradhassan.com Garrad Hassan & Partners Ltd www.garradhassan.com Concerted Action on Offshore Wind Energy in Europe State of the art - offshore wind turbine technology
20

ewea wp21 dec 01 - offshore wind energy · Nordex N60 1300 Stall reg., fixed speed 60 Nordex N80 (offshore) 2000 Pitch reg., variable speed 80 1.33 Bonus 1300 (land) 1300 Active stall,

Jul 14, 2018

Download

Documents

vandieu
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: ewea wp21 dec 01 - offshore wind energy · Nordex N60 1300 Stall reg., fixed speed 60 Nordex N80 (offshore) 2000 Pitch reg., variable speed 80 1.33 Bonus 1300 (land) 1300 Active stall,

Colin MorganColin Morgan

Garrad Hassan & Partners Ltd

www.garradhassan.com

Garrad Hassan & Partners Ltd

www.garradhassan.com

Concerted Action on Offshore Wind Energy in EuropeState of the art - offshore wind turbine technology

Page 2: ewea wp21 dec 01 - offshore wind energy · Nordex N60 1300 Stall reg., fixed speed 60 Nordex N80 (offshore) 2000 Pitch reg., variable speed 80 1.33 Bonus 1300 (land) 1300 Active stall,

Contract No. NEE5/1999/562

Concerted Action on Offshore Wind Energy in EuropeState of the art - offshore wind turbine technology

Funded by the European Commission

Page 3: ewea wp21 dec 01 - offshore wind energy · Nordex N60 1300 Stall reg., fixed speed 60 Nordex N80 (offshore) 2000 Pitch reg., variable speed 80 1.33 Bonus 1300 (land) 1300 Active stall,

CA-OWEE ProjectCA-OWEE Project

Concerted Action on Offshore Wind Energy in EuropeState of the art - offshore wind turbine technology

17 European Partners from 13 Countries:

Principal partners:

• Delft University of Technology, NL (co-ordinator)

• Garrad Hassan & Partners, United Kingdom *

• Kvaerner Oil & Gas, United Kingdom *

• Energi & Miljoe Undersoegelser (EMU), Denmark

• Risø National Laboratory, Denmark

• Tractebel Energy Engineering, Belgium

Page 4: ewea wp21 dec 01 - offshore wind energy · Nordex N60 1300 Stall reg., fixed speed 60 Nordex N80 (offshore) 2000 Pitch reg., variable speed 80 1.33 Bonus 1300 (land) 1300 Active stall,

Concerted Action on Offshore Wind Energy in EuropeState of the art - offshore wind turbine technology

17 European Partners from 13 Countries:

Other Contributors:

• Centro de Investigaciones Energéticas, Medioambientales y Tecnológicas (CIEMAT), Spain

• Centre for Renewable Energy Sources (CRES), Greece

• Deutsches Windenergie-Institut (DEWI), Germany

• Germanischer Lloyd Windenergie, Germany *

• Netherlands Energy Research Foundation (ECN), The Netherlands

• Espace Eolien Developpement (EED), France

• Ente per le Nuove Tecnologie, l'Energia e l'Ambiente (ENEA), Italy *

• University College Cork, Ireland

• Vindkompaniet i Hemse AB, Sweden *

• Technical Research Centre of Finland (VTT), Finland *

• Baltic Energy Conservation Agency (BAPE), Poland

Page 5: ewea wp21 dec 01 - offshore wind energy · Nordex N60 1300 Stall reg., fixed speed 60 Nordex N80 (offshore) 2000 Pitch reg., variable speed 80 1.33 Bonus 1300 (land) 1300 Active stall,

Objective:

“to define the maturity of the technology currently available for offshore wind farms”

Objective:

“to define the maturity of the technology currently available for offshore wind farms”

Concerted Action on Offshore Wind Energy in EuropeState of the art - offshore wind turbine technology

Page 6: ewea wp21 dec 01 - offshore wind energy · Nordex N60 1300 Stall reg., fixed speed 60 Nordex N80 (offshore) 2000 Pitch reg., variable speed 80 1.33 Bonus 1300 (land) 1300 Active stall,

Scope:Scope:

l Offshore wind turbine size and configuration

l Support structure

l Installation, decommissioning and dismantling

l Operation and maintenance, reliability

l Electrical transmission and grid connection

l Offshore wind turbine size and configuration

l Support structure

l Installation, decommissioning and dismantling

l Operation and maintenance, reliability

l Electrical transmission and grid connection

Concerted Action on Offshore Wind Energy in EuropeState of the art - offshore wind turbine technology

Page 7: ewea wp21 dec 01 - offshore wind energy · Nordex N60 1300 Stall reg., fixed speed 60 Nordex N80 (offshore) 2000 Pitch reg., variable speed 80 1.33 Bonus 1300 (land) 1300 Active stall,

Wind turbine size and configurationWind turbine size and configuration

1. Scaling trends

2. Control

3. Rotor blades

4. Gearboxes

1. Scaling trends

2. Control

3. Rotor blades

4. Gearboxes

Concerted Action on Offshore Wind Energy in EuropeState of the art - offshore wind turbine technology

Page 8: ewea wp21 dec 01 - offshore wind energy · Nordex N60 1300 Stall reg., fixed speed 60 Nordex N80 (offshore) 2000 Pitch reg., variable speed 80 1.33 Bonus 1300 (land) 1300 Active stall,

Growth of the technologyGrowth of the technology

0

500

1000

1500

2000

2500

1988 1990 1992 1994 1996 1998 2000 2002

kW

Offshore

Onshore Germany

Page 9: ewea wp21 dec 01 - offshore wind energy · Nordex N60 1300 Stall reg., fixed speed 60 Nordex N80 (offshore) 2000 Pitch reg., variable speed 80 1.33 Bonus 1300 (land) 1300 Active stall,

Power rating trend - up to 62m rotor diameter

Power rating trend - up to 62m rotor diameter

P = 0.0664D 2.43

0

200

400

600

800

1000

1200

1400

0 10 20 30 40 50 60 70

rotor diameter, D [m]

ratedoutput

power P [kW]

Page 10: ewea wp21 dec 01 - offshore wind energy · Nordex N60 1300 Stall reg., fixed speed 60 Nordex N80 (offshore) 2000 Pitch reg., variable speed 80 1.33 Bonus 1300 (land) 1300 Active stall,

….. with larger machines….. with larger machines

P = 0.1215D2.23

0

500

1000

1500

2000

2500

3000

0 10 20 30 40 50 60 70 80

rotor diameter, D [m]

rate

d ou

tput

pow

er, P

[kW

]

P = 0.1215D2.23

0

500

1000

1500

2000

2500

3000

0 10 20 30 40 50 60 70 80

rotor diameter, D [m]

rate

d ou

tput

pow

er, P

[kW

]

Page 11: ewea wp21 dec 01 - offshore wind energy · Nordex N60 1300 Stall reg., fixed speed 60 Nordex N80 (offshore) 2000 Pitch reg., variable speed 80 1.33 Bonus 1300 (land) 1300 Active stall,

Design blade tip speedDesign blade tip speed

0

20

40

60

80

100

120

0 10 20 30 40 50 60 70 80 90

rotor diameter [m]

blad

e ti

p sp

eed

[m/s

]

0

20

40

60

80

100

120

0 10 20 30 40 50 60 70 80 90

rotor diameter [m]

blad

e ti

p sp

eed

[m/s

]

Page 12: ewea wp21 dec 01 - offshore wind energy · Nordex N60 1300 Stall reg., fixed speed 60 Nordex N80 (offshore) 2000 Pitch reg., variable speed 80 1.33 Bonus 1300 (land) 1300 Active stall,

Increasing tip speedIncreasing tip speedDesign Power

[kW]Controlconcept

Tip speed[m/s]

Ratio(offshore/land)

Vestas V66 (land) 1650 Pitch reg.,variable slip

66

Vestas V80 (offshore) 2000 Pitch reg.,variable speed

80

1.21

Nordex N60 1300 Stall reg.,fixed speed

60

Nordex N80 (offshore) 2000 Pitch reg.,variable speed

80

1.33

Bonus 1300 (land) 1300 Active stall,fixed speed

62

Bonus 2000 (offshore) 2000 Active stall,fixed speed

68

1.10

NEG Micon 1000/60 (land) 1000 Stall reg.,fixed speed

57

NEG Micon 2000/72 (offshore) 2000 Active stall,fixed speed

68

1.19

Page 13: ewea wp21 dec 01 - offshore wind energy · Nordex N60 1300 Stall reg., fixed speed 60 Nordex N80 (offshore) 2000 Pitch reg., variable speed 80 1.33 Bonus 1300 (land) 1300 Active stall,

Control system trendsControl system trends

l Pitch controlOnly around half of models historicallyPredominant in turbines over 70m diameter

l Variable speedLess than 10% of models historically are fixed speedDual-speed; high slip; moderate range variable speed; direct drive systemsSome form of variable speed predominant in large machines

l Pitch controlOnly around half of models historicallyPredominant in turbines over 70m diameter

l Variable speedLess than 10% of models historically are fixed speedDual-speed; high slip; moderate range variable speed; direct drive systemsSome form of variable speed predominant in large machines

Page 14: ewea wp21 dec 01 - offshore wind energy · Nordex N60 1300 Stall reg., fixed speed 60 Nordex N80 (offshore) 2000 Pitch reg., variable speed 80 1.33 Bonus 1300 (land) 1300 Active stall,

Blade technologyBlade technology

y = 0.2699x2.3448

0

1,000

2,000

3,000

4,000

5,000

6,000

7,000

8,000

0 10 20 30 40 50 60 70 80

rotor diame te r D, [m]

blad

e w

eigh

t [k

g]

Page 15: ewea wp21 dec 01 - offshore wind energy · Nordex N60 1300 Stall reg., fixed speed 60 Nordex N80 (offshore) 2000 Pitch reg., variable speed 80 1.33 Bonus 1300 (land) 1300 Active stall,

GearboxesGearboxes

l Rotor speed approx. 20rpm; generator speed approx. 1500rpm

l Historically, 3 stage - 1 planetary, 2 parallel

l Larger machines likely to require 4th stage (>3MW onshore, larger offshore due to higher rotor speed)

Marked increase in complexity, or,

Increased generator speed, or,

Direct drive approach

l Rotor speed approx. 20rpm; generator speed approx. 1500rpm

l Historically, 3 stage - 1 planetary, 2 parallel

l Larger machines likely to require 4th stage (>3MW onshore, larger offshore due to higher rotor speed)

Marked increase in complexity, or,

Increased generator speed, or,

Direct drive approach

Page 16: ewea wp21 dec 01 - offshore wind energy · Nordex N60 1300 Stall reg., fixed speed 60 Nordex N80 (offshore) 2000 Pitch reg., variable speed 80 1.33 Bonus 1300 (land) 1300 Active stall,

Future trendsFuture trends

l Higher tip speedsLower torque, less mass and cost of tower top

l Increased carbon fibre usageHigher specific strength if solidity is to be maintained

l Direct driveLess mechanical complexity

l Increasingly integrated designSupport structure

Grid connection (e.g. HVDC generator)

Design for installation & maintenance

l Higher tip speedsLower torque, less mass and cost of tower top

l Increased carbon fibre usageHigher specific strength if solidity is to be maintained

l Direct driveLess mechanical complexity

l Increasingly integrated designSupport structure

Grid connection (e.g. HVDC generator)

Design for installation & maintenance

Page 17: ewea wp21 dec 01 - offshore wind energy · Nordex N60 1300 Stall reg., fixed speed 60 Nordex N80 (offshore) 2000 Pitch reg., variable speed 80 1.33 Bonus 1300 (land) 1300 Active stall,

Support structuresSupport structures

Monopile expected to be most common option for future offshore wind projects (but probably least stiff)

Monopile expected to be most common option for future offshore wind projects (but probably least stiff)

Monopile Piled-BracedMonotower

GBS-BracedMonotower

GBSMonotower

GBS-LatticeTower

Page 18: ewea wp21 dec 01 - offshore wind energy · Nordex N60 1300 Stall reg., fixed speed 60 Nordex N80 (offshore) 2000 Pitch reg., variable speed 80 1.33 Bonus 1300 (land) 1300 Active stall,

Monopile designMonopile design

Well-established codes and practices (oil and gas)Structures typically supported by 3 or 4 legs

Single pile through each leg“Skirt” piles around each leg

But, unlike an offshore platform,Turbines exert much higher live loads (shear and bending)Cyclic loading of near-surface soils more importantPotential for loss of soil contact near surface (post-holing)

Much higher volume jobs (I.e. not one-offs)

Nearshore works practice (jetties, etc.) important reference

Well-established codes and practices (oil and gas)Structures typically supported by 3 or 4 legs

Single pile through each leg“Skirt” piles around each leg

But, unlike an offshore platform,Turbines exert much higher live loads (shear and bending)Cyclic loading of near-surface soils more importantPotential for loss of soil contact near surface (post-holing)

Much higher volume jobs (I.e. not one-offs)

Nearshore works practice (jetties, etc.) important reference

Page 19: ewea wp21 dec 01 - offshore wind energy · Nordex N60 1300 Stall reg., fixed speed 60 Nordex N80 (offshore) 2000 Pitch reg., variable speed 80 1.33 Bonus 1300 (land) 1300 Active stall,

Monopile installationMonopile installation

Four options:Above-surface hammeringUnderwater hammeringDrill-driveDrill and grout

Trade-off:Installation speedRequired pile capacityGeotechnical knowledgeRisk of damage to pileRequired placement accuracy

Four options:Above-surface hammeringUnderwater hammeringDrill-driveDrill and grout

Trade-off:Installation speedRequired pile capacityGeotechnical knowledgeRisk of damage to pileRequired placement accuracy

Page 20: ewea wp21 dec 01 - offshore wind energy · Nordex N60 1300 Stall reg., fixed speed 60 Nordex N80 (offshore) 2000 Pitch reg., variable speed 80 1.33 Bonus 1300 (land) 1300 Active stall,

www.offshorewindenergy.orgwww.offshorewindenergy.org

Concerted Action on Offshore Wind Energy in EuropeState of the art - offshore wind turbine technology

Acknowledgement: EC funding & 17 partnersAcknowledgement: EC funding & 17 partners